Exhibits

Public In Camera Description Date Witness
P-01989 GNL Decision/Direction Note - Cabinet Secretariat re Contract Award - Muskrat Falls Oversight Committee Advisory Services dated October 17, 2014 26-Feb-19 Paul Davis
P-01969 Responsibility Matrix and Status of Recommendations of the Joint Review Panel dated July 11, 2019 (Annex E to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-00001 Commission of Inquiry Respecting the Muskrat Falls Project – Terms of Reference 17-Sep-18 CIMFP
P-00002 Commission of Inquiry Respecting the Muskrat Falls Project – Rules of Procedure 17-Sep-18 CIMFP
P-00003 CV – Dr. Bent Flyvbjerg, Expert 17-Sep-18 Dr. Bent Flyvbjerg
P-00004 Report for the Commission of Inquiry Respecting the Muskrat Falls Project by Dr. Bent Flyvbjerg dated August 2018 17-Sep-18 Dr. Bent Flyvbjerg
P-00005 Commission of Inquiry Respecting the Muskrat Falls Project – Muskrat Falls Project Timeline 17-Sep-18 CIMFP
P-00006 Presentation for the Commission of Inquiry Respecting the Muskrat Falls Project by Professor Bent Flyvbjerg 17-Sep-18 Dr. Bent Flyvbjerg
P-00007 CV – Dr. Jason Churchill, Expert 19-Sep-18 Dr. Jason Churchill
P-00008 A History of the Negotiations to Develop the Hydroelectric Resources of the Churchill River from 1949 to 2007 dated August 16, 2018 by Jason L. Churchill 19-Sep-18 Dr. Jason Churchill
P-00009 Agreement dated May 2, 2018, between Dr. Jason Churchill and the Commission of Inquiry Respecting the Muskrat Falls Project 19-Sep-18 Dr. Jason Churchill
P-00010 Agreement dated May 10, 2018, between Dr. Bent Flyvbjerg and the Commission of Inquiry Respecting the Muskrat Falls Project 17-Sep-18 Dr. Bent Flyvbjerg
P-00011 CV – David Malamed, Grant Thornton 21-Sep-18 David Malamed/ Scott Shaffer
P-00012 CV – Scott Shaffer, Grant Thornton 21-Sep-18 David Malamed/ Scott Shaffer
P-00013 Agreement dated February 3, 2018, between Grant Thornton and Commission of Inquiry Respecting the Muskrat Falls Project 21-Sep-18 David Malamed/ Scott Shaffer
P-00014 Forensic Audit Report to the Commission of Inquiry Respecting the Muskrat Falls Project – Sanctioning Phase, dated July 16, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00015 Memorandum dated September 10, 2018, from Grant Thornton, LLP to Commission of Inquiry Respecting the Muskrat Falls Project re Sensitivity Analysis on the CPW Model 21-Sep-18 David Malamed/ Scott Shaffer
P-00016 The Churchill Falls (Labrador) Corporation Limited (Lease) Act, 1961 18-Sep-18 CIMFP
P-00017 NL Hydro “An Energy Giant: The Churchill Falls Power Development 18-Sep-18 CIMFP
P-00018 Power Contract dated May 12, 1969 18-Sep-18 CIMFP
P-00019 Presentation to the Shareholders: Lower Churchill Development Corporation dated June 1980 18-Sep-18 CIMFP
P-00020 Lower Churchill Hydroelectric Project: Report of the Environmental Assessment Panel dated December 1980 18-Sep-18 CIMFP
P-00021 GNL News Release dated March 9, 1998 re Framework in Place for Churchill River Hydro Developments 18-Sep-18 CIMFP
P-00022 SNC-AGRA – Muskrat Falls Hydroelectric Development Final Feasibility Study dated January 1999 18-Sep-18 CIMFP
P-00023 Labrador Hydro Project Exemption Order (2000) 18-Sep-18 CIMFP
P-00024 GNL News Release dated August 1, 2001 re Premiers Grimes and Landry announce continuance of discussions on development of Gull Island hydro resource in Labrador 18-Sep-18 CIMFP
P-00025 GNL News Release dated January 10, 2005 re Premier releases Request for Expressions of Interest and Proposals for development of Lower Churchill hydro resource 18-Sep-18 CIMFP
P-00026 GNL News Release dated August 8, 2005 re Premier announces results of phase one of Expression of Interests process for Lower Churchill development 18-Sep-18 CIMFP
P-00027 Nalcor Energy – Gateway Process – LCP-PT-MD-0000-PM-PR-0001-01_B1 18-Sep-18 CIMFP
P-00028 GNL News Release dated May 8, 2006 re Newfoundland and Labrador will lead Lower Churchill development 18-Sep-18 CIMFP
P-00029 Energy Plan: Focusing Our Energy (2007) 18-Sep-18 CIMFP
P-00030 GNL News Release dated December 11, 2008 re Nalcor Energy – The Future of Energy Development in NL 18-Sep-18 CIMFP
P-00031 GNL News Release dated September 26, 2008 re Innu Nation and Province Reach Historic Agreement 18-Sep-18 CIMFP
P-00032 Letter dated November 10, 2009 from Geoffrey P. Young to Board of Commissioners of Public Utilities re Application for Establishment of a Water Management Application 18-Sep-18 CIMFP
P-00033 Nalcor Energy – Summary of Arguments: Régie de l’énergie Ruling 18-Sep-18 CIMFP
P-00034 NL Hydro – Generation Planning Issues dated July 2010 18-Sep-18 CIMFP
P-00035 Lower Churchill Construction Projects Benefits Strategy (2010) 18-Sep-18 CIMFP
P-00036 GNL News Release dated November 18, 2010 re Lower Churchill Project to Become a Reality; Province Signs Partnership Agreement with Emera Inc. for Development of Muskrat Falls 18-Sep-18 CIMFP
P-00037 Nalcor Energy News Release dated March 24, 2011 re Nalcor Energy awards EPCM contract to SNC-Lavalin for Phase One of the Lower Churchill Project 18-Sep-18 CIMFP
P-00038 PUB – Terms of Reference (2011) 18-Sep-18 CIMFP
P-00039 GNL News Release dated November 18, 2011 re A New Dawn for the Labrador Innu 18-Sep-18 CIMFP
P-00040 FLG Memorandum of Agreement (2011) 18-Sep-18 CIMFP
P-00041 Report of the Joint Review Panel dated August 2011 18-Sep-18 CIMFP
P-00042 Navigant – Independent Supply Decision Review dated September 14, 2011 18-Sep-18 CIMFP
P-00043 GNL Paper re Commitment Letter to Assist Financing of Phase One of the Lower Churchill Project dated August 31, 2011 18-Sep-18 CIMFP
P-00044 GNL News Release dated November 28, 2011 re Provincial Government Finalizes Memorandum of Understanding for Business and Employment Benefits Associated with Development of Muskrat Falls 18-Sep-18 CIMFP
P-00045 Letter dated December 12, 2011 from Jerome Kennedy to Andy Wells re deadline for its review of the Muskrat Falls Project 18-Sep-18 CIMFP
P-00046 Letter dated December 16, 2011 from Andy Wells to Jerome Kennedy re Muskrat Falls Review – requesting further extension 18-Sep-18 CIMFP
P-00047 Letter dated December 23, 2011 from Jerome Kennedy to Andy Wells re Muskrat Falls Review – refusing further extension 18-Sep-18 CIMFP
P-00048 MHI – Report on Two Generation Expansion Alternatives for the Island Interconnected Electrical System (Volume 1: Summary of Reviews) dated January 2012 18-Sep-18 CIMFP
P-00049 MHI – Report on Two Generation Expansion Alternatives for the Island Interconnected Electrical System (Volume 2: Studies) dated January 2012 18-Sep-18 CIMFP
P-00050 Government of Canada Response to JRP Report (2012) 18-Sep-18 CIMFP
P-00051 Government of Newfoundland and Labrador’s Response to the Report of the Joint Review Panel for Nalcor Energy’s Lower Churchill Hydroelectric Generation Project dated March 15, 2012 18-Sep-18 CIMFP
P-00052 Public Utilities Board Final Report dated March 30, 2012 18-Sep-18 CIMFP
P-00053 Nalcor – Plain Language Summary of the Labrador-Island Transmission Link Environmental Impact Statement 18-Sep-18 CIMFP
P-00054 Natural Resources Canada – Economic Analysis Lower Churchill Hydroelectric Generation Project Report 18-Sep-18 CIMFP
P-00055 Hansard Excerpt from House of Assembly Proceedings dated April 30, 2012 18-Sep-18 CIMFP
P-00056 GNL News Release dated July 31, 2012 re Formal Agreements signed between Nalcor Energy and Emera Inc. for Muskrat Falls Development 18-Sep-18 CIMFP
P-00057 Hatch Report for Wind Integration Study – Isolated Island dated August 7, 2012 18-Sep-18 CIMFP
P-00058 MHI – Review of the Muskrat Falls and Labrador Island HVdc Link and the Isolated Island Options dated October 2012 18-Sep-18 CIMFP
P-00059 MHI – Review of the Wind Study for the Isolated Island of Newfoundland dated October 2012 18-Sep-18 CIMFP
P-00060 Ziff Energy – Natural Gas as an Island Power Generation Option dated October 30, 2012 18-Sep-18 CIMFP
P-00061 Department of Natural Resources – Upper Churchill: Can We Wait Until 2041? dated November 2012 18-Sep-18 CIMFP
P-00062 Department of Natural Resources – Gull Island: Why Not Develop Gull Island First? dated November 2012 18-Sep-18 CIMFP
P-00063 Department of Natural Resources – Legal Options: S92A, Good Faith and Regulatory Proceedings in Quebec dated November 2012 18-Sep-18 CIMFP
P-00064 Wood McKenzie Review of Ziff Analysis of Grand Banks Natural Gas Option dated November 2012 18-Sep-18 CIMFP
P-00065 Agreement Providing Key Terms and Conditions for the Federal Loan Guarantee by Her Majesty the Queen in Right of Canada for the Debt Financing of the Lower Churchill River Projects dated November 2012 18-Sep-18 CIMFP
P-00066 GNL News Release dated December 17, 2012 re Government of Newfoundland and Labrador Announces Sanction of the Muskrat Falls Development 18-Sep-18 CIMFP
P-00067 Government of Newfoundland and Labrador Paper re Sanction Decision on the Muskrat Falls Project dated December 5, 2012 18-Sep-18 CIMFP
P-00068 NL Hydro – An Assessment of Limitations for Non-Dispatchable Generation on the Newfoundland Island System dated October 2004 18-Sep-18 CIMFP
P-00069 Dr. Wade Locke – Economic Impact Analysis of Iron Ore Mining Industry in Labrador 2011-31 dated September 24, 2012 18-Sep-18 CIMFP
P-00070 Department of Natural Resources – Electricity Demand Forecast: Do We Need the Power? dated November 2012 18-Sep-18 CIMFP
P-00071 Department of Natural Resources – Labrador mining and power: how much and where from? dated November 2012 18-Sep-18 CIMFP
P-00072 Department of Natural Resources – Electricity Rates Forecasting: Muskrat Falls Will Stabilize Rates for Consumers dated November 2012 18-Sep-18 CIMFP
P-00073 DNR Environmental Benefits of Closing the Holyrood Terminal Generating Station dated November 2012 18-Sep-18 CIMFP
P-00074 Nalcor Monthly Construction Report for Muskrat Falls and Labrador Transmission dated January 20, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00075 Nalcor Monthly Construction Report for Labrador Island Link dated January 20, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00076 Transcript of Understanding Muskrat Falls Presentation by Stan Marshall dated February 15, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00077 Nalcor’s Submission to PUB dated November 10, 2011 21-Sep-18 David Malamed/ Scott Shaffer
P-00078 Lower Churchill Project Gatekeeper’s Decision Support Package: Request for Approval to Proceed to Gateway Phase 3 dated November 16, 2010 21-Sep-18 David Malamed/ Scott Shaffer
P-00079 Nalcor Energy – Lower Churchill Project – Decision Gate Process dated March 24, 2009 21-Sep-18 David Malamed/ Scott Shaffer
P-00080 Independent Project Analysis - Pacesetter Evaluation of the Muskrat Falls Generation Project and Island Link Transmission Project dated September 2010 21-Sep-18 David Malamed/Scott Shaffer
P-00081 Nalcor Energy – Lower Churchill Project – Project Governance Plan dated January 6, 2009 21-Sep-18 David Malamed/ Scott Shaffer
P-00082 Nalcor Energy – Lower Churchill Project – Gateway Process dated June 9, 2011 21-Sep-18 David Malamed/ Scott Shaffer
P-00083 Lower Churchill Project – Decision Gate 3 – Independent Project Review Presentation dated August 31, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00084 Lower Churchill Project – Decision Gate 3 – Independent Project Review Presentation (Updated) dated August 31, 2013 21-Sep-18 David Malamed/ Scott Shaffer
P-00085 Nalcor Response to Grant Thornton Question 8.4 IPR Versions dated July 6, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00086 Nalcor Response to Grant Thornton Question 8.6 Screening Principles dated June 17, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00087 Electrical Power Control Act, 1994 21-Sep-18 David Malamed/ Scott Shaffer
P-00088 Pan Maritime Kenny Final Summary Report to Government of Newfoundland and Labrador re Technical Feasibility of Offshore Natural Gas Liquid Dev Based on a Submarine Pipeline Transportation System dated October 2001 21-Sep-18 David Malamed/ Scott Shaffer
P-00089 Dr. Stephen E. Bruneau Submission to PUB re Discussion Points – Natural Gas for Island Electrical Generation dated February 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00090 Dr. Stephen E. Brueneau Presentation on Grand Banks Natural Gas for Island Electric Generation dated March 28, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00091 Wood Mackenzie Review of Ziff Report to GNL dated November 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00092 NL Hydro Report on An Assessment of Limitations for Non-Dispatchable Generation on the Newfoundland Island System dated October 2004 21-Sep-18 David Malamed/ Scott Shaffer
P-00093 Nalcor Energy – Lower Churchill Project – Gate 2 Decision Support Package – Summary Recommendation to Nalcor’s Board of Directors dated November 17, 2010 21-Sep-18 David Malamed/ Scott Shaffer
P-00094 Nalcor Energy – Lower Churchill Project Decision Gate 3 Basis of Estimate dated May 22, 2013 21-Sep-18 David Malamed/ Scott Shaffer
P-00095 Nalcor Energy Response to Grant Thornton Question 8.10 re Imports from or via HQ dated July 10, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00096 Nalcor Energy Response to Grant Thornton Question 8.11 re Imports from NEISO dated July 10, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00097 Nalcor Energy – Lower Churchill Project Gate 2 Project Risk Analysis dated September 15, 2011 21-Sep-18 David Malamed/ Scott Shaffer
P-00098 Nalcor Energy Response to CA/KPR-Nalcor-32 21-Sep-18 David Malamed/ Scott Shaffer
P-00099 Nalcor’s Final Submission to PUB dated March 2, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00100 Nalcor Response to Grant Thornton Question 5.3 External re Reviews of Load Forecast dated June 8, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00101 PUB-NLH-058 – Island Interconnected System Supply Issues and Power Outages 21-Sep-18 David Malamed/ Scott Shaffer
P-00102 Nalcor Energy Response to Grant Thornton Question 8.2 re Strategic Risk Exposure dated July 3, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00103 S&P Global News Release dated September 15, 2016 re S&P Global Platts Finalizes Acquisition of PIRA Energy Group 21-Sep-18 David Malamed/ Scott Shaffer
P-00104 Nalcor Energy Response to Grant Thornton Question 5.2 re Load Forecast Research Program dated June 8, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00105 AACE International Recommended Practice No. 17R-97 – Cost Estimate Classification System 21-Sep-18 David Malamed/ Scott Shaffer
P-00106 The Public Utilities Board Report on the Needs for and Alternatives to (NFAT) – Review of Manitoba Hydro’s Preferred Development Plan dated June 2014 21-Sep-18 David Malamed/ Scott Shaffer
P-00107 Nalcor Energy Response to Grant Thornton Question 2.6 re Price Elasticity dated May 29, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00108 Ausgrid Appendix 5: Price Elasticity of Demand dated November 27, 2015 21-Sep-18 David Malamed/ Scott Shaffer
P-00109 Nalcor Energy Response to Grant Thornton Question 1.3 re Steering Committee dated July 3, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00110 Power Advisory Report – Review of the Newfoundland and Labrador Electricity System dated October 26, 2015 21-Sep-18 David Malamed/ Scott Shaffer
P-00111 Vale 2011 Annual Report 21-Sep-18 David Malamed/ Scott Shaffer
P-00112 Nalcor Energy Response to Grant Thornton Question 9.5 re Discount Rate Change dated July 4, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00113 Government of Newfoundland and Labrador Department of Finance Economic Forecast Table for NL April 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00114 Statistics Canada – Population Projections for Canada, Provinces and Territories – 2009 to 2036 21-Sep-18 David Malamed/ Scott Shaffer
P-00115 National Energy Board – Energy Futures Backgrounder: Addendum to Canada’s Energy Future: Energy Supply and Demand Projections to 2035 dated November 2011 21-Sep-18 David Malamed/ Scott Shaffer
P-00116 Nalcor Table of Demand Actual and Forecasts 2001-2010 21-Sep-18 David Malamed/ Scott Shaffer
P-00117 Nalcor Energy Response to Grant Thornton Question 3.2 re Internal Reviews of Load Forecast dated May 29, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00118 Price Responsiveness in the AEO2003 NEMS Residential and Commercial Buildings Sector Models by Steven H. Wade 21-Sep-18 David Malamed/ Scott Shaffer
P-00119 ICF Report – NL Conservation and Demand Management Potential Study: 2015 – Residential Sector Final Report dated June 2015 21-Sep-18 David Malamed/ Scott Shaffer
P-00120 ICF Report – NL Conservation and Demand Management Potential Study: 2015 – Commercial Sector Final Report dated August 2015 21-Sep-18 David Malamed/ Scott Shaffer
P-00121 Nalcor Energy – Lower Churchill Project Phase 1 – Decision Gate 3 Support Package dated November 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00122 Prudence Review of NL Hydro Decisions and Actions – Final Report dated July 6, 2015 21-Sep-18 David Malamed/ Scott Shaffer
P-00123 NL Hydro 2013 Amended General Rate Application dated November 2014 21-Sep-18 David Malamed/ Scott Shaffer
P-00124 Nalcor Energy – Lower Churchill Project Decision Gate 3 Capital Cost Estimate dated December 11, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00125 Nalcor System Planning Outline Material for PUB review v3 undated 21-Sep-18 David Malamed/ Scott Shaffer
P-00126 Stantec – Precipitator and Scrubber Installation Study for Holyrood Thermal Generating Station dated November 20, 2008 21-Sep-18 David Malamed/ Scott Shaffer
P-00127 Nalcor Energy – Muskrat Falls Project Update Presentation dated June 23, 2017 21-Sep-18 David Malamed/ Scott Shaffer
P-00128 Nalcor Energy Response to Grant Thornton Question 7.1 re O&M Cost Change dated June 5, 2018 21-Sep-18 David Malamed/ Scott Shaffer
P-00129 PIRA Price Forecast Methodology and Assessment of Future Oil Price Trends for GNL dated October 26, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00130 Nalcor Energy – Lower Churchill Project – Decision Gate 3 Project Cost and Schedule Risk Analysis Report dated October 1, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00131 Nalcor Work Task Order Lower Churchill Project hiring Westney Consulting Group to review PIRA numbers dated July 12, 2012 21-Sep-18 David Malamed/ Scott Shaffer
P-00132 US Energy Information Administration – Annual Energy Outlook 2001 with Projections to 2035 21-Sep-18 David Malamed/ Scott Shaffer
P-00133 Nalcor Energy – Lower Churchill Project – Decision Gate 3 Basis of Estimate dated May 22, 2013 21-Sep-18 David Malamed/ Scott Shaffer
P-00134 What You Should Know About Megaprojects and Why: An Overview by Dr. Bent Flyvbjerg 17-Sep-18 Dr. Bent Flyvbjerg
P-00135 Grant Thornton – Forensic Audit Presentation to the Commission of Inquiry Respecting the Muskrat Falls Project – Sanctioning Phase 21-Sep-18 David Malamed/ Scott Shaffer
P-00136 Stan Marshall – Muskrat Falls Project Overview Presentation to the Muskrat Falls Public Inquiry dated September 19, 2018 19-Sep-18 Stan Marshall
P-00137 Government of Newfoundland and Labrador Paper dated August 2, 1976 re Lease dated May 16, 1961 19-Sep-18 Dr. Jason Churchill
P-00138 Letter dated June 25, 1980 from V.L. Young, A.D. Hunt and W.S. Read to Honourable Leo D. Barry, Q.C. and Honourable Marc Lalonde, re report outlining immediate opportunities for development of the substantial untapped hydro-electric potential of the Churchill River 19-Sep-18 Dr. Jason Churchill
P-00139 Government of Newfoundland and Labrador paper dated August 7, 1980 re revenue and energy requirements of the Province 19-Sep-18 Dr. Jason Churchill
P-00140 Government of Newfoundland and Labrador paper dated October 23, 1987 re attempt to resolve the Upper Churchill Power contract dispute 19-Sep-18 Dr. Jason Churchill
P-00141 Stan Marshall – Presentation Video #1 – Muskrat Falls Site 2013 19-Sep-18 Stan Marshall
P-00142 Stan Marshall – Presentation Video #2 – Muskrat Falls Full Site 19-Sep-18 Stan Marshall
P-00143 Stan Marshall – Presentation Video #3 – North Dam Time Lapse 19-Sep-18 Stan Marshall
P-00144 Stan Marshall – Presentation Video #4 – North Spur Video 19-Sep-18 Stan Marshall
P-00145 Stan Marshall – Presentation Video #5 – Muskrat Falls Generation Facility 19-Sep-18 Stan Marshall
P-00146 Stan Marshall – Presentation Video #6 – Powerhouse Time Lapse 19-Sep-18 Stan Marshall
P-00147 Stan Marshall – Presentation Video #7 – Power Generation Animation 19-Sep-18 Stan Marshall
P-00148 Stan Marshall – Presentation Video #8 – Transmission Line 19-Sep-18 Stan Marshall
P-00149 Stan Marshall – Presentation Video #9 – Transmission Tower Installation 19-Sep-18 Stan Marshall
P-00150 Stan Marshall – Presentation Video #10 – Transmission Line 19-Sep-18 Stan Marshall
P-00151 Stan Marshall – Presentation Video #11 – Soldiers Pond Site 19-Sep-18 Stan Marshall
P-00152 Jason Churchill – Presentation to Commission of Inquiry Respecting the Muskrat Falls Project – September 19, 2018 19-Sep-18 Dr. Jason Churchill
P-00153 Jason Churchill Biography 19-Sep-18 Dr. Jason Churchill
P-00154 Hansard Excerpt from House of Assembly Proceedings dated 2002 – 2010 1-Oct-18 Danny Williams
P-00155 News Article dated November 22, 2002 re Newfoundland and Labradorians do not support Grimes’ Lower Churchill Agreement 1-Oct-18 Danny Williams
P-00156 Email dated December 8, 2004, 11:26 PM from Jeff Paddock to Elizabeth Matthews and Ken Morrissey re Q&A: Churchill 1-Oct-18 Danny Williams
P-00157 Cabinet Directive dated December 10, 2004 re the Development of a Comprehensive Provincial Energy Plan 1-Oct-18 Danny Williams
P-00158 Transcript of CBC-TV News media clip dated January 6, 2006, 6:09 PM Premier Receives Response to Letter 1-Oct-18 Danny Williams
P-00159 Shawmont Newfoundland Ltd. report for Newfoundland and Labrador Hydro dated December 1986 re An Inventory of Small Hydro Sites for Energy Supply to the Island Grid – Volume I – Methodology and Findings (GNL) 24-Sep-18 CIMFP
P-00160 Comparison of CPW Estimates for the Two Supply Options 25-Sep-18 Bob Moulton/Paul Stratton/Auburn Warren
P-00161 Project Time Line – Isolated Island Option 25-Sep-18 Bob Moulton/Paul Stratton/Auburn Warren
P-00162 Project Time Line – Interconnected Island Option 25-Sep-18 Bob Moulton/Paul Stratton/Auburn Warren
P-00163 Comparative Energy Forecasts – The 2012 Isolated Island option versus 2012 Interconnected Island option 25-Sep-18 Bob Moulton/Paul Stratton/Auburn Warren
P-00164 NL Hydro Generation Planning Issues Report – 2006 Update dated December 2006 25-Sep-18 Bob Moulton/Paul Stratton/Auburn Warren
P-00165 Exhibit from 2014 PUB Reliability Review – PUB-NLH-061 25-Sep-18 Bob Moulton/Paul Stratton/Auburn Warren
P-00166 Email dated January 20, 2006, 8:39:56 AM from Elizabeth Matthews to Brian Crawley, Ken Morrissey and Stephen Dinn re Included 1-Oct-18 Danny Williams
P-00167 GNL News Release dated January 20, 2006 re Province directs Newfoundland and Labrador Hydro to apply for transmission access with Hydro-Québec TransÉnergie 1-Oct-18 Danny Williams
P-00168 Email dated January 21, 2006, 8:40:21 AM from 709News@BristolGroup.ca to Kwinsor@nlh.nf.ca and NLIS@gov.nl.ca re NL Hydro Applies for Transmission Rights: Another step today in the process to develop the Lower Churchill. 06:08PM Item #04 1-Oct-18 Danny Williams
P-00169 Hydro Presentation dated April 29, 2006 re 2006 Project Strategy 1-Oct-18 Danny Williams
P-00170 Email dated May 15, 2006, 9:15 AM from OnlineNews to Lower Churchill re National Post – Hydro projects empower premiers 1-Oct-18 Danny Williams
P-00171 GNL News Release dated September 5, 2006 re Premier says great lessons to be learned from Iceland and Norway 1-Oct-18 Danny Williams
P-00172 News Article dated September 27, 2006 re Quebec too politically ‘volatile’ to reply on the energy needs: N.L. premier 1-Oct-18 Danny Williams
P-00173 Presentation dated August 2006 re Newfoundland and Labrador’s Provincial Energy Plan – Working Session with Premier/Minister 1-Oct-18 Danny Williams
P-00174 Email dated October 10, 2006, 10:15:35 PM from Elizabeth Matthews to Jeff Paddock re Quotes for Le Journal Interview 1-Oct-18 Danny Williams
P-00175 NL Hydro Presentation dated November 2006 re Lower Churchill Project Update 1-Oct-18 Danny Williams
P-00176 Transcript of VOCM Radio media clip dated December 1, 2006, 1:30 PM, Item #01 re Lower Churchill Project Registered 1-Oct-18 Danny Williams
P-00177 News Release dated December 1, 2006 re Environmental Assessment Process Initiated for Lower Churchill Project 1-Oct-18 Danny Williams
P-00178 Transcript of CBC Radio media clip dated February 6, 2007, 4:47 PM Item #05 re Route of the Lower Churchill Power 1-Oct-18 Danny Williams
P-00179 Transcript of NTV Evening News media clip dated April 8, 2007, 12:18 PM Item #01 re Issues and Answers – Lynn Burry interviews Premier Danny Williams 1-Oct-18 Danny Williams
P-00180 Memorandum to Executive Council dated April 11, 2007 re Creation of New Crown Corporation 1-Oct-18 Danny Williams
P-00181 Transcript of CBC Labrador media clip dated April 17, 2007, 7:22 AM Item # 05 re Progress of Lower Churchill 1-Oct-18 Danny Williams
P-00182 Transcript of VOCM Radio media clip dated April 18, 2007, 8:24 AM Item # 06 re Premier Williams on Equalization/Lower Churchill 1-Oct-18 Danny Williams
P-00183 Memorandum to Executive Council dated May 24, 2007 re Proposed Energy Corporation (Holdco) Act and Proposed Hydro Act – Legislation 1-Oct-18 Danny Williams
P-00184 Report of the Department of Natural Resources – The Lower Churchill Project dated July 11, 2007 1-Oct-18 Danny Williams
P-00185 The Telegram news article dated August 10, 2007 re Keeping Churchill power home 1-Oct-18 Danny Williams
P-00186 GNL News Release dated February 6, 2007 re Hydro Continues to Explore Market Access Options for Lower Churchill Power 1-Oct-18 Danny Williams
P-00187 Department of Natural Resources Presentation to Cabinet dated September 2007 – Energy Plan – Focusing Our Energy 1-Oct-18 Danny Williams
P-00188 GNL News Release dated September 11, 2007 re Economic Self-Reliance and Environmental Sustainability Cornerstones of the Province’s Energy Plan 1-Oct-18 Danny Williams
P-00189 Premier’s Briefing Note – Cabinet Secretariat dated December 10, 2007 re Lower Churchill Environmental Assessment (EA) 1-Oct-18 Danny Williams
P-00190 Email dated January 3, 2008, 10:05 AM from Carmel Turpin to Diane Hart, John Tompkins, Lesley Clarke, NLIS, cc Josephine Cheeseman re FW: Developing Lower Churchill: Premier “Danny Williams” says the odds of developing the Lower Churchill are 50/50 at best 1-Oct-18 Danny Williams
P-00191 Email dated January 14, 2008, 2:20:56 PM from Gbennett@lh.l.ca to Brian Crawley and Elizabeth Matthews re News Release: Newfoundland and Labrador Hydro, Emera Inc. and Nova Scotia Power Inc. sign MOU to explore options for Lower Churchill power 1-Oct-18 Danny Williams
P-00192 Email dated March 31, 2008, 8:43:45 AM from Corey Snook to Pierre F. Tobin re FW: LCP Article – Economy 2008 1-Oct-18 Danny Williams
P-00193 Memorandum to Executive Council dated May 1, 2008 re Amendments to the Energy Corporation Act 1-Oct-18 Danny Williams
P-00194 Memorandum to Executive Council dated May 2, 2008 re Proclamation of the Hydro Corporation Act, 2007 1-Oct-18 Danny Williams
P-00195 Memorandum to Executive Council dated November 24, 2008 re Proclamation of Amendments to the Electrical Power Control Act 1994 and Promulgation of Regulations 1-Oct-18 Danny Williams
P-00196 Email dated May 28, 2008, 12:39:26 PM from Elizabeth Matthews to Carmel Turpin and Andrea Nolan, cc Josephine Cheeseman and Tracey B Barron re RE: revised release 1-Oct-18 Danny Williams
P-00197 Memorandum to Executive Council dated November 26, 2008 re Issuance of Water Rights for the Lower Churchill River to the Energy Corporation of Newfoundland and Labrador 1-Oct-18 Danny Williams
P-00198 GNL News Release dated April 2, 2009 re Historic Arrangement Sees Newfoundland and Labrador Wheel Upper Churchill Power Through Quebec to North American Markets 1-Oct-18 Danny Williams
P-00199 The Telegram news article dated October 21, 2009 re Premier vows to stop Hydro-Quebec’s power grab 1-Oct-18 Danny Williams
P-00200 GNL News Release dated October 28, 2009 re Premier Releases Response to Premier of New Brunswick 1-Oct-18 Danny Williams
P-00201 The National Post article dated October 30, 2009 re N.S., NL wary of Quebec’s Power – NB Power buy creates utility energy giant in Atlantic region 1-Oct-18 Danny Williams
P-00202 Transcript of VOCM Radio media clip dated November 23, 2009, 9:41 AM Item # 10 re New Brunswick Power Issue: “Premier Danny Williams” calling to talk about the New Brunswick Power issue 1-Oct-18 Danny Williams
P-00203 Letter dated November 25, 2009 from Danny Williams, Q.C., Premier to Honourable Jim Prentice, Minister of the Environment re Newfoundland and Labrador’s climate change priorities and perspectives 1-Oct-18 Danny Williams
P-00204 GNL and the Government of Nova Scotia News Release dated December 2, 2009 re Premier Williams and Premier Dexter Send Letter to the Premier of New Brunswick 1-Oct-18 Danny Williams
P-00205 Email dated April 8, 2010, 3:42:44 PM from Gbennett@nalcorenergy.com to Charles W. Bown re Fw: Presentation 1-Oct-18 Danny Williams
P-00206 Nalcor Energy Presentation dated April 23, 2010 re Lower Churchill Update 1-Oct-18 Danny Williams
P-00207 Email dated May 12, 2010, 11:24:33 AM from Elizabeth Matthews to Robert Thompson, Gary Norris, Brian Crawley, Emartin@nalcorenergy.com, Gbennett@nalcorenergy.com, LeonaBarrington@nalcorenergy.com and Tracey B. Barron re Draft release 1-Oct-18 Danny Williams
P-00208 GNL News Release dated May 12, 2010 re Quebec’s Refusal of Transmission Access Once Again Demonstrates Its Arrogance and Discriminatory Business Practices 1-Oct-18 Danny Williams
P-00209 The Telegram news article dated May 13, 2010 re Access denied – Quebec regulator rejects application; province to switch focus to maritime route 1-Oct-18 Danny Williams
P-00210 Email dated May 17, 2010, 11:05:50 AM from Elizabeth Matthews to Tracy B. Barron re would you mind getting sign off from your minister for me to move the following Private Member’s Resolution 1-Oct-18 Danny Williams
P-00211 The Telegram news article dated May 29, 2010 re Provincial officials calculating costs 1-Oct-18 Danny Williams
P-00212 Nalcor Energy News Release dated June 10, 2010 re Nalcor Energy Files Applications for Administrative Revision with Régie de l’énergie 1-Oct-18 Danny Williams
P-00213 Nalcor Energy Presentation re Lower Churchill Project – Decision Review Criteria and Process 1-Oct-18 Danny Williams
P-00214 CBC news article dated August 13, 2010, 7:33 AM NT re Williams attacks ‘predatory’ Quebec over hydro – N.S. minister says Charest should ‘mind his own business’ 1-Oct-18 Danny Williams
P-00215 The Telegram news article dated September 9, 2010 re Williams talks tough 1-Oct-18 Danny Williams
P-00216 Nalcor Energy Presentation dated September 23, 2010 re Island Energy Supply and Lower Churchill – Option Evaluation and Recommendation 1-Oct-18 Danny Williams
P-00217 Email dated October 15, 2010, 3:38:47 PM from Paul O Parsons to Gerard Collins re presentation 1-Oct-18 Danny Williams
P-00218 Email dated October 23, 2010, 8:22:44 PM from Elizabeth Matthews to Emartin@nalcorenergy.com, Gbennett@nalcorenergy.com, leonabarrington@nlh.nl.ca re Fw: 1-Oct-18 Danny Williams
P-00219 The Telegram news article dated October 26, 2010 re A new deal 1-Oct-18 Danny Williams
P-00220 Email dated October 30, 2010, 11:12:39 AM from Robert Thompson to Kathy Dunderdale re FW: Cost Risk Framework 1-Oct-18 Danny Williams
P-00221 Email dated November 1, 2010, 11:39:50 AM from Elizabeth Matthews to Elizabeth Matthews re Fw: Cost Risk 1-Oct-18 Danny Williams
P-00222 Transcript of Rogers Channel 9 media clip dated November 9, 2010, 7:36 PM Item # 01 re Conversation with the Premier: Danny Williams is never one to shy away from controversy or a public dispute 1-Oct-18 Danny Williams
P-00223 Nalcor Energy Presentation to Cabinet – Update on Negotiations with Emera dated November 9, 2010 1-Oct-18 Danny Williams
P-00224 Letter dated November 12, 2010 from Danny Williams, Q.C., Premier to Honourable Peter MacKay re final stages of negotiations to develop the Lower Churchill hydroelectric project 1-Oct-18 Danny Williams
P-00225 Email dated November 16, 2010, 5:27:03 PM from Elizabeth Matthews to Elizabeth Matthews re Key Messages.doc; NR Emera.doc; SN DW.doc 1-Oct-18 Danny Williams
P-00226 Email dated November 18, 2010, 8:18:09 AM from Elizabeth Matthews to leonabarrington@nlh.nl.ca re Fw: final for tomorrow 1-Oct-18 Danny Williams
P-00227 Nalcor and Emera Inc. – Term Sheet dated November 18, 2010 1-Oct-18 Danny Williams
P-00228 The Canadian Press news article dated November 19, 2010 re Deal frees N.L. from Quebec: Williams 1-Oct-18 Danny Williams
P-00229 The Telegram news article dated November 25, 2010 re Williams’s shaky legacy? Expert says Lower Churchill project could unravel 1-Oct-18 Danny Williams
P-00230 Statement dated November 25, 2010 issued by The Honourable Danny Williams re stepping down as Premier 1-Oct-18 Danny Williams
P-00231 CBC News article dated April 3, 2012, 1:31 PM NT re Danny Williams says PUB report ‘baffling’ shows bias 1-Oct-18 Danny Williams
P-00232 GNL News Release dated April 3, 2012 re Williams disappointed by indecisive PUB report on Muskrat development 1-Oct-18 Danny Williams
P-00233 CBC News article dated October 22, 2012, 4:20 PM NT re Williams reaffirms Muskrat Falls support 1-Oct-18 Danny Williams
P-00234 CBC News article dated December 6, 2012, 1:47 PM NT re No pleasing Muskrat critics Danny Williams says 1-Oct-18 Danny Williams
P-00235 Email dated June 24, 2014, 9:31:10 AM from Lesley Clarke to Milly Brown, Darrell Hynes, James Sheppard, Jeff Paddock, cc Jennifer Collinwood and Jacquelyn Howard re CBC – Danny Williams defend Nalcor Energy, attacks critics 1-Oct-18 Danny Williams
P-00236 CBC News article dated April 28, 2016, 10:54 PM AT re Danny Williams ‘unequivocally positive’ about Muskrat Falls 1-Oct-18 Danny Williams
P-00237 CBC News article dated July 3, 2016, 8:02 PM NT re Where have all the Muskrat Falls cheerleaders gone? 1-Oct-18 Danny Williams
P-00238 GNL Energy Plan – Questions and Answers dated August 30, 2007 1-Oct-18 Danny Williams
P-00239 CBC news article dated October 1, 2015 re “That’s the cost of doing business’: Danny Williams defends Muskrat Falls, Ed Martin 1-Oct-18 Danny Williams
P-00240 CBC news article dated January 19, 2017 re Danny Williams says new head of Nalcor ‘intent on tearing down Muskrat Falls with his words’ 1-Oct-18 Danny Williams
P-00241 CBC news article dated June 28, 2017 re Stan Marshall a ‘boondoggled buffoon’ who’s no good for Muskrat Falls: Danny Williams 1-Oct-18 Danny Williams
P-00242 The Telegram news article dated April 20, 2018 re Danny Williams condemns ‘negativity’ over Muskrat Falls project 1-Oct-18 Danny Williams
P-00243 Royal Commission on Renewing and Strengthening Our Place in Canada: Report Excerpts 1-Oct-18 Danny Williams
P-00244 Chartered Professional Accountants Canada – Standard Practices for Investigative and Forensic Accounting Engagements dated November 2006 21-Sep-18 David Malamed/ Scott Shaffer
P-00245 Decision dated July 22, 2013 of the Nova Scotia Utility and Review Board in the Matter of the Maritime Link Act (2013 NSUARB 154) 24-Sep-18 David Malamed/ Scott Shaffer
P-00246 Marbek Resource Consultants Ltd. Report dated January 31, 2008 re Conservation and Demand Management (CDM) Potential NL Residential, Commercial and Industrial Sectors – Summary Report 24-Sep-18 David Malamed/ Scott Shaffer
P-00247 Amec Letter dated April 25, 2012 from Blair Seckington to Nelson Seymour, P. Eng re Nalcor Holyrood Generating Station (Holyrood) Life Extension Review with attached report 24-Sep-18 David Malamed/ Scott Shaffer
P-00248 Statistics Canada – Annual Demographic Estimates: Canada, Provinces and Territories 2017 dated September 27, 2017 24-Sep-18 David Malamed/ Scott Shaffer
P-00249 The Conference Board of Canada – Provincial Outlook 2012 – Long-Term Economic Forecast – Chapter 1 24-Sep-18 David Malamed/ Scott Shaffer
P-00250 2013 Nova Scotia Utility and Review Board in the Matter of the Maritime Link Act and an Application by Nova Scotia Power Maritime Link Incorporated for approval of the Maritime Link Project dated April 17, 2013 24-Sep-18 David Malamed/ Scott Shaffer
P-00251 Maritime Link Project (NSUARB ML-2013-01) NSPML Responses to NSUARB Information Requests dated March 11, 2013 24-Sep-18 David Malamed/ Scott Shaffer
P-00252 Excerpt from an American Association of Cost Engineers publication IOS-90: Cost Engineering Terminology dated June 20, 2018 27-Sep-18 David Malamed/ Scott Shaffer
P-00253 Excerpt from Knight Piésold Consulting report to Manitoba Public Utilities Board – NFAT Review of Keeyask and Conawapa GS dated January 23, 2014 24-Sep-18 David Malamed/ Scott Shaffer
P-00254 Excerpt from Nalcor Energy Presentation – Exhibit 5 – Net Benefits to NL at DG3 24-Sep-18 David Malamed/ Scott Shaffer
P-00255 Hydro Québec Strategic Plan – 2009-2013 24-Sep-18 David Malamed/ Scott Shaffer
P-00256 System Planning – DG# Information Requirements dated April 4, 2012 25-Sep-18 Bob Moulton/ Paul Stratton/ Auburn Warren
P-00257 Email dated April 1, 2012, 4:43:46 PM from Gbennett@nalcorenergy to Plwilson@mhi.ca re Contact with Charles Bown – Government of Newfoundland and Labrador 25-Sep-18 David Malamed/ Scott Shaffer
P-00258 Email dated April 2, 2012, 4:06:09 PM from Paul Wilson to Charles W. Bown, cc Allen Snyder and Mack Kast re DG3 Items – M Greene – 21 February 2012.docx 25-Sep-18 David Malamed/ Scott Shaffer
P-00259 Email dated April 2, 2012, 10:44:41 AM from Don Burrage to Charles W. Bown re Work Scope 25-Sep-18 David Malamed/ Scott Shaffer
P-00260 Email dated April 12, 2012, 10:35:05 AM from Charles W. Bown to Paul G. Scott and Walter Parsons re FW: Timing 25-Sep-18 David Malamed/ Scott Shaffer
P-00261 Email dated April 16, 2012, 8:21:25 AM from BrianCrawley to Charles W. Bown re FW: MHI in St. John’s 25-Sep-18 David Malamed/ Scott Shaffer
P-00262 Email dated April 19, 2012, 3:19:31 PM from Charles W. Bown to Walter Parsons re FW NFL2 Scope of Services – Government of Newfoundland – Muskrat Falls DG3 review 25-Sep-18 David Malamed/ Scott Shaffer
P-00263 Email dated April 30, 2012, 4:42:14 PM from Charles W. Bown to Paul Wilson, cc Allen Snyder and Mack Kast re NFL2 Scope of Services – Government of Newfoundland – Muskrat Falls DG3 review 25-Sep-18 David Malamed/ Scott Shaffer
P-00264 Nalcor Energy Report – Muskrat Falls Project Summary of Pre-Sanction – Briefing Note as Requested by Nalcor Legal Counsel McInnes-Cooper 25-Sep-18 David Malamed/ Scott Shaffer
P-00265 Handwritten Notes of Robert Thompson dated May 2, 2005 to September 30, 2010 1-Oct-18 Danny Williams
P-00266 Innu Nation Submission on Consultation and Mitigation Measures in relation to the Muskrat Falls Project dated August 7, 2018 2-Oct-18 Prote Poker
P-00267 Summary of NunatuKavut Community Council’s Position concerning the Commission of Inquiry Respecting the Muskrat Falls Project 2-Oct-18 Todd Russell
P-00268 Indigenous Consultation regarding the Lower Churchill Hydroelectric Generation (LCP), Labrador Island Transmission Link (LITL), and Maritime Link Projects prepared by the Government of Newfoundland and Labrador 2-Oct-18 Aubrey Gover
P-00269 A Summary of Position of the Nunatsiavut Government of the Commission of Inquiry Concerning the Muskrat Falls Project dated June 2018 2-Oct-18 Carl McLean/ Rodd Laing
P-00270 Submissions of the Conseil Des Innu de Ekuanitshit to Counsel for the Commission of Inquiry Respecting the Muskrat Falls Project regarding Consultation and Mitigation Measures dated June 29, 2018 2-Oct-18 Jean-Charles Piétacho
P-00271 Nalcor Energy – Indigenous Consultation Report – Muskrat Falls Project dated August 21, 2018 2-Oct-18 CIMFP
P-00271 - Appendix O - 02 Nalcor Energy - Lower Churchill Project - LCP Avifauna Management Plan dated September 22, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 03 Nalcor Energy - Lower Churchill Project - LCP Avifauna Management Plan dated February 25, 2013 2-Oct-18 CIMFP
P-00271 - Appendix O - 04 Nalcor Energy - Lower Churchill Project - LCP Annual Black Bear Encounter Report - 2013 dated August 28, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 05 Nalcor Energy - Lower Churchill Project - 2014 Annual Caribou Report - Red Wine Mountain Herd 2-Oct-18 CIMFP
P-00271 - Appendix O - 09 Nalcor Energy - Lower Churchill Project - 2016 Annual Caribou Report - Red Wine Mountain Herd 2-Oct-18 CIMFP
P-00271 - Appendix O - 10 Nalcor Energy - Lower Churchill Project - L-ITL Avifauna Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 11 Nalcor Energy - Lower Churchill Project - LCP Aquatic Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 12 Nalcor Energy - Lower Churchill Project - LCP Atmospheric Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 13 Nalcor Energy - Lower Churchill Project - LCP Black Bear Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 14 Nalcor Energy - Lower Churchill Project - L-ITL Caribou Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 15 Nalcor Energy - Lower Churchill Project - LCP Furbearers Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 16 Nalcor Energy - Lower Churchill Project, Environmental Effects Monitoring Program - 2014 Herptile dated September 19, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 17 Nalcor Energy - Lower Churchill Project - LCP Ice Formation Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 18 Nalcor Energy - Lower Churchill Project - Navigation Mitigation and Monitoring Plan dated January 24, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 19 Nalcor Energy - Lower Churchill Project - LCP Methylmercury Environmental Effects Monitoring Plan: Osprey and River Otter 2-Oct-18 CIMFP
P-00271 - Appendix O - 20 Nalcor Energy - Lower Churchill Project - LCP Moose Protection and Environmental Effects Monitoring Plan dated October 6, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 21 Nalcor Energy - Lower Churchill Project - LCP Small Mammals Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 22 Nalcor Energy - Lower Churchill Project - LCP Socioeconomic Environmental Effects Monitoring Plan dated May 30, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 23 Nalcor Energy - Lower Churchill Project - LCP Species at Risk Protection and Environmental Effects Monitoring Plan dated October 15, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 24 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - 2014 Avifauna dated September 26, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 25 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - 2015 Avifauna, 2015 Avifauna EEMP Surveys dated December 7, 2015 2-Oct-18 CIMFP
P-00271 - Appendix O - 26 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - Avifauna, 2016 Forest Songbird and Common Nighthawk (Chordeiles minor) Point-Count Surveys dated January 5, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 27 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - Avifauna dated August 15, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 28 Lower Churchill Labrador Island Transmission Link - Newfoundland Marten Environmental Effects Monitoring Program dated February 10, 2015 2-Oct-18 CIMFP
P-00271 - Appendix O - 29 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - Newfoundland Marten dated December 2, 2015 2-Oct-18 CIMFP
P-00271 - Appendix O - 30 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - 2016 Newfoundland Marten - Newfoundland Marten Hair Snag Trapping and Off Highway Vehicle Surveys dated September 2, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 31 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - Newfoundland Marten dated September 1, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 32 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - 2014 Red Wine Mountains Caribou Herd, 2014 Aerial Survey and Collar Deployment dated October 3, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 33 Nalcor Energy - Lower Churchill Project - Environmental Effects Monitoring Program - 2016 Red Wine Mountains Caribou Herd, 2016 Aerial Survey dated October 3, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 34 Nalcor Energy - Lower Churchill Project - LCP Avifauna Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 35 Nalcor Energy - Lower Churchill Project - LCP Caribou Protection and Environmental Effects Monitoring Plan dated June 26, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 36 Nalcor Energy - Lower Churchill Project - L-ITL Freshwater Fish Protection and Environmental Effects Monitoring Plan dated October 3, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 37 Nalcor Energy - Lower Churchill Project - L-ITL Furbearers and Small Mammals Protection and Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 38 Nalcor Energy - Lower Churchill Project - L-ITL Outfitters Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 39 Nalcor Energy - Lower Churchill Project - Labrador-Island Transmission Link - Species at Risk - Impacts Mitigation and Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 40 Nalcor Energy - Lower Churchill Project - LITL Vegetation Protection and Environmental Effects Monitoring Plan dated June 19, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 41 Nalcor Energy - Lower Churchill Project - Muskrat Falls Generation and Labrador Transmission Assets - Environmental Protection Plan dated May 20, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 42 Amec Report dated February 2013 re Lower Churchill Hydroelectric Development - Freshwater Fish Habitat Compensation Plan - Muskrat Falls 2-Oct-18 CIMFP
P-00271 - Appendix O - 43 Nalcor Energy - Lower Churchill Project - Human Health Risk Assessment Plan dated April 12, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 44 Dillon Consulting report dated October 2016 re Nalcor Energy Lower Churchill Hydroelectric Generation Project - Final Baseline Human Health Risk Assessment: Lower Churchill Hydroelectric Generation Project 2-Oct-18 CIMFP
P-00271 - Appendix O - 45 Nalcor Energy - Lower Churchill Project - LCP HVdc Overland Transmission and HVdc Specialties - Environmental Protection Plan dated June 8, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 46 Nalcor Energy - Lower Churchill Project - LCP No Harvesting Policy dated July 3, 2013 2-Oct-18 CIMFP
P-00271 - Appendix O - 47 Lower Churchill Construction Projects - Benefits Strategy 2-Oct-18 CIMFP
P-00271 - Appendix O - 48 Nalcor Energy - Lower Churchill Project - Labrador-Island Transmission Link - Marine Emissions Environmental Effects Monitoring Plan 2-Oct-18 CIMFP
P-00271 - Appendix O - 49 Nalcor Energy - Lower Churchill Project - Master Spill Response Plan - All Components dated June 6, 2015 2-Oct-18 CIMFP
P-00271 - Appendix O - 50 Azimuth Consulting Group Partnership Technical Memorandum dated July 19, 2018 from Randy Baker to Peter Madden re Summary of Post-Exposure Human Health Risk Assessment from Methylmercury in Seafood in Goose Bay and Lake Melville, Labrador 2-Oct-18 CIMFP
P-00271 - Appendix O - 51 Baird Technical Memorandum dated August 2, 2018 from Alex Brunton to Reed Harris, cc Rob Naim re Lake Melville Model Setup and Results 2-Oct-18 CIMFP
P-00271 - Appendix O - 52 Reed Harris Environmental Ltd. Report date August 3, 2018 to Peter Madden re Updated analysis of predicted increases in methylmercury concentrations and downstream export from Muskrat Falls Reservoir 2-Oct-18 CIMFP
P-00271 - Appendix O - 53 Azimuth Consulting Group Partnership Technical Memorandum dated February 25, 2018 from Randy Baker with G. Mann to Peter Madden re Evaluation of MeHg Production by Muskrat Falls Reservoir and Implications for Lake Melville - A Top-Down, Mass-Balance Approach 2-Oct-18 CIMFP
P-00271 - Appendix O - 54 Amec Foster Wheeler report dated May 2018 re Aquatic Species Habitat Utilization Overview - Churchill River, Goose Bay, and Lake Melville - 1998-2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 55 Amec Foster Wheeler memo dated May 10, 2018 from Peter Madden to Jim McCarthy, cc Reed Harris and Randy Baker re Summary of Isotope and Stomach Data, Goose Bay / Lake Melville Estuary 2-Oct-18 CIMFP
P-00271 - Appendix O - 56 Amec Foster Wheeler report dated July 2018 re Predicted Increases in Fish Methylmercury Muscle Tissue Concentrations in Goose Bay and Lake Melville 2-Oct-18 CIMFP
P-00271 - Appendix O - 57 Nalcor Energy - Lower Churchill Project - Lower Churchill Hydroelectric Development Project 2016 Historic Resources Assessment and Recovery Program dated October 11, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 58 Nalcor Energy - Lower Churchill Project - LCP Strait of Belle Isle Marine Crossing - Environmental Protection Plan dated May 14, 2014 2-Oct-18 CIMFP
P-00271 - Appendix O - 59 Nalcor Energy - Lower Churchill Project - 2014 Wildlife Sightings Report for the Lower Churchill Project dated July 27, 2015 2-Oct-18 CIMFP
P-00271 - Appendix O - 06 Nalcor Energy - Lower Churchill Project - 2015 Annual Caribou Report - Mealy Mountain Herd dated January 3, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 60 Nalcor Energy - Lower Churchill Project - 2015 Wildlife Sightings Report for the Lower Churchill Project dated October 25, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 61 Nalcor Energy - Lower Churchill Project - 2016 Wildlife Sightings Report for the Lower Churchill Project dated October 25, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 62 Nalcor Energy - Lower Churchill Project - 2017 Wildlife Sightings Report for the Lower Churchill Project dated January 22, 2017 2-Oct-18 CIMFP
P-00271 - Appendix O - 63 Nalcor Energy - Lower Churchill Project - 2011-2012 Wildlife Reconnaissance Surveys dated May 2, 2013 2-Oct-18 CIMFP
P-00271 - Appendix O - 07 Nalcor Energy - Lower Churchill Project - 2015 Annual Caribou Report - Red Wine Mountain Herd dated November 29, 2016 2-Oct-18 CIMFP
P-00271 - Appendix O - 08 Nalcor Energy - Lower Churchill Project - 2016 Annual Caribou Report - Mealy Mountain Herd dated January 9, 2017 2-Oct-18 CIMFP
P-00271 - Appendix I Appendix I – Socioeconomic Environment: Aboriginal Communities and Land Use Component Study (Nalcor Energy, 2011) 2-Oct-18 CIMFP
P-00271 - Appendix O - 01 Nalcor Energy - Lower Churchill Project - 2013-2015 Avifauna Report 2-Oct-18 CIMFP
P-00271 - Appendix A Appendix A – Environmental Impact Statement (EIS) Guidelines, Lower Churchill Hydroelectric Generation Project, Government of Canada and Government of Newfoundland and Labrador (July 2008) 2-Oct-18 CIMFP
P-00271 - Appendix B Appendix B – Report of the Joint Review Panel, Lower Churchill Hydroelectric Generation Project (August 2011). 2-Oct-18 CIMFP
P-00271 - Appendix C Appendix C – Impact Statement Guidelines and Scoping Document for Labrador Island Transmission Link, Government of Canada and Government of Newfoundland and Labrador (May 2011) 2-Oct-18 CIMFP
P-00271 - Appendix D Appendix D – The Government of Newfoundland and Labrador’s Aboriginal Consultation Policy on Land and Resource Development Decisions (“The Policy”) (April 2013). 2-Oct-18 CIMFP
P-00271 - Appendix E Appendix E – News Release. Nalcor Receives EA Release for Lower Churchill Generation Project, (March 2012) 2-Oct-18 CIMFP
P-00271 - Appendix F Appendix F – News release. Nalcor Receives Federal Release from EA for LITL, (November 2013) 2-Oct-18 CIMFP
P-00271 - Appendix G Appendix G – Council of the Innu of Ekuanitshit v. Canada (Attorney General), 2013 FC 418 (CanLII); Council of the Innu of Ekuanitshit v. Canada (Attorney General), 2014 FCA 189; Nunatsiavut v. Canada (Department of Fisheries and Oceans), 2015 FC 492; Nunatukavut Community Council Inc. v. Newfoundland & Labrador Hydro-Electric Corp., 2011 NLTD(G) 44; Nunatukavut Community Council Inc. v. Canada (Attorney General), 2015 FC 981; Grand Riverkeeper, Labrador Inc. v. Canada (Attorney General), 2012 FC 1520 2-Oct-18 CIMFP
P-00271 - Appendix H Appendix H – News release. Canada and NuntuKavur enter into Historic Talks. (June 2018) 2-Oct-18 CIMFP
P-00271 - Appendix J Appendix J – Environmental Impact Statement, Labrador Island transmission Link, Existing Socioeconomic Environment, Volume 3, Chapter 15 (Nalcor Energy, 2012 ) 2-Oct-18 CIMFP
P-00271 - Appendix K Appendix K – Environmental Impact Statement, Generation, Volume 1A, Chapter 8 (Nalcor Energy,2009) 2-Oct-18 CIMFP
P-00271 - Appendix L Appendix L – Supplemental Information to IR JRP 151, Consultation Assessment Report (CAR) (Nalcor Energy, September 2010) 2-Oct-18 CIMFP
P-00271 - Appendix M Appendix M – Environmental Impact Statement, Labrador Island transmission Link, Existing Socioeconomic Environment, Volume 1, Chapter 7 (Nalcor Energy, 2012 2-Oct-18 CIMFP
P-00271 - Appendix N Appendix N – Record of Engagement 2-Oct-18 CIMFP
P-00271 - Appendix O Appendix O – Supporting Documentation 2-Oct-18 CIMFP
P-00272 Email dated November 30, 2012, 1:36:17 PM from Paul Carter to Christopher Appleby re FW: Nunatsiavut Government response to panel report 3-Oct-18 Carl McLean/ Rodd Laing
P-00273 Using Energy to Build the Québec of Tomorrow – Québec Energy Strategy 2006-2015 1-Oct-18 Danny Williams
P-00274 Hydro Québec – Québec Hydropower Exports: A Winning Solution 1-Oct-18 Danny Williams
P-00275 Relations Internationales et Francophonie Québec news article dated August 13, 2010 re Québec and Vermont agree on new electricity supply contract 1-Oct-18 Danny Williams
P-00276 Hydro Québec news release dated January 25, 2018 re Massachusetts request for proposals – Hydro Québec selected for the biggest contract of its history 1-Oct-18 Danny Williams
P-00277 PC Party 2003 Platform 1-Oct-18 Danny Williams
P-00278 The Telegram news article dated May 11, 2006 re We Want Respect 1-Oct-18 Danny Williams
P-00279 Email dated November 18, 2009, 3:00:07 PM from Elizabeth Matthews to Andrea Nolan and Ronalda Walsh re Copy of Premier’s Speech 1-Oct-18 Danny Williams
P-00280 Email dated December 1, 2009, 11:48:38 PM from Robert Thompson to Charles W. Bown re FW: Urgent 1-Oct-18 Danny Williams
P-00281 GNL News Release dated May 26, 2010 re Unofficial English Translation of the Régie de l’énergie’s Decision Available 1-Oct-18 Danny Williams
P-00282 The Telegram news article dated August 13, 2010 re Williams slams Quebec letter 1-Oct-18 Danny Williams
P-00283 Email dated September 8, 2010, 10:59:47 AM from Elizabeth Matthews to Brian Crawley 1-Oct-18 Danny Williams
P-00284 GNL Briefing Note dated November 22, 2010 re CAP – Backgrounder – Reaction to Lower Churchill Announcement – Intergovernment Affairs Secretariat 1-Oct-18 Danny Williams
P-00285 CBC news article dated January 14, 2012 re Danny Williams slams Muskrat Falls critics 1-Oct-18 Danny Williams
P-00286 CBC news article dated June 28, 2012 re John Crosbie endorses Muskrat Falls megaproject 1-Oct-18 Danny Williams
P-00287 Map of Quebec borders 1-Oct-18 Danny Williams
P-00288 Letter dated October 31, 2005 from Chris Montague to Hon. Danny Williams re Lower Churchill hydroelectric development 1-Oct-18 Danny Williams
P-00289 Letter dated November 10, 2005 from Danny Williams, Q.C. to Chris Montague re Proposed Lower Churchill hydro development 1-Oct-18 Danny Williams
P-00290 GNL Briefing Note re Lower Churchill Engagement Strategy with Aboriginal Groups 1-Oct-18 Danny Williams
P-00291 Memorandum to Executive Council re Aboriginal consultation on the Provincial Environmental Assessment of the Lower Churchill Hydroelectric Generation Project 1-Oct-18 Danny Williams
P-00292 Memorandum to Executive Council re Consultation with the Labrador Metis Nation and the Quebec Innu on the Environmental Assessment of the Lower Churchill Hydroelectric Generation Project 1-Oct-18 Danny Williams
P-00293 Email dated April 24, 2007, 12:29:17 PM from David Hughes to Bas Cleary and Robert Coombs re EA & AbConsult BN.doc 1-Oct-18 Danny Williams
P-00294 GNL Briefing Note dated July 11, 2007 re Current status of issues with the Labrador Metis Nation (LMN) 1-Oct-18 Danny Williams
P-00295 GNL Briefing Note dated April 14, 2008 re Consultation with Aboriginal Stakeholders in the Lower Churchill Project (the “Project”) 1-Oct-18 Danny Williams
P-00296 GNL Briefing Note dated July 12, 2010 re Aboriginal Consultation and Issues related to the Lower Churchill Development 1-Oct-18 Danny Williams
P-00297 The Tshash Petapen Agreement (jash pey-taah-ben) – New Dawn Agreement dated September 26, 2008 3-Oct-18 Prote Poker
P-00298 Lower Churchill Impacts and Benefits Agreement Summary 3-Oct-18 Prote Poker
P-00299 Ratification Vote for Agreement-in-Principle for Innu Land Rights – Lower Churchill Impacts and Benefits Agreement – Upper Churchill Redress Agreement held on June 23, 29 and 30 of 2011 3-Oct-18 Prote Poker
P-00300 Lower Churchill Innu Impacts and Benefits Agreement dated November 18, 2011 among Nalcor Energy and Innu Nation and Sheshatshiu Innu First Nation and Mushuau Innu First Nation 3-Oct-18 Prote Poker
P-00301 Review of Statements Made in 2002 about the Draft Gull Island Development Project dated 2010 (GNL) 2-Oct-18 Danny Williams
P-00302 Memorial Presents – Natural Gas Better than Labrador Hydro for Island Energy Requirements by Dr. StephenBruneau 5-Oct-18 Dr. Stephen Bruneau
P-00303 The Telegram news article dated March 29, 2012 re Natural gas a viable option, says prof 5-Oct-18 Dr. Stephen Bruneau
P-00304 Labrador Innu Land Claims Agreement-in-Principle 3-Oct-18 Aubrey Gover
P-00305 Memo dated April 24, 2008 from Maeve Baird to Minister Pottle re Letter to Minister Strahl re Labrador Metis Nation Land Claim with GNL Briefing Note dated April 22, 2008 re Labrador Metis Nation 3-Oct-18 Aubrey Gover
P-00306 Email dated May 11, 2010, 9:47:53 AM from Vaughn Hammond to Jamie Chippett re Meeting Note – Premier and Min Strahl – April 27 (GNL) 3-Oct-18 Aubrey Gover
P-00307 Email dated June 23, 2010, 4:52:29 PM from Aubrey Gover to Bas Cleary, cc Sean Dutton, Robert Thompson, Don Burrage, Richard Wardle, Paul Carter and Justin S.C. Mellor re FW: NunatuKavut (LMN) Reply Letter to Chris Montague 3-Oct-18 Aubrey Gover
P-00308 Government of Newfoundland and Labrador Policy regarding Aboriginal Lands Claims dated December 1987 3-Oct-18 Aubrey Gover
P-00309 GNL Briefing Note dated July 28, 2006 re Analysis of Quebec Innu Interests in the Lower Churchill Area 3-Oct-18 Aubrey Gover
P-00310 GNL Briefing Note dated December 10, 2007 re Lower Churchill Environmental Assessment (EA) 3-Oct-18 Aubrey Gover
P-00311 Curriculum Vitae – Dr. Wade Locke dated October 2017 9-Oct-18 Dr. Wade Locke
P-00312 ATIPPA Request NR-39-2016 – Wade Locke – 2003 – 2017 9-Oct-18 Dr. Wade Locke
P-00313 Nalcor Energy Report – Economic Impact Analysis for Phase 1 and Phase 2 of Nalcor Energy’s Lower Churchill Project dated January 23, 2011 9-Oct-18 Dr. Wade Locke
P-00314 Transcript of NTV Evening News media clip dated September 4, 2011, 6:04 PM, Item # 06 re Muskrat Falls: A leading environmental group is weighing in 9-Oct-18 Dr. Wade Locke
P-00315 Email dated December 1, 2011, 5:28:47 PM from Charles W. Bown to l.locke re Memorial Presents 9-Oct-18 Dr. Wade Locke
P-00316 Handwritten Notes of Jerome Kennedy dated January 11, 2012 re Meeting of Wade Locke 9-Oct-18 Dr. Wade Locke
P-00317 Memorial University Presentation – Muskrat Falls: The Best Option?: A Public Forum by Dr. Wade Locke dated January 17, 2012 9-Oct-18 Dr. Wade Locke
P-00318 Summary of Lower Churchill/Nalcor work from Wade Locke’s CV 9-Oct-18 Dr. Wade Locke
P-00319 Comments of the Innu of Ekuanitshit on the Consultation Assessment Report Submitted as Supplemental Information to IR JRP.151 by David Schulze dated October 2010 13-Dec-18 Jean-Charles Piétacho
P-00320 Submission from the Innu of Ekuanitshit to the Joint Review Panel Public Hearings - CEAR 07-05-26178 - Lower Churchill Hydroelectric Generation Project dated April 2011 (English and French versions) 13-Dec-18 Jean-Charles Piétacho
P-00321 C.D. Howe Institute E-brief dated January 11, 2012 re Economic Growth and Innovation – Newfoundland’s Electricity Options: Making the Right Choice Requires and Efficient Pricing Regime by James P. Feehan 9-Oct-18 Dr. James Feehan
P-00322 The Telegram news article dated August 11, 2012 re Muskrat Falls and true alternatives 9-Oct-18 Dr. James Feehan
P-00323 Aims Commentary – Electricity Market Integration – Newfoundland Chooses Monopoly and Protectionism dated November 2013 by James Feehan, PhD 9-Oct-18 Dr. James Feehan
P-00324 Department of Economics, Memorial University of Newfoundland article dated December 2016 re Connecting to the North American Grid: Time for Newfoundland to Discontinue Inefficient Price Regulation 2016 by James P. Feehan 9-Oct-18 Dr. James Feehan
P-00325 Jim Feehan Document “Nalcor Comments re Newfoundland and Labrador’s Electricity Dilemma” 9-Oct-18 Dr. James Feehan
P-00326 Report titled The Long-Run Price Elasticity of Demand for Electricity and the Feasibility of Raising Electricity Rates to Finance Muskrat Falls dated July 31, 2018 prepared for Dennis Browne, QC by James P. Feehan 9-Oct-18 Dr. James Feehan
P-00327 Comments by the Ekuanitshit Innu on the Report of the Joint Review Panel - Lower Churchill River Hydroelectric Project - CEAR 07-05-26178 by Dionne Schulze, Lawyer dated November 14, 2011 13-Dec-18 Jean-Charles Piétacho
P-00328 Letter dated May 2, 2012 from Dionne Schulze to Hon. Terry French and Hon. Jerome Kennedy, Q.C. re Muskrat Falls Project permit applications (Courtesy Translation) 13-Dec-18 Jean-Charles Piétacho
P-00329 Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018 10-Oct-18 Ron Penney/David Vardy
P-00330 Letter from Ronald Penney and David Vardy to Hon. Sean Skinner, MHA re Review of Muskrat Falls Project by Public Utilities Board (Appendix A for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00331 Letter dated June 22, 2011 from Shawn Skinner to Ronald Penney and David Vardy re Review of Muskrat Falls Project by Public Utilities Board (Appendix B for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00332 Essay prepared for Action Canada titled Making Best Use of the Lower Churchill: The Muskrat Falls Development dated August 31, 2011 by David A Vardy (Appendix C for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00333 The Telegram news article dated November 8, 2011 re Former PUB chair questions Muskrat Falls (Appendix D for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00334 The Telegram news article dated January 12, 2012 re Muskrat Falls must have full review (Appendix E for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00335 The Telegram news article dated January 12, 2012 re Calling Muskrat into question (Appendix F for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00336 The Telegram news article dated February 11, 2012 re Minister tackles Muskrat Falls critics (Appendix G for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00337 Email dated February 13, 2012, 1:27:46 PM from Gary Kean to David Vardy re Excerpt of Jerome Kennedy’s speech (Appendix H for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00338 Transcontinental Media, Corner Brook, news article dated February 14, 2012, re Former PUB chairman takes exception to minister’s comments (Appendix I for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00339 Presentation to the Public Utilities Board in the Matter of the Muskrat Falls Reference dated February 20, 2012 by Ron Penney and David Vardy (Appendix J for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00340 Letter dated February 29, 2012, from Cheryl Blundon to Ronald Penney, David Vardy, Thomas O’Reilly, Denis Fleming, Thomas Johnson re Reference from Lieutenant-Governor in Council on the Muskrat Falls Project (the “Muskrat Falls Review”) Appendix K for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018 10-Oct-18 Ron Penney/David Vardy
P-00341 Supplementary Submission to the Public Utilities Board in the Matter of the Muskrat Falls Reference (Appendix L for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00342 Letter dated March 9, 2012 from Thomas J. O’Reilly, Q.C. to Cheryl Blundon re Reference fromo Lieutenant-Governor in Council on the Muskrat Falls Project (the “Muskrat Falls Review”) Appendix M for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018 10-Oct-18 Ron Penney/David Vardy
P-00343 Letter dated March 14, 2012 from Ronald G. Penney and David Vardy to Cheryl Blundon re The Muskrat Falls Review (Appendix N for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00344 The Telegram news article dated March 28, 2012 re Reviewing all the alternatives (Appendix O for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00345 The Telegram news article dated October 11, 2012 re Nova Scotia is doing due diligence (Appendix P for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00346 Financial Post article dated October 12, 2012, re Needed: Muskrat review (Appendix Q for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00347 Letter dated November 20, 2012 from Craig Bellefontaine to Richard Cashin re receipt of correspondence of November 9, 2012 (Appendix R for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00348 The Telegram news article dated December 5, 2012 re Putting a term sheet in perspective (Appendix S for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00349 Article dated January 17, 2013 re Muskrat Falls: Why We Need a Regulatory Review – Part One (Appendix T for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00350 Letter dated July 28, 2016 from David Vardy and Ron Penney to Andy Wells re Speech by Jerome Kennedy to the Greater Corner Brook Board of Trade with respect to the Muskrat Falls Project (Appendix U for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00351 Access to Information Request Form 1 dated March 2, 2018 by David Vardy to the Public Utilities Board (Appendix V for Submission from Ronald Penney and David Vardy of the Muskrat Falls Concerned Citizens Coalition dated July 31, 2018) 10-Oct-18 Ron Penney/David Vardy
P-00352 Paper of Grand Riverkeeper Labrador, Inc. and Labrador Land Protectors for the Commission of Inquiry Respecting the Muskrat Falls Project dated October 1, 2018 11-Oct-18 Roberta Benefiel
P-00352 Tab 01 Tab 1 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 02 Tab 2 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 03 Tab 3 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 04 Tab 4 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 05 Tab 5 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 06 Tab 6 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 07 Tab 7 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 08 Tab 8 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 09 Tab 9 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 10 Tab 10 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 11 Tab 11 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 12 Tab 12 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 13 Tab 13 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 14 Tab 14 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 15 Tab 15 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 16 Tab 16 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 17 Tab 17 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 18 Tab 18 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 19 Tab 19 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 20 Tab 20 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 21 Tab 21 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 22 Tab 22 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 23 Tab 23 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 24 Tab 24 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 25 Tab 25 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 26 Tab 26 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 27 Tab 27 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 28 Tab 28 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 29 Tab 29 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 30 Tab 30 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 31 Tab 31 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 32 Tab 32 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 33 Tab 33 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 34 Tab 34 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 35 Tab 35 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 36 Tab 36 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 37 Tab 37 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 38 Tab 38 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 39 Tab 39 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 40 Tab 40 for P-00352 11-Oct-18 Roberta Benefiel
P-00352 Tab 41 Tab 41 for P-00352 11-Oct-18 Roberta Benefiel
P-00353 Curriculum Vitae – Philip Raphals 11-Oct-18 Philip Raphals
P-00354 Comments on the Proposed Justification for the Lower Churchill Project dated February 28, 2011 by Philip Raphals on behalf of the Grand Riverkeeper Labrador Inc. 11-Oct-18 Philip Raphals
P-00355 Nalcor letter dated November 12, 2010 from Todd Burlingame to Lower Churchill Hydroelectric Generation Project, attention Ms. Lesley Griffiths and Mr. Herb Clarke re Lower Churchill Hydroelectric Generation Project – Request for Additional Information 11-Oct-18 Philip Raphals
P-00356 Transcript of the Lower Churchill Hydroelectric Generation Project – Joint Review Panel – Canadian Environmental Assessment Registry 07-05-26178 Hearing dated March 8, 2011 11-Oct-18 Philip Raphals
P-00357 Letter dated March 14, 2011 from Philip Raphals to Leslie Griffiths and Herbert Clarke re Presentation to the Joint Review Panel at the Topical Session on Need, Justification and Rationale 11-Oct-18 Philip Raphals
P-00358 Comments on Proponent’s Response to the Panel’s Information Request of March 21, 2011 by Philip Raphals dated April 13, 2011 11-Oct-18 Philip Raphals
P-00359 Federal Court File No. T-2060-11 between Grand Riverkeeper, Labrador Inc., Sierra Club of Canada and Nunatukavut Community Council Inc. (Applicants) and Attorney General of Canada, Minister of Fisheries and Ocean, Minister of Transport, Minister of Natural Resources and Nalcor Energy (Respondents) 11-Oct-18 Philip Raphals
P-00360 Comments on the Muskrat Falls Reference – Presentation to the Public Utilities Board of Newfoundland Labrador by Philip Raphals on behalf of Grand Riverkeeper Labrador Inc. dated February 23, 2012 11-Oct-18 Philip Raphals
P-00361 Muskrat Falls Review – Exhibit GRK#3 filed February 23, 2012 11-Oct-18 Philip Raphals
P-00362 Muskrat Falls Review – Exhibit GRK#6 filed February 23, 2013 11-Oct-18 Philip Raphals
P-00363 Comments on the Justification for the Lower Churchill Transmission Project (Labrador-Island Transmission Link) by Philip Raphals on behalf of Grand Riverkeeper Labrador Inc. dated June 12, 2012 11-Oct-18 Philip Raphals
P-00364 Comments on the Proposed Maritime Link Project submitted to the Nova Scotia UARB in the Matter of the Maritime Link Act Matter #M05419 on behalf of CanWEA by Philip Raphals dated April 17, 2013 11-Oct-18 Philip Raphals
P-00365 Conformity of the Maritime Line Compliance Filing with UARB Condition Concerning Market-Priced Energy submitted to the Nova Scotia UARB in the Matter of the Maritime Link Act Matter #M05419 on behalf of the Lower Power Rates Alliance by Philip Raphals dated rev. November 15, 2013 11-Oct-18 Philip Raphals
P-00366 Supplemental Decision dated November 29, 2013 of the Nova Scotia Utility and Review Board in the Matter of the Maritime Link Act (2013 NSUARB 242) 11-Oct-18 Philip Raphals
P-00367 Letter dated April 1, 2011 from Nalcor Energy to Lesley Griffiths and Herb Clarke re Response to Panel’s Information of March 21, 2011 11-Oct-18 Philip Raphals
P-00368 Hearing Transcript of the Lower Churchill Hydroelectric Generation Project Joint Review Panel – Canadian Environmental Assessment Registry 07-05-26178, Volume 32 dated April 13, 2011 11-Oct-18 Philip Raphals
P-00369 Transcript re In the Matter of the Maritime Link Act and In the Matter of an Application by Nova Scotia Power Maritime Link Incorporated for Approval of the Maritime Link Project dated May 8, 2013 11-Oct-18 Philip Raphals
P-00370 Hearing Transcript of the Lower Churchill Hydroelectric Generation Project Joint Review Panel – Canadian Environmental Assessment Registry 07-05-26178, Volume 33 dated April 14, 2011 11-Oct-18 Philip Raphals
P-00371 Speaking Notes for witness testimony for the Muskrat Falls Inquiry dated October 5, 2018 by Stephen E. Bruneau 5-Oct-18 Dr. Stephen Bruneau
P-00372 Utilities Policy – The long-run price elasticity of residential demand for electricity: Results from a natural experiment by James P. Feehan 9-Oct-18 Dr. James Feehan
P-00373 R. Goodfellow & Assoc Inc. Fax dated June 10, 2018 re various articles 11-Oct-18 Roberta Benefiel
P-00374 Email dated January 11, 2012, 7:20:32 AM from Wade Locke to DawnDalley@nalcorenergy.com, and wlocke, cc Gbennett@nalcorenergy.com and Charles W. Bown re Information requested 9-Oct-18 Dr. Wade Locke
P-00375 Email dated January 18, 2012, 12:02:55 AM from Wade Locke to Dawn Dalley, gbennett@nalcorenergy.com and emartin@nalcorenergy.com re Locke Presentation 9-Oct-18 Dr. Wade Locke
P-00376 Email dated January 18, 2012, 5:32 AM from Wade Locke to Premier re Locke Presentation 9-Oct-18 Dr. Wade Locke
P-00377 Email dated January 18, 2012, 9:08 AM from Premier to Wade Locke re Locke Presentation 9-Oct-18 Dr. Wade Locke
P-00378 Email dated October 6, 2018, 9:56:51 AM from Wade Locke to Barry Learmonth and Kate O’Brien re FW: Memorial Presents 9-Oct-18 Dr. Wade Locke
P-00379 Letter dated March 3, 2015 from Mark J. Surrette to Ed Martin re summary of activities to date. 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00380 Electricity Mandate – Integrated Resource Planning (Document Number 226808) 11-Oct-18 Philip Raphals
P-00381 Power Purchase Agreement – Schedule 1 – Base Block Capital Costs Recovery and Schedule 2 – Initial Load Forecast and Base Block Energy 11-Oct-18 Philip Raphals
P-00382 Appointment and Termination Dates for Newfoundland and Labrador Hydro Directors (1999 – 2007) 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00383 Newfoundland and Labrador Hydro Presentation – A strengthened capital structure to enable expanded mandate dated February 22, 2006 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00384 Email dated May 27, 2006, 2:23:46 PM from dsturge@nlh.ca to Tom Clift re Corp. Gov. Documents 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00385 Newfoundland and Labrador Hydro – Corporate Governance Committee dated June 29, 2006 re Item: Corporate Governance Committee Charter 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00386 Newfoundland and Labrador Hydro – Corporate Governance Committee dated July 10, 2006 re Item: Review of Board of Directors Charter 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00387 Deloitte Presentation – Newfoundland and Labrador Hydro – Report on Findings of Jurisdictional Review dated October 6, 2006 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00388 Email dated December 15, 2006, 11:14 AM from dsturge@nlh.nl.ca to Thomas Clift re Board Selection Criteria Memo 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00389 Email dated January 9, 2008, 4:49:46 PM from lanceclarke@nlh.nl.ca to gmcdonald@nlh.nl.ca, gbennett@nlh.nl.ca, phickman@nlh.nl.ca, cc pharrington@nlh.nl.ca re Code of Conduct supplemental for LCP 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00390 Email dated April 10, 2008, 12:57 PM from emartin@nlh.nl.ca to wchamberlain@nlh.nl.ca, cc blane@nlh.nl.ca re Fw: Memo re. Directors 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00391 Newfoundland and Labrador Hydro – Board of Directors Mandate dated November 20, 2008 (Draft) 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00392 Nalcor Energy – Board of Directors Mandate dated April 2010 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00393 Nalcor Energy – Mandate – Compensation and Human Resources Committee dated April 2010 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00394 Minutes of the Thirty-Third Meeting of the Board of Directors of Nalcor Energy dated November 16, 2010 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00395 Email dated January 31, 2012, 4:02:11 PM from Thomas Clift to Robert Thompson re Additional Information: Board Governance at Nalcor 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00396 Email dated March 1, 2012, 10:06:31 AM from Gerry Shortall to Thomas Clift, cc Ed Martin, Cathy Bennett and Ken Marshall re Board composition and compensation – Nalcor 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00397 Email dated March 30, 2012, 11:54 AM from Theresa M. Rahal to dawndalley@nalcorenergy.com re Board governance 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00398 Email dated June 7, 2012, 12:17 PM from Jacquelyn Howard to Heather Maclean, Tina Williams, Josephine Cheeseman, Jennifer Collingwood and Release, News re News Release – Minister Announced Board Appointments 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00399 Email dated June 11, 2012, 3:27 PM from Jennifer Collingwood to Glenda Power, Milly Brown, Heather MacLean, cc Jacquelyn Howard and Josephine Cheeseman re FW: Nalcor appointments all about politics: Ball 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00400 Email dated September 24, 2012, 11:44:52 AM from abrophy@nlh.nl.ca to wchamberlain@nalcorenergy.com re Code of Conduct under Nalcor Corp P&P 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00401 Email dated September 26, 2012, 10:03:28 AM from Thomas Clift to Robert Thompson re FW: Board Compensation – New and Old 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00402 Nalcor Energy Presentation – Shareholder Relations Strategy dated December 2012 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00403 Minutes of the Sixty-Second Meeting of the Board of Directors of Nalcor Energy dated December 5, 2012 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00404 Email dated February 21, 2014, 3:37:16 PM from Terry Styles to Derrick Daley re Nalcor Doc 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00405 Email dated November 17, 2014, 11:34:14 AM from abrophy@nalcorenergy.com to wchamberlain@nalcorenergy.com re Code of Conduct presented to Nalcor Board on Sept. 30, 2011 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00406 Nalcor Energy – Corporate Governance Committee dated June 2015 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00407 Nalcor Energy – Mandate of the Audit Committee of the Board of Directors dated November 2015 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00408 Email dated April 20, 2016, 8:55:17 AM from Ken Marshall to Premier of NL, Dwight Ball and Siobhan Coady, cc emartin@nalcorenergy.com, Tom Clift, g.shortall and labbass re Nalcor 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00409 Minutes of the Ninety-Seventh Meeting of the Board of Directors of Nalcor Energy dated April 20, 2016 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00410 Nalcor Energy – Mandate – Corporate Governance Committee dated September 2017 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00411 Nalcor Energy – Mandate – Human Resources and Compensation Committee dated September 2017 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00412 Nalcor Energy – Mandate – Audit Committee dated November 2017 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00413 Statutes of Newfoundland and Labrador 2018 – Chapter 10 – An Act to Amend the Electrical Power Control Act, 1994 and the Public Utilities Act 9-Oct-18 CIMFP
P-00414 VOCM news article dated September 30, 2018 re Muskrat Falls Wouldn’t Pass Third Year Economics: Feehan 9-Oct-18 Dr. James Feehan
P-00415 Presentation to the Board of Commissioners of Public Utilities dated February 20, 2012 by Cabot Martin 10-Oct-18 Ron Penney/David Vardy
P-00416 The Telegram news article dated January 9, 2015 re Tough times call for tough decisions – The province’s fortunes have shifted – can we still afford Muskrat Falls? 10-Oct-18 Ron Penney/David Vardy
P-00417 The Independent dated February 23, 2018 re ‘What we can learn for the future’: David Vardy on the Muskrat Falls Inquiry 10-Oct-18 Ron Penney/David Vardy
P-00418 CBC news article dated September 13, 2018 re Canadian Taxpayers will ultimately bear Muskrat Falls burden, predicts Ron Penney 10-Oct-18 Ron Penney/David Vardy
P-00419 Transcript of CBC – East Coast Morning Show media clip dated September 17, 2018, 7:23 re Federal Bailout on Muskrat Falls Inevitable 10-Oct-18 Ron Penney/David Vardy
P-00420 CADO – Companies and Deeds Online – Detailed Company Information – The Muskrat Falls Concerned Citizens Coalition Inc. 10-Oct-18 Ron Penney/David Vardy
P-00421 CADO – Companies and Deeds Online – Detailed Company Information – Deer Lake Oil and Gas Inc. 10-Oct-18 Ron Penney/David Vardy
P-00422 CADO – Companies and Deeds Online – Detailed Company Information – 2041 Energy Inc. 10-Oct-18 Ron Penney/David Vardy
P-00423 Homepage of Muskrat Falls Concerned Citizens Coalition – Seeking Truth and Demanding Accountability 10-Oct-18 Ron Penney/David Vardy
P-00424 Mission, Goals and Role of the Coalition – Mission of the Muskrat Falls Concerned Citizens’ Coalition (The Coalition) 10-Oct-18 Ron Penney/David Vardy
P-00425 Speaking Notes for Premier Kathy Dunderdale re Decision Gate 3/MHI Report dated October 30, 2012 9-Oct-18 Dr. Wade Locke
P-00426 GNL News Release dated November 1, 2012 re Reports on Labrador Mining Support Need for Power 9-Oct-18 Dr. Wade Locke
P-00427 Email dated January 19, 2012, 8:52:01 AM from gbennett@nalcorenergy.com to emartin@nalcorenergy.com re Fw: Wade says he screwed up Telegram 9-Oct-18 Dr. Wade Locke
P-00428 Email dated October 30, 2014, 8:03:53 AM from Charles W. Bown to Paula Burt re FW: Presentations on Governance and Org Evolution 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00429 Board of Directors for Nalcor Energy for the Period 2017-10-11 to Current 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00430 Nalcor Energy By-Laws 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00431 SNL 2007 Chapter E-11.01 – Energy Corporation Act 15-Nov-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00432 CanLII – Energy Corporation Act, SNL 2007, c E-11.01 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00433 Nalcor Energy Charter of the Audit Committee of the Board of Directors dated April 2010 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00434 Lulea University of Technology – Technical Report – Response to and Comments on “Geotechnical Peer Review of Dr. S. Bernander’s Reports and Analysis of the North Spur” by Stig Bernander and Lennart Elfgren 11-Oct-18 Roberta Benefiel
P-00435 Canadian Dam Association 2015 Annual Conference – Stabilization of the North Spur at Muskrat Falls: An Overview dated October 5-8, 2015 11-Oct-18 Roberta Benefiel
P-00436 Errata: Lower Churchill River: Riverbank Stability Report (November 26, 2015) Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System on behalf of Grand Riverkeeper Labrador, Inc. by Dr. S. Bernander dated October 3, 2016 11-Oct-18 Roberta Benefiel
P-00437 Lower Churchill River Riverbank Stability Report prepared for Grand Riverkeeper Labrador, Inc. by Dr. S. Bernander dated November 26, 2015 11-Oct-18 Roberta Benefiel
P-00438 Safety and Reliability of the Muskrat Falls Dam, in Light of the Engineering Report of 21 December 2015 by Nalcor/SNC-Lavalin Submitted to the NL Public Utilities Board’s – Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System on behalf of Grand Riverkeeper Labrador, Inc. by Dr. S. Bernander dated October 13, 2016 11-Oct-18 Roberta Benefiel
P-00439 Geotechnical Peer Review of Dr. S. Bernander’s Reports and Analysis of the North Spur by Prof. Biput C. Hawlader, Prof. Serge Leroueil, Dr. Jean-Sebastien L’Heureux and Prof. Ariane Locat dated February 2, 2018 11-Oct-18 Roberta Benefiel
P-00440 HATCH Presentation dated January 29 to February 2, 2017 re Muskrat Falls Generation – Independent Dam Safety Review and Audit – Audit #1 11-Oct-18 Roberta Benefiel
P-00441 HATCH Presentation dated April 16-20, 2017 re Muskrat Falls Generation – Independent Dam Safety Program Audit – Audit #2 11-Oct-18 Roberta Benefiel
P-00442 HATCH Presentation dated November 27 to 30, 2017 re Muskrat Falls Generation – Independent Dam Safety Program Audit – Audit #3 11-Oct-18 Roberta Benefiel
P-00443 Muskrat Falls North Spur – Independent Engineer Comments on Reports by Dr. S. Bernander & Others dated January 17, 2018 11-Oct-18 Roberta Benefiel
P-00444 Article re Is the North Spur dam safe? written by Jim Gordon, Peng, (Retired) 11-Oct-18 Roberta Benefiel
P-00445 Responses from Nalcor Energy to Public – Questions on the North Spur dated January 2017 11-Oct-18 Roberta Benefiel
P-00446 HATCH Report re Nalcor Energy – Lower Churchill Project – North Spur Dam Break Analysis Final Report dated June 26, 2015 11-Oct-18 Roberta Benefiel
P-00447 SNC-Lavalin – Nalcor Energy – Lower Churchill Project – Engineering Report – North Spur Stabilization Works – Progressive Failure Study dated December 21, 2015 11-Oct-18 Roberta Benefiel
P-00448 SNC-Lavalin – Nalcor Energy – Lower Churchill Project – Engineering Report – North Spur Stabilization Works – Design Report dated January 30, 2016 11-Oct-18 Roberta Benefiel
P-00449 Lulea University of Technology – Degree Project – Progressive Landslides Analysis – Applications of a Finite Difference Method by Dr. Stig Bernander – Case Study of the North Spur at Muskrat Falls, Labrador, Canada by Robin Dury 11-Oct-18 Roberta Benefiel
P-00450 Letter dated July 9, 2017 from Greg Snyder to Scott O’Brien re Lower Churchill, Phase 1 Development Agreement LC-G-002 – Engineering Procurement (EPCM) Services – Muskrat Falls – R. Dury Thesis on North Spur 11-Oct-18 Roberta Benefiel
P-00451 Curriculum Vitae – Tom Brockway, Grant Thornton 18-Oct-18 Tom Brockway
P-00452 Letter dated May 29, 2018 from Steve Power, Grant Thornton to Commissioner LeBlanc re Engagement Agreement in Respect of the Commission of Inquiry Respecting the Muskrat Falls Project 18-Oct-18 Tom Brockway
P-00453 Grant Thornton Report for the Commission of Inquiry Respecting the Muskrat Falls Project re Review of the Emera Agreements and the UARB Experience dated September 7, 2018 18-Oct-18 Tom Brockway
P-00454 Grant Thornton Report for the Commission of Inquiry Respecting the Muskrat Falls Project re Review of the Federal Loan Guarantees and the Power Purchase Agreement dated September 7, 2018 18-Oct-18 Tom Brockway
P-00455 Nalcor Energy and Emera Inc. Term Sheet dated November 18, 2010 18-Oct-18 Tom Brockway
P-00456 Labrador-Island Link Limited Partnership – Limited Partnership Agreement dated July 31, 2012 18-Oct-18 Tom Brockway
P-00457 Newfoundland and Labrador Hydro and Muskrat Falls Corporation – Power Purchase Agreement dated November 29, 2013 18-Oct-18 Tom Brockway
P-00458 Nalcor Energy and Emera Inc. – Amended and Restated Energy and Capacity Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00459 Nalcor Energy and Emera Inc. – Amended and Restated Joint Operations Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00460 Nalcor Energy and Emera Inc. – Amended and Restated Maritime Link – Joint Development Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00461 Nalcor Energy and Emera Inc. and Labrador-Island Link General Partner Corp. and Labrador-Island Link Holding Corp. and ENL Island Link Incorp – Amended and Restated Newfoundland and Labrador Development Agreement (NLDA) dated July 31, 2014 18-Oct-18 Tom Brockway
P-00462 Nalcor Energy and Emera Inc. and Nova Scotia Power Incorporated – Energy Access Agreement dated April 13, 2015 18-Oct-18 Tom Brockway
P-00463 Her Majesty in Right of Newfoundland and Labrador and Her Majesty in Right of Nova Scotia and Nalcor Energy and Emera Inc. – Inter-Provincial Agreement dated July 31, 2012 18-Oct-18 Tom Brockway
P-00464 Agreement Confirming Assignments dated July 31, 2014 among 3264956 Nova Scotia Ltd. And Emera Inc. and NSP Maritime Link Incorporated 18-Oct-18 Tom Brockway
P-00465 Agreement Confirming Assignments dated July 31, 2014 among Nalcor Energy and Emera Inc. and Bayside Power L.P. 18-Oct-18 Tom Brockway
P-00466 Agreement Confirming Assignments dated July 31, 2014 among Nalcor Energy and Emera Inc. and NSP Maritime Link Incorporated 18-Oct-18 Tom Brockway
P-00467 Agreement Terminating Sanction Agreement dated July 31, 2014 among Nalcor Energy and Emera Inc. and NSP Maritime Link Incorporated 18-Oct-18 Tom Brockway
P-00468 Newfoundland and Labrador Hydro and Nova Scotia Power Incorporated – Amended and Restated Interconnection Operators Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00469 Emera Inc. and 3264956 Nova Scotia Limited – Amended and Restated Maritime Link (Emera) Transmission Service Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00470 Emera Inc. and Nalcor Energy – Amended and Restated Maritime Link (Nalcor) Transmission Service Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00471 Nalcor Energy and Emera Inc. – Amended and Restated MEPCO Transmission Rights Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00472 Nalcor Energy and Emera Inc. – Amended and Restated New Brunswick Transmission Utilization Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00473 Nalcor Energy and Emera Inc. – Amended and Restated Nova Scotia Transmission Utilization Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00474 Nalcor Energy and Emera Inc. – Amended and Restated Supplemental Agreement dated July 31, 2014 18-Oct-18 Tom Brockway
P-00475 IPR Team – Biographical Information 16-Oct-18 John Mallam/Derek Owen
P-00476 Email dated March 30, 2006, 11:06 AM from pharrington@nlh.nl.ca to emartin@nlh.nl.ca and gbennett@nlh.nl.ca re Role for Derek Owen 16-Oct-18 John Mallam/Derek Owen
P-00477 Agreement for Consulting Services Relating to the Proposed Lower Churchill Hydroelectric Project dated July 24, 2006 between Newfoundland and Labrador Hydro and RDO Consulting Ltd., representing Derek Owen 16-Oct-18 John Mallam/Derek Owen
P-00478 Agreement 15538-OB for Professional Services for The Lower Churchill Project between Energy Corporation of Newfoundland and Labrador and RDO Consulting Ltd. dated April 1, 2008 16-Oct-18 John Mallam/Derek Owen
P-00479 Curriculum Vitae – B.J. (Bernie) Osiowy, B. Sc. – Civil – Hydro Power Development Consultant 16-Oct-18 John Mallam/Derek Owen
P-00480 Nalcor Energy Response to Grant Thornton Question 2.8 re Did Nalcor evaluate the independence of the members of the Independent Project Review team dated May 31, 2018 16-Oct-18 John Mallam/Derek Owen
P-00481 Email dated December 20, 2006, 11:13 AM from Derek Owen to pharrington@nlh.nl.ca, cc Derek Owen re Gate 2 Charter 16-Oct-18 John Mallam/Derek Owen
P-00482 Email dated April 5, 2010, 6:03 PM from pharrington@nalcorenergy.com to emartin@nalcorenergy.com and gbennett@nalcorenergy.com, cc chriskieley@nalcorenergy.com and leonabarrington@nalcorenergy.com re Gate 2 IPR Charter 16-Oct-18 John Mallam/Derek Owen
P-00483 Email dated August 16, 2010, 5:18 PM from pharrington@nalcorenergy.com to gbennett@nalcorenergy.com, emartin@nalcorenergy.com, dsturge@nalcorenergy.com and chriskieley@nalcorenergy.com, cc landclarke@nalcorenergy.com, jasonkean@nalcorenergy.com, markmcgrath@nalcorenergy.com, nancyhart@nalcorenergy.com and phumphries@nalcorenergy.com re IPR Gate 2 Charter 16-Oct-18 John Mallam/Derek Owen
P-00484 Email dated August 24, 2010, 2:32:56 PM from Bernie Osiowy to Derek Owen, cc jamllam@nalcorenergy.com re Nalcor IPR Charter 16-Oct-18 John Mallam/Derek Owen
P-00485 Email dated August 23, 2010, 4:27:44 PM from jmallam@nalcorenergy.com to Derek Owen, cc bjoelsie@ re Nalcor IPR Charter 16-Oct-18 John Mallam/Derek Owen
P-00486 Email dated August 30, 2010, 5:56:59 PM from Derek Owen to Richard Westney, Bernie Osiowy and jmallam@nalcorenergy.com re Nalcor IPR 16-Oct-18 John Mallam/Derek Owen
P-00487 Email dated September 5, 2010, 6:35:27 AM from Derek Owen to Richard Westney, Bernie Osiowy, and jmallam@nalcorenergy.com, cc markmcgrath@nalcorenergy.com re Focus areas 16-Oct-18 John Mallam/Derek Owen
P-00488 Nalcor Energy Presentation dated September 2010 re The Fundamentals…Independent Project Reviews (IPR) 16-Oct-18 John Mallam/Derek Owen
P-00489 Email dated September 17, 2010, 11:56:42 AM from Derek Owen to Richard Westney, Bernie Osiowy and jmallam@nalcorenergy.com re Nalcor IPR 16-Oct-18 John Mallam/Derek Owen
P-00490 Email dated September 17, 2010, 11:41:20 AM from Richard Westney to pharrington@nalcorenergy.com, cc Derek Owen re Spreadsheet – Confidential 16-Oct-18 John Mallam/Derek Owen
P-00491 Presentation dated September 17, 2010 re Gate 2 Independent Project Review – Muskrat Falls Generation and Island Link Project by Derek Owen, John Mallam, Bernie Osiowy and Dick Westney 16-Oct-18 John Mallam/Derek Owen
P-00492 Executive Employment Amending Agreement dated October 1, 2010 between Newfoundland and Labrador Hydro and John Mallam and Nalcor Energy 16-Oct-18 John Mallam/Derek Owen
P-00493 Nalcor Energy – Lower Churchill Project – Decision Gate 2 Independent Project Review Charter – LCP-PT-MD-0000-PM-CH-0002-01 16-Oct-18 John Mallam/Derek Owen
P-00494 Email dated March 12, 2012, 2:42:17 PM from Derek Owen to pharrington@nalcorenergy.com re Project Effectiveness Programme 16-Oct-18 John Mallam/Derek Owen
P-00495 Email dated June 14, 2011, 8:59:50 AM from jmallam@nalcorenergy.com to Bernie Osiowy, Derek Owen and Richard Westney re IPR Report 16-Oct-18 John Mallam/Derek Owen
P-00496 Email dated June 14, 2011, 10:37:03 AM from jmallam@nalcorenergy.com to ronpower@nalcorenergy.com re FW: Nalcor CEO happy with Muskrat review – The Telegram – June 14, 2011 16-Oct-18 John Mallam/Derek Owen
P-00497 Email dated August 7, 2012, 5:05:16 PM from pharrington@nalcorenergy.com to briancrawley@nalcorenergy.com re IPR DG3 16-Oct-18 John Mallam/Derek Owen
P-00498 Email dated August 9, 2012, 8:20:06 AM from pharrington@nalcorenergy.com to ronpower@nalcorenergy.com re FW: DG 3 IPR 16-Oct-18 John Mallam/Derek Owen
P-00499 DG 3 IPR Team – Biographical Information 16-Oct-18 John Mallam/Derek Owen
P-00500 Email dated August 21, 2012, 11:01:22 AM from Richard Westney to Derek Owen re Scope of Work 16-Oct-18 John Mallam/Derek Owen
P-00501 Email dated August 22, 2012, 9:08:38 AM from blane@nalcorenergy.com to jasonkean@nalcorenergy.com re DG3 IPR Debrief 16-Oct-18 John Mallam/Derek Owen
P-00502 Nalcor Energy – Lower Churchill Project – Decision Gate 3 Independent Project Review Charter – LCP-PT-MD-0000-PM-CH-0003-01 16-Oct-18 John Mallam/Derek Owen
P-00503 Email dated August 27, 2012, 7:40:28 AM from samanthalundrigan@nalcorenergy.com to rdowen, bjoelsie, r_westney, timothy,leopold@nspower.ca, johnmallam, Jason Kean, Lance Clarke, Ron Power, Normand Bechard, Greg Fleming, Paul Harrington, cc markpeddle@nalcorenergy.com re IPR Schedule Update 16-Oct-18 John Mallam/Derek Owen
P-00504 Presentation – Lower Churchill Project – Decision Gate 3 – Independent Project Review – Final Report dated August 31, 2012 16-Oct-18 John Mallam/Derek Owen
P-00505 Email dated September 2, 2012, 12:42:07 PM from pharrington to rdowen re Schedule 16-Oct-18 John Mallam/Derek Owen
P-00506 Email dated September 5, 2012, 8:02:27 PM from pharrington to rdowen re Schedule Reserve 16-Oct-18 John Mallam/Derek Owen
P-00507 Presentation – Lower Churchill Project – Decision Gate 3 – Independent Project Review – Final Report dated August 31, 2012 (Updated) 16-Oct-18 John Mallam/Derek Owen
P-00508 Email dated September 3, 2012, 11:38:32 PM from Richard Westney to Derek Owen re Schedule Reserve 16-Oct-18 John Mallam/Derek Owen
P-00509 Email dated September 6, 2012, 12:40:59 PM from Richard Westney to rdowen re LCP 16-Oct-18 John Mallam/Derek Owen
P-00510 Email dated April 18, 2012, 2:04:21 PM from jmallam@nalcorenergy.com to pathussey@nalcorenergy.com re Fw: Isolated Island scenario 16-Oct-18 John Mallam/Derek Owen
P-00511 Nalcor Energy-Bull Arm Fabrication Inc. Board of Directors – Appointment and Termination Dates 15-Oct-18 Tom Clift/Ken Marshall/Gerry Shortall/Terry Styles
P-00512 Churchill Falls (Labrador) Corporation Limited Board of Directors – Appointment and Termination Dates 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00513 Nalcor Energy Marketing Corporation Board of Directors – Appointment and Termination Dates 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00514 Newfoundland and Labrador Hydro Board of Directors – Appointment and Termination Dates 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00515 Nalcor Energy-Oil and Gas Inc. Board of Directors – Appointment and Termination Dates 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00516 Assignment Agreement between Nalcor Energy and RDO Consulting Ltd. dated February 24, 2014 16-Oct-18 John Mallam/ Derek Owen
P-00517 Nalcor Energy Amending Agreement Number 2 dated March 2, 2010 between Nalcor Energy and RDO Consulting Ltd. 16-Oct-18 John Mallam/ Derek Owen
P-00518 Nalcor Energy Amending Agreement Number 3 dated January 11, 2011 between Nalcor Energy and RDO Consulting Ltd. 16-Oct-18 John Mallam/ Derek Owen
P-00519 Letter dated June 12, 2012 from Gerry Humphrey to Derek Owen, RDO Consulting Ltd. Re Amending Agreement 4 16-Oct-18 John Mallam/ Derek Owen
P-00520 Nalcor Energy Amending Agreement Number 5 dated November 14, 2013 between Nalcor Energy and RDO Consulting Ltd. 16-Oct-18 John Mallam/ Derek Owen
P-00521 Supply Issues and Power Outages Review – Island Interconnected System – Executive Summary of Report on Island Interconnected System to Interconnection with Muskrat Falls addressing Newfoundland and Labrador Hydro dated December 17, 2014 by The Liberty Consulting Group 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00522 Lower Churchill Project Review Report dated March 9, 2012 16-Oct-18 John Mallam/ Derek Owen
P-00523 Commission of Inquiry Respecting the Muskrat Falls – Timeline of Events prepared by Tom Brockway, Grant Thornton 18-Oct-18 Tom Brockway
P-00524 Nalcor Energy Director’s Charter dated November 2012 15-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00525 Nalcor’s Reply to the Grant Thornton (Brockway) Emera Report dated October 11, 2018 18-Oct-18 Tom Brockway
P-00526 Nalcor’s Reply to the Grant Thornton (Brockway) FLG/PPA Report dated October 11, 2018 18-Oct-18 Tom Brockway
P-00527 Curriculum Vitae – Dr. Guy Holburn 23-Oct-18 Dr. Guy Holburn
P-00528 The Impact of Exempting the Muskrat Falls Project from Oversight by the Newfoundland and Labrador Board of Commissioners of Public Utilities – Report for the Commission of Inquiry Respecting the Muskrat Falls Project dated October 15, 2018 by Professor Guy Holburn 23-Oct-18 Dr. Guy Holburn
P-00529 GNL Memorandum to Executive Council re Legislative Amendments Required to Advance the Implementation of the Muskrat Falls Project dated April 2, 2012 22-Oct-18 Todd Stanley
P-00531 GNL News Release dated February 13, 2008 re Premier Comments on Appointment to PUB 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00532 Information Note to Board/Management Committee re Reference by Government to Review Muskrat Falls Staffing requirements 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00533 Excerpt from House of Assembly Proceedings dated May 17, 2011 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00534 Letter dated May 25, 2011 from Andrew Wells re Engineering/Technical Advisory Services 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00535 Email dated June 8, 2011, 8:51 AM from Maureen Greene to Andy Wells, Darlene Whalen, Dwanda Newman, and James Oxford, cc Cheryl Blundon, Sam Fanfield and Doreen Dray re Telephone Call to Charles Bown – Reference re Muskrat Falls 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00536 Newfoundland and Labrador Board of Commissioners of Public Utilities Request for Proposals – Professional Services – To Review and Report on Two Generation Expansion Alternatives – Island of Newfoundland Interconnected Electrical System 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00537 Letter dated June 13, 2011 from Shawn Skinner to Andy Wells re Terms of Reference and Reference Question 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00538 Letter dated June 17, 2011 from Cheryl Blundon to Geoffrey P. Young re Reference from the Lieutenant-Governor in Council on the Muskrat Falls Project 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00539 Board of Commissioners of Public Utilities – Notes of Meeting between Nalcor Officials and Board Staff dated June 17, 2011 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00540 Newfoundland and Labrador Board of Commissioners of Public Utilities Media Release dated June 17, 2011 re Reference to the Board in relation to Muskrat Falls 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00541 Letter dated June 21, 2011 from Cheryl Blundon to Geoffrey P. Young re Reference from the Lieutenant-Governor in Council on the Muskrat Falls Project 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00542 Email dated June 27, 2011, 1:34 PM from Maureen Greene to Gyoung@nlh.nl.ca, cc ito@pub.nl.ca and tjohnson@odeaearle.nf.ca re Reference re Muskrat Falls Project 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00543 Email dated July 4, 2011, 10:36 AM from Sam Banfield to mgreene@pub.nl.ca and fmartin@pub.nl.ca re Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00544 Email dated July 5, 2011, 8:14 AM from Sam Banfield to Maureen Greene, cc Fred Martin re Update 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00545 Letter dated July 12, 2011 from Maureen P. Greene to Geoffrey P. Young re Reference from the Lieutenant-Governor in Council on the Muskrat Falls Project (the “”Muskrat Falls Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00546 Letter dated July 15, 2011 from Geoffrey P. Young to Maureen Greene re Reference to the Public Utilities Board in relation to Muskrat Falls 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00547 Agreement for Professional Services to Review and Report on Two Generation Expansion Alternatives – Island of Newfoundland Interconnected Electrical System between Newfoundland and Labrador Board of Commissioners of Public Utilities and Manitoba Hydro International Ltd. dated July 4, 2011 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00548 Letter dated July 21, 2011 from Maureen P. Greene to Geoffrey P. Young re Muskrat Falls Review – Document Filings 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00549 Maureen Greene Legal Services PLC Inc. Invoices re Legal Services for Board of Commissioners of Public Utilities 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00550 Board of Commissioners of Public Utilities Information Note re Meeting of July 27, 2011 re Reference by Government to Review Muskrat Falls 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00551 Memo dated July 29, 2011 from Fred Martin to Maureen Green and Sam Banfield, cc Cheryl Blundon re Synopsis of Meeting with Nalcor July 29, 2011 (Muskrat Falls Review) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00552 Memo dated August 1, 2011 from Fred Martin to Maureen Green and Sam Banfield, cc Cheryl Blundon re Synopsis of Meeting with Nalcor August 1, 2011 (Muskrat Falls Review) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00553 Email dated October 12, 2011, 1:43 PM from Cheryl Blundon to NL Public Utilities Board re FW: Muskrat Falls Referral – RFI Status Update 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00554 Email dated April 15, 2016, 5:22 PM from Ken Marshall to Gerry Shortall, Leo Abbass, kenmarshall@nalcorenergy.com, emartin@nalcorenergy.com, and Tom Clift re Meeting with Premier 16-Oct-18 Tom Clift/ Ken Marshall/ Gerry Shortall/ Terry Styles
P-00555 Email dated August 3, 2011, 8:04 AM from Maureen Greene to Fred Martin re FW: Muskrat Falls Referral – RFI Status Update 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00556 Email dated October 21, 2011, 10:37 AM from Maureen Greene to NL Public Utilities Board, cc Maureen Greene re FW: Muskrat Falls Referral – RFI Status Update 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00557 Email dated August 5, 2011, 12:56 AM from Al Snyder to mkast and Fred Martin re Fwd: Missing docs on hydraulics/hydrology & agenda 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00558 Email dated August 16, 2011, 3:05 PM from Paul Wilson to Fred Martin, cc Allen Snyder and Mack Kast re Biweekly reports 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00559 Email dated August 26, 2011, 9:21 PM from Paul Wilson to Fred Martin re Biweekly report, RFI assessments 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00560 Email dated August 31, 2011, 4:59 PM from Paul Wilson to Fred Martin re Biweekly report revised 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00561 Email dated September 6, 2011, 1:12 PM from Fred Martin to Paul Wilson re Thermal Report etc. 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00562 Email dated October 12, 2011, 4:19 PM from Cheryl Blundon to NL Public Utilities Board re FW: Muskrat Falls Review—Schedule 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00563 Handwritten Meeting Notes of Cheryl Blundon dated September 12, 2011 of Nalcor Meeting Officials and G. Bennett, D. Harris and G. Young 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00564 Board of Commissioners of Public Utilities Meeting Agenda dated September 12, 2011 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00565 Briefing Note dated June 14, 2011 prepared by Maureen Greene re Reference by the Government of Newfoundland and Labrador on the Muskrat Falls Project – Third Progress Report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00566 Letter dated September 14, 2011 from Cheryl Blundon to Geoffrey P. Young re Reference from the Lieutenant-Governor in Council on the Muskrat Falls Project (the “”Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00567 Letter dated September 22, 2011 from Andy Wells to The Honourable Shawn Skinner re ongoing review concerning the Muskrat Falls Project 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00568 Email dated October 14, 2011, 11:15 AM from Cheryl Blundon to NL Public Utilities Board re FW: Muskrat Referral Status Update: October 12, 2011 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00569 Email dated October 15, 2011, 7:04 PM from Paul Wilson to Maureen Greene re MHI Biweekly Report 6 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00570 Information/Briefing Note dated October 18, 2011 prepared by Maureen Greene Reference by the Government of Newfoundland and Labrador on the Muskrat Falls Project – Fourth Progress Report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00571 Letter dated October 20, 2011 from Geoffrey Young to Cheryl Blundon re Reference from the Lieutenant Governor in Council on the Muskrat Falls Project (“”the Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00572 Letter dated October 25, 2011 from Cheryl Blundon to Geoffrey P. Young re Reference from the Lieutenant-Governor in Council on the Muskrat Falls Project (the “”Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00573 Letter dated October 25, 2011 from Andy Wells to The Honourable Shawn Skinner re correspondence forwarded to Nalcor Energy 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00574 Newfoundland and Labrador Board of Commissioners of Public Utilities Media Release dated October 26, 2011 re Update on Muskrat Falls Review Schedule 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00575 Handwritten Meeting Notes dated October 28, 2011 between Nalcor and Gilbert Bennett, Paul Humphries, Maureen, Fred and Cheryl Blundon 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00576 Letter dated November 7, 2011 from Gilbert Bennett to Cheryl Blundon re Reference from the Lieutenant Governor in Council on the Muskrat Falls Project (the “”Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00577 Email dated November 16, 2011, 12:36 AM from Paul Wilson to Fred Martin, cc Mack Kast and Allen Snyder re MHI Interim Report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00578 Email dated November 29, 2011, 9:37 AM from Fred Martin to Paul Wilson, cc Maureen Greene and Sam Banfield re Comments on Interim Draft Report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00579 Letter dated December 2, 2011 from Gilbert J. Bennett to Cheryl Blundon re Screening of Confidential Exhibits for the Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00580 Briefing Note dated December 5, 2011 prepared by Maureen Greene for Internal Discussion Purposes re Reference by the Government of Newfoundland and Labrador on the Muskrat Falls Project – Fourth Progress Report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00581 Letter dated December 14, 2011 from Cheryl Blundon to Thomas Johnson re Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00582 Letter dated December 15, 2011 from Thomas Johnson to G. Cheryl Blundon re Muskrat Falls Review – Tentative Schedule 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00583 Letter dated December 23, 2011 from Jerome P. Kennedy to Thomas J. Johnson re Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00584 Letter dated December 23, 2011 from Jerome P. Kennedy to Andy Wells re Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00585 Handwritten Notes of Jerome Kennedy dated January 3, 2012 re Meeting of Tom Johnson 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00586 Handwritten Notes of Jerome Kennedy dated January 4, 2012 re Meeting of Andy Wells 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00587 Reference from the Lieutenant-Governor in Council on the Muskrat Falls Project – Chronology re Communication with Nalcor on Information dated January 5, 2012 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00588 Handwritten Notes of Jerome Kennedy dated January 5, 2012 re Meeting of Andy Wells and Maureen Greene 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00589 Letter dated January 6, 2012 from Andy Wells to Honourable Jerome P. Kennedy re Muskrat Falls Review – preliminary schedule 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00590 Letter dated January 6, 2012 from Andy Wells to Honourable Jerome P. Kennedy re Muskrat Falls Review – Receipt of Board’s report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00591 The Telegram news article dated January 10, 2012 re Muskrat Falls review on fast track 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00592 Letter dated January 11, 2012 from Ed Martin to Andy Wells re summary of efforts Nalcor has made to date 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00593 Email dated January 16, 2012, 9:46 AM from Fred Martin to Maureen Greene and Sam Banfield re FW: Changes to the CPW section(s) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00594 Letter dated January 31, 2012 from Paul Wilson to Cheryl Blundon re Manitoba Hydro International’s (MHI) Report on Two Generation Expansion Alternatives for the Island Interconnected Electrical System 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00595 Email dated February 22, 2012, 10:57 PM from Paul Wilson to Fred Martin re DG3 Items MHI Letter draft 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00596 MHI RFIs – Newfoundland Options Review Project – Request for Information Log (Revised February 28, 2012) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00597 Letter dated February 29, 2012, from Cheryl Blundon to Ronald Penney, David Vardy, Thomas O’Reilly, Denis Fleming, Thomas Johnson re Reference from Lieutenant-Governor in Council on the Muskrat Falls Project (the “”Muskrat Falls Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00598 Letter dated March 9, 2012 from Thomas J. O’Reilly, Q.C. to Cheryl Blundon re Reference fromo Lieutenant-Governor in Council on the Muskrat Falls Project (the “”Muskrat Falls Review””) 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00599 Letter dated March 14, 2012 from Ronald G. Penney and David Vardy to Cheryl Blundon re The Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00600 Newfoundland and Labrador Board of Commissioners of Public Utilities – Reference to the Board – Review of Two Generation Expansion Options for the Least-Cost Supply of Power to Island Interconnected Customers for the period 2011 – 2067 – Report to Government dated March 30, 2012 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00601 Excerpt from House of Assembly Proceedings dated April 2, 2012 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00602 Letter dated April 4, 2012 from Paul Wilson to C. Blundon re Manitoba Hydro International 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00603 Letter from Andy Wells to Paul Wilson re Professional Services to Review and Report on Two Generation Expansion Alternatives – Island of Newfoundland Interconnected Electrical System 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00604 Handwritten Notes of Andy Wells 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00605 Emails and handwritten notes pertaining to Fred Martin dated from September 8, 2011 to January 16, 2012 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00606 Emera Report – Grant Thornton Responses to Nalcor’s Reply dated October 17, 2018 18-Oct-18 Tom Brockway
P-00607 Interview – Kathleen Dunderdale dated August 2, 2018 17-Oct-18 Dr. Jason Churchill
P-00608 Newfoundland and Labrador Board of Commissioners of Public Utilities Media Release dated February 1, 2012 re Muskrat Falls Review 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00609 Board of Commissioners of Public Utilities Newfoundland and Labrador – Notice – Muskrat Falls Review dated February 1, 2012 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00610 Letter dated April 9, 2012 from John K. Hollman to Jason R. Kean re attached Validation Estimating LLC’s draft report of its review of Nalcor’s Lower Churchill Project Gate 3 capex estimate 18-Oct-18 Derek Owen
P-00611 Minutes of the First Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated October 11, 2007 18-Oct-18 CIMFP
P-00612 Minutes of the Second Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated November 23, 2007 18-Oct-18 CIMFP
P-00613 Minutes of the Third Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated December 14, 2007 18-Oct-18 CIMFP
P-00614 Minutes of the Fourth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated March 7, 2008 18-Oct-18 CIMFP
P-00615 Minutes of the Fifth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated March 28, 2008 18-Oct-18 CIMFP
P-00616 Minutes of the Sixth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated April 24, 2008 18-Oct-18 CIMFP
P-00617 Minutes of the Seventh Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated June 26, 2008 18-Oct-18 CIMFP
P-00618 Minutes of the Eighth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated August 12, 2008 18-Oct-18 CIMFP
P-00619 Minutes of the Ninth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated August 18, 2008 18-Oct-18 CIMFP
P-00620 Minutes of the Tenth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated October 8, 2008 18-Oct-18 CIMFP
P-00621 Minutes of the Eleventh Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated October 27, 2008 18-Oct-18 CIMFP
P-00622 Minutes of the Twelfth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated November 21, 2008 18-Oct-18 CIMFP
P-00623 Minutes of the Continuation of the Twelfth Meeting of the Board of Directors of Energy Corporation of Newfoundland and Labrador dated November 28, 2008 18-Oct-18 CIMFP
P-00624 Minutes of the Thirteenth Meeting of the Board of Directors of Nalcor Energy dated January 29, 2009 18-Oct-18 CIMFP
P-00625 Minutes of the Fourteenth Meeting of the Board of Directors of Nalcor Energy dated February 18, 2009 18-Oct-18 CIMFP
P-00626 Minutes of the Fifteenth Meeting of the Board of Directors of Nalcor Energy dated March 6, 2009 18-Oct-18 CIMFP
P-00627 Minutes of the Sixteenth Meeting of the Board of Directors of Nalcor Energy dated April 24, 2009 18-Oct-18 CIMFP
P-00628 Minutes of the Seventeenth Meeting of the Board of Directors of Nalcor Energy dated June 26, 2009 18-Oct-18 CIMFP
P-00629 Minutes of the Eighteenth Meeting of the Board of Directors of Nalcor Energy dated September 25, 2009 18-Oct-18 CIMFP
P-00630 Minutes of the Nineteenth Meeting of the Board of Directors of Nalcor Energy dated October 22, 2009 18-Oct-18 CIMFP
P-00631 Minutes of the Twentieth Meeting of the Board of Directors of Nalcor Energy dated November 6, 2009 18-Oct-18 CIMFP
P-00632 Minutes of the Twenty-First Meeting of the Board of Directors of Nalcor Energy dated November 12, 2009 18-Oct-18 CIMFP
P-00633 Minutes of the Twenty-Second Meeting of the Board of Directors of Nalcor Energy dated November 27, 2009 18-Oct-18 CIMFP
P-00634 Minutes of the Twenty-Third Meeting of the Board of Directors of Nalcor Energy dated February 12, 2010 18-Oct-18 CIMFP
P-00635 Minutes of the Twenty-Fourth Meeting of the Board of Directors of Nalcor Energy dated March 5, 2010 18-Oct-18 CIMFP
P-00636 Minutes of the Twenty-Fifth Meeting of the Board of Directors of Nalcor Energy dated April 30, 2010 18-Oct-18 CIMFP
P-00637 Minutes of the Twenty-Sixth Meeting of the Board of Directors of Nalcor Energy dated June 25, 2010 18-Oct-18 CIMFP
P-00638 Minutes of the Twenty-Seventh Meeting of the Board of Directors of Nalcor Energy dated August 11, 2010 18-Oct-18 CIMFP
P-00639 Minutes of the Twenty-Eighth Meeting of the Board of Directors of Nalcor Energy dated September 10, 2010 18-Oct-18 CIMFP
P-00640 Minutes of the Twenty-Ninth Meeting of the Board of Directors of Nalcor Energy dated September 24, 2010 18-Oct-18 CIMFP
P-00641 Minutes of the Thirtieth Meeting of the Board of Directors of Nalcor Energy dated October 8, 2010 18-Oct-18 CIMFP
P-00642 Minutes of the Thirty-First Meeting of the Board of Directors of Nalcor Energy dated November 2, 2010 18-Oct-18 CIMFP
P-00643 Minutes of the Thirty-Second Meeting of the Board of Directors of Nalcor Energy dated November 10, 2010 18-Oct-18 CIMFP
P-00644 Minutes of the Thirty-Third Meeting of the Board of Directors of Nalcor Energy dated November 16, 2010 (Duplicate of P-00394) 18-Oct-18 CIMFP
P-00645 Minutes of the Thirty-Fourth Meeting of the Board of Directors of Nalcor Energy dated December 21, 2010 18-Oct-18 CIMFP
P-00646 Minutes of the Thirty-Fifth Meeting of the Board of Directors of Nalcor Energy dated January 19, 2011 18-Oct-18 CIMFP
P-00647 Minutes of the Thirty-Sixth Meeting of the Board of Directors of Nalcor Energy dated February 4, 2011 18-Oct-18 CIMFP
P-00648 Minutes of the Thirty-Seventh Meeting of the Board of Directors of Nalcor Energy dated April 1, 2011 18-Oct-18 CIMFP
P-00649 Minutes of the Thirty-Eighth Meeting of the Board of Directors of Nalcor Energy dated June 23, 2011 18-Oct-18 CIMFP
P-00650 Minutes of the Thirty-Ninth Meeting of the Board of Directors of Nalcor Energy dated August 25, 2011 18-Oct-18 CIMFP
P-00651 Minutes of the Fortieth Meeting of the Board of Directors of Nalcor Energy dated September 15, 2011 18-Oct-18 CIMFP
P-00652 Minutes of the Forty-First Meeting of the Board of Directors of Nalcor Energy dated September 30, 2011 18-Oct-18 CIMFP
P-00653 Minutes of the Forty-Second Meeting of the Board of Directors of Nalcor Energy dated November 25, 2011 18-Oct-18 CIMFP
P-00654 Minutes of the Forty-Third Meeting of the Board of Directors of Nalcor Energy dated January 13, 2012 18-Oct-18 CIMFP
P-00655 Minutes of the Forty-Fourth Meeting of the Board of Directors of Nalcor Energy dated January 23, 2012 18-Oct-18 CIMFP
P-00656 Minutes of the Forty-Fifth Meeting of the Board of Directors of Nalcor Energy dated February 3, 2012 18-Oct-18 CIMFP
P-00657 Minutes of the Forty-Sixth Meeting of the Board of Directors of Nalcor Energy dated March 2, 2012 18-Oct-18 CIMFP
P-00658 Minutes of the Forty-Seventh Meeting of the Board of Directors of Nalcor Energy dated April 5, 2012 18-Oct-18 CIMFP
P-00659 Minutes of the Forty-Eighth Meeting of the Board of Directors of Nalcor Energy dated April 18, 2012 18-Oct-18 CIMFP
P-00660 Minutes of the Forty-Ninth Meeting of the Board of Directors of Nalcor Energy dated April 27, 2012 18-Oct-18 CIMFP
P-00661 Minutes of the Fiftieth Meeting of the Board of Directors of Nalcor Energy dated May 23, 2012 18-Oct-18 CIMFP
P-00662 Minutes of the Fifty-First Meeting of the Board of Directors of Nalcor Energy dated June 28, 2012 18-Oct-18 CIMFP
P-00663 Minutes of the Fifty-Second Meeting of the Board of Directors of Nalcor Energy dated July 25, 2012 18-Oct-18 CIMFP
P-00664 Minutes of the Fifty-Third Meeting of the Board of Directors of Nalcor Energy dated August 23, 2012 18-Oct-18 CIMFP
P-00665 Minutes of the Fifty-Fourth Meeting of the Board of Directors of Nalcor Energy dated September 28, 2012 18-Oct-18 CIMFP
P-00666 Minutes of the Fifty-Fifth Meeting of the Board of Directors of Nalcor Energy dated October 16, 2012 18-Oct-18 CIMFP
P-00667 Minutes of the Fifty-Sixth Meeting of the Board of Directors of Nalcor Energy dated November 5, 2012 18-Oct-18 CIMFP
P-00668 Minutes of the Fifty-Seventh Meeting of the Board of Directors of Nalcor Energy dated November 13, 2012 18-Oct-18 CIMFP
P-00669 Minutes of the Fifty-Eighth Meeting of the Board of Directors of Nalcor Energy dated November 20, 2012 18-Oct-18 CIMFP
P-00670 Minutes of the Fifty-Ninth Meeting of the Board of Directors of Nalcor Energy dated November 25, 2012 18-Oct-18 CIMFP
P-00671 Minutes of the Sixtieth Meeting of the Board of Directors of Nalcor Energy dated December 3, 2012 18-Oct-18 CIMFP
P-00672 Minutes of the Sixty-First Meeting of the Board of Directors of Nalcor Energy dated December 4, 2012 18-Oct-18 CIMFP
P-00673 Minutes of the Sixty-Second Meeting of the Board of Directors of Nalcor Energy dated December 5, 2012 (Duplicate of P-00403) 18-Oct-18 CIMFP
P-00674 Minutes of the Sixty-Third Meeting of the Board of Directors of Nalcor Energy dated December 19, 2012 18-Oct-18 CIMFP
P-00675 Minutes of the Sixty-Fourth Meeting of the Board of Directors of Nalcor Energy dated January 18, 2013 18-Oct-18 CIMFP
P-00676 Minutes of the Sixty-Fifth Meeting of the Board of Directors of Nalcor Energy dated March 22, 2013 18-Oct-18 CIMFP
P-00677 Minutes of the Sixty-Sixth Meeting of the Board of Directors of Nalcor Energy dated May 21, 2013 18-Oct-18 CIMFP
P-00678 Minutes of the Sixty-Seventh Meeting of the Board of Directors of Nalcor Energy dated July 3, 2013 18-Oct-18 CIMFP
P-00679 Minutes of the Sixty-Eighth Meeting of the Board of Directors of Nalcor Energy dated September 27, 2013 18-Oct-18 CIMFP
P-00680 Minutes of the Sixty-Ninth Meeting of the Board of Directors of Nalcor Energy dated October 28, 2013 18-Oct-18 CIMFP
P-00681 Minutes of the Seventieth Meeting of the Board of Directors of Nalcor Energy dated November 14, 2013 18-Oct-18 CIMFP
P-00682 Minutes of the Seventy-First Meeting of the Board of Directors of Nalcor Energy dated November 15, 2013 18-Oct-18 CIMFP
P-00683 Minutes of the Seventy-Second Meeting of the Board of Directors of Nalcor Energy dated December 3, 2013 18-Oct-18 CIMFP
P-00684 Minutes of the Seventy-Third Meeting of the Board of Directors of Nalcor Energy dated December 18, 2013 18-Oct-18 CIMFP
P-00685 Minutes of the Seventy-Fourth Meeting of the Board of Directors of Nalcor Energy dated March 7, 2014 18-Oct-18 CIMFP
P-00686 Minutes of the Seventy-Fifth Meeting of the Board of Directors of Nalcor Energy dated March 21, 2014 18-Oct-18 CIMFP
P-00687 Minutes of the Seventy-Sixth Meeting of the Board of Directors of Nalcor Energy dated June 20, 2014 18-Oct-18 CIMFP
P-00688 Minutes of the Seventy-Seventh Meeting of the Board of Directors of Nalcor Energy dated June 26, 2014 18-Oct-18 CIMFP
P-00689 Minutes of the Seventy-Eighth Meeting of the Board of Directors of Nalcor Energy dated October 2, 2014 18-Oct-18 CIMFP
P-00690 Minutes of the Seventy-Ninth Meeting of the Board of Directors of Nalcor Energy dated November 28, 2014 18-Oct-18 CIMFP
P-00691 Minutes of the Eightieth Meeting of the Board of Directors of Nalcor Energy dated December 17, 2014 18-Oct-18 CIMFP
P-00692 Minutes of the Eighty-First Meeting of the Board of Directors of Nalcor Energy dated March 13, 2015 18-Oct-18 CIMFP
P-00693 Minutes of the Eighty-Second Meeting of the Board of Directors of Nalcor Energy dated April 2, 2015 18-Oct-18 CIMFP
P-00694 Minutes of the Eighty-Third Meeting of the Board of Directors of Nalcor Energy dated April 13, 2015 18-Oct-18 CIMFP
P-00695 Minutes of the Eighty-Fourth Meeting of the Board of Directors of Nalcor Energy dated May 13, 2015 18-Oct-18 CIMFP
P-00696 Minutes of the Eighty-Fifth Meeting of the Board of Directors of Nalcor Energy dated June 25, 2015 18-Oct-18 CIMFP
P-00697 Minutes of the Eighty-Sixth Meeting of the Board of Directors of Nalcor Energy dated July 14, 2015 18-Oct-18 CIMFP
P-00698 Minutes of the Eighty-Seventh Meeting of the Board of Directors of Nalcor Energy dated August 11, 2015 18-Oct-18 CIMFP
P-00699 Minutes of the Eighty-Eighth Meeting of the Board of Directors of Nalcor Energy dated October 2, 2015 18-Oct-18 CIMFP
P-00700 Minutes of the Eighty-Ninth Meeting of the Board of Directors of Nalcor Energy dated November 10, 2015 18-Oct-18 CIMFP
P-00701 Minutes of the Ninetieth Meeting of the Board of Directors of Nalcor Energy dated November 27, 2015 18-Oct-18 CIMFP
P-00702 Minutes of the Ninety-First Meeting of the Board of Directors of Nalcor Energy dated December 15, 2015 18-Oct-18 CIMFP
P-00703 Minutes of the Ninety-Second Meeting of the Board of Directors of Nalcor Energy dated February 26, 2016 18-Oct-18 CIMFP
P-00704 Minutes of the Ninety-Third Meeting of the Board of Directors of Nalcor Energy dated March 7, 2016 18-Oct-18 CIMFP
P-00705 Minutes of the Ninety-Fourth Meeting of the Board of Directors of Nalcor Energy dated March 14, 2016 18-Oct-18 CIMFP
P-00706 Minutes of the Ninety-Fifth Meeting of the Board of Directors of Nalcor Energy dated March 18, 2016 18-Oct-18 CIMFP
P-00707 Minutes of the Ninety-Sixth Meeting of the Board of Directors of Nalcor Energy dated March 23, 2016 18-Oct-18 CIMFP
P-00708 Minutes of the Ninety-Seventh Meeting of the Board of Directors of Nalcor Energy dated April 20, 2016 (Duplicate of P-00409) 18-Oct-18 CIMFP
P-00709 Minutes of the Ninety-Eighth Meeting of the Board of Directors of Nalcor Energy dated May 12, 2016 18-Oct-18 CIMFP
P-00710 Minutes of the Ninety-Ninth Meeting of the Board of Directors of Nalcor Energy dated June 14, 2016 18-Oct-18 CIMFP
P-00711 Minutes of the One Hundred Meeting of the Board of Directors of Nalcor Energy dated August 9, 2016 18-Oct-18 CIMFP
P-00712 Minutes of the One Hundred and First Meeting of the Board of Directors of Nalcor Energy dated September 30, 2016 18-Oct-18 CIMFP
P-00713 Minutes of the One Hundred and Second Meeting of the Board of Directors of Nalcor Energy dated October 23, 2016 18-Oct-18 CIMFP
P-00714 Minutes of the One Hundred and Third Meeting of the Board of Directors of Nalcor Energy dated October 28, 2016 18-Oct-18 CIMFP
P-00715 Minutes of the One Hundred and Fourth Meeting of the Board of Directors of Nalcor Energy dated November 10, 2016 18-Oct-18 CIMFP
P-00716 Minutes of the One Hundred and Fifth Meeting of the Board of Directors of Nalcor Energy dated November 25, 2016 18-Oct-18 CIMFP
P-00717 Minutes of the One Hundred and Sixth Meeting of the Board of Directors of Nalcor Energy dated December 14, 2016 18-Oct-18 CIMFP
P-00718 Minutes of the One Hundred and Seventh Meeting of the Board of Directors of Nalcor Energy dated January 27, 2017 18-Oct-18 CIMFP
P-00719 Minutes of the One Hundred and Eighth Meeting of the Board of Directors of Nalcor Energy dated March 6, 2017 18-Oct-18 CIMFP
P-00720 Minutes of the One Hundred and Ninth Meeting of the Board of Directors of Nalcor Energy dated May 9, 2017 18-Oct-18 CIMFP
P-00721 Minutes of the One Hundred and Tenth Meeting of the Board of Directors of Nalcor Energy dated June 21, 2017 18-Oct-18 CIMFP
P-00722 Minutes of the One Hundred and Eleventh Meeting of the Board of Directors of Nalcor Energy dated August 8, 2017 18-Oct-18 CIMFP
P-00723 FLG/PPA Report – Grant Thornton Responses to Nalcor’s Reply dated October 17, 2018 18-Oct-18 Tom Brockway
P-00724 Presentation re The Impact of Exempting the Muskrat Falls Project from Oversight by the Newfoundland and Labrador Board of Commissioners of Public Utilities – Report for the Commission of Inquiry Respecting the Muskrat Falls Project dated October 17, 2018 by Professor Guy Holburn 23-Oct-18 Dr. Guy Holburn
P-00725 Presentation by PricewaterhouseCoopers LLP re Nalcor Energy – Grant Thornton Review – DG3 Model Process Review dated June 2018 26-Oct-18 Tom Garner
P-00726 Agreement dated May 28, 2018 between Dr. Guy Holburn and the Commission of Inquiry Respecting the Muskrat Falls Project 23-Oct-18 Dr. Guy Holburn
P-00727 GNL News Release dated April 2, 2012 re Provincial Government Responds to Release of PUB Report 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00728 CBC News On Point article dated April 7, 2012 re Kennedy defends shift in Muskrat tone 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00729 MHI-Nalcor-4 – Muskrat Falls Review – Question and Answer 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00730 MHI-Nalcor-6 – Muskrat Falls Review – Question and Answer 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00731 MHI-Nalcor-9 – Muskrat Falls Review – Question and Answer 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00732 Notes dated July 20 re load forecasting component 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00733 Notes dated July 22 re load forecast 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00734 MHI-Nalcor-71 – Muskrat Falls Review – Question and Answer 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00735 MHI-Nalcor-78 – Muskrat Falls Review – Question and Answer 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00736 Email dated February 9, 2012, 1:50 PM from Al Snyder to Paul Wilson re Thermal Generating Stations 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00737 Email dated February 9, 2012, 3:08 PM from Al Snyder to Paul Wilson re HVdc Transmission Lines 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00738 Email dated February 22, 2012, 1:56 PM from Diane Donnelly to Paul Wilson, cc Allen Snyder and Mack Kast re MHI RFIs 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00739 Email dated April 1, 2012, 4:43:46 PM from Gbennett@nalcorenergy.com to plwilson@mhi.ca re Contact with Charles Bown – Government of Newfoundland and Labrador 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00740 Email dated April 2, 2012, 4:06:09 PM from Paul Wilson to Charles W. Bown, cc Allen Snyder and Mack Kast re DG3 Items – M Greene – 21 February 2012 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00741 Email dated April 3, 2012, 12:40:32 AM from Paul Wilson to Charles W. Bown, cc Allen Snyder and Mack Kast re Timing 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00742 Email dated April 19, 2012, 3:19:31 PM from Charles W. Bown to Walter Parsons re Fw: NFL2 Scope of Services – Government of Newfoundland – Muskrat Falls DG3 review 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00743 Email dated April 30, 2012, 4:42:14 PM from Charles W. Bown to Paul Wilson, cc Allen Snyder and Mack Kast re NFL2 Scope of Services – Government of Newfoundland – Muskrat Falls DG3 review 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00744 Email dated May 2, 2012, 2:36 PM from Al Snyder to Paul Wilson, cc Allen Snyder, Rick Horocholyn and Mack Kast re Newfoundland Project – CPW Scope of Services 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00745 - R Email dated May 15, 2012, 9:23:13 AM from Charles W. Bown to Paul Wilson re NFL2 Proposal 29-Oct-18 Mack Kast/Allen Snyder/Paul Wilson
P-00746 Email dated May 16, 2012, 12:02:27 PM from Charles W. Bown to plwilson@mhi.ca re Letter 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00747 Email dated May 31, 2012, 12:50 PM from Paul Wilson to G Bennett re MHI visit schedule 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00748 Email dated July 23, 2012, 11:40:40 AM from Paul G. Scott to Charles W. Bown, Walter Parsons, Corey Snook and Paul O. Parsons re NFL3 Proposal for Wind Capacity Assessment (scope of work) rev 1.docx 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00749 Email dated June 8, 2012, 8:09 AM from Paul Wilson to Gerry Proteau, cc Allen Snyder re FW: Newfoundland – DG3 review sharepoint 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00750 Email dated June 25, 2012, 1:58 PM from Charles W. Bown to Paul Wilson re Nalcor Visit June 18-22nd 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00751 Email dated June 26, 2012, 11:19:55 PM from Charles W. Bown to Gbennett@nalcorenergy.com re Fw: Proposal for Wind Capacity Credit Assessment rev 2 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00752 Manitoba Hydro International Ltd. Report dated July 2012 re Manitoba Hydro International’s Review of the Muskrat Falls and Labrador Island HVdc Link (LIL) and the Isolated Island Options prepared for Hon. Jerome Kennedy, Q.C. 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00753 Email dated July 5, 2012, 8:51:06 AM from paulstratton@nlh.nl.ca to briancrawley@nalcorenergy.com, cc phumphries@nalcorenergy.com and bmoulton@nlh.nl.ca re Final 2012 Planning Load Forecast Information for MHI (Confidential) 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00754 Email dated August 2, 2012, 4:44:53 PM from Paul Wilson to Charles W. Bown, cc Allen Snyder and Mack Kast re MHI Decision Gate 3 review report draft 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00755 Email dated July 24, 2012, 6:23 PM from Paul G. Scott to Paul Wilson, cc Danny Northcott re TOR 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00756 Email dated July 27, 2012, 1:49:48 PM from Charles W. Bown to Paul Wilson re MHI DG3 review 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00757 Newfoundland Wind Assessment Questions dated August 1, 2012 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00758 Email dated September 3, 2012, 3:03:55 PM from Charles W. Bown to plwilson@mhi.ca re Draft Final report – MHI DG3 review 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00759 Email dated August 8, 2012, 1:56:06 PM from BrianCrawley@nalcorenergy.com to Paul Wilson, Mack Kast, cc Gbennett@nalcorenergy.com, Phumphries@nalcorenergy.com and Charles W. Bown re CPW analysis 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00760 Email dated August 10, 2012, 12:04 PM from mkast to briancrawley@nalcorenergy.com and Paul Wilson, cc gbennett@nalcorenergy.com, phumphries@nalcorenergy.com and Charles Bown re CPW analysis 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00761 Email dated September 25, 2012, 12:23:46 PM from Paul Wilson to Charles W. Bown re MHI Muskrat Falls DG3 Review report (draft) 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00762 Email dated August 14, 2012, 11:01 AM from David Jacobson to Danny Northcott and Tom Molinski, cc Paul Wilson re Status of Newfoundland Wind Assessment 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00763 Email dated August 14, 2012, 7:35:05 PM from gbennett@nalcorenergy.com plwilson@mhi.ca, cc briancrawley@nalcorenergy.com re Fw: LCP Estimate Accuracy Analysis 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00764 Email dated August 15, 2012, 4:55 PM from Tom Molinski to Danny Northcott, cc Paul Wilson, Rick Horocholyn, and David Jacobson re Wind Power Costs in NFLD 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00765 Email dated August 15, 2012, 8:42 AM from Mack Kast to Rick Horocholyn, cc Paul Wilson and Allen Snyder re Nfld – DG3 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00766 Email dated August 22, 2012, 12:51 PM from Paul Wilson to Allen Snyder, cc Mack Kast, Tom Moffat, Les Recksiedler re FW: response on contingency 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00767 Contingency – MHI’s review of the additional information provided by Nalcor on contingency allocation for the Muskrat Falls project 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00768 Email dated August 22, 2012, 4:15:48 PM from briancrawley@nalcorenergy.com to Paul Wilson, cc gbennett@nalcorenergy.com, pharrington@nalcorenergy.com, phumphries@nalcorenergy.com, bcc lanceclarke@nalcorenergy.com re response on contingency 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00769 RFI Log dated August 27, 2012 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00770 Letter dated June 5, 2012 from Paul Wilson to Charles Bown re Agreement between MHI and the Department of Natural Resources 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00771 Email dated September 4, 2012, 2:15 PM from Paul Wilson to David Jacobson re Draft Final report – MHI DG3 review 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00772 Email dated September 5, 2012, 11:53:57 AM from Paul Wilson to briancrawley@nalcorenergy.com re MHI visit to Nalcor 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00773 Email dated September 19, 2012, 12:01:01 AM from Paul Wilson to Charles W. Bown re DG3 report with redline on 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00774 Email dated September 21, 2012, 2:48:01 PM from Paul Wilson to briancrawley@nalcorenergy.com re MHI final draft 3 DG3 report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00775 Email dated September 21, 2012, 3:22:04 PM from briancrawley@nalcorenergy.com to Paul Wilson re comments on report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00776 Email dated September 23, 2012, 3:17:43 PM from pharrington@nalcorenergy.com to Brian Crawley and Jason Kean, cc gbennett@nalcorenergy.com 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00777 Email dated October 1, 2012, 5:52:58 PM from Charles W. Bown to Tracy English re FW: MHI Wind Assessment Report – Draft 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00778 Email dated October 2, 2012, 5:19:29 PM from Paul Wilson to Charles W. Bown re DG3 wind assessment report draft 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00779 Email dated October 12, 2012, 9:07:24 PM from Paul Wilson to Charles W. Bown, cc Danny Northcott re MHI DG3 Wind Assessment Report – Draft 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00780 Email dated October 21, 2012, 12:43 PM from Paul Wilson to briancrawley@nalcorenergy.com re DG3 MHI Wind report – draft 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00781 Email dated October 22, 2012, 11:32:28 PM from Paul Wilson to Charles W. Bown re Update 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00782 Email dated October 23, 2012, 2:25 PM from Gerry Proteau to Paul Wilson re Nalcor 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00783 Manitoba Hydro International Presentation re Decision Gate 3: Review of the Muskrat Falls and Labrador Island HVdc Link and the Isolated Island Options dated October 22, 2012 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00784 Manitoba Hydro International Presentation re Decision Gate 3: Assessment of Wind for the Isolated Island of Newfoundland dated October 22, 2012 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00785 Email dated October 24, 2012, 12:49 PM from Gerry Proteau to Paul Wilson re Nalcor Report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00786 Email dated October 26, 2012, 11:26:19 AM from Charles W. Bown to Brian Crawley and Brian W. Taylor re FW: Draft MHI report – Review of the Muskrat Falls and Labrador Island HVdc Link and the Isolated Island Options 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00787 GNL News Release dated October 30, 2012 re MHI Analysis and DG3 Cost Estimates Support Development of Muskrat Falls 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00788 Email dated December 2, 2012, 4:41:25 AM from Paul Wilson to Charles W. Bown re MHI and Muskrat Falls 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00789 GNL Report – Moving Forward – Energy Efficiency Action Plan 2011 23-Oct-18 Dr. Guy Holburn
P-00790 Witness Interview Transcript of Todd Stanley dated August 31, 2018 23-Oct-18 Todd Stanley
P-00791 Agreement dated August 13, 2012 between Her Majesty in Right of Newfoundland and Labrador and Manitoba Hydro International 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00792 The Telegram news article dated August 19, 2017 re Andy Wells says he was always against Muskrat Falls – privately 24-Oct-18 Maureen Greene/ Fred Martin/ Andy Wells/ Darlene Whalen
P-00793 Nalcor Executive and Associate Teams Organizational Chart dated December 11, 2012 31-Oct-18 Derrick Sturge
P-00794 Nalcor Vice-Presidents and Direct Reports Organizational Chart dated December 11, 2012 31-Oct-18 Derrick Sturge
P-00795 Nalcor Associate Leadership Team Organizational Chart dated November 19, 2012 31-Oct-18 Derrick Sturge
P-00796 Nalcor Corporate Relations Organizational Chart dated September 17, 2012 31-Oct-18 Derrick Sturge
P-00797 Nalcor Finance Division Organizational Chart dated January 4, 2013 31-Oct-18 Derrick Sturge
P-00798 Nalcor Project Execution & Technical Services Organizational Chart dated April 23, 2012 31-Oct-18 Derrick Sturge
P-00799 Nalcor System Planning Organization Chart 31-Oct-18 Derrick Sturge
P-00800 Letter dated January 27, 2006 from David Dal Bello and John Matovich to Gilbert Bennett re written views with respect to certain financing issues related to the Lower Churchill development project 31-Oct-18 Derrick Sturge
P-00801 Curriculum Vitae – Derrick F. Sturge 31-Oct-18 Derrick Sturge
P-00802 Email dated February 7, 2006 from emartin@nlh.nl.ca to Lloyd Powell, Gilbert Bennett; Gerard McDonald, cc Mark Surrett re D Sturge Resume Feb 6, 2006 31-Oct-18 Derrick Sturge
P-00803 Email dated October 21, 2007, 9:29:06 PM from mbradbury@nlh.nl.ca to tpaddon@mail.gov.nl.ca, cc dsturge@nlh.nl.ca, bcc karen.d.dawson@uk.pwc.com and thomas.f.garner@ca.pwc.com re Request from PWC 31-Oct-18 Derrick Sturge
P-00804 Email dated April 23, 2008, 9:48 AM from mbradbury@nlh.nl.ca to kenwall@nlh.nl.ca, cc Paul Harrington, Philip Bursey, Gilbert Bennett, Derrick Sturge, Joanna Harris, Rob Hull and Ruby Carter re PWC progress 31-Oct-18 Derrick Sturge
P-00805 Memorandum of Understanding dated March 30, 2010 between Nalcor Energy and Emera Inc. 31-Oct-18 Derrick Sturge
P-00806 Nalcor Energy Presentation dated March 3, 2011 re Estimate Contingency Discussion prepared for LCP Gatekeeper 31-Oct-18 Derrick Sturge
P-00807 Email dated May 11, 2011, 1:36 PM from Brenda Haynes to Brian Delaney, cc Yvonne Power re Muskrat Falls Independent Review Decision/Direction Note 31-Oct-18 Derrick Sturge
P-00808 Nalcor Energy – Lower Churchill Project – Gate 2 Project Risk Analysis dated June 16, 2011 31-Oct-18 Derrick Sturge
P-00809 Email dated October 25, 2011, 7:45 PM from jamesmeaney@nalcorenergy.com to Derrick Sturge, Auburn Warren, Paul Harrington, Jason Kean, Lance Clarke and thomas.f.garner@ca.pwc.com, cc Joe Parker, jmatovich@kcpl.ca, Carla Russell, Martis_Xeno, Daniel Picotte and johanne.mullen@ca.pwc.com re Rating agency presentation – latest version 31-Oct-18 Derrick Sturge
P-00810 Email dated October 31, 2011, 7:59:10 PM from Paul Harrington to Derrick Sturge and Charles Bown re Costs 31-Oct-18 Derrick Sturge
P-00811 Email dated August 28, 2012, 10:14:23 AM from dsturge@nalcorenergy.com to emartin@nalcorenergy.com re Premier Briefing Note 31-Oct-18 Derrick Sturge
P-00812 Email dated August 9, 2011, 9:13 AM from mkast@mymts.net to bmoulton@nlh.nl.ca, cc Paul Wilson and Allen Snyder re further sensitivities 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00813 Email dated April 26, 2012, 9:06:42 AM from briancrawley@nalcorenergy.com to gbennett@nalcorenergy.com re mhi 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00814 Email dated May 14, 2012, 3:52:17 PM from pharrington@nalcorenergy.com to gbennett@nalcorenergy.com, cc Brian Crawley and Ed Martin re MHI Terms of Reference 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00815 Email dated June 4, 2012, 1:58:43 PM from Paul Harrington to Brian Crawley and Gilbert Bennett re MHI 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00816 Email dated June 17, 2012, 9:53:13 AM from bbarnes@nalcorenergy.com to jasonkean@nalcorenergy.com, cc Paul Harrington, Ron Power and Scott O’Brien re Fw: Standard Agenda for all MHI meetings 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00817 Email dated August 7, 2012, 11:46:49 AM from briancrawley@nalcornergy.com to pharrington@nalcorenergy.com re for NR 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00818 Email dated August 7, 2012, 12:30:51 PM from pharrington@nalcorenergy.com to briancrawley@nalcorenergy.com re for NR 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00819 Email dated August 10, 2012, 1:51:20 PM from phumphries@nalcorenergy.com to gbennett@nlh.nl.ca and briancrawley@nalcorenergy.com re Fw: CPW analysis 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00820 Email dated September 20, 2012, 2:27:50 PM from Charles W. Bown to Brian Crawley re FW: Final Draft: Decision Gate 3 Review of the Muskrat Falls and Labrador Island HVdc Link and the Isolated Island options 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00821 Email dated September 20, 2012, 12:31:26 PM from Jack Evans to jasonkean@nalcorenergy.com, cc Keith Dodson and Eric Briel re Final Document for LCP Risk Report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00822 Email dated September 20, 2012, 1:41:26 PM from Carla Russell to Brian Crawley re Fw: Comments re MHI report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00823 Email dated June 14, 2012, 12:24:51 PM from Paul Wilson to Charles W. Bown and Walter Parsons, cc Danny Northcott re Proposal for Wind Capacity Credit Assessment rev 2 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00824 Email dated June 27, 2012, 7:28:09 PM from Charles W. Bown to Gbennett@nalcorenergy.com, cc Paul G. Scott re Fw: Newfoundland Wind Assessment Study – MHI proposal 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00825 Email dated June 28, 2012, 9:29:25 PM from Gbennett@nalcorenergy.com to Charles W. Bown re Fw: Newfoundland Wind Assessment Study – MHI proposal 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00826 Email dated August 13, 2012, 11:37:25 AM from Charles W. Bown to Kwinsor@nalcorenergy.com re FW: Government of Newfoundland and Labrador – Visit to Winnipeg 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00827 Answers to Undertakings by Paul Wilson/Al Snyder/Mack Kast from Interview on August 27, 2018 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00828 Email dated August 22, 2012, 4:57:41 PM from Project Solutions Inc to jasonkean@nalcorenergy.com re FW: Owner’s Contingency Analysis 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00829 Email dated September 4, 2012, 8:37:19 AM from jasonkean@nalcorenergy.com to pharrington@nalcorenergy.com re Schedule risk desk 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00830 Email dated September 7, 2012, 11:10:20 AM from Keith Dodson to jasonkean@nalcorenergy.com, cc Eric Briel and Jack Evans re Risk Report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00831 Email dated September 18, 2012, 5:18:49 PM from jasonkean@nalcorenergy.com to Jack Evans, cc Eric Briel and Keith Dodson re Updated Risk Report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00832 Email dated September 19, 2012, 8:25 AM from Jack Evans to jasonkean@nalcorenergy.com, cc Keith Dodson and Eric Briel re Updated Final Risk Report 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00833 Westney Consulting Group presentation re Nalcor Energy – Analysis of Potential Management Reserve and Lender’s Owner Contingency for the Lower Churchill Project dated May 23 to June 4, 2012 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00834 Derrick Sturge Handwritten Notes dated October 27-28, 2010 31-Oct-18 Derrick Sturge
P-00835 The Telegram news article dated December 28, 2010 re Questions welcome on Muskrat Falls: minister 2-Nov-18 Shawn Skinner
P-00836 The Telegram news article dated March 1, 2011 re Muskrat Falls bolsters energy security: minister 2-Nov-18 Shawn Skinner
P-00837 Email dated March 7, 2011, 1:15:42 PM from Charles W. Bown to Shawn Skinner, cc Heather Maclean and Denise Humphries re Fw: DD and PUB request 2-Nov-18 Shawn Skinner
P-00838 Email dated March 17, 2011, 11:04:01 PM from DawnDalley@nalcorenergy.com to Tina Williams, cc Charles W. Bown re Review – Letter of Response 2-Nov-18 Shawn Skinner
P-00839 Email dated March 18, 2011, 4:31:49 PM from Shawn Skinner to Charles W. Bown re Meeting with Premier 2-Nov-18 Shawn Skinner
P-00840 GNL News Release dated April 7, 2011 re Quebec Energy Regulator Denies Fair and Open Access to Quebec’s Transmission System 2-Nov-18 Shawn Skinner
P-00841 Email dated April 11, 2011, 7:42:59 PM from Charles W. Bown to Shawn Skinner re Lower Churchill Questions 2-Nov-18 Shawn Skinner
P-00842 Nalcor Energy Presentation re Lower Churchill Project – Presentation to Caucus April 13, 2011 2-Nov-18 Shawn Skinner
P-00843 Letter dated May 5, 2011 from Ronald Penney and David Vardy to The Honourable Sean Skinner, M.H.A. re Muskrat Falls Project to be reviewed by the Public Utilities Board 2-Nov-18 Shawn Skinner
P-00844 Email dated May 15, 2011 from Shawn Skinner to Charles W. Bown and Robert Thompson, cc Heather Maclean and Denise Humphries re Muskrat question 2-Nov-18 Shawn Skinner
P-00845 Email dated May 25, 2011, 10:18:31 PM from Charles W. Bown to Shawn Skinner re Confidential – Cabinet Materials 2-Nov-18 Shawn Skinner
P-00846 GNL Direction/Decision Note – Department of Natural Resources re Referral of Lower Churchill Project to the Board of Commissioners of Public Utilities (the Board) dated May 26, 2011 2-Nov-18 Shawn Skinner
P-00847 GNL News Release dated June 17, 2011 re Public Utilities Board to Review Lower Churchill Project 2-Nov-18 Shawn Skinner
P-00848 GNL News Released dated August 19, 2011 re Provincial Government Signs Memorandum of Agreement for Loan Guarantee with Government of Canada 2-Nov-18 Shawn Skinner
P-00849 Email dated August 23, 2011, 1:19:42 PM from Shawn Skinner to Robert Thompson, Heather Maclean, Charles W. Bown and Glenda Power re Core Messages 2-Nov-18 Shawn Skinner
P-00850 Email dated September 2, 2011, 5:10:01 PM from Emartin@nalcorenergy.com to Shawn Skinner and Charles W. Bown, cc gbennett@nlh.nl.ca, ddalley@nlh.nl.ca and Robert Thompson re Fw: LCP Referral RFI Status Update: September 2 2-Nov-18 Shawn Skinner
P-00851 The Telegram news article dated January 16, 2012 re Muskrat Falls deserves dedicated discussion: Skinner 2-Nov-18 Shawn Skinner
P-00852 Nalcor’s Corporate Structure as of March 31, 2018 31-Oct-18 Derrick Sturge
P-00853 PriceWaterhouseCoopers Report dated February 2008 re Lower Churchill Project – Financial Close Requirements: Procurement Issues – Draft for Discussion 31-Oct-18 Derrick Sturge
P-00854 Nalcor Energy Presentation dated October 2012 re Lower Churchill Phase I: Update to Indicative Ratings 31-Oct-18 Derrick Sturge
P-00855 Letter dated July 27, 2011 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development – Agreement LC-G-002 – Engineering, Procurement and Construction Management (EPCM) Services – 2011 Muskrat Falls Geotechnical Field Program 1-Nov-18 Paul Lemay
P-00856 Email dated January 4, 2012, 5:30 PM from Jason Kean to Mahmoud Berjaoui, Normand Bechard, Ron Power, Scott O’Brien, Darren Debourke, cc Kyle Tucker, Francois Couturier, Luc Chausse and Afzal Hussain and Dave Pardy re Meeting Request – Estimate Clarifications 1-Nov-18 Paul Lemay
P-00857 DG3 Estimate – Major Deficiencies List (as of 31-Jan-2012) 1-Nov-18 Paul Lemay
P-00858 Nalcor Energy presentation dated April 24, 2012 re LCP “Task Force” Initiative 1-Nov-18 Paul Lemay
P-00859 Letter dated May 17, 2012 from Normand Bechard to Ron Power re Lower Churchill, Phase 1 Development – Agreement LC-G-002 – Engineering, Procurement and Construction Management (EPCM) Services – Geotechnical Investigation to determine foundation selection of Transmission Lines and Gate-3 estimate 1-Nov-18 Paul Lemay
P-00860 DG3 Estimates – December 15, 2011 – May 31, 2012 1-Nov-18 Paul Lemay
P-00861 Email dated July 5, 2012, 9:23:00 AM from Jean-Daniel Tremblay to Jason Kean re Revision 02 of Basis of estimate Draft no. 2 1-Nov-18 Paul Lemay
P-00862 Nalcor Energy Report dated January 2018 re Muskrat Falls Project – Timeline of Events – Briefing Note as Requested by Nalcor Legal Counsel McInnes-Cooper 1-Nov-18 Paul Lemay
P-00863 Handwritten Notes of Paul Lemay re Summary of Costs for December 2011, December 2012 and June 2014 1-Nov-18 Paul Lemay
P-00864 Muskrat Falls Project Update as of May 2016 1-Nov-18 Paul Lemay
P-00865 Nalcor Energy – Lower Churchill Project – Project Controls Management Plan dated March 7, 2011 1-Nov-18 Paul Lemay
P-00866 Curriculum Vitae – Paul Lemay 1-Nov-18 Paul Lemay
P-00867 Email dated October 16, 2012, 2:35:18 PM from Paul Wilson to Charles W. Bown re DG3 reports 29-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00868 Letter dated October 18, 2011 from Premier Kathy Dunderdale to Edmund J. Martin re Objections and intentions of the Government of Newfoundland and Labrador in support of the Lower Churchill Projects 31-Oct-18 Derrick Sturge
P-00869 Nalcor Energy – DG3 Estimate – General Control Sheet (GCS) dated June 1, 2012 1-Nov-18 Paul Lemay
P-00870 Nalcor Energy – DG3 Estimate – General Control Sheet (GCS) – Phase 2 dated June 1, 2012 1-Nov-18 Paul Lemay
P-00871 Emera Levelized Energy Cost dated October 29, 2010 31-Oct-18 Derrick Sturge
P-00872 Email dated April 23, 2002, 9:39:18 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay, MarkTurpin@nalcorenergy.com, cc Afzal Hussain, Claude Daneau, DarrenDebourke@nalcorenergy.com, Gervais Savard, Keenan Healey, ktucker@nalcorenergy.com, Luc Chausse, Mahmoud Berjaoui, MarkTurpin@nalcorenergy.com, Paul Lemay, scotto”brien@nalcorenergy.com and RonPower@nalcorenergy.com re Services Packages – Action Items from April 23 meeting 1-Nov-18 Paul Lemay
P-00873 Email dated September 3, 2012, 5:03:18 PM from Charles W. Bown to BrianCrawley@nalcorenergyt.com re Fw: Draft Final report – MHI DG3 review 30-Oct-18 Mack Kast/ Allen Snyder/ Paul Wilson
P-00874 Pages 18 and 19 – Nalcor Energy – Muskrat Falls Project – Post Sanction – Unexpected Event/Unknown Strategic Risk #1 – Slumping Oil Prices and Impact on Shareholder Fiscal Capacity 31-Oct-18 Derrick Sturge
P-00875 Email dated October 22, 2012, 11:09 PM from Derrick Sturge to Auburn Warren re Gong show 31-Oct-18 Derrick Sturge
P-00876 Review and Consideration of Energy Access Agreement and Related Information – Nova Scotia Utility and Review Board in the Matter of the Maritime Link Act and in the Matter of An Application by NSP Maritime Link Incorporated for approval of the Maritime Link Project dated November 7, 2013 31-Oct-18 Derrick Sturge
P-00877 Derrick Sturge Handwritten Notes dated August 8, 2012 31-Oct-18 Derrick Sturge
P-00878 Derrick Sturge Handwritten Notes dated April 23, 2012 31-Oct-18 Derrick Sturge
P-00879 Derrick Sturge Handwritten Notes dated December 10, 2012 31-Oct-18 Derrick Sturge
P-00880 Derrick Sturge Handwritten Notes dated September 12, 2013 31-Oct-18 Derrick Sturge
P-00881 Nalcor Energy Presentation dated November 2011 re Lower Churchill Phase I: Indicative Rating Presentation 31-Oct-18 Derrick Sturge
P-00882 LCP Cases as of November 16, 2010 31-Oct-18 Derrick Sturge
P-00883 Derrick Sturge Handwritten Notes dated April 22-23, 2010 1-Nov-18 Derrick Sturge
P-00884 Curriculum Vitae – Jason R. Kean (Revision Date: April 2018) 7-Nov-18 Jason Kean
P-00885 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 2 – Governance Oversight and Assurance Reviews 7-Nov-18 Jason Kean
P-00886 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 3 – Project Delivery Model and Organization 7-Nov-18 Jason Kean
P-00887 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 4 – SNC Lavalin Inc. Contract 7-Nov-18 Jason Kean
P-00888 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 5 – Contracting Strategy and Process 7-Nov-18 Jason Kean
P-00889 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 7 – Pre-Sanction 7-Nov-18 Jason Kean
P-00890 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 8 – The Sanction Decision 7-Nov-18 Jason Kean
P-00891 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 9 – Financial close / Completion Guarantees / Corea 7-Nov-18 Jason Kean
P-00892 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 10 – Post Sanction 7-Nov-18 Jason Kean
P-00893 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 11 – SNC Risk Report 7-Nov-18 Jason Kean
P-00894 Nalcor Energy Report – Muskrat Falls Project – The Sanction Decision – Briefing Note as Requested by Nalcor Legal Counsel McInnes-Cooper 7-Nov-18 Jason Kean
P-00895 Independent Project Analysis – Summary of IPA’s Review of the Muskrat Falls Project and Island Link Transmission Project Prepared for Nalcor Energy dated September 2010 7-Nov-18 Jason Kean
P-00896 Nalcor Energy – Lower Churchill Project – Project Risk Management Policy dated June 8, 2012 7-Nov-18 Jason Kean
P-00897 Nalcor Energy – Lower Churchill Project – Risk Management Philosophy dated June 8, 2012 7-Nov-18 Jason Kean
P-00898 Email dated September 1, 2010, 6:27 PM from jasonkean@nalcorenergy.com to mbradbury@nalcorenergy.com, cc Rob Hull re Contingent equity 7-Nov-18 Jason Kean
P-00899 Email dated May 10, 2012, 9:27 PM from jasonkean@nalcorenergy.com to Eric Briel, cc Kelly Clifton and Jack Evans re Upcoming Risk Analysis 7-Nov-18 Jason Kean
P-00900 Email dated July 9, 2018, 2:10 PM from Pharrington@pharrington to Pharrington@lowerchurchillproject.ca re Fwd: AACE Cost Engineering Terminology 7-Nov-18 Jason Kean
P-00901 Newfoundland Hydro Presentation dated June 10, 2008 re Lower Churchill Project – Cost, Schedule & Risk Update to Gatekeeper 7-Nov-18 Jason Kean
P-00902 PMI PMBOK Guide 7-Nov-18 Jason Kean
P-00903 AACE International Recommended Practice No. 41R-08 – Risk Analysis and Contingency Determination Using Range Estimating – TCM Framework: 7.6 – Risk Management 7-Nov-18 Jason Kean
P-00904 Westney Presentation – Nalcor Energy – Lower Churchill Project Risk Analysis – Results of Time-Risk and Strategic-Risk Assessments September 2009 dated December 2009 7-Nov-18 Jason Kean
P-00905 The Telegram news article dated October 2, 2008 re Hydro development still attractive: Marshall 6-Nov-18 Tom Marshall
P-00906 Nalcor Energy Presentation dated September 2, 2010 re Lower Churchill Financing Considerations – Presentation to the NL Department of Finance 6-Nov-18 Tom Marshall
P-00907 Email dated October 1, 2010, 10:45:42 AM from Hon. Thomas Marshall, Q.C. to Terry Paddon re Loan Guarantee 6-Nov-18 Tom Marshall
P-00908 Email dated November 19, 2010, 10:46:47 PM from Hon. Thomas Marshall, Q.C. to Boyd Cohen 6-Nov-18 Tom Marshall
P-00909 Email dated November 21, 2010, 5:02:35 PM from Hon. Thomas Marshall, Q.C. to adamc 6-Nov-18 Tom Marshall
P-00910 Email dated November 25, 2010, 6:48:37 PM from Hon. Thomas Marshall, Q.C. to Robert Wall re Danny 6-Nov-18 Tom Marshall
P-00911 The Telegram news article dated December 30, 2010 re Ontario interested in province’s hydro power: Marshall 6-Nov-18 Tom Marshall
P-00912 CBC news article dated April 4, 2011 re Harper on our side against Quebec: minister 6-Nov-18 Tom Marshall
P-00913 Email dated June 9, 2011, 8:13:34 AM from Charles W. Bown to Terry Paddon and Dsturge@nalcorenergy.com re Minister Marshall 5-Nov-18 Terry Paddon
P-00914 Nalcor Energy Presentation dated June 15, 2011 re Lower Churchill Project 6-Nov-18 Tom Marshall
P-00915 Email dated June 26, 2011, 4:10:30 PM from Hon. Thomas Marshall, Q.C. to Larry Wells re FW: key messages – muskrat falls (general) 6-Nov-18 Tom Marshall
P-00916 Transcript of VOCM radio media clip dated July 8, 2011, 2:34 PM, Item #11 re Electricity Rates 6-Nov-18 Tom Marshall
P-00917 Email dated August 9, 2011, 8:24:36 PM from Charles W. Bown to Shawn Skinner re presentation 6-Nov-18 Tom Marshall
P-00918 Email dated August 28, 2011, 6:51:35 PM from Hon. Thomas Marshall, Q.C. to Robert Constantine re Info for Minister Marshall 6-Nov-18 Tom Marshall
P-00919 Email dated September 7, 2011, 9:37:20 PM from Hon. Thomas Marshall, Q.C. to Seth Marshall re FW: VOCM Openline_Kevin Aylward_Muskrat Falls_Summary_09072011.doc 6-Nov-18 Tom Marshall
P-00920 Email dated September 16, 2011, 12:28:22 PM from Hon. Thomas Marshall, Q.C. to Larry Wells re FW: Navigant Information for Ministers 6-Nov-18 Tom Marshall
P-00921 GNL Information Note – Natural Resources dated December 21, 2011 re Joint Review Panel (JRP) Response 6-Nov-18 Tom Marshall
P-00922 GNL Information Note – Department of Finance dated January 19, 2012 re Economic Opinions on Development of Muskrat Falls 5-Nov-18 Terry Paddon
P-00923 Nalcor Energy Presentation dated March 28 & 29, 2012 re Muskrat Falls Technical Briefing 6-Nov-18 Tom Marshall
P-00924 Email dated April 11, 2012, 10:58:13 AM from Emartin@nalcorenergy.com to Charles Bown re Fw: Need for Independent Financial Review to be tabled in the House! 6-Nov-18 Tom Marshall
P-00925 Nalcor Energy Presentation dated July 31, 2012 re Technical Briefing – Formal Agreements between Nalcor & Emera 6-Nov-18 Tom Marshall
P-00926 Nalcor Energy Presentation dated August 3, 2012 re DG3 Alignment Session 6-Nov-18 Tom Marshall
P-00927 Email dated August 8, 2012, 2:40:10 PM from Rob McGrath to Charles W. Bown, cc Judy Beckwith and Paul G. Scott re Trim Speeches & Presentations: PRES-2153: Muskrat Falls Presentation to Caucus – July 2012 update 6-Nov-18 Tom Marshall
P-00928 Email dated August 13, 2012, 12:25:56 PM from Hon. Thomas Marshall, Q.C. to Luke Joyce re News Release – DBRS Report 6-Nov-18 Tom Marshall
P-00929 Transcript of VOCM Radio media clip dated August 14, 2012, 9:22 AM, Item #08 re Rating Related to Muskrat Falls: “Tom Marshall” 6-Nov-18 Tom Marshall
P-00930 Nalcor Energy Presentation dated September 19, 2012 re Muskrat Falls Net Benefit Analysis 6-Nov-18 Tom Marshall
P-00931 Email dated October 29, 2012, 7:20:06 PM from Heather Maclean to Jerome Kennedy and Charles W. Bown, cc Tracy Shute, DawnDalley@nalcorenergy.com and Tina Williams re SN – Minister Marshall 6-Nov-18 Tom Marshall
P-00932 Email dated November 1, 2012, 5:12:19 PM from Hon. Thomas Marshall, Q.C. to Seth Marshall re FW: Information on Muskrat Falls 6-Nov-18 Tom Marshall
P-00933 Email dated November 6, 2012, 9:27:17 AM from Tina Williams to DawnDalley@nalcorenergy.com and KONeill@nlh.nl.ca, cc Heather Maclean and Charles W. Bown re Demand: Tech Deck 6-Nov-18 Tom Marshall
P-00934 Email dated November 7, 2012, 1:16:25 PM from Tina Williams to Darek Nakonieczny, cc Heather Maclean re Rates: Tech Deck 6-Nov-18 Tom Marshall
P-00935 Speaking Notes dated November 9, 2012 for Honourable Tom Marshall re Muskrat Falls Debate 6-Nov-18 Tom Marshall
P-00936 Email dated November 15, 2012, 10:35:40 PM from Laurie Skinner to Hon. Thomas Marshall, Q.C. re Muskrat Falls – Financing Note 6-Nov-18 Tom Marshall
P-00937 The Telegram news article dated November 17, 2012 re Federal loan guarantee for Muskrat Falls is ‘very close’, Marshall says 6-Nov-18 Tom Marshall
P-00938 GNL Information Note – Department of Finance dated November 19, 2012 re Muskrat Falls Financing 6-Nov-18 Tom Marshall
P-00939 Speaking Notes for Minister Marshall dated November 28, 2012 re Private Members Motion 6-Nov-18 Tom Marshall
P-00940 Nalcor Energy Presentation dated December 4, 2012 re Federal Loan Guarantee Briefing 6-Nov-18 Tom Marshall
P-00941 Natural Resources Presentation to Cabinet dated December 6, 2012 re Muskrat Falls Project Sanction 6-Nov-18 Tom Marshall
P-00942 CBC news article dated December 13, 2012 re Provinces finances worse than expected 6-Nov-18 Tom Marshall
P-00943 Natural Resources Presentation dated December 14, 2012 re Legislative Changes to Enable Muskrat Falls Project Financing 6-Nov-18 Tom Marshall
P-00944 Jason Kean’s notes on Management Reserve 7-Nov-18 Jason Kean
P-00945 Question re Replacing Holyrood with New CCCTs 13-Nov-18 Paul Humphries
P-00946 CA/KPL-Nalcor-3 - Muskrat Falls Review - Question and Answer 13-Nov-18 Paul Humphries
P-00947 Nalcor Energy Presentation dated October 28, 2013 re Maritime Link Technical Conference 13-Nov-18 Paul Humphries
P-00948 PUB-Nalcor-22 - Muskrat Falls Review - Question and Answer 13-Nov-18 Paul Humphries
P-00949 PUB-Nalcor-108 - Muskrat Falls Review - Question and Answer 13-Nov-18 Paul Humphries
P-00950 John Flynn Report, Professional Engineer, dated August 18, 2012 re Wind Integration Study - Isolated Island - Technical Study of Voltage Regulation and System Stability 13-Nov-18 Paul Humphries
P-00951 GNL News Release dated December 4, 1996 re Environmental Assessment Bulletin - Silver Mountain (Upper) Humber Hydroelectric Development 13-Nov-18 Paul Humphries
P-00952 Newfoundland and Labrador Hydro - 2006 General Rate Application - Supplementary Evidence of J.R. Haynes (Regulated Activities) dated November 27 13-Nov-18 Paul Humphries
P-00953 Transcript of Maritime Link Compliance Filing Technical Conference dated October 28, 2013 13-Nov-18 Paul Humphries
P-00954 Email dated September 14, 2011, 7:19 AM from jasonkean@nalcorenergy.com to markmcgrath@nalcorenergy.com re Fw: CV 7-Nov-18 Jason Kean
P-00955 Memo dated September 30, 2018 from Richard Westney to Kate O’Brien and Barry Learmonth re Followup to questions raised during teleconference interview on 11 September 2018 7-Nov-18 Jason Kean
P-00956 Nalcor Energy – Lower Churchill Project – Project Risk Management Plan dated June 30, 2011 7-Nov-18 Jason Kean
P-00957 Email dated April 9, 2012, 11:53 AM from jasonkean@nalcorenergy.com to markturpin@nalcorenergy.com re Fw: Draft Report-LCP Gate 3 Estimate Review 7-Nov-18 Jason Kean
P-00958 Email dated February 6, 2007, 4:40 PM from pharrington@nlh.nl.ca to ccook@nlh.nl.ca re Jason Kean 7-Nov-18 Jason Kean
P-00959 The Monte-Carlo Challenge: A Better Approach by John K. Hollmann, PE CCE 7-Nov-18 Jason Kean
P-00960 Presentation dated June 28, 2005 re Phase 1 EOI Assessment 5-Nov-18 Terry Paddon
P-00961 Notes dated June 28, 2005 re LHP Meeting with Premier 5-Nov-18 Terry Paddon
P-00962 Email dated May 4, 2006, 11:16:32 AM from Robert Thompson to Terry Paddon re Confidential 5-Nov-18 Terry Paddon
P-00963 Email dated December 18, 2007, 11:59:18 AM from Dennis Sharpe to Rob Hull and Steve Goudie, cc Brian Hurley, Robert Constantine and Terry Paddon re LCP Scenario 1 Results 5-Nov-18 Terry Paddon
P-00964 Email dated November 14, 2008, 8:51:37 AM from Terry Paddon to Paul Myrden and Robert Constantine re Questions from S&P (Lower Churchill Power Project) 5-Nov-18 Terry Paddon
P-00965 Email dated October 16, 2009, 1:18:01 PM from Dennis Sharpe to Brian Hurley, Robert Constantine, Terry Paddon, Paul Myrden and Jim Candwell re FW: Gull (Confidential and Commercially Sensitive) 5-Nov-18 Terry Paddon
P-00966 Email dated September 2, 2010, 4:44:31 PM from Dsturge@nalcorenergy.com to Emartin@nalcorenergy.com, cc Robert Thompson re Terry Paddon / Equity Ask 5-Nov-18 Terry Paddon
P-00967 Email dated September 8, 2010, 2:44:00 PM from Robert Constantine to KentLegge@nalcorenergy.com, cc RobHull@nalcorenergy.com, AuburnWarren@nalcorenergy.com, Terry Paddon, Brian Hurley and Dennis Sharpe re Nalcor LCP Information Request 5-Nov-18 Terry Paddon
P-00968 Email dated September 24, 2010, 3:24:28 PM from Terry Paddon to Mbradbury@nalcorenergy.com re Input to DG2 Decision Document – Financing Strategy 5-Nov-18 Terry Paddon
P-00969 Email dated September 30, 2010, 6:04:10 PM from Terry Paddon to Hon. Thomas Marshall, Q.C. re Loan Guarantee 5-Nov-18 Terry Paddon
P-00970 Email dated October 7, 2010, 2:01:33 PM from Vaughn Hammond to Michael Harvey re FW: LC Federal guarantee process note 6(2).doc 5-Nov-18 Terry Paddon
P-00971 Email dated October 20, 2010, 8:15:35 AM from Robert Thompson to Mbradbury@nalcorenergy.com and Terry Paddon, cc Charles W. Bown and Robert Constantine re Federal Guarantee letter – benefits para 5-Nov-18 Terry Paddon
P-00972 Email dated November 4, 2010, 8:08:07 AM from Terry Paddon to Robert Thompson re LCP 5-Nov-18 Terry Paddon
P-00973 Email dated November 5, 2010, 4:41:22 PM from Terry Paddon to Robert Thompson re Benefits 5-Nov-18 Terry Paddon
P-00974 GNL Presentation dated September 30, 2010 re Long Term Financial Outlook – Lower Churchill Project – Equity Financing – June 29th PIRA 5-Nov-18 Terry Paddon
P-00975 Email dated November 10, 2010, 8:08:47 AM from Terry Paddon to Robert Thompson re LCP Financing 5-Nov-18 Terry Paddon
P-00976 Email dated March 18, 2011, 4:31:16 PM from Charles W. Bown to Shawn Skinner, cc Emartin@nalcorenergy.com, Terry Paddon, Brenda Haynes, Denise Humphries, Judy Beckwith and Debbie A. Jacobs re Meeting with Premier 5-Nov-18 Terry Paddon
P-00977 Email dated March 27, 2011, 11:34:35 AM from Terry Paddon to Charles W. Bown re Economic Forecast 5-Nov-18 Terry Paddon
P-00978 Email dated April 6, 2011, 9:19:26 AM from Terry Paddon to Charles W. Bown re Briefing 5-Nov-18 Terry Paddon
P-00979 Email dated April 11, 2011, 4:42:58 PM from Terry Paddon to Charles W. Bown re Budget Question 5-Nov-18 Terry Paddon
P-00980 Email dated April 15, 2011, 4:21:11 PM from Hon. Thomas Marshall, Q.C. to Terry Paddon re Electricity Price 5-Nov-18 Terry Paddon
P-00981 Email dated April 26, 2011, 5:03:59 PM from Terry Paddon to Robert Constantine and Paul Myrden re Fw: DG3 Note 5-Nov-18 Terry Paddon
P-00982 Email dated June 1, 2011, 12:16:33 PM from Terry Paddon to AuburnWarren@nalcorenergy.com re LCP Debt Communication 5-Nov-18 Terry Paddon
P-00983 Email dated July 13, 2011, 7:08:55 PM from Charles W. Bown to JamesMeaney@nalcorenergy.com, cc AuburnWarren@nalcorenergy.com, DSturge@nalcorenergy.com, RobHull@nalcorenergy.com, Terry Paddon and Judy Beckwith re Update Session 5-Nov-18 Terry Paddon
P-00984 Email dated July 29, 2011, 4:13:29 PM from Robert Constantine to Terry Paddon re FW: NL Commitment Letter 5-Nov-18 Terry Paddon
P-00985 Email dated August 2, 2011, 3:43:50 PM from Terry Paddon to Hon. Thomas Marshall, Q.C. re Greece 5-Nov-18 Terry Paddon
P-00986 Email dated October 11, 2011, 11:36:41 AM from Charles W. Bown to Terry Paddon re LCP Capex/Equity 5-Nov-18 Terry Paddon
P-00987 Email dated November 7, 2011, 4:37:07 PM from Dsturge@nalcorenergy.com to CarlaRussell@nalcorenergy.com , jmatovich@kcpl.ca , k_dodson@westney.com, et al re Rating Agency Process 5-Nov-18 Terry Paddon
P-00988 Email dated November 25, 2011, 4:13:20 PM from William Parrott to Robert Thompson, Julia Mullaley, Diana Dalton, et al re LC DM’s Steering Committee meeting 5-Nov-18 Terry Paddon
P-00989 Email dated January 11, 2012, 11:49:24 AM from Terry Paddon to Robert Thompson re FW: Why Newfoundland Should Hold Off on Lower Churchill: C.D. Howe Institute 5-Nov-18 Terry Paddon
P-00990 Email dated May 29, 2012, 1:43:17 PM from Dsturge@nalcorenergy.com to Charles W. Bown re Announcement 5-Nov-18 Terry Paddon
P-00991 Email dated January 19, 2014, 10:04:25 AM from Terry Paddon to Charles W. Bown re Muskrat Falls cost 5-Nov-18 Terry Paddon
P-00992 Email dated January 20, 2014, 7:55:15 AM from Tina Williams to Derrick Dalley, Darrell Hynes, Charles W. Bown, et al re Media: Canadian Press – AG raising concerns about province’s finances 5-Nov-18 Terry Paddon
P-00993 Email dated July 31, 2014, 8:13:37 AM from Terry Paddon to Julia Mullaley re Report of Oversight Committee 5-Nov-18 Terry Paddon
P-00994 Email dated October 29, 2014, 9:43:11 AM from Ann Marie Miller to David J. Drover and Peter Andrews, cc John Tompkins re Muskrat Falls excerpt 5-Nov-18 Terry Paddon
P-00995 Email dated October 29, 2014, 9:45:59 AM from Charles W. Bown to Ann Marie Miller re Muskrat Falls costs – some clarification 5-Nov-18 Terry Paddon
P-00996 Hebron Project Development Plan dated September 2011 5-Nov-18 Dr. Stephen Bruneau
P-00997 Email dated August 13, 2010, 10:55 AM from Dave Pardy to Steve Goudie, cc Jason Kean re Project Services Input for Capex Case 11 OL Screening Level (MF, 900 MW Island Link LCC Technology with Overload, and 500 MW Maritime Link VSC Technology) 7-Nov-18 Jason Kean
P-00998 Nalcor Energy – Lower Churchill Project – LCP Organizational Charts dated December 7, 2011 7-Nov-18 Jason Kean
P-00999 Nalcor Energy – Lower Churchill Project – LCP Organizational Charts dated January 24, 2012 7-Nov-18 Jason Kean
P-01000 Nalcor Energy – Lower Churchill Project – LCP Organizational Charts dated September 21, 2012 7-Nov-18 Jason Kean
P-01001 CBC news article dated November 28, 2012 re Inuit fear Muskrat Falls could poison food supply 7-Nov-18 Jason Kean
P-01002 Email dated January 4, 2008, 10:20 AM from jasonkean@nlh.nl.ca to stevelethbridge@nlh.nl.ca re Fw: Westney notes from Dec 5/6 meetings 7-Nov-18 Jason Kean
P-01003 Muskrat Falls Project – CE-52 – Technical Note – Strategic Risk Analysis and Mitigation 7-Nov-18 Jason Kean
P-01004 Email dated May 15, 2012, 9:46:58 AM from Yuri Raydugin to jasonkean@nalcorenergy.com, cc tonyscott@nalcorenergy.com, davepardy@nalcorenergy.com and Lee Stanton re Cost & Schedule Risks for Probabilistic Analyses (After addressing only) 7-Nov-18 Jason Kean
P-01005 Presentation to Muskrat Falls Inquiry Counsel dated June 20, 2018 by Paul Harrington, Ron Power, Scott O’Brien, Lance Clarke, Pat Hussey and Jason Kean 7-Nov-18 Jason Kean
P-01006 Nalcor Energy Presentation dated June 2018 re Lower Churchill Project – 1 – Introduction and Project Components dated June 2018 7-Nov-18 Jason Kean
P-01007 Nalcor Energy – Lower Churchill Project – Project Execution Risk & Uncertainty Management Guidelines dated June 8, 2012 7-Nov-18 Jason Kean
P-01008 Email dated July 17, 2012, 10:51 PM from jasonkean@nalcorenergy.com to pharrington@nalcorenergy.com, cc Auburn Warren, Derrick Sturge, Ed Martin, Gilbert Bennett, and James Meaney re key messages 7-Nov-18 Jason Kean
P-01009 Email dated August 30, 2012, 9:02 AM from abrophy@nlh.nl.ca to g.shortall re 3 presentations for this mornings meeting 7-Nov-18 Jason Kean
P-01010 Email dated October 3, 2012, 7:23 AM from briancrawley@nalcorenergy.com, cc Paul Harrington and Steve Goulding re DG3 support package 7-Nov-18 Jason Kean
P-01011 Email dated March 29, 2010, 10:25 AM from Dave Pardy to Steve Goudie, cc Jason Kean and Paul Harrington re Project Services Input for Financial Modeling – General Info 7-Nov-18 Jason Kean
P-01012 Email dated October 28, 2010, 8:50 AM from Steve Goudie to Jason Kean and Dave Pardy re Priority real time request 7-Nov-18 Jason Kean
P-01013 Email dated October 28, 2010, 11:08 AM from Dave Pardy to Steve Goudie, cc Jason Kean re Separation of MF Gen and AC Transmission Capex 7-Nov-18 Jason Kean
P-01014 Email dated June 27, 2011, 1:31 PM from Mark Bradbury to Auburn Warren, Tom Garner and Jason Kean re Fw: Cost Overrun estimates Maritime Link 7-Nov-18 Jason Kean
P-01015 Email dated July 1, 2011, 10:39 AM from Jason Kean to Mark Bradbury, bcc Paul Harrington re Fw: LCP-PT-ED-0000-RI-RP-0001-01 Rev. B1 – Gate 2 Project Risk Analysis (Confidential) 7-Nov-18 Jason Kean
P-01016 Nalcor Energy Presentation dated July 18, 2011 re Potential Changes and Impact on Contingency – Review with LCP Gatekeeper 7-Nov-18 Jason Kean
P-01017 Email dated July 26, 2012, 10:30 PM from Jason Kean to Carla Russell, cc Dave Pardy, Paul Harrington, Brian Crawley, Auburn Warren, Steve Goudie, bcc Ron Power re Final DG3 Capital Cash Flows – MF, LTA and LITL 7-Nov-18 Jason Kean
P-01018 Email dated August 13, 2012, 9:44 PM from Jason Kean to Paul Harrington, cc Gilbert Bennett re Contingency 7-Nov-18 Jason Kean
P-01019 Email dated March 6, 2016, 8:42 PM from JasonKean@lowerchurchillproject.ca to Project Solutions Inc. re Fw: Contingency – Some Clarifying Points 7-Nov-18 Jason Kean
P-01020 Email dated October 26, 2008, 8:10 PM from jasonkean@nlh.nl.ca to Raminder Bali re Risk Analysis for Contingency Determination 7-Nov-18 Jason Kean
P-01021 Independent Project Analysis Presentation dated July 2008 – A Pacesetter Evaluation of the Lower Churchill Project Presented to NL Hydro – Final – NLH-8001-PAC 7-Nov-18 Jason Kean
P-01022 Independent Project Analysis – Pacesetter Evaluation of the Muskrat Falls Generation Project and Island Link Transmission Project dated September 2010 7-Nov-18 Jason Kean
P-01023 Shawmont Newfoundland Ltd. report for Newfoundland and Labrador Hydro dated December 1986 re An Inventory of Small Hydro Sites for Energy Supply to the Island Grid - Volume 2 - Site Analyses 13-Nov-18 Paul Humphries
P-01024 Newfoundland and Labrador Hydro - Tender Opening Record - Request for Proposals for Non-Utility Generation from Small Hydro Projects - RFP 92-195 dated August 13, 1993 13-Nov-18 Paul Humphries
P-01025 Newfoundland and Labrador Hydro Report dated April 1983 re A Brief Overview of Environmental Information on the Potential Hydroelectric Development of the Bay du Nord and Main Rivers 13-Nov-18 Paul Humphries
P-01026 Newfoundland and Labrador Hydro - Dry Pond Hydro Development - Feasibility Study and Cost Control Estimate dated February 8, 1982 13-Nov-18 Paul Humphries
P-01027 Ten Mile Lake - Hydro Power Development - Estimate of Available Power and Cost dated June 24, 1968 13-Nov-18 Paul Humphries
P-01028 Newfoundland and Labrador Hydro - Lake Michel Hydro Development - Feasibility Study and Cost Estimate dated July 27, 1982 13-Nov-18 Paul Humphries
P-01029 Feasibility Study of Hydro Generation Sites - Burgeo, Newfoundland dated March 31, 1977 prepared for Newfoundland and Labrador Hydro 13-Nov-18 Paul Humphries
P-01030 Email dated February 1, 2005, 5:21:07 PM from jhaynes@nlh.nf.ca to dbazeley@mail.gov.nf.ca, cc terrydale@mail.gov.nf.ca and bcc rhenderson@nlh.nf.ca re Hydro's review of ACI possible projects on the Exploits River 13-Nov-18 Paul Humphries
P-01031 Newfoundland and Labrador Hydro - Request for Proposals for Non-Utility Generation (NUG) from Small Hydro Projects (RFP 92-195) 13-Nov-18 Paul Humphries
P-01032 Newfoundland and Labrador Hydro - Cumulative Present Worth Analysis - PLF12 Iteration #1 - Isolated Island Alternative dated August 1, 2012 13-Nov-18 Paul Humphries
P-01033 Email dated September 2, 2011, 9:54:18 AM from phumphries@nalcorenergy.com to Todd Williams, cc auburnwarren@nalcorenergy.com, Dawei Zhou, Frank Stern, Jim Peterson and Ralph Zarumba re 1992 Hydro Offer 13-Nov-18 Paul Humphries
P-01034 Newfoundland Hydro Presentation dated April 13, 2006 re Structuring and Financing Growth 14-Nov-18 Robert Thompson
P-01035 Email dated August 28, 2006, 1:03:56 PM from Robert Thompson to Chris Kieley and emartin@nlh.nl.ca re Alignment 14-Nov-18 Robert Thompson
P-01036 Email dated September 14, 2006, 1:09:10 PM from Robert Thompson to Chris Kieley, Brian Crawley, Terry Paddon and emartin@nhl.nl.ca re Energy Plan 14-Nov-18 Robert Thompson
P-01037 Email dated January 24, 2007, 3:12:40 PM from Robert Thompson to Chris Kieley and emartin@nlh.nl.ca re Energy Plan comments 14-Nov-18 Robert Thompson
P-01038 Email dated April 11, 2007, 9:30:44 AM from Robert Thompson to Chris Kieley, Bruce Hollett, Robert Coombs, Don Burrage and Gilbert Bennett, cc Brian Crawley re Lower Churchill Coordinating Committee 14-Nov-18 Robert Thompson
P-01039 Email dated April 27, 2007, 3:08:10 PM from Robert Thompson to Chris Kieley and Sean Dutton, cc Brian Crawley re Follow-up with Premier 14-Nov-18 Robert Thompson
P-01040 Email dated March 17, 2009, 8:48:43 PM from Robert Thompson to Charles W. Bown re Lower Churchill Lease 14-Nov-18 Robert Thompson
P-01041 Email dated May 25, 2009, 7:04:42 PM from Robert Thompson to KONeill@nalcorenergy.com, Tracy B. Barron, Charles W. Bown, cc Derrick Sturge and Emartin@nalcorenergy.com re Release - Hydro restructuring 14-Nov-18 Robert Thompson
P-01042 Email dated August 4, 2009, 4:41:53 PM from Robber Thompson to Charles W. Bown and Pierre F. Tobin re Shareholder Senior Advisor 14-Nov-18 Robert Thompson
P-01043 Email dated October 8, 2009, 11:33:49 AM from Robert Thompson to Charles W. Bown re Senior Advisory - Shareholder Relations 14-Nov-18 Robert Thompson
P-01044 Email dated October 27, 2009, 1:04:47 PM from Kathy Dunderdale to Robert Thompson 14-Nov-18 Robert Thompson
P-01045 Email dated October 28, 2009, 3:25:15 PM from Robert Thompson to Charles W. Bown re Outline for Premiers New York Speech 14-Nov-18 Robert Thompson
P-01046 Email dated November 4, 2009, 10:05:29 AM from Charles W. Bown to Robert Thompson re PD - Advisor, Shareholder Relations 14-Nov-18 Robert Thompson
P-01047 Email dated November 13, 2009, 9:15:57 PM from Robert Thompson to Charles W. Bown re FW: Letter re Grimes Comments.doc 14-Nov-18 Robert Thompson
P-01048 Email dated November 17, 2009, 4:29:36 PM from Robert Thompson to Charles W. Bown re Fw: New York Times: Canadian Provincial Leader Seeks U.S. Support for 2 Hydro Projects 14-Nov-18 Robert Thompson
P-01049 Email dated November 18, 2009, 8:13:00 PM from Robert Thompson to Gary Norris, Brian Crawley, Elizabeth Matthews and Emartin@nalcorenergy.com re Fw: NB power mou 14-Nov-18 Robert Thompson
P-01050 Muskrat Falls Project – CE-52 Rev. 1 (Public) – Technical Note – Strategic Risk Analysis and Mitigation 8-Nov-18 Jason Kean
P-01051 Email dated September 17, 2012, 11:30:09 AM from Keith Dodson to JasonKean@nalcorenergy.com, cc Jack Evans re Report 8-Nov-18 Jason Kean
P-01052 Email dated May 17, 2010, 12:13:53 PM from Robert Thompson to Tracy B. Barron re would you mind getting sign off from your minister for me 14-Nov-18 Robert Thompson
P-01053 Email dated May 21, 2010, 1:50:13 PM from Robert Thompson to Mary Byrne re Fw: Regis Messages 14-Nov-18 Robert Thompson
P-01054 Email dated May 25, 2010, 11:30:24 AM from Robert Thompson to Tracy B. Barron re FW: Regis Ruling 14-Nov-18 Robert Thompson
P-01055 Email dated July 8, 2010, 11:56:30 PM from Robert Thompson to Kathy Dunderdale re LCP Benefits 14-Nov-18 Robert Thompson
P-01056 Email dated July 9, 2010, 11:13:07 AM from Robert Thompson to Kathy Dunderdale re Fw: News Release: Request for Proposals issued for the Lower Churchill Project 14-Nov-18 Robert Thompson
P-01057 Email dated July 15, 2010, 2:13:50 PM from Robert Thompson to Kathy Dunderdale re Comments Pls 14-Nov-18 Robert Thompson
P-01058 Email dated August 2, 2010, 3:42:02 PM from Robert Thompson to Kathy Dunderdale, cc Charles W. Bown re Lower Churchill 14-Nov-18 Robert Thompson
P-01059 Email dated September 30, 2010, 6:55:48 PM from Robert Thompson to Kathy Dunderdale re Emera 14-Nov-18 Robert Thompson
P-01060 Email dated October 4, 2010, 5:06:37 PM from Robert Thompson to Vanessa Newhook, cc Charles W. Bown re LCP Assessment 14-Nov-18 Robert Thompson
P-01061 Email dated October 5, 2010, 5:09:32 PM from Paul O. Parsons to Robert Thompson, Vanessa Newhook and Gerard Collins re Data Access 14-Nov-18 Robert Thompson
P-01062 Email dated October 6, 2010, 12:47:11 PM from Gerard Collins to Robert Thompson, Paul O. Parsons and Vanessa Newhook, cc Charles W. Bown re Data Access 14-Nov-18 Robert Thompson
P-01063 Email dated October 7, 2010, 5:09:28 Pm from Vanessa Newhook to Robert Thompson re FW: Data Access 14-Nov-18 Robert Thompson
P-01064 Email dated October 12, 2010, 9:03:52 AM from Gerard Collins to Vanessa Newhook, cc Paul O Parsons re Call from Rob Hull 14-Nov-18 Robert Thompson
P-01065 Email dated October 12, 2010, 10:17:39 AM from Gerard Collins to RobHull@nalcorenergy.com, cc Paul O. Parsons, Vanessa Newhook and AuburnWarren@nalcorenergy.com re Information Request 14-Nov-18 Robert Thompson
P-01066 Email dated October 25, 2010, 11:13:21 AM from Robert Thompson to EMartin@nalcorenergy.com re Fw: Gate Doc 14-Nov-18 Robert Thompson
P-01067 Email dated October 25, 10:02:07 PM from Robert Thompson to Charles W. Bown re LCP 14-Nov-18 Robert Thompson
P-01068 Email dated October 25, 2010, 2:25:07 PM from Robert Thompson to coolicm@gov.nl.ca re Premier Williams' Speech 14-Nov-18 Robert Thompson
P-01069 Note dated October 26, 2010 from Paul to Charles re information package regarding Island electricity supply 14-Nov-18 Robert Thompson
P-01070 Email dated April 27, 2011, 8:41:27 AM from Yvonne A Power to Robert Constantine and Paul Myrden re FW: DG3 Note 14-Nov-18 Robert Thompson
P-01071 Email dated October 29, 2010, 11:50:52 PM from Robert Thompson to Kathy Dunderdale re Fw: update 2 14-Nov-18 Robert Thompson
P-01072 Email dated October 30, 2010, 9:54:27 PM from Charles W. Bown to Robert Thompson re Gate 2 Report 14-Nov-18 Robert Thompson
P-01073 Email dated November 8, 2010, 10:45:08 PM from Robert Thompson to Charles W. Bown 14-Nov-18 Robert Thompson
P-01074 Email dated November 9, 2010, 7:38:23 AM from Robert Thompson to Kathy Dunderdale and Charles W. Bown re Pre-Cabinet morning 14-Nov-18 Robert Thompson
P-01075 Email dated November 10, 2010, 2:10:41 PM from Robert Thompson to Brian Crawley and Elizabeth Matthews, cc Charles W. Bown and Ken Morrissey re LCP Summary Note 14-Nov-18 Robert Thompson
P-01076 Email dated November 11, 2010, 5:06:29 PM from Robert Thompson to Charles W. Bown re Letter 14-Nov-18 Robert Thompson
P-01077 Email dated November 16, 2010, 11:59:25 PM from Robert Thompson to LeonaBarrington@nalcorenergy.com, cc Ken Morrissey and Charles W. Bown re Questions 14-Nov-18 Robert Thompson
P-01078 Email dated November 16, 2010, 1:33:03 AM from Robert Thompson to Elizabeth Matthews re Six Key Points 14-Nov-18 Robert Thompson
P-01079 Email dated November 17, 2010, 3:56:39 PM from Robert Thompson to Ken Morrissey, Elizabeth Matthews and LeonaBarrington@nalcorenergy.com re QF 14-Nov-18 Robert Thompson
P-01080 Email dated November 20, 2010, 11:10:21 AM from Robert Thompson to Elizabeth Matthews, Emartin@nalcorenergy.com, Kathy Dunderdale, Gbennett@nalcorenergy.com re Great editorial 14-Nov-18 Robert Thompson
P-01081 Email dated November 23, 2010, 10:38:41 PM from Robert Thompson to Charles W. Bown, DawnDalley@nalcorenergy.com and Ken Morrissey re Capex - isolated island list of projects, inservice dates and capex 14-Nov-18 Robert Thompson
P-01082 Email dated December 3, 2010, 3:59:32 PM from Robert Thompson to Murray Coolican re Congratulations and sympathies 14-Nov-18 Robert Thompson
P-01083 Email dated December 6, 2010, 10:00:06 PM from Robert Thompson to Brian W. Taylor re Fw: LCP Federal Financing 14-Nov-18 Robert Thompson
P-01084 Email dated December 17, 2010, 1:52:34 PM from Robert Thompson to Emartin@nalcorenergy.com, Brian W. Taylor and Charles W. Bown re Draft Letter to PM 14-Nov-18 Robert Thompson
P-01085 Email dated December 21, 2010, 11:30:35 PM from Robert Thompson to DawnDalley@nalcorenergy.com, Ken Morrissey, Charles W. Bown and Glenda Power re EPCM Contract Announcement materials 14-Nov-18 Robert Thompson
P-01086 Email dated March 18, 2011, 9:30:25 PM from Robert Thompson to Jamie Chippett and Jeff Paddock re Energy question/issue 14-Nov-18 Robert Thompson
P-01087 Email dated April 7, 2011, 2:41:47 PM from Robert Thompson to Brian W. Taylor and Milly Brown re Fw: Regie NR Revised 11:30 am 14-Nov-18 Robert Thompson
P-01088 Email dated April 14, 2011, 3:14:19 PM from Robert Thompson to Gbennett@nalcorenergy.com, Emartin@nalcorenergy.com, Charles W. Bown and Dsturge@nalcorenergy.com re Independent Study 14-Nov-18 Robert Thompson
P-01089 Email dated May 10, 2011, 12:11:08 AM from Robert Thompson to Heather Maclean, Shawn Skinner, et al re Revised Draft - News Release - LCP PUB Exemption 14-Nov-18 Robert Thompson
P-01090 Email dated May 11, 2011, 8:33:29 AM from Charles W. Bown to Heather Maclean, Paul G. Scott, DawnDalley@nalcorenergy.com, emartin@nalcorenergy.com and Dsturge@nalcorenergy.com re Revised draft - news release 14-Nov-18 Robert Thompson
P-01091 Email dated May 12, 2011, 12:05:41 AM from Robert Thompson to Brian W. Taylor re Fw: Letter from Penny and Vardy 14-Nov-18 Robert Thompson
P-01092 Email dated May 12, 2011, 2:46:21 PM from Robert Thompson to Charles W. Bown re Here is the logic model on PUB policy 14-Nov-18 Robert Thompson
P-01093 Email dated May 17, 2011, 12:34:48 PM from Robert Thompson to Milly Brown, Brian W. Taylor and Kathy Dunderdale re Answers to Premier's question on MF 14-Nov-18 Robert Thompson
P-01094 Email dated May 18, 2011, 2:11:13 PM from Charles W. Bown to Robert Thompson re Scope 14-Nov-18 Robert Thompson
P-01095 Email dated May 19, 2011, 1:08:20 PM from Charles W. Bown to Dharris@nalcorenergy.com, Paul G. Scott, et al, cc Emartin@nalcorenergy.com, DSturge@nalcorenergy.com, et al re LCP PUB Referral - Nalcor Comments 14-Nov-18 Robert Thompson
P-01096 Email dated May 20, 2011, 4:48:02 PM from Robert Thompson to Brian W. Taylor and Kathy Dunderdale re Draft Question for PUB 14-Nov-18 Robert Thompson
P-01097 Email dated May 26, 2011, 2:12:33 PM from Robert Thompson to Heather Maclean, Brian Taylor, et al, cc Charles W. Bown, Tina Williams, et al re DRAFT PUB NR for comment 14-Nov-18 Robert Thompson
P-01098 Email dated September 19, 2011, 12:50:49 Pm from Robert Thompson to Robert Thompson 14-Nov-18 Robert Thompson
P-01099 Email dated October 26, 2011, 12:52:47 PM from Robert Thompson to Robert Thompson 14-Nov-18 Robert Thompson
P-01100 Email dated November 1, 2011, 3:57:37 PM from Charles W. Bown to Diana Dalton re Fw: Updated PUB response letter 14-Nov-18 Robert Thompson
P-01101 Email dated November 30, 2011, 11:36:58 AM from Robert Thompson to Brian W. Taylor re Fw: Emera Maritime Link 14-Nov-18 Robert Thompson
P-01102 Email dated December 14, 2011, 12:53:29 PM from Robert Thompson to Heather Maclean, Glen Power and Milly Brown, cc Diane Dalton re DRAFT for comment 14-Nov-18 Robert Thompson
P-01103 Email dated December 21, 2011, 11:13:53 AM from Robert Thompson to Diana Dalton and Jerome Kennedy re PUB Letters - latest draft (9am-Dec 21) 14-Nov-18 Robert Thompson
P-01104 Email dated December 22, 2011, 6:22:40 PM from Robert Thompson to Brian W. Taylor re Fw: PUB Letters 14-Nov-18 Robert Thompson
P-01105 Email dated January 10, 2012, 11:44:59 PM from Robert Thompson to emartin@nalcorenergy.com re MF Schedule 14-Nov-18 Robert Thompson
P-01106 Email dated January 11, 2012, 11:35:39 AM from Robert Thompson to DawnDalley@nalcorenergy.com, Don Burrage and Tom O'Reilly re Letter to PUB - URGENT 14-Nov-18 Robert Thompson
P-01107 Email dated February 12, 2012, 8:53:22 PM from Robert Thompson to DawnDalley@nalcorenergy.com, Charles W. Bown and Don Burrage re Draft presentation to PUB - still working now but this is close 14-Nov-18 Robert Thompson
P-01108 Email dated February 27, 2012, 10:33:54 AM from Robert Thompson to Julia Mullaley, Dennis A. Hogan, Josephine Cheeseman, Sean Dutton and Terry Paddon, cc DawnDalley@nalcorenergy.com re FW: technical briefing on MF 14-Nov-18 Robert Thompson
P-01109 Email dated April 1, 2012, 6:07:58 PM from Robert Thompson to Robert Thompson 14-Nov-18 Robert Thompson
P-01110 Email dated April 2, 2012, 12:05:48 PM from Robert Thompson to Glenda Power re revised news release draft for comment - PUB 14-Nov-18 Robert Thompson
P-01111 Email dated April 12, 2012, 4:51:40 PM from Robert Thompson to Emartin@nalcorenergy.com and Charles W. Bown re Draft Email for Premier 14-Nov-18 Robert Thompson
P-01112 Email dated April 22, 2012, 9:19:14 AM from Robert Thompson to Brian W. Taylor and Glenda Power re FW: Presentation 14-Nov-18 Robert Thompson
P-01113 Email dated April 26, 2012, 6:39:00 PM from Robert Thompson to KMD, cc Brian W. Taylor re Dinner 14-Nov-18 Robert Thompson
P-01114 Email dated May 4, 2012, 1:04:58 AM from Robert Thompson to Brian W. Taylor and Glenda Power re Fwd: Resolution 14-Nov-18 Robert Thompson
P-01115 Email dated May 8, 2012, 11:45:31 PM from Robert Thompson to Charles W. Bown re MHI 14-Nov-18 Robert Thompson
P-01116 Email dated June 17, 2012, 11:29:42 PM from Robert Thompson to DSturge@nalcorenergy.com, cc Emartin@nalcorenergy.com re Board Compensation 14-Nov-18 Robert Thompson
P-01117 Email dated July 13, 2012, 4:36:59 PM from Robert Thompson to Robert Thompson re Tactical Plan 14-Nov-18 Robert Thompson
P-01118 Email dated July 21, 2012, 9:00:59 AM from Robert Thompson to BrianCrawley@nalcorenergy.com re weekly meetings 14-Nov-18 Robert Thompson
P-01119 Email dated July 26, 2012, 1:57:13 PM from Robert Thompson to Glenda Power and Brian W. Taylor re Fw: agenda for this afternoon's call 14-Nov-18 Robert Thompson
P-01120 Email dated July 31, 2012, 8:36:59 AM from Robert Thompson to Glenda Power and Brian W. Taylor re NR - Nalcor and Emera 14-Nov-18 Robert Thompson
P-01121 Email dated August 28, 2012, 4:25:22 PM from Robert Thompson to BrianCrawley@nalcorenergy.com and Brian W. Taylor, cc Emartin@nalcorenergy.com re discussion paper NR 14-Nov-18 Robert Thompson
P-01122 Email dated October 2, 2012, 5:03:28 PM from Robert Thompson to Lynn Hammond re New edit to new text 14-Nov-18 Robert Thompson
P-01123 Email dated October 2, 2012, 5:11:51 PM from Robert Thompson to Emartin@nalcorenergy.com re Speech 14-Nov-18 Robert Thompson
P-01124 Email dated October 28, 2012, 10:16:06 PM from Robert Thompson to Heather Maclean, cc Charles W. Bown, BrianCrawley@nalcorenergy.com, et al re Nalcor Technical Briefing Deck 14-Nov-18 Robert Thompson
P-01125 Email dated November 21, 2012, 9:43:18 AM from Robert Thompson to Robert Thompson re MF 14-Nov-18 Robert Thompson
P-01126 Email dated November 25, 2012, 7:41:50 PM from Robert Thompson to Brian W. Taylor re Fw: Key Principles Document 14-Nov-18 Robert Thompson
P-01127 Email dated November 25, 2012, 11:26:12 PM from Robert Thompson to Robert Thompson 14-Nov-18 Robert Thompson
P-01128 GNL Direction Note - Department of Natural Resources dated November 27, 2012 re Accountability Oversight for the Muskrat Falls Project / Labrador-Island Transmission Link / Labrador Transmission Assets (collectively referred to as "the Project" in this note) 14-Nov-18 Robert Thompson
P-01129 Email dated December 5, 2012, 11:36:39 PM from Robert Thompson to Charles W. Bown re Nalcor accountability and oversight for MF 14-Nov-18 Robert Thompson
P-01130 Email dated December 17, 2012, 11:48:56 AM from Robert Thompson to rthompson re Fw: Proclamation 14-Nov-18 Robert Thompson
P-01131 Email dated December 17, 2012, 11:51:35 AM from Robert Thompson to rthompson 14-Nov-18 Robert Thompson
P-01132 Email dated April 24, 2013, 3:30:58 PM from Robert Thompson to Daisy Heath re FW: Sanction 14-Nov-18 Robert Thompson
P-01133 Email dated July 9, 2013, 9:12:28 AM from Robert Thompson to Catherine Evans re FW: Quick Question 14-Nov-18 Robert Thompson
P-01134 Email dated July 19, 2013, 5:12:47 PM from Robert Thompson to Lynette Carroll and Jennifer L. Tulk re FW: Monday is the day for release Maritime Link Decision 14-Nov-18 Robert Thompson
P-01135 Email dated August 13, 2013, 8:25:22 AM from Robert Thompson to Ross Reid re Fw: Reading 14-Nov-18 Robert Thompson
P-01136 Newfoundland and Labrador Hydro - Generation Planning Issues - November 2012 13-Nov-18 Paul Humphries
P-01137 Internal Correspondence Memorandum dated October 25, 1971 from H.R. Young to J.G. Fitzgerald re The Newfoundland and Labrador Power Commission Review and Consolidation of Existing Reports of Potential Hydroelectric Developments 13-Nov-18 Paul Humphries
P-01138 Shawmont Newfoundland Limited Report dated December 15, 1979 re Newfoundland and Labrador Hydro - Hydro-Electric Potential Study for Dry Pond Brook - Pinware River - Lake Michel - Cloud River 13-Nov-18 Paul Humphries
P-01139 Email dated August 28, 2006, 3:355 PM from pharrington@nlh.nl.ca to brianporter@nlh.nl.ca re Fw: Followup to your conversation with Westney Consulting Group 16-Nov-18 Richard Westney
P-01140 Article by Keith Dodson and Richard Westney re Risk Resolution - Predictable Projects in a World of Black Swans 16-Nov-18 Richard Westney
P-01141 Email dated September 4, 2007, 2:05:35 PM from Gilbert Bennett to Paul Harrington, cc Leona Barrington, Ed Martin and Derrick Sturge re Risk Analysis Consultant 16-Nov-18 Richard Westney
P-01142 Email dated September 4, 2007, 4:44 PM from pharrington@nlh.nl.ca to lanceclarke@nlh.nl.ca and jasonkean@nlh.nl.ca re Fw: Risk Analysis Consultant 16-Nov-18 Richard Westney
P-01143 Email dated September 6, 2007, 2:48:14 AM from Ric Massie to jasonkean@nlh.nl.ca, cc keith.dodson@sbcglobal.net, Eric Briel and Richard Westney re Westney Risk Assessment Services 16-Nov-18 Richard Westney
P-01144 Letter dated October 26, 2007 from Philip Bursey to Ric Massie re Request for Proposal (RFP) - Project Execution Risk Management Advisory Services for the Lower Churchill Project - Package # 36821-OQ 16-Nov-18 Richard Westney
P-01145 Email dated January 23, 2009, 10:39:46 AM from stevelethbridge@nalcorenergy.com to jasonkean@nalcorenergy.com re Westney Advisory article 16-Nov-18 Richard Westney
P-01146 Email dated February 28, 2008, 10:56:47 AM from jasonkean@nlh.nl.ca to gbennett@nlh.nl.ca, cc pharrington@nlh.nl.ca re Westney 16-Nov-18 Richard Westney
P-01147 Email dated February 28, 2008, 11:05 AM from pharrington@nlh.nl.ca to gbennett@nlh.nl.ca re Fw: Westney 16-Nov-18 Richard Westney
P-01148 Report by Westney Consulting Group re Why projects overrun, and what to do about it 16-Nov-18 Richard Westney
P-01149 Newfoundland and Labrador Hydro - Lower Churchill Project - Gate 2a Risk Management Plan dated October 14, 2008 16-Nov-18 Richard Westney
P-01150 Email dated July 7, 2010, 6:02 PM from Richard Westney to jasonkean@nlh.nl.ca, cc Jack Evans, Keith Dodson, Eric Briel and Kelly Clifton re Westney Overview Slides 16-Nov-18 Richard Westney
P-01151 Email dated July 9, 2010, 7:36:44 AM from jasonkean@nalcorenergy.com to Jack Evans re Plan for Westney Final Report 16-Nov-18 Richard Westney
P-01152 Email dated August 16, 2011, 1:06:42 PM from jasonkean@nalcorenregy.com to gbennett@nalcorenergy.com, cc pharrington@nalcorenergy.com re DG2 Westney presentation 16-Nov-18 Richard Westney
P-01153 Letter dated October 20, 2010 from Gerry Humphrey to Eric Briel re LC-PM-039 - Professional Support - EPCM Readiness Activities - Letter of Award 16-Nov-18 Richard Westney
P-01154 Email dated October 29, 2010, 1:40 PM from jasonkean@nalcorenergy.com to bbarnes@nalcorenergy.com, davidbrown@nalcorenergy.com, et al, cc David Grassbaugh, Eric Briel, et al re UPDATE: EPCM Mobilization Readiness Initiative 16-Nov-18 Richard Westney
P-01155 Email dated May 21, 2012, 8:22:06 AM from jasonkean@nalcorenergy.com to rhenderson@nlh.nl.ca, cc Auburn Warren, Brian Crawley, et al re LCP Key Risk Review Workshop (with Westney) 16-Nov-18 Richard Westney
P-01156 Curriculum Vitae - Paul Harrington 19-Nov-18 Paul Harrington
P-01157 Agreement for Consulting Services Relating to the Proposed Lower Churchill Hydroelectric Project dated October 1, 2005, between Newfoundland and Labrador Hydro and Fabcon Canada Ltd. (Redacted Version) 19-Nov-18 Paul Harrington
P-01158 Lower Churchill Project - Tactical Cost Risk Assessment - May 31, 2012 16-Nov-18 Richard Westney
P-01159 Email dated July 15, 2012, 7:18 PM from briancrawley to pharrington re Fwd: opinion draft - PLEASE CONFIRM RECEIPT 16-Nov-18 Richard Westney
P-01160 Email dated July 16, 2012, 5:13 PM from r_westney to pharrington re DRAFT_of_NALCOR_CPW_Opinion_rev9.docx 16-Nov-18 Richard Westney
P-01161 Nalcor Energy - Lower Churchill Project - Work Task Order - IRP Consultant dated August 9, 2012 16-Nov-18 Richard Westney
P-01162 Memo dated October 25, 2018 from Richard Westney to Angie Brown re Risk Ranges and Responsbilities for DG3 QRA 16-Nov-18 Richard Westney
P-01163 Email dated December 7, 2007, 8:45 AM from philipbursey@nlh.nl.ca to Ric Massie re contract document 16-Nov-18 Richard Westney
P-01164 Email dated July 21, 2010, 11:35:44 AM from Dave Bazeley to Charles W. Bown re FW: Integrated Resource Planning 16-Nov-18 Paul Humphries
P-01165 Handwritten Notes of Robert Thompson re meeting with Andy Wells 14-Nov-18 Robert Thompson
P-01166 Calendar Event dated September 14, 2011 from Robert Thompson to Minister Skinner, Brian Taylor and Andy Wells 14-Nov-18 Robert Thompson
P-01167 Note dated October 26, 2010 from Paul to Robert re information package regarding Island electricity supply 14-Nov-18 Robert Thompson
P-01168 Email dated February 3, 2011, 1:08:12 PM from Charles W. Bown to Richard Wardle re Draft Shareholder Letter of Expectations.doc 14-Nov-18 Robert Thompson
P-01169 Agreement for Consulting Services Relating to the Proposed Lower Churchill Hydroelectric Project dated October 1, 2005, between Newfoundland and Labrador Hydro and Fabcon Canada Ltd. (Unredacted Version) 20-Nov-18 Paul Harrington
P-01170 Email dated January 13, 2006, 12:07:52 PM from pharrington@nlh.nl.ca to gbennett@nlh.nl.ca 19-Nov-18 Paul Harrington
P-01171 Email dated January 27, 2006, 8:48:56 AM from Paul Harrington to gbennett@nlh.nl.ca and r.d.owen re Draft Presentation for meetings next week 19-Nov-18 Paul Harrington
P-01172 Newfoundland and Labrador Hydro - Lower Churchill Project - Project Management Approach and Contracting Strategy (Post-Gate 2) dated April 28, 2008 19-Nov-18 Paul Harrington
P-01173 Email dated September 24, 2008, 3:46:16 PM from paulkennedy@nlh.nl.ca to lanceclarke@nlh.nl.ca re Copies of Contracts (Redacted) 19-Nov-18 Paul Harrington
P-01174 Email dated September 27, 2010, 8:21:02 PM from jasonkean@nalcorenergy.com to Deepesh Singh, cc pharrington@nalcorenergy.com re Comments to Public-Disclosable Report 19-Nov-18 Paul Harrington
P-01175 Email dated September 24, 2008, 3:46:16 PM from paulkennedy@nlh.nl.ca to lanceclarke@nlh.nl.ca re Copies of Contracts (Unredacted version) 20-Nov-18 Paul Harrington
P-01176 Email dated August 9, 2011, 9:11 AM from pharrington@nalcorenergy.com to gbennett@nalcorenergy.com and jasonkean@nalcorenergy.com re DG 2 Risk Report 19-Nov-18 Paul Harrington
P-01177 Nalcor Energy - Lower Churchill Project - Overarching Contracting Strategy dated October 28, 2011 19-Nov-18 Paul Harrington
P-01178 Email dated April 4, 2012, 8:18 AM from pharrington@nalcorenergy.com to briancrawley@nalcorenergy.com, gbennett@nalcorenergy.com and phumphries@nalcorenergy.com, cc jasonkean@nalcorenergy re Fw: Scope of Services 19-Nov-18 Paul Harrington
P-01179 Email dated April 9, 2012, 8:02:46 AM from briancrawley@nalcorenergy.com to gbennett@nalcorenergy.com, cc pharrington@nalcorenergy.com re scope of work MHI review 19-Nov-18 Paul Harrington
P-01180 Email dated April 12, 2012, 10:30:40 AM from briancrawley@nalcorenergy.com to Charles Bown re Scope of Services - Government of Newfoundland - Muskrat Falls DG3 review revised.docx 19-Nov-18 Paul Harrington
P-01181 Email dated April 20, 2012, 6:30 PM from Paul Harrington to Brian Crawley, Gilbert Bennett and Lance Clarke re NFL2 Scope of Services - Government of Newfoundland - Muskrat Falls DG3 review 19-Nov-18 Paul Harrington
P-01182 Email dated September 27, 2010, 3:06:53 PM from jasonkean@nalcorenergy.com to pharrington@nalcorenergy.com 19-Nov-18 Paul Harrington
P-01183 Nalcor Energy - Lower Churchill Project - Decision Gate 3 Key Deliverables List 19-Nov-18 Paul Harrington
P-01184 Email dated September 27, 2010, 5:16:04 PM from pharrington@nalcorenergy.com to jasonkean@nalcorenergy.com 19-Nov-18 Paul Harrington
P-01185 Nalcor Energy - Lower Churchill Project - Decision Gate 3 Key Deliverables List dated September 28, 2012 19-Nov-18 Paul Harrington
P-01186 Email dated September 5, 2012, 3:57:28 PM from pharrington@nalcorenergy.com, jasonkean@nalcorenergy.com and gbennett@nalcorenergy.com, cc lanceclarke@nalcorenergy.com and ronpower@nalcorenergy.com re Revised deck for use with MHI 19-Nov-18 Paul Harrington
P-01187 Email dated October 22, 2010, 10:28 AM from Paul O Parsons to auburnwarren@nalcorenergy.com and Gerard Collins, cc RobHull@nalcorenergy.com and SGoudie@nalcorenergy.com re Follow Up Materials 15-Nov-18 Robert Thompson
P-01188 Email dated October 14, 2010, 5:03:32 PM from AuburnWarren@nalcorenergy.com to Paul O Parsons, Gerard Collins and Vanessa Newhook, cc RobHull@nalcorenergy.com and SGoudie@nalcorenergy.com re Information Request - LCP DG#2 15-Nov-18 Robert Thompson
P-01189 Email dated September 6, 2012, 9:58:48 AM from pharrington@nalcorenergy.com to jasonkean@nalcorenergy.com, cc briancrawley@nalcorenergy.com, gbennett@nalcorenergy.com, lanceclarke@nalcorenergy.com and ronpower@nalcorenergy.com re Revised deck for use with MHI 19-Nov-18 Paul Harrington
P-01190 Email dated August 8, 2012, 10:35:41 AM from pharrington@nalcorenergy.com to briancrawley@nalcorenergy.com, gbennett@nalcorenergy.com and dawndalley@nalcorenergy.com, cc jasonkean@nalcorenergy.com re Deck for use with NS, NL, Feds 19-Nov-18 Paul Harrington
P-01191 Email dated August 13, 2012, 4:07:12 PM from pharrington@nalcorenergy.com to Charles Bown re Deck 19-Nov-18 Paul Harrington
P-01192 LCP Strategic Risk Ranges dated May 24, 2012 16-Nov-18 Richard Westney
P-01193 Nalcor Energy - Lower Churchil Project - Decision Gate 3 Basis of Estimate dated December 3, 2012 19-Nov-18 Paul Harrington
P-01194 Email dated March 18, 2012, 10:27:20 AM from dawndalley@nalcorenergy.com to emartin@nalcorenergy.com, cc Charles Bown and Jim Keating re Strategy 22-Nov-18 Jim Keating
P-01195 Email dated March 29, 2012, 8:42:03 AM from Charles W. Bown to Charles W. Bown re Fw: Ziff analysis 22-Nov-18 Jim Keating
P-01196 Email dated April 2, 2012, 1:43:30 PM from Paul McCloskey to JKeating@nalcorenergy.com re For information: NL government to study natural gas 22-Nov-18 Jim Keating
P-01197 Email dated April 3, 2012, 9:38 AM from Paul McCloskey to JKeating@nalcorenergy.com, cc Malcolm Maclean and Carol James re nat gas 22-Nov-18 Jim Keating
P-01198 Email dated April 9, 2012, 3:30:10 PM from pharrington@nalcorenergy.com to briancrawley@nalcorenergy.com and phumphries@nalcorenergy.com re Fw: Gas report 22-Nov-18 Jim Keating
P-01199 Email dated April 12, 2012, 7:02:32 PM from Jim Keating to Wes Foote re Ziff Call 22-Nov-18 Jim Keating
P-01200 Email dated April 12, 2012, 8:17 PM from Ed Martin to Jim Keating re Ziff 22-Nov-18 Jim Keating
P-01201 Email dated April 16, 2012, 5:15:07 PM from jkeating@nalcorenergy.com to gbennett@nlh.nl.ca and dawndalley@nalcorenergy.com re Fw: Ziff report on Natural Gas Viability and Analysis 22-Nov-18 Jim Keating
P-01202 Email dated July 13, 2012, 2:13 PM from kriscostello@nalcorenergy.com to wesfoote@gov.nl.ca, cc jkeating@nalcorenergy.com re Fw: Report 22-Nov-18 Jim Keating
P-01203 PIRA Energy Group - Newfoundland LNG Import Advisory for Nalcor dated September 7, 2012 22-Nov-18 Jim Keating
P-01204 Email dated October 19, 2012, 12:41 PM from Charles W. Bown to Wes Foote re FW: CPWs with LNG and Piped Gas - using Ziff estimates 22-Nov-18 Jim Keating
P-01205 Email dated October 31, 2012, 5:24:21 PM from jkeating@nalcorenergy.com to Tony Curtis re ziff excerpt 22-Nov-18 Jim Keating
P-01206 Email dated October 31, 2012, 8:29:47 PM from jkeating@nalcorenergy.com to Wes Foote, cc Charles Bown re Comments on WM Review 22-Nov-18 Jim Keating
P-01207 Email dated December 3, 2012, 2:41:12 PM from briancrawley@nalcorenergy.com to koneill@nlh.nl.ca, cc gbennett@nalcorenergy.com and dawndalley@nalcorenergy.com re thank you's 22-Nov-18 Jim Keating
P-01208 Handwritten Notes of Jerome Kennedy dated November 9, 2010 re Lower Churchill Presentation to Cabinet 3-Dec-18 Jerome Kennedy
P-01209 Handwritten Notes of Jerome Kennedy dated November 17, 2010 re Lower Churchill Meeting 3-Dec-18 Jerome Kennedy
P-01210 Handwritten Notes of Jerome Kennedy dated April 9, 2011 re Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01211 Handwritten Notes of Jerome Kennedy dated April 13, 2011 re Muskrat Falls and Quebec 3-Dec-18 Jerome Kennedy
P-01212 Handwritten Notes of Jerome Kennedy dated October 27, 2011 re Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01213 CBC News article dated November 2, 2011 re Muskrat Falls to get a PR push 3-Dec-18 Jerome Kennedy
P-01214 Email dated December 1, 2011, 9:14:16 AM from Charles W. Bown to Charles W. Bown re Fw: Meeting with PUB 3-Dec-18 Jerome Kennedy
P-01215 Handwritten Notes of Jerome Kennedy dated January 3, 2012 to March 30, 2012 3-Dec-18 Jerome Kennedy
P-01216 Letter dated January 9, 2012 from Jerome Kennedy, Q.C. to Thomas Johnson re review of the Muskrat Falls Project 3-Dec-18 Jerome Kennedy
P-01217 Email dated January 11, 2012, 3:27:07 PM from DawnDalley@nalcorenergy.com to Charles W. Bown, cc Brian W. Taylor, Don Burrage, Robert Thompson and toreilly@coxandpalmer.com re Final draft of letter - we are reviewing as well - one last read please 3-Dec-18 Jerome Kennedy
P-01218 Handwritten Notes of Jerome Kennedy dated August 10, 2011 to December 18, 2011 3-Dec-18 Jerome Kennedy
P-01219 Email dated January 12, 2012, 1:21:27 PM from Jerome Kennedy to Heather Maclean re James Feehan - info on paper 3-Dec-18 Jerome Kennedy
P-01220 CBC News On Point article dated January 14, 2012 re Kennedy sticks to guns on Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01221 Email dated January 18, 2012, 12:10:48 PM from Jerome Kennedy to Heather Maclean and Tracy Shute re messages as requested - PUB 3-Dec-18 Jerome Kennedy
P-01222 Email dated January 18, 2012, 10:35:05 AM from Jerome Kennedy to Heather Maclean re PUB Messages 3-Dec-18 Jerome Kennedy
P-01223 Email dated January 31, 2012, 11:29 AM from Heather Maclean to Jerome Kennedy and Diana Dalton, cc Tracy Shute re FYI - messages as requested by PO 3-Dec-18 Jerome Kennedy
P-01224 Emera Newfoundland and Labrador - ML Project Organizational Plan for DG3 dated September 23, 2013 20-Nov-18 Paul Harrington
P-01225 Email dated February 2, 2012, 9:20:15 AM from Rodney C. Drover to Cameron Bodnar, Carol Ann Carter, et al re VOCM - Reaction Swift to Report on Muskrat 3-Dec-18 Jerome Kennedy
P-01226 Email dated February 8, 2012, 5:40:16 PM from Jerome Kennedy to Heather Maclean re LCP Expenditures 3-Dec-18 Jerome Kennedy
P-01227 VOCM news article dated February 9, 2012 re Parties Debate Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01228 Email dated February 12, 2012, 1:37:16 PM from Jerome Kennedy to dvardy and Heather Maclean, cc ronaldp and david.vardy re Corner Brook Address 3-Dec-18 Jerome Kennedy
P-01229 Email dated February 13, 2012, 7:56 PM from Jerome Kennedy to Jerome Kennedy re Follow up 3-Dec-18 Jerome Kennedy
P-01230 The Telegram news article dated February 14, 2012 re Former PUB chairman takes exception to minister's comments 3-Dec-18 Jerome Kennedy
P-01231 The Telegram news article dated February 15, 2012 re Former premier reassured by Muskrat Falls talk 3-Dec-18 Jerome Kennedy
P-01232 Email dated February 16, 2012, 2:00:46 PM from Charles W. Bown to Heather Maclean and Jerome Kennedy, cc Tracy Shute re media request - david vardy CB speech 3-Dec-18 Jerome Kennedy
P-01233 Email dated February 21, 2012, 10:20 AM from Glenda Power to Brian W. Taylor and Jerome Kennedy re Fwd: Lower Churchill Project 3-Dec-18 Jerome Kennedy
P-01234 Email dated February 24, 2012, 4:26:52 PM from Robert Thompson to Brian W. Taylor re Suggestion 3-Dec-18 Jerome Kennedy
P-01235 GNL News Release dated March 6, 2012 re Opposition Parties Continue to Display a Lack of Understanding on Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01236 Email dated April 4, 2012, 3:33:09 PM from BrianCrawley@nalcorenergy.com to Charles W. Bown re scope 3-Dec-18 Jerome Kennedy
P-01237 Handwritten Notes of Jerome Kennedy dated April 1, 2012 to August 23, 2012 3-Dec-18 Jerome Kennedy
P-01238 Nalcor Energy Amending Agreement Number 3 dated July 13, 2010 between Nalcor Energy and Erimus Consulting Ltd. 20-Nov-18 Paul Harrington
P-01239 Nalcor Energy Amending Agreement Number 4 dated July 29, 2010 between Nalcor Energy and Erimus Consulting Ltd. 20-Nov-18 Paul Harrington
P-01240 CBC news article dated April 2, 2012 re Muskrat Falls will get special debate in legislature 3-Dec-18 Jerome Kennedy
P-01241 GNL News Release dated April 2, 2012 re Provincial Government Responds to Release of PUB Report 3-Dec-18 Jerome Kennedy
P-01242 Email dated April 10, 2012, 8:31:02 PM from Jerome Kennedy to Heather Maclean re Media requests for Ed 3-Dec-18 Jerome Kennedy
P-01243 Email dated April 12, 2012, 10:25:02 AM from Jerome Kennedy to Robert Thompson re Draft Preliminary Cabinet Agenda - comments welcome 3-Dec-18 Jerome Kennedy
P-01244 Email dated April 13, 2012, 1:55 PM from Robert Thompson to KMD and Jerome Kennedy re Fw: Muskrat - Important 3-Dec-18 Jerome Kennedy
P-01245 Email dated April 20, 2012, 10:20:33 AM from Jerome Kennedy to Tracy Shute and Heather Maclean re Fw: Presentation 3-Dec-18 Jerome Kennedy
P-01246 Email dated April 26, 2012, 8:53:14 AM from Rodney C. Drover to Christopher Appleby, Cameron Bodnar, et al re VOCM - Government Delays Muskrat Falls Debate 3-Dec-18 Jerome Kennedy
P-01247 VOCM news article dated April 27, 2012 re Kennedy Responds to Court Challenge 3-Dec-18 Jerome Kennedy
P-01248 Email dated April 30, 2012, 2:49 PM from Judy Beckwick to karen1 re Untitled Message 3-Dec-18 Jerome Kennedy
P-01249 Letter dated April 30, 2012 from Jerome P. Kennedy, Q.C. to Leonard Clarke re Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01250 Email dated May 1, 2012, 12:59:31 PM from Heather Maclean to Tracy Shute re can you print for minister kennedy? 3-Dec-18 Jerome Kennedy
P-01251 Letter dated May 1, 2012 from Jerome P. Kennedy, Q.C. to Judy Facey 3-Dec-18 Jerome Kennedy
P-01252 Email dated May 9, 2012, 10:41 AM from Charles to Jerome Kennedy re NS legislation 3-Dec-18 Jerome Kennedy
P-01253 Email dated May 9, 2012, 4:03:22 PM from Rodney C Drover to Cameron Bodnar, Carol Ann Carter, et al re NS Release: Province Ensures Regulator Reviews Maritime Link 3-Dec-18 Jerome Kennedy
P-01254 Email dated May 11, 2012, 9:03:57 AM from Rodney C Drover to Cameron Bodnar, Carol Ann Carter, et all re VOCM - Nova Scotia Following Our Lead: Premier 3-Dec-18 Jerome Kennedy
P-01255 Excerpt from Transcript of House of Assembly Proceedings dated May 15, 2012 and Options and Alternatives 3-Dec-18 Jerome Kennedy
P-01256 Email dated May 29, 2012, 2:26:26 PM from Heather Maclean to Tracy Shute re docs to print for Minister Kennedy 3-Dec-18 Jerome Kennedy
P-01257 GNL Direction Note - Department of Natural Resources dated May 31, 2012 re Accountability Oversight for the Muskrat Falls Project / Labrador-Island Transmission Link / Labrador Transmission Assets (collectively referred to as "the Project" in this note) 3-Dec-18 Jerome Kennedy
P-01258 GNL News Release dated June 6, 2012 re House of Assembly Passes Motion for Creation of an East-West Electricity Corridor 3-Dec-18 Jerome Kennedy
P-01259 Email dated June 19, 2012, 2:50:14 PM from Jerome Kennedy to Heather Maclean re Fyi: CBC 3-Dec-18 Jerome Kennedy
P-01260 Email dated July 15, 2012, 8:49:18 PM from Charles W. Bown to Paul G. Scott, Rob McGrath and Corey Snook re MF papers 3-Dec-18 Jerome Kennedy
P-01261 Email dated July 22, 2012, 3:36:17 PM from Paul G. Scott to Charles W. Bown re Small Hydro Development as an Alternative to Muskrat Falls (6).doc 3-Dec-18 Jerome Kennedy
P-01262 Email dated July 24, 2012, 2:46:38 PM from Tina Williams to Jerome Kennedy, Diana Dalton, Charles W. Bown and Paul G. Scott, cc Tracy Shute re Nalcor - Media Requests - MF Preliminary Work 3-Dec-18 Jerome Kennedy
P-01263 Email dated July 29, 2012, 6:17:34 PM from Paul G. Scott to Charles W. Bown, cc Rob McGrath, Paul O Parsons and Judy Beckwith re FW: TRIM DOCUMENT: DOC-17014 : Export Opportunities (Muskrat Debate) 3-Dec-18 Jerome Kennedy
P-01264 Email dated July 29, 2012, 6:27:32 PM from Paul G. Scott to Charles W. Bown, cc Corey Snook re FW: TRIM DOCUMENT : DOC-17015 : Electricity Imports (Muskrat Debate) 3-Dec-18 Jerome Kennedy
P-01265 Email dated July 30, 2012, 8:02:52 PM from Charles W. Bown to Robert Thompson re Authorization Letter 3-Dec-18 Jerome Kennedy
P-01266 Speaking Notes for the Honourable Jerome Kennedy dated July 31, 2012 re formal agreements regarding construction of the Maritime Link between Nalcor and Emera 3-Dec-18 Jerome Kennedy
P-01267 The Telegram news article dated August 23, 2012 re Kennedy disputes Lower Churchill letter 3-Dec-18 Jerome Kennedy
P-01268 VOCM news article dated August 24, 2012 re Kennedy Hesitant about any Deal with Quebec 3-Dec-18 Jerome Kennedy
P-01269 Email dated September 3, 2012, 11:19 AM from Jerome Kennedy to Jerome Kennedy re Fw: Summary of Wood Mac meeting in London - Aug. 31/12 3-Dec-18 Jerome Kennedy
P-01270 Email dated September 5, 2012, 2:56:05 PM from Rob McGrath to Heather Maclean, cc Paul G. Scott re House papers 3-Dec-18 Jerome Kennedy
P-01271 Email dated September 7, 2012, 9:06:44 AM from Jerome Kennedy to Heather Maclean re Fyi. Letter to editor re: Wangersky's editorial 3-Dec-18 Jerome Kennedy
P-01272 Email dated September 11, 2012, 1:08:09 PM from Charles W. Bown to Robert Thompson, cc Laurie Skinner 3-Dec-18 Jerome Kennedy
P-01273 Email dated September 17, 2012, 5:44:31 PM from Charles W. Bown to Paul G. Scott re Fw: 2041 paper 3-Dec-18 Jerome Kennedy
P-01274 Handwritten Notes of Jerome Kennedy dated September 19, 2012 re Meeting re Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01275 Email dated September 24, 2012, 10:42 AM from Jerome Kennedy to Jerome Kennedy re Fw: Status 3-Dec-18 Jerome Kennedy
P-01276 Email dated October 10, 2012, 12:33 PM from Jerome Kennedy to Jerome Kennedy re Fw: Meeting with Wood Mac with handwritten notes 3-Dec-18 Jerome Kennedy
P-01277 Email dated October 10, 2012, 12:33 PM from Jerome Kennedy to Jerome Kennedy re Fw: Meeting with Ziff with handwritten notes 3-Dec-18 Jerome Kennedy
P-01278 Letter dated October 25, 2012 from Joan Morris for Secretary of Treasury Board to Honourable J. Kennedy re Provincial Public Information Campaign - Lower Churchill Project 3-Dec-18 Jerome Kennedy
P-01279 House of Assembly proceedings dated December 18, 2012 - Vol. XLVII No. 71 3-Dec-18 Jerome Kennedy
P-01280 Handwritten Notes of Jerome Kennedy dated October 28, 2012 re MHI's Wind Report 3-Dec-18 Jerome Kennedy
P-01281 Email dated October 29, 2012, 8:05:48 PM from Jerome Kennedy to Heather Maclean re KM - for Caucus 3-Dec-18 Jerome Kennedy
P-01282 Email dated October 29, 2012, 9:15:15 PM from Heather Maclean to Lynn Hammond, DawnDalley@nalcorenergy.com and Glenda Power, cc Luke Joyce, Tina Williams and Tracy Shute re UPDATED SN - Minister Kennedy 3-Dec-18 Jerome Kennedy
P-01283 Email dated October 30, 2012, 9:50:50 PM from DawnDalley@nalcorenergy.com to Heather Maclean re FYI - Minister Kennedy's speaking notes - MHI Wind 3-Dec-18 Jerome Kennedy
P-01284 GNL News Release dated October 30, 2012 re MHI Analysis and DG3 Cost Estimates Support Development of Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01285 Transcript of VOCM Back Talk dated October 31, 2012, 2:00 PM, Item # 01 re Paddy welcomes his in studio guests Jerome Kennedy, Minister of Natural Resources and Ed Martin, CEO of Nalcor 3-Dec-18 Jerome Kennedy
P-01286 GNL News Release dated October 31, 2012 re Independent Review Shows Wind at Least $3.5B More than Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01287 CBC news article dated November 3, 2012 re PCs have "no confidence" in Public Utilities Board, says Kennedy 3-Dec-18 Jerome Kennedy
P-01288 Handwritten notes of Jerome Kennedy on Gull Island: Why Not Develop Gull Island First? 3-Dec-18 Jerome Kennedy
P-01289 Handwritten notes of Jerome Kennedy on Upper Churchill: Can we Wait Until 2041? 3-Dec-18 Jerome Kennedy
P-01290 Handwritten notes of Jerome Kennedy dated November 6, 2012 re MHI Load Forecast 3-Dec-18 Jerome Kennedy
P-01291 GNL News Release dated November 6, 2012 re Report Shows Muskrat Falls will Stabilize Electricity Rates for Consumers 3-Dec-18 Jerome Kennedy
P-01292 The Telegram news article dated November 7, 2012 re Minister rebranded 3-Dec-18 Jerome Kennedy
P-01293 GNL News Release dated November 7, 2012 re New Power Generation is Required to Meet Future Electricity Demand 3-Dec-18 Jerome Kennedy
P-01294 GNL News Release dated November 9, 2012 re Developing Muskrat Falls is Best Option - Reports Released on Waiting Until 2041, Developing Gull Island First and Other Legal Options 3-Dec-18 Jerome Kennedy
P-01295 Email dated November 13, 2012, 11:02:08 AM from Jerome Kennedy to Heather Maclean re FYI: Questions from Dave Vardy and Ron Penney for Approval 3-Dec-18 Jerome Kennedy
P-01296 Email dated November 16, 2012, 9:34 AM from Jerome Kennedy to Jerome Kennedy re Fw: Questions from Ball 3-Dec-18 Jerome Kennedy
P-01297 Email dated November 26, 2012, 12:21:41 PM from Heather Maclean to Jennifer Collingwood 3-Dec-18 Jerome Kennedy
P-01298 GNL News Release dated November 30, 2012 re Premier, Prime Minister Announce Agreement on Loan Guarantee 3-Dec-18 Jerome Kennedy
P-01299 Statement by The Honourable Jerome Kennedy, Minister of Natural Resources dated December 3, 2012 re The Government of Newfoundland and Labrador secures agreement on terms for a federal loan guarantee 3-Dec-18 Jerome Kennedy
P-01300 CBC news article dated December 5, 2012 re NL Legislature votes to approve Muskrat Falls 3-Dec-18 Jerome Kennedy
P-01301 Handwritten Notes of Jerome Kennedy dated December 17, 2012 re Meeting in Premier's Office 3-Dec-18 Jerome Kennedy
P-01302 GNL News Release dated December 18, 2012 re New Legislation to Help Advance Muskrat Falls Hydroelectric Project 3-Dec-18 Jerome Kennedy
P-01303 GNL News Release dated December 18, 2012 re Proposed Amendments Support Financing of the Muskrat Falls Development 3-Dec-18 Jerome Kennedy
P-01304 Email dated December 18, 2012, 11:21:12 AM from Jerome Kennedy to Heather Maclean and Charles W. Bown re Is sanction agreement released? 3-Dec-18 Jerome Kennedy
P-01305 Newfoundland Hydro Presentation dated August 2006 re Proposal to Monetize Grand Banks Natural Gas 22-Nov-18 Jim Keating
P-01306 EnerSea Transport LLC Presentation dated October 2007 re Natural Gas Production-Shuttling - Unique Applications of Low Pressure CNG 22-Nov-18 Jim Keating
P-01307 EnerSea Canada Inc. - Grand Banks Detailed Feasibility Study Commercial Report dated January 17, 2008 prepared for Newfoundland and Labrador Hydro 22-Nov-18 Jim Keating
P-01308 EnerSea Canada Inc. - Grand Banks Gas Export Project - Detailed Feasibility Study dated August 4, 2009 prepared for Nalcor Energy 22-Nov-18 Jim Keating
P-01309 Nalcor Energy Presentation dated February 28, 2012 re Muskrat Falls Development - Board of Trade 22-Nov-18 Jim Keating
P-01310 Email dated July 13, 2012, 10:22:36 from jkeating@nalcorenergy.com to cbown@gov.nl.ca re Fw: Discussion Paper - Gas Draft - Confidential and Commercially Sensitive 22-Nov-18 Jim Keating
P-01311 GNL News Release dated December 31, 2012 re Newfoundland and Labrador's Energy Sector to Sustain the Provincial Economy for Generations to Come 3-Dec-18 Jerome Kennedy
P-01312 Email dated October 27, 2012, 11:19:51 AM from Charles Bown to Jerome Kennedy re Fw: Ziff Paper and review 3-Dec-18 Jerome Kennedy
P-01312 Email dated October 27, 2012, 11:19:51 AM from Charles Bown to Jerome Kennedy re Fw: Ziff Paper and review 22-Nov-18 Jim Keating
P-01313 Husky Energy Report dated May 2012 - White Rose Extension Project - Project Description 22-Nov-18 Jim Keating
P-01314 Curriculum Vitae - Gilbert John Bennett 26-Nov-18 Gilbert Bennett
P-01315 Newfoundland and Labrador Hydro - 2006 Project Strategy - Lower Churchill Project dated April 29, 2006 26-Nov-18 Gilbert Bennett
P-01316 Email dated November 25, 2007, 7:16:33 PM from mbradbury@nlh.nl.ca to jharris@nlh.nl.ca, cc dsturge@nlh.nl.ca re Goal 6 Planning 26-Nov-18 Gilbert Bennett
P-01317 Email dated December 19, 2007, 3:12:26 PM from pharrington@nlh.nl.ca to cstratton@nlh.nl.ca re Decision Gate Process 26-Nov-18 Gilbert Bennett
P-01318 Newfoundland and Labrador Hydro - Lower Churchill Project - Project Steering Committee Charter 26-Nov-18 Gilbert Bennett
P-01319 Email dated February 6, 2012, 8:09:16 AM from stevegoulding@nalcorenergy.com to davepardy@nalcorenergy.com, cc jasonkean@nalcorenergy.com and markturpin@nalcorenergy.com re Fw: Notes from our PUB strategy meeting 26-Nov-18 Gilbert Bennett
P-01320 Email dated July 10, 2012, 6:35:55 AM from Charles W. Bown to Robert Thompson and emartin@nalcorenergy.com re Outline of plan 26-Nov-18 Gilbert Bennett
P-01321 Gull Island Capex - 1998 - 2018 26-Nov-18 Gilbert Bennett
P-01322 Labrador Innu Land Use in Relation to the Proposed Trans Labrador Highway, Cartwright Junction to Happy Valley-Goose Bay and Assessment of Highway Effects on Innu Land Use prepared by Peter Armitage and Marianne Stopp submitted to the Department of Works, Services and Transportation, submitted by Innu Environmental Ltd. Partnership dated January 29, 2003 26-Nov-18 Gilbert Bennett
P-01323 Government of Canada - Government of Newfoundland and Labrador - Environmental Impact Statement Guidelines - Lower Churchill - Hydroelectric Generation Project - Newfoundland and Labrador Hydro dated July 2008 26-Nov-18 Gilbert Bennett
P-01324 Nalcor Energy - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 5 - IR# JRP.1S/2S to JRP.112S dated October 2009 26-Nov-18 Gilbert Bennett
P-01325 Joint Review Panel - Information Request Number: JRP16 - Composite Mapping (Land and Resource Use) 26-Nov-18 Gilbert Bennett
P-01326 Joint Review Panel - Information Request Number: JRP16 - Composite Mapping (Land and Resource Use) Nalcor Energy - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 1 - IR# JRP.19 to JRP.44 dated October 2009 26-Nov-18 Gilbert Bennett
P-01327 Nalcor Energy - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 2 - IR# JRP.45 to JRP.75 dated October 2009 26-Nov-18 Gilbert Bennett
P-01328 Joint Review Panel - Information Request Number: JRP59 - Seismic Hazard - Regional Normal Faults 26-Nov-18 Gilbert Bennett
P-01329 Joint Review Panel - Information Request Number: JRP.63 - Hydrogeology 26-Nov-18 Gilbert Bennett
P-01330 Nalcor Energy - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 3 - IR# JRP.76 to JRP.104 dated October 2009 26-Nov-18 Gilbert Bennett
P-01331 Nalcor Energy - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 4 - IR# JRP.105 to JRP.145 dated October 2009 26-Nov-18 Gilbert Bennett
P-01332 Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 1 - IR#s JRP.146 to JRP164 dated August 2010 26-Nov-18 Gilbert Bennett
P-01333 Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 1 - IR#s JRP.146 to JRP164 dated August 2010 26-Nov-18 Gilbert Bennett
P-01334 Nalcor Energy - Lower Churchill Project - Supplemental Information to IR JRP.151 (Consultation Assessment Report) dated September 2010 26-Nov-18 Gilbert Bennett
P-01335 Nalcor Energy facsimile dated May 13, 2009 from Gilbert Bennett to Chef Jean-Charles Piétacho re Community Consultation Agreement - 2009 between Nalcor Energy and Conseil des Innus d'Ekuanitshit 26-Nov-18 Gilbert Bennett
P-01336 Preliminary Review of the Environmental Impact Statement and Methodologies Used for Woodland Caribou and Waterfowl Studies Prepared by Nalcor Energy in the Context of the Lower Churchill Hydroelectric Generation Project in Labrador dated June 2009 26-Nov-18 Gilbert Bennett
P-01337 Information Request Number: JRP.15 - Composite Mapping (Terrestrial Environment) 26-Nov-18 Gilbert Bennett
P-01338 Nalcor Energy - Lower Churchill Project - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 1-A - IR Numbers JRP.1 to JRP.13 dated July 3, 2009 26-Nov-18 Gilbert Bennett
P-01339 Nalcor Energy - Lower Churchill Project - Information Responses - Lower Churchill Project - CEAA Reference No. 07-05-26178 - Joint Review Panel - Volume 1-B - IR Numbers JRP.14 to JRP.18 dated July 3, 2009 26-Nov-18 Gilbert Bennett
P-01340 Comments of the Innu of Ekuanitshit on the Additional Information Provided by the Proponent, Nalcor Energy - Lower Churchill Hydroelectric Generation Project - CEAR 07-05-26178 dated December 18, 2009 26-Nov-18 Gilbert Bennett
P-01341 Letter dated August 13, 2010 from David Schulze to Lesley Griffiths and Herbert Clarke re Proposed Lower Churchill Hydroelectric Generation Project (Gull Island et Muskrat Falls); Your file no. CEAR 07-05-26178; our files nos. 7550/001 and 7550/002 26-Nov-18 Gilbert Bennett
P-01342 Letter dated November 9, 2010 from David Schulze to Mary Hatherly re Proposed Lower Churchill Hydroelectric Generation Project (Gull Island and Muskrat Falls); CEAR no. 07-05-26178; our files nos. 7550/001 and 7550/002 26-Nov-18 Gilbert Bennett
P-01343 Transmittal dated June 23, 2011 from Rick Hendriks to Pat Marrie, cc Richard Nuna and Paula Reid re Labrador-Island Transmission Link - Historic Resources Component Study 26-Nov-18 Gilbert Bennett
P-01344 Email dated July 1, 2011, 8:37 AM from MaryHatherly@nalcorenergy.com to David Schulze, cc Toleniuk@osler.com, StevePellerin@nalcorenergy.com, et al re Response to E-Mail: Community Engagement -- Ekuanitshit - Labrador-Island Transmission Link Project 26-Nov-18 Gilbert Bennett
P-01345 Labrador-Island Transmission Link - Environmental Impact Statement - Innu Nation Comments dated June 12, 2012 26-Nov-18 Gilbert Bennett
P-01346 Federal Court File No: T-778-12 between Conseil Des Innus de Ekuanitshit and Le Procureur General du Canada - Examination on Affidavit - Deposition of Mr. Gilbert John Bennett examined by David Schulze dated August 28, 2012 26-Nov-18 Gilbert Bennett
P-01347 Comments of the Innu of Ekuanitshit on the Comprehensive Study Report - Labrador - Island Transmission Link Project - CEAR No. 10-03-51746 dated July 27, 2013 26-Nov-18 Gilbert Bennett
P-01348 Letter dated June 23, 2011 from Nicholas Dodd to Bill Coulter and Pat Marrie re Labrador Island Transmission Link Project - CEAR No. 10-03-51746; our file #7550/005 26-Nov-18 Gilbert Bennett
P-01349 Letter dated September 13, 2011 from David Schulze to Bill Coulter and Pat Marrie re Labrador Island Transmission Link Project - CEAR No. 10-03-51746; our file #7550/005 26-Nov-18 Gilbert Bennett
P-01350 Letter dated January 23, 2012 from David Schulze to Bill Coulter and Pat Marrie re Labrador Island Transmission Link Project - CEAR No. 10-03-51746; our file #7550/005 26-Nov-18 Gilbert Bennett
P-01351 Submission from the Innu of Ekuanitshit to the Joint Review Panel Public Hearings - CEAR 07-05-26178 - Lower Churchill Hydroelectric Generation Project dated April 2011 26-Nov-18 Gilbert Bennett
P-01352 Government of Newfoundland and Labrador and Government of Canada - Environmental Impact Statement Guidelines and Scoping Document - Labrador-Island Transmission Link - Nalcor Energy dated May 2011 26-Nov-18 Gilbert Bennett
P-01353 Government of Newfoundland and Labrador - Lower Churchill Hydroelectric Generation Project - Aboriginal Consultation Guidelines for Regulatory Approval Applications dated May 30, 2012 26-Nov-18 Gilbert Bennett
P-01354 Government of Newfoundland and Labrador - Labrador-Island Transmission Link Project - Aboriginal Consultation Guidelines for Regulatory Approval Applications dated July 2, 2013 26-Nov-18 Gilbert Bennett
P-01355 Nalcor Energy - Lower Churchill Hydroelectric Generation Project - Environmental Impact Statement - Volume 1 Part A - Project Planning and Description dated February 2009 26-Nov-18 Gilbert Bennett
P-01356 Westney Consulting Group presentation re Emera - Final Report - Cost and Schedule Risk Assessment for the Maritime Link Project dated October 15 to October 19, 2012 26-Nov-18 Gilbert Bennett
P-01357 Westney Consulting Group presentation re Emera - Cost and Schedule Risk Assessment Update for the Maritime Link Project dated September 9 to September 11, 2013 26-Nov-18 Gilbert Bennett
P-01358 Email dated April 24, 2007, 3:35:39 PM from Charles W. Bown to Chris Kieley re Fwd: Lower Churchill Coordinating Committee Meeting 5-Dec-18 Charles Bown
P-01359 Email dated August 9, 2007, 9:10:40 AM from Charles W. Bown to Chris Kieley and Pierre F. Tobin re Premier's comments on Energy plan 5-Dec-18 Charles Bown
P-01360 Email dated August 27, 2007, 8:17:08 AM from Charles W. Bown to Chris Kieley re Energy Plan - final review 5-Dec-18 Charles Bown
P-01361 Email dated October 28, 2007, 11:38:28 AM from Charles W. Bown to Judy Beckwith re Fwd: Hydro Goal 3 - To strengthen our financial and governance structure to enable Hydro ?s new, expanded 5-Dec-18 Charles Bown
P-01362 Regulatory and Structural Steering Committee (RSSC) Meeting Minutes dated April 15, 2008 5-Dec-18 Charles Bown
P-01363 Email dated June 4, 2008, 7:16:34 PM from Charles W. Bown to Mbradbury@nlh.nl.ca re ECNL Act Amendments 5-Dec-18 Charles Bown
P-01364 Email dated August 27, 2008, 3:09:19 PM from Mbradbury@nlh.nl.ca to DSturge@nlh.nl.ca, GBennett@nlh.nl.ca, Charles W. Bown, Dave Bazeley and DHarris@nhl.nl.ca re Minutes of Aug 25 meeting of the Regulatory and Structural Steering Committee 5-Dec-18 Charles Bown
P-01365 Email dated January 9, 2009, 12:53:33 PM from MBradbury@nalcorenergy.com to DSturge@nalcornergy.com, GBennett@nalcorenergy.com and Charles W. Bown, cc JHarris@nalcorenergy.com, DHarris@nlh.nl.ca, Dave Bazeley and Terry Dale re Regulatory & Structural Steering Committee next steps 5-Dec-18 Charles Bown
P-01366 Email dated February 10, 2009, 5:32:13 PM from Charles W. Bown to Kathy Dunderdale, cc Robert Thompson and Kimberley Mullins re Hydro Financial Viability 5-Dec-18 Charles Bown
P-01367 Email dated June 4, 2009, 10:23:32 AM from Charles W. Bown to Robert Thompson 5-Dec-18 Charles Bown
P-01368 Email dated September 4, 2009, 5:41:40 PM from Charles W. Bown to Tracy B. Barron re Sanction date 5-Dec-18 Charles Bown
P-01369 Email dated May 3, 2010, 12:11:44 PM from Charles W. Bown to Sharon Griffiths re Presentation Finance Group 30 April 2010.PPT; image001.png.image002.jpg 5-Dec-18 Charles Bown
P-01370 Email dated May 8, 2010, 9:21:52 AM from Charles W. Bown to Robert Thompson re Communications Plan in anticipation of Regie ruling 5-Dec-18 Charles Bown
P-01371 Email dated May 12, 2010, 8:47:42 AM from Charles W. Bown to Robert Thompson, LeonaBarrington@nalcorenergy.com, EMartin@nalcorenergy.com, et al re Draft News Release and Backgrounder 5-Dec-18 Charles Bown
P-01372 Nalcor Energy Presentation - Lower Churchill Project - Muskrat Falls - Technical Briefing 5-Dec-18 Charles Bown
P-01373 Email dated November 8, 2010, 10:24:19 PM from Charles W. Bown to Robert Thompson re Update 5-Dec-18 Charles Bown
P-01374 Email dated November 11, 2010, 9:15:59 PM from Charles W. Bown to LeonaBarrington@nalcorenergy.com and Paul Harrington re Gate 2 5-Dec-18 Charles Bown
P-01375 Email dated November 27, 2010, 4:16:17 PM from Charles W. Bown to GBennett@nalcorenergy.com, cc Robert Thompson re Fw: Meetings in Ottawa 5-Dec-18 Charles Bown
P-01376 Email dated December 3, 2010, 10:23:35 AM from Charles W. Bown to Robert Thompson and Ed Martin re Summary of Ottawa Meetings 5-Dec-18 Charles Bown
P-01377 Email dated December 4, 2010, 10:24:13 PM from Charles W. Bown to Charles W. Bown re Ottawa Meetings.ppt 5-Dec-18 Charles Bown
P-01378 - R Email dated December 17, 11:28:38 AM from Charles W. Bown to Judy Beckwith re Meeting Note 5-Dec-18 Charles Bown
P-01379 Email dated December 17, 2010, 2:07:59 PM from Charles W. Bown to Robert Thompson, EMartin@nalcorenergy.com and Brian W. Taylor re Draft Letter to PM 5-Dec-18 Charles Bown
P-01380 Email dated March 6, 2011, 2:13:09 PM from Charles W. Bown to Charles W. Bown re LCP Panel Presentation 5-Dec-18 Charles Bown
P-01381 Email dated March 7, 2011, 7:25:47 PM from Charles W. Bown to Robert Thompson re Panel presentation 5-Dec-18 Charles Bown
P-01382 Email dated April 14, 2011, 4:14:13 PM from Dave Bazeley to Charles W. Bown, cc Paul G. Scott re Normal vs Nalcor Process 5-Dec-18 Charles Bown
P-01383 Email dated April 14, 2011, 6:31:15 PM from Dave Bazeley to Charles W. Bown and Paul G. Scott re Independent Study 5-Dec-18 Charles Bown
P-01384 Email dated April 27, 2011, 4:49:54 PM from Charles W. Bown to Shawn Skinner and Richard Wardle re Draft Briefing Note 5-Dec-18 Charles Bown
P-01385 Email dated April 27, 2011, 5:36:11 PM from Charles W. Bown to DSturge@nalcorenergy.com and Robert Thompson, cc EMartin@nalcorenergy.com and AuburnWarren@nalcorenergy.com re Draft Briefing Note 5-Dec-18 Charles Bown
P-01386 - R Email dated April 28, 2011, 2:43:11 PM from Charles W. Bown to Paul G. Scott and Terry Paddon re FW: Draft Response to Queries (Confidential & Commercially Sensitive) 5-Dec-18 Charles Bown
P-01387 Email dated May 5, 2011, 3:18:43 PM from Charles W. Bown to Catherine Evans re Fw: Emailing: LCP Regulatory Process.doc 5-Dec-18 Charles Bown
P-01388 - R Email dated May 10, 2011, 8:42:34 AM from Paul G. Scott to Todd Stanley, cc Charles W. Bown re FW: PUB Letter 5-Dec-18 Charles Bown
P-01389 Email dated May 18, 2011, 3:54:10 PM from Charles W. Bown to Robert Thompson re Lower Churchill - Proposed PUB Question 5-Dec-18 Charles Bown
P-01390 - R Email dated May 25, 2011, 9:25:27 from DHarris@nalcorenergy.com to Paul G. Scott, cc DSturge@nalcorenergy.com re Nalcor Comments on PUB Referral 5-Dec-18 Charles Bown
P-01391 Email dated July 13, 2011, 5:36:05 PM from Charles W. Bown to Terry Paddon and DSturge@nalcorenergy.com, cc RobHull@nalcorenergy.com, JamesMeaney@nalcorenergy.com and AuburnWarren@nalcorenergy.com re Update Session 5-Dec-18 Charles Bown
P-01392 Email dated August 23, 2011, 6:43:04 PM from Serge Dupont to Charles W. Bown, cc Mark Corey and Johanne Mongeon re LCP Panel Report 5-Dec-18 Charles Bown
P-01393 Email dated August 25, 2011, 1:53:25 PM from Charles W. Bown to Mark.Corey@NRCan-RNCan.gc.ca 5-Dec-18 Charles Bown
P-01394 - R GNL Cabinet Secretariat Analysis re Commitment Letter to Assist Financing of Phase One of the Lower Churchill Project dated September 2, 2011 5-Dec-18 Charles Bown
P-01395 Email dated October 17, 2011, 1:31:43 PM from Charles W. Bown to Diana Dalton re FW: TRIM DOCUMENT: DOC-14125 : DNR Response to Muskrat Generation EA Panel Recommendations 5-Dec-18 Charles Bown
P-01396 Email dated October 18, 2011, 2:43:56 PM from Charles W. Bown to Robert Thompson re Critical Path 5-Dec-18 Charles Bown
P-01397 Email dated October 20, 2011, 9:04:09 PM from Charles W. Bown to Sharon Griffiths re FW: RFI's 5-Dec-18 Charles Bown
P-01398 Email dated October 26, 2011, 10:33:36 AM from Charles W. Bown to Heather Maclean re FW: Muskrat Falls Review 5-Dec-18 Charles Bown
P-01399 Email dated November 7, 2011, 1:04:08 PM from Paul G. Scott to Charles W. Bown re PUB Submission 5-Dec-18 Charles Bown
P-01400 Email dated November 28, 2011, 8:30:16 AM from Charles W. Bown to Mark Corey, cc Don Burrage, William Parrott, Serge.Dupont@NRCan-RNCan.gc.ca and Diana Dalton, bcc Andrew Noseworthy re Coordinated Review of LCP Joint Review Panel Report 5-Dec-18 Charles Bown
P-01401 Email dated December 1, 2011, 9:07:02 AM from GBennett@nalcorenergy.com to Charles W. Bown re thinking 29-Nov-18 Gilbert Bennett
P-01402 GNL Information Note - Department of Natural Resources dated December 10, 2011 re A review of the requests for information by the Board of Commissioners of Public Utilities in relation to its review of the Muskrat Falls project 5-Dec-18 Charles Bown
P-01403 Email dated December 22, 2011, 9:14:11 AM from Rob McGrath to Charles W. Bown, cc Judy Beckwith and Paul G. Scott re TRIM BRIEFING NOTES : BN-5388 : Briefing Note - NR's Joint Review Panel Responses 5-Dec-18 Charles Bown
P-01404 Email dated January 11, 2012, 12:12:23 PM from Charles W. Bown to Heather Maclean re FW: Letter to PUB - URGENT 5-Dec-18 Charles Bown
P-01405 Email dated January 12, 2012, 12:55:30 PM from GBennett@nalcorenergy.com to Charles W. Bown and Paul G. Scott, cc dawndalley@nalcorenergy.com re RFIs PUB-Nalcor-139 and PUB-Nalcor-162 5-Dec-18 Charles Bown
P-01406 Email dated March 31, 2012, 6:20:45 PM from Charles W. Bown to Brian W. Taylor and Glenda Power re Fw: Draft Materials 5-Dec-18 Charles Bown
P-01407 - R Email dated April 10, 2012, 2:52 PM from Paul Wilson to Charles W. Bown, cc Allen Snyder and Mack Kast re FW: Professional Services - Engagement with MHI 5-Dec-18 Charles Bown
P-01408 - R Email dated April 30, 2012, 8:17:28 PM from Charles W. Bown to DSturge@nalcorenergy.com re Fw: Oliver Letters 5-Dec-18 Charles Bown
P-01409 - R Email dated May 7, 2012, 10:04 AM from Charles W. Bown to charleswesleybown re Fw: Concern 5-Dec-18 Charles Bown
P-01410 Email dated May 15, 2012, 5:46:13 PM from GBennett@nalcorenergy.com to Charles W. Bown re wording 5-Dec-18 Charles Bown
P-01411 - R Email dated May 16, 2012, 4:23:15 PM from AuburnWarren@nalcorenergy.com to AuburnWarren@nalcorenergy.com, Jonathan Will, dpyper, Fred Mifflin and Anoop Kapor, cc DSturge@nalcorenergy.com, Charles W. Bown and Nancy Tower re FLG Meeting - May 17 at 9 am 5-Dec-18 Charles Bown
P-01412 Email dated May 17, 2012, 3:30:31 PM from Charles W. Bown to Charles W. Bown 5-Dec-18 Charles Bown
P-01413 Email dated June 19, 2012, 8:34:55 AM from Charles W. Bown to Walter Parsons re wind scope 5-Dec-18 Charles Bown
P-01414 Email dated June 19, 2012, 1:05:08 PM from Charles W. Bown to BrianCrawley@nalcorenergy.com re LCP Executive Committee 5-Dec-18 Charles Bown
P-01415 Email dated June 24, 2012, 12:30:41 PM from GBennett@nalcorenergy.com to Charles W. Bown re FW: wind scope 5-Dec-18 Charles Bown
P-01416 Email dated June 30, 2012, 12:36:33 PM from Charles W. Bown to COOLICM@gov.nl.ca re FLG timeline 5-Dec-18 Charles Bown
P-01417 Email dated July 5, 2012, 3:01:51 PM from Charles W. Bown to Charles W. Bown 5-Dec-18 Charles Bown
P-01418 Email dated July 15, 2012, 10:58:31 PM from Robert Thompson to Catherine Evans re Fwd: Outline of plan 5-Dec-18 Charles Bown
P-01419 Email dated July 16, 2012, 1:53:03 PM from Charles W. Bown to Heather Maclean and Paul G. Scott re Fw: MLARegs & Backgrounder_1, Jul 13, 2012.doc 5-Dec-18 Charles Bown
P-01420 - R Email dated July 22, 2012, 4:34:39 PM from Paul G. Scott to Charles W. Bown re HOA Papers 5-Dec-18 Charles Bown
P-01421 Email dated August 1, 2012, 1:23:34 PM from BrianCrawley to Brian W. Taylor, EMartin@nalcorenergy.com, et al re Agenda for tomorrow's call 5-Dec-18 Charles Bown
P-01422 Email dated August 8, 2012, 3:18:13 PM from Corey Snook to Charles W. Bown, Rob McGrath, et al, cc Paul G. Scott re papers 5-Dec-18 Charles Bown
P-01423 Email dated August 16, 20112, 10:16:26 AM from BrianCrawley@nalcorenergy.com to Brian W. Taylor, EMartin@nalcorenergy.com, et al re agenda for today's discussion 5-Dec-18 Charles Bown
P-01424 Email dated September 4, 2012, 12:27:16 PM from Charles W. Bown to Brian.Rendell@emera.com re Charles Bown is appointed Deputy Minister, Natural Resources with responsibility for Mines and Energy 5-Dec-18 Charles Bown
P-01425 Email dated September 21, 2012, 6:59:18 PM from Paula Burt to Robert Thompson and Brian W. Taylor re Fw: Meeting Note 5-Dec-18 Charles Bown
P-01426 Email dated October 11, 2012, 12:54:45 PM from Charles W. Bown to Tracy English and Heather Maclean re Fw: today's agenda 5-Dec-18 Charles Bown
P-01427 Email dated October 12, 2012, 2:21:17 PM from Heather Maclean to Heather Maclean re Fw: Update 5-Dec-18 Charles Bown
P-01428 Email dated October 15, 2012, 8:13:07 PM from Edward Kallio to Charles W. Bown re Contract 5-Dec-18 Charles Bown
P-01429 Email dated October 26, 2012, 4:59:47 PM from Charles W. Bown to Wes Foote re Fw: Front Section 5-Dec-18 Charles Bown
P-01430 Email dated October 27, 2012, 8:11:40 PM from DawnDalley@nalcorenergy.com to Charles W. Bown, Brian Crawley@nalcorenergy.com and Heather Maclean re technical deck 5-Dec-18 Charles Bown
P-01431 Email dated October 30, 2012, 6:36:15 PM from Bob Fleck to Charles W. Bown re Ziff Paper and review 5-Dec-18 Charles Bown
P-01432 Email dated October 31, 2012, 10:20:12 AM from Bob Fleck to Charles W. Bown re David Barrowman re Ziff Paper and review 5-Dec-18 Charles Bown
P-01433 Email dated November 1, 2012, 10:13:45 AM from Bob Fleck to Charles W. Bown, cc David Barrowman re Ziff Paper and review 5-Dec-18 Charles Bown
P-01434
P-01434 Email dated November 19, 2012, 1:51:17 PM from Charles W. Bown to Ed Martin, Robert Thompson and Brian W. Taylor re FW: Term Sheet for Lower Churchill Projects 29-May-19 Charles Bown
P-01435 - R Email dated November 26, 2012, 7:44:35 AM from Charles W. Bown to Robert Thompson, emartin@nalcorenergy.com and Brian W. Taylor re Ed, I have re drafted the letter to reflect the tone that I would recommend. Happy to discuss in the morning. I will delay my flight to Toronto so as to be available. Jim Prentice 5-Dec-18 Charles Bown
P-01436 Agreement LC-G-002 between Nalcor Energy and SNC-Lavalin INc. for Engineering, Procurement and Construction Management Services for the Muskrat Falls Hydroelectric Development 26-Nov-18 Gilbert Bennett
P-01437 Email dated June 9, 2011, 4:11 PM from ClarenceHewitt@nalcorenergy.com to John Husch, cc Andre St-Jean, LCO_LCG002@nalcorenergy.com, et al re Amendment No. 1 to Agreement LC-G-002 Rec. No. L010-S011-200-170331-00051 26-Nov-18 Gilbert Bennett
P-01438 Letter dated September 26, 2011 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amending Agreement No. 2 26-Nov-18 Gilbert Bennett
P-01439 Letter dated January 23, 2012 from Normand Bechard to Ron Power re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amending Agreement No. 3 - Deletion of Milestone 4 - Exhibit 7 26-Nov-18 Gilbert Bennett
P-01440 Letter dated August 15, 2012 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amending Agreement No. 4 - Assignment Conditions for Labrador Construction Sites 26-Nov-18 Gilbert Bennett
P-01441 Letter dated September 30, 2013 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amending Agreement No. 5 - Rate Adjustments 26-Nov-18 Gilbert Bennett
P-01442 Nalcor Energy Amending Agreement dated November 1, 2013 between Nalcor Energy and SNC-Lavalin Inc. 26-Nov-18 Gilbert Bennett
P-01443 Amending Agreement dated April 7, 2014 between Lower Churchill Management Corporation and SNC-Lavalin Inc. 26-Nov-18 Gilbert Bennett
P-01444 Letter dated May 22, 2014 from Ron Power to David Haley re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - 2014 Rate Adjustments for CSR and RSR increase 26-Nov-18 Gilbert Bennett
P-01445 Amending Agreement dated January 1, 2015 between Lower Churchill Management Corporation and SNC-Lavalin Inc. 26-Nov-18 Gilbert Bennett
P-01446 Amending Agreement dated August 15, 2017 between Lower Churchill Management Corporation and SNC-Lavalin Inc. 26-Nov-18 Gilbert Bennett
P-01447 Letter dated April 24, 2017 from Lance Clarke to Joe Leone re Lower Churchill Phase 1 Development - Agreement LC-G-002 - PM+ Access - Amending Agreement No. 11 26-Nov-18 Gilbert Bennett
P-01448 Amending Agreement dated May 1, 2017 between Lower Churchill Management Corporation and SNC-Lavalin Inc. 26-Nov-18 Gilbert Bennett
P-01449 Email dated May 20, 2011, 6:25 PM from Todd Williams to jharris@nalcorenergy.com re Strange Request 26-Nov-18 Gilbert Bennett
P-01450 Email dated May 24, 2011, 12:30:07 PM from gmcdonald@nalcorenergy.com to gbennett@nalcorenergy.com and catherinesquire@nalcorenergy.com re Draft Mandate - LC Executive Committee 26-Nov-18 Gilbert Bennett
P-01451 Email dated September 9, 2011, 11:11:05 AM from Auburnwarren@nalcorenergy.com to Todd Williams re Hardcopy of latest version of the report 26-Nov-18 Gilbert Bennett
P-01452 Nalcor Energy Presentation dated February 13, 2012 re Presentation to the Board of Commissioners of Public Utilities 26-Nov-18 Gilbert Bennett
P-01453 Email dated April 16, 2012, 4:54:04 PM from briancrawley@nalcorenergy.com to dawndalley@nalcorenergy.com re excomm charter 26-Nov-18 Gilbert Bennett
P-01454 In the Supreme Court of Newfoundland and Labrador Trial Division (General) Citation: Nunatukavut Community Council Inc. v. Newfoundland and Labrador Hydro-Electric Corporation (Nalcor Energy), 2011 NLTD (G) 44 dated March 24, 2011 26-Nov-18 Gilbert Bennett
P-01455 Federal Court Citation: 2012 FC 1520 dated December 20, 2012 between Grand Riverkeeper, Labrador Inc., Sierra Club of Canada and Nunatukavut Community Council Inc. and Attorney General of Canada, Minister of Natural Resources, Minister of Fisheries and Oceans, Minister of Transport and Nalcor Energy 26-Nov-18 Gilbert Bennett
P-01456 Federal Court Citation: 2013 FC 418 dated April 23, 2013 between Conseil des Innus de Ekuanitshit and Le Procureur Général du Canada et Ministre des Pêches et des Océans Canada et Ministre des Transports Canada et Ministres des Resources Naturelles Canada et Nalcor Energy et Newfoundland and Labrador Hydro-Electric Corporation 26-Nov-18 Gilbert Bennett
P-01457 Federal Court of Appeal Citation: 2014 FCA 189 dated August 22, 2014 between Council of the Innu of Ekuanitshit and The Attorney General of Canada and Minister of Fisheries and Oceans Canada and Minister of Transport Canada and Minister of Natural Resources Canada and Nalcor Energy 26-Nov-18 Gilbert Bennett
P-01458 In the Supreme Court of Newfoundland and Labrador Trial Division (General) Citation: Nunatsiavut v. Newfoundland and Labrador (Department of Environment and Conservation), 2015 NLTD(G) 1 dated January 12, 2015 26-Nov-18 Gilbert Bennett
P-01459 Federal Court Citation: 2015 FC 492 dated April 17, 2015 between Nunatsiavut Government and Attorney General of Canada and Her Majesty in Right of Newfoundland and Labrador and Nalcor Energy 26-Nov-18 Gilbert Bennett
P-01460 Federal Court Citation: 2015 FC 981 dated August 18, 2015 between Nunatukavut Community Council Inc and Todd Russell, on their own behalves and on behalf of the Members of Nunatukavut Community Council Inc. and the Attorney General of Canada and Nalcor Energy 26-Nov-18 Gilbert Bennett
P-01461 Request for Proposal Number LC-PM-070 for Independent Supply Decision Review for Nalcor-Energy - Lower Churchill Project 26-Nov-18 Gilbert Bennett
P-01462 Chris Huskilson response to Question from Legal Counsel to the Commission of Inquiry with respect to Muskrat Falls dated November 25, 2018 26-Nov-18 Gilbert Bennett
P-01463 Letter dated August 2, 2010 from Gilbert Bennett to Anne-Marie Erickson re Hydro-Québec's Application for an Electricity Export Permit dated February 19, 2010 and revised/republished July 3, 2010 26-Nov-18 Gilbert Bennett
P-01464 Water Management Agreement Application - Exhibits - Volume II 30-Nov-18 Water Management
P-01465 Written Submission on behalf of Churchill Falls (Labrador) Corporation Limited ("CF(L)Co") to The Board of Commissioners of Public Utilities and to Nalcor Energy dated December 10, 2009 30-Nov-18 Water Management
P-01466 Letter dated December 10, 2009 from Geoffrey P. Young to Cheryl Blundon re Application for Establishment of a Water Management Agreement 30-Nov-18 Water Management
P-01467 Letter dated December 15, 2009 from Christian G. Brosseau to Cheryl Blundon re Nalcor Application: Letter of Comment, Section 13 Public Utilities Regulations 30-Nov-18 Water Management
P-01468 Muskrat Falls' Contribution to the Reliability of the Island Interconnected System Expert Report dated October 17, 2016 submitted to the NL Public Utilities Board - Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System on behalf of Grand Riverkeeper (Labrador) Inc. by Philip Raphals 30-Nov-18 Water Management
P-01469 Newfoundland and Labrador Board of Commissioners of Public Utilities - An Order of the Board - No. P.U. 8(2010) dated March 9, 2010 in the matter of the Electrical Power Control Act, 1994, SNL 1994, Chapter E-5.1 (the "EPCA"), and regulations thereunder and in the matter of an application by Nalcor Energy for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited with respect to the Churchill River, Labrador 30-Nov-18 Water Management
P-01470 Newfoundland and Labrador Board of Commissioners of Public Utilities - Reasons for Decision: Order NO. P.U. 8(2010) dated March 17, 2010 in the matter of in the matter of the Electrical Power Control Act, 1994, SNL 1994, Chapter E-5.1 and regulations thereunder and in the matter of an application by Nalcor Energy for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited with respect to the Churchill River, Labrador 30-Nov-18 Water Management
P-01471 PUB-CF(L)Co-5 - Application for Establishment of a Water Management Agreement 30-Nov-18 Water Management
P-01472 PUB-CF(L)Co-7 - Application for Establishment of a Water Management Agreement 30-Nov-18 Water Management
P-01473 PUB-NE-49 - Application for Establishment of a Water Management Agreement 30-Nov-18 Water Management
P-01474 CBC news article dated August 12, 2016 re Nalcor insists court loss won't impact Muskrat Falls 30-Nov-18 Water Management
P-01475 Unofficial translation of a formal Court decision - Superior Court - dated August 8, 2016 - Hydro-Quebec v. Churchill Falls (Labrador) Corporation Limited 30-Nov-18 Water Management
P-01476 Court of Appeal of Quebec 500-09-026327-163 - On appeal from a judgment of the Superior Court, District of Montreal rendered on August 8, 2016 and rectified on November 8, 2016 30-Nov-18 Water Management
P-01477 Unofficial translation of a formal Court document - Quebec Court of Appeal - 500-09-026327-163 - Churchill Falls (Labrador) Corporation Limited v. Hydro-Quebec 30-Nov-18 Water Management
P-01478 Court of Appeal - Province of Quebec - District of Montreal - Notice of Appeal - Churchill Falls (Labrador) Corporation Limited v. Hydro-Quebec dated September 7, 2016 30-Nov-18 Water Management
P-01479 2011 01G 1093 - In the Supreme Court of Newfoundland and Labrador Trial Division (General) between Nunatukavut Community Council Inc. and Newfoundland and Labrador Hydro-Electric Corporation (Nalcor Energy) and Energy Corporation of Newfoundland and Labrador and Her Majesty in the Right of Newfoundland and Labrador and Attorney General of Canada and Canadian Environment Assessment Agency and Lesley Griffiths, Herbert Clarke, Meinhard Doelle, Catherine Jong and James Igloliorte dated March 11, 2011 28-Nov-18 Gilbert Bennett
P-01480 Newfoundland and Labrador Regulation 4/09 - Water Management Regulations under the Electrical Power Control Act, 1994 (O.C. 2009-016) 30-Nov-18 Water Management
P-01481 Nalcor Energy - Lower Churchill Project - Project Charter dated December 12, 2011 28-Nov-18 Gilbert Bennett
P-01482 Email dated June 26, 2009, 12:25:45 PM from LeonaBarrington@nalcorenergy.com to Paul O Parsons re LCP Presentation 28-Nov-18 Gilbert Bennett
P-01483 Email dated October 22, 2012, 1:00:55 PM from Edward Kallio to Charles W. Bown, cc Wes Foote and Edward Kallio re Exec Summary Wording 5-Dec-18 Charles Bown
P-01484 Nalcor Energy News Release dated October 22, 2012 re Water Management Agreement in place for Churchill River 30-Nov-18 Water Management
P-01485 Transcript of VOCM media clip dated November 8, 2012 re Water Management Agreement 30-Nov-18 Water Management
P-01486 - R Email dated November 3, 2012, 10:53 AM from Gilbert Bennett to Gideon John Samms, cc Dawn Dalley re Water Management 30-Nov-18 Water Management
P-01487 Email dated December 1, 2011, 4:33:04 PM from GBennett@nalcorenergy.com to Paul G. Scott, cc. Charles W. Bown, DawnDalley@nalcorenergy.com and Vanessa Newhook 29-Nov-18 Gilbert Bennett
P-01488 Email dated August 29, 2011, 4:20:59 PM from Heather Maclean to Shawn Skinner, Charles W. Bown, et al re Fw: from the NG - comments on panel report 29-Nov-18 Gilbert Bennett
P-01489 Excerpt from the National Energy Board Act (R.S.C., 1985, c. N-7) - Issuance of Licences 29-Nov-18 Gilbert Bennett
P-01490 Nalcor Energy - Lower Churchill Project - Minutes of Meeting dated February 17, 2010 29-Nov-18 Gilbert Bennett
P-01491 Transfert Environnement - Nalcor Lower Churchill Project - Strategic Reviewing of the JRP Report dated September 13, 2011 29-Nov-18 Gilbert Bennett
P-01492 Nalcor Energy - JRP Report Recommendation Review - Lower Churchill Hydroelectric Generation Project dated November 21, 2011 29-Nov-18 Gilbert Bennett
P-01493 SNC-Lavalin - Nalcor Energy Lower Churchill Project - Analysis of the Report of the Joint Review Panel for the Lower Churchill Hydroelectric Generation Project dated September 16, 2011 29-Nov-18 Gilbert Bennett
P-01494 Lower Churchill Project - Decision Gate 2 Decision Support Package - Reference Information 29-Nov-18 Gilbert Bennett
P-01495 Government of Canada - Daily Discharge Graph for Churchill River Above Upper Muskrat Falls (03OE001) [NL] 30-Nov-18 Water Management
P-01496 Letter dated November 15, 2018 from Shirley A. Walsh to Cheryl Blundon re Cost of Service Methodology Review 30-Nov-18 Water Management
P-01497 Newfoundland and Labrador Hydro - Churchill River Complex: Power and Energy Modeling Study Final Report dated July 1998 30-Nov-18 Water Management
P-01498 DD-NLH-065 - Island Interconnected System Supply Issues and Power Outages 30-Nov-18 Water Management
P-01499 PUB-NLH-217 - Island Interconnected System Supply Issues and Power Outages 30-Nov-18 Water Management
P-01500 Supreme Court of Canada Citation: Churchill Falls (Labrador) Corp. v. Hydro Quebec, 2018 SCC 46 - Judgment Rendered November 2, 2018 29-Nov-18 Gilbert Bennett
P-01501 - R Email dated June 13, 2007, 10:16:17 AM from Tracey B. Barron to Charles W. Bown, Chris Kieley, et al, cc Andrea Nolan re EPCA - Final Materials 30-Nov-18 Water Management
P-01502 Email dated November 6, 2012, 4:35:12 PM from Charles W. Bown to Robert Thompson re Coffey 30-Nov-18 Water Management
P-01503 - R Email dated November 7, 2012, 10:37:49 AM from Robert Thompson to Charles W. Bown re Coffey 30-Nov-18 Water Management
P-01504 - R Email dated November 7, 2012, 11:25:18 AM from Charles W. Bown to Robert Thompson re Coffey 30-Nov-18 Water Management
P-01505 - R Email dated November 7, 2012, 1:15:45 PM from Robert Thompson to Charles W. Bown re Coffey 30-Nov-18 Water Management
P-01506 - R Email dated November 7, 2012, 3:05:08 PM from Charles W. Bown to Robert Thompson re Coffey 30-Nov-18 Water Management
P-01507 - R Email dated July 22, 2013, 7:05 PM from Tracy English to Robert Thompson, Charles W. Bown, Todd Stanley and Ed Martin, cc Jennifer L. Tulk and Lynette re HQ 30-Nov-18 Water Management
P-01508 - R Email dated July 22, 2013, 8:58 PM from Robert Thompson to Tracy English, Todd Stanley, et al re HQ 30-Nov-18 Water Management
P-01509 - R Email dated July 22, 2013, 9:37:32 PM from EMartin@nalcorenergy.com to Charles W. Bown, GBennett@nalcorenergy.com, et al re HQ 30-Nov-18 Water Management
P-01510 - R Email dated July 22, 2013, 11:43:27 PM from RHenderson@nlh.nl.ca to WChamberlain@nalcorenergy.com and EMartin@nalcorenergy.com, cc Charles W. Bown, GBennett@nalcorenergy.com, et al re HQ 30-Nov-18 Water Management
P-01511 - R Email dated July 23, 2013, 5:45 AM from Todd Stanley to Paul Noble re Fw: I suggest you connect tonight with communication folks. From NR and Nalcor to get them plugged into this material. Nalcor needs to be reviewing this at legal and strategy level 30-Nov-18 Water Management
P-01512 - R Natural Resources Response to comments made by Dennis Browne, 2041 Group dated September 17, 2013 30-Nov-18 Water Management
P-01513 Email dated March 18, 2015, 4:54:15 PM from gbennett@nalcorenergy.com to Aubrey Gover, cc galewarren@lowerchurchillproject.ca 29-Nov-18 Gilbert Bennett
P-01514 The Telegram news article dated October 20, 2012 re Water-management rights need to be worked out 30-Nov-18 Water Management
P-01515 The Telegram news article dated October 24, 2012 re Nalcor, lawyer wrangle over water management rights 30-Nov-18 Water Management
P-01516 Email dated November 16, 2012, 9:41:49 AM from Jerome Kennedy to Jerome Kennedy re Fw: Liberal Angles 30-Nov-18 Water Management
P-01517 Email dated July 23, 2013, 8:38:38 AM from Tracy English to GBennett@nalcorenergy.com, Todd Stanley and Diana Quinton re HQ Key Messages 30-Nov-18 Water Management
P-01518 Email dated July 24, 2013, 8:20:49 AM from WChamberlain@nalcorenergy.com to Todd Stanley re HQ Motion - Fasken Translation 30-Nov-18 Water Management
P-01519 Natural Resources Declaratory Judgement Case/Water Management Agreement dated August 9, 2016 30-Nov-18 Water Management
P-01520 - R Nalcor Energy - Lower Churchill Project Presentation dated September 25, 2009 re Water Management - Update to Board of Directors 30-Nov-18 Water Management
P-01521 Water Management Summary dated November 30, 2018 produced by the Commission of Inquiry Respecting the Muskrat Falls Project 30-Nov-18 Water Management
P-01522 GNL Decision Note - Department of Natural Resources dated May 29, 2012 re Manitoba Hydro International Contract for Decision Gate 3 3-Dec-18 Jerome Kennedy
P-01523 Excerpt from House of Assembly Proceedings dated December 5, 2012, Vol. XLVII No. 64 3-Dec-18 Jerome Kennedy
P-01524 Handwritten Notes of Jerome Kennedy (Various Dates) 3-Dec-18 Jerome Kennedy
P-01525 Handwritten Notes of Jerome Kennedy (Various Dates) 3-Dec-18 Jerome Kennedy
P-01526 Index to Handwritten/Personal Notes by Jerome Kennedy 3-Dec-18 Jerome Kennedy
P-01527 Email dated April 12, 2012, 11:05:31 AM from Paul Wilson to Charles W. Bown re NFL2 Scope of Services - Government of Newfoundland - Muskrat Falls DG3 review rev1.docx. 4-Dec-18 Jerome Kennedy
P-01528 - R Email dated May 14, 2012, 2:56:07 PM from Charles W. Bown to Gilbert Bennett 4-Dec-18 Jerome Kennedy
P-01529 Email dated April 2, 2012, 10:54 AM from Charles W. Bown to Paul Wilson re Muskrat Falls 4-Dec-18 Jerome Kennedy
P-01530 Knight Piésold Report dated November 2, 2011 - Consumer Advocate for Newfoundland and Labrador - Two Generation Expansion Options - High Level Review Report 4-Dec-18 Jerome Kennedy
P-01531 - R GNL - Department of Natural Resources Draft Report - Governance and Accountability - Nalcor Energy 5-Dec-18 Charles Bown
P-01532 - R Email dated August 9, 2012, 12:11 AM from Allen Snyder to Charles W. Bown re Paul Wilson and mkast re MHI Decision Gate 3 review report draft 5-Dec-18 Charles Bown
P-01533 - R Email dated May 9, 2011, 12:16:28 PM from Vanessa Newhook to Robert Thompson, cc Charles W. Bown and Richard Wardle re Hebron Cost and Design Evolution 5-Dec-18 Charles Bown
P-01534 Email dated August 26, 2011, 4:29:18 PM from DawnDalley@nalcorenergy.com to Glenda Power, Milly Brown, Heather Maclean and Charles W. Bown re Ed's notes from this afternoon 5-Dec-18 Charles Bown
P-01535 Nalcor Energy - Lower Churchill Project Presentation dated October 30, 2012 re DG3 Technical Briefing 4-Dec-18 Jerome Kennedy
P-01536 Email dated July 26, 2006, 8:49:01 AM from jschisamore@nlh.nl.ca to sgoudie@nlh.nl.ca and ddalley@nlh.nl.ca re Ed's Latest Evidence 10-Dec-18 Edmund Martin
P-01537 Executive Employment Agreement (First Renewal) between Nalcor Energy and Edmund Martin executed November 2, 2009 10-Dec-18 Edmund Martin
P-01538 IPA Pacesetter Evaluation of LCP - June 2008 - Review Findings and Observations - Gap Closure Plan - Updated August 30, 2010 10-Dec-18 Edmund Martin
P-01539 Email dated March 6, 2011, 9:21:53 AM from jamesmeaney@nalcorenergy.com to emartin@nalcorenergy.com, cc dsturge@nalcorenergy.com, pharrington@nalcorenergy, et al re DG2 Document - Updated March 2011 10-Dec-18 Edmund Martin
P-01540 CBC news article dated January 11, 2012 re Shelve Muskrat Falls, MUN economist urges 10-Dec-18 Edmund Martin
P-01541 Email dated January 17, 2012, 10:40 PM from Ed Martin to Dawn Dalley re Locke 10-Dec-18 Edmund Martin
P-01542 Memo dated November 14, 2013 from Peter A. Hickman to Muskrat Falls Corporation Board of Directors re Execution of Muskrat Falls Contracts and Instruments 10-Dec-18 Edmund Martin
P-01543 Nalcor Energy - Lower Churchill Project - Delegation of Authority - President & CEO dated August 2, 2016 10-Dec-18 Edmund Martin
P-01544 Email dated September 2, 2016, 1:48:14 PM from Cindy Hussey to Suzanne Williams re FW: 2005 EM Employment Contract 10-Dec-18 Edmund Martin
P-01545 Nalcor Energy - Lower Churchill Project - Financial Authority Procedure dated October 6, 2016 10-Dec-18 Edmund Martin
P-01546 MHI-Nalcor-3 - Muskrat Falls Review 10-Dec-18 Edmund Martin
P-01547 Project Background and Rationale 10-Dec-18 Edmund Martin
P-01548 Email dated April 28, 2011, 11:28 PM from Robert Thompson to gbennett@nalcorenergy.com, cc auburnwarren@nalcorenergy.com, Charles Bown, dsturege@nalcorenergy.com and emartin@nalcorenergy.com re *Confidential: RE: Draft Response to Queries (Confidential & Commercially Sensitive) 5-Dec-18 Charles Bown
P-01549 Handwritten Notes of Jerome Kennedy dated July 17, 2012 and August 3, 2012 5-Dec-18 Jerome Kennedy
P-01550 Report on Conservation and Demand Management - Extracted from the December 2009 PUB Quarterly report 10-Dec-18 Edmund Martin
P-01551 Report on Conservation and Demand Management - Extracted from the December 2010 PUB Quarterly report 10-Dec-18 Edmund Martin
P-01552 Letter dated May 22, 2012 from Geoffrey P. Young to Cheryl Blundon re 2011 Conservation and Demand Management Report 10-Dec-18 Edmund Martin
P-01553 A Report to the Board of Commissioners of Public Utilities dated March 2013 re 2012 Conservation and Demand Management Report 10-Dec-18 Edmund Martin
P-01554 A Report to the Board of Commissioners of Public Utilities dated April 2014 re 2013 Conservation and Demand Management Report 10-Dec-18 Edmund Martin
P-01555 Newfoundland and Labrador Hydro and Newfoundland Power - A Report to the Board of Commissioners of Public Utilities dated June 2008 re Five-Year Energy Conservation Plan: 2008 - 2013 10-Dec-18 Edmund Martin
P-01556 Newfoundland and Labrador Hydro and Newfoundland Power Report dated August 2012 re Five-Year Energy Conservation Plan: 2012 - 2016 10-Dec-18 Edmund Martin
P-01557 Email dated March 19, 2018, 9:54 AM from karenoneill@nalcorenergy.com to David Vardy re Questions - reply to Jan 28 question 10-Dec-18 Edmund Martin
P-01558 CA/KPL-Nalcor-27 Rev. 1 - Muskrat Falls Review 10-Dec-18 Edmund Martin
P-01559 Muskrat Falls Project - Exhibit 36 - Board Letter - July 12, 2011 10-Dec-18 Edmund Martin
P-01560 Muskrat Falls Project - Development Cost - Sources & Uses of Funds ($Billions) dated August 2017 10-Dec-18 Edmund Martin
P-01561 GNL Muskrat Falls Project Oversight Committee Presentation dated November 3, 2017 re Quarterly Report - Period Ending September 30, 2017 10-Dec-18 Edmund Martin
P-01562 Letter dated October 3, 2017 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/651/2017) 10-Dec-18 Edmund Martin
P-01563 Letter dated November 9, 2017 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/740/2017) 10-Dec-18 Edmund Martin
P-01564 Letter dated February 12, 2018 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/33/2018) 10-Dec-18 Edmund Martin
P-01565 Letter dated April 18, 2018 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/242/2018) 10-Dec-18 Edmund Martin
P-01566 Labrador Metis Nation - Response to Lower Churchill Hydroelectric Generation Project Environmental Impact Statement - Registry Number 07-05-26178 dated December 18, 2009 10-Dec-18 Edmund Martin
P-01567 A Socioeconomic Review of Nalcor Energy's Environmental Impact Statement Regarding the Proposed Lower Churchill Hydroelectric Generation Project dated August 23, 2010 prepared for NunatuKavut Community Council Inc. 10-Dec-18 Edmund Martin
P-01568 Nalcor Energy - Lower Churchill Project - Supplemental Information to IR JRP.151 (Consultation Assessment Report) dated September 2010 10-Dec-18 Edmund Martin
P-01569 NunatuKavut Comments on Joint Review Panel - IR#s JRP.146 to JRP164 - CEAA Reference No. 07-05-26178 dated September 23, 2010 10-Dec-18 Edmund Martin
P-01570 NunatuKavut Comments on Joint Review Panel - IR#s JRP.151 - CEAA Reference No. 07-05-26178 dated October 2010 10-Dec-18 Edmund Martin
P-01571 Letter dated December 2010 from Todd Burlingame to Lesley Griffiths and Herbert Clarke re Response to letter of December 2, 2010 - Information on Current Use of Lands and Resources by Aboriginal Persons (EIS Guidelines 4.4.4.4 (b)) 10-Dec-18 Edmund Martin
P-01572 Email dated April 13, 2011, 8:19 AM from Kevin Aylward to Lower Churchill Review [CEAA], cc cmontague@labradormetis.ca and grussell@labradormetis.ca re Further information for consideration by JRP on Alternatives to Project 10-Dec-18 Edmund Martin
P-01573 A brief paper to the Joint Review Panel on the Lower Churchill Hydroelectric Generation Project dated April 13, 2011 compiled by Greg Mitchell, NunatuKavut Community Council 10-Dec-18 Edmund Martin
P-01574 CBC news article dated September 15, 2011 re Review supports Nalcor's Muskrat Falls plan 10-Dec-18 Edmund Martin
P-01575 Nalcor Energy JRP Report Recommendation Review - Lower Churchill Hydroelectric Generation Project dated November 21, 2011 10-Dec-18 Edmund Martin
P-01576 CBC news article dated April 21, 2012 re Muskrat megaproject called burden for future generations 10-Dec-18 Edmund Martin
P-01577 Email dated November 1, 2012, 11:41:13 AM from Taracetta Galgay to Mark Bugden re FW: endorsement 10-Dec-18 Edmund Martin
P-01578 Email dated October 31, 2012, 6:35:52 PM from Charles W. Bown to Wes Foote, Tracy English, Heather Maclean and jkeating@nalcorenergy.com re Comments on WM Review 6-Dec-18 Charles Bown
P-01579 - R Email dated October 31, 2012, 8:05:50 PM from Ed Martin to ed.martin re Fw: Wood Mackenzie 6-Dec-18 Charles Bown
P-01580 Email dated November 14, 2008, 2:18 PM from gmcdonald@nlh.nl.ca to gmcdonald@nlh.nl.ca, cc Dawn Dalley; leadership team meeting regular attendees re ECNL Vision Statement November 2008 10-Dec-18 Edmund Martin
P-01581 Email dated November 15, 2011, 11:05:40 PM from Ed Martin to Gilbert Bennett, Dawn Dalley, Karen O'Neill, Derrick Sturge and Chris Kieley re I've had enough 10-Dec-18 Edmund Martin
P-01582 Email dated July 12, 2018, 10:01:27 AM from Paul Harrington to PHarrington@lowerchurchillproject.ca re Fwd: Final version of opinion memo - PLEASE CONFIRM RECEIPT 10-Dec-18 Edmund Martin
P-01583 Nalcor Energy - Lower Churchill Project - Project Change Approval Hierarchy 10-Dec-18 Edmund Martin
P-01584 Nalcor Energy - Lower Churchill Project Presentation re The Lower Churchill Project - Renewable Energy for the Future 10-Dec-18 Edmund Martin
P-01585 Calendar meeting request dated September 26, 2011, 11:30 AM from Anne Butland on behalf of Diana Dalton to Wes Foote, Charles Bown, et al re Keith Warren & Spanish Company Union Fenosa Gas (UF Gas) 7-Dec-18 Charles Bown
P-01586 GNL News Release dated May 31, 2007 re Government to Create New Energy Corporation 17-Dec-18 Kathy Dunderdale
P-01587 GNL News Release dated September 1, 2009 re House of Assembly to Reconvene to Amend Water Rights Act 17-Dec-18 Kathy Dunderdale
P-01588 Email dated September 6, 2009, 11:25:25 AM from Kathy Dunderdale to Tracy B. Barron re Sanction date for the Lower Churchill 17-Dec-18 Kathy Dunderdale
P-01589 GNL News Release dated September 9, 2009 re Maritime Route Still Option for Lower Churchill Power 17-Dec-18 Kathy Dunderdale
P-01590 Email dated January 27, 2010, 5:18:04 PM from Kathy Dunderdale to Robert Thompson re BN re: Prime Minister 17-Dec-18 Kathy Dunderdale
P-01591 Email dated February 11, 2010, 2:56:03 PM from Kathy Dunderdale to Robert Thompson re Nalcor Op-Ed Article 17-Dec-18 Kathy Dunderdale
P-01592 GNL News Release dated July 14, 2010 re Benefits Strategy for Lower Churchill Construction Projects Ensures Opportunities for the People of Newfoundland and Labrador 17-Dec-18 Kathy Dunderdale
P-01593 Email dated July 27, 2010, 9:09:21 PM from Kathy Dunderdale to Charles W. Bown re Nalcor 2011 Generation Plan 17-Dec-18 Kathy Dunderdale
P-01594 Speaking Notes - Premier Kathy Dunderdale - Swearing-in Ceremony dated December 3, 2010 17-Dec-18 Kathy Dunderdale
P-01595 Email dated February 2, 2011, 4:57:09 Pm from Lesley Clarke to Lana Callan, Thomas Duggan, el al re CBC - PM meeting 'good first step': Dunderdale 17-Dec-18 Kathy Dunderdale
P-01596 Email dated February 8, 2011, 5:11:05 PM from Debbie A. Jacobs to Kathy Dunderdale re PM Letter from Robert 17-Dec-18 Kathy Dunderdale
P-01597 Email dated March 8, 2011, 4:37 PM from Bev Bailey to Robert Thompson, Richard Wardle, emartin@nalcorenergy.com, cc Catherine Evans, Anne Butland and BLane@nalcorenergy.com re FW: TRIM Incoming Correspondence : ICOR2011/0502 : Letter from Stephen Harper to Premier concerning federal support for the Muskrat Falls hydroelectric project, and this province's interest in acquiring the Government of Canada's ownership share in Hibern 17-Dec-18 Kathy Dunderdale
P-01598 Postmedia news article dated April 1, 2011 re PM makes loan promise to Newfoundland 17-Dec-18 Kathy Dunderdale
P-01599 Email dated April 29, 2011, 5:18:27 PM from Chris Huskilson to Kathy Dunderdale re Letter from Chris Huskilson 17-Dec-18 Kathy Dunderdale
P-01600 Email dated October 15, 2009, 8:13:04 PM from Charles W. Bown to Robert Thompson re Briefing Note NB-QC final.doc 10-Dec-18 Edmund Martin
P-01601 Matrix for NL Response to Recommendations dated October 26, 2011 7-Dec-18 Charles Bown
P-01602 Initial Triage Guidance and Tracking Matrix for Response to Recommendations dated November 1, 2011 7-Dec-18 Charles Bown
P-01603 Calendar meeting request dated October 27, 2011, 3:00 PM from Anne Butland on behalf of Diana Dalton to Diana Dalton, Paul Scott, Wes Foote and Charles Bown, cc Judy Beckwick, Diane Carroll and Brenda Jones re Updated: Revised Time - Union Fenosa Gas / Keith Warren, Foreign Affairs 7-Dec-18 Charles Bown
P-01604 Calendar meeting request dated October 27, 2011, 3:00 PM from Anne Butland on behalf of Diana Dalton to Diana Dalton, Paul Scott, Wes Foote and Charles Bown, cc Judy Beckwick, Diane Carroll and Brenda Jones re Updated: Revised Location (See Notes) - Union Fenosa Gas / Keith Warren, Foreign Affairs 7-Dec-18 Charles Bown
P-01605 The Telegram news article dated May 18, 2011 re No full PUB review for Muskrat Falls 17-Dec-18 Kathy Dunderdale
P-01606 Speaking Notes - Premier Dunderdale - Newfoundland and Labrador Oil and Gas Industries Association's (NOIA) 27th Annual Conference dated June 21, 2011 17-Dec-18 Kathy Dunderdale
P-01607 Email dated July 22, 2011, 11:29:48 AM from Kathy Dunderdale to kmd@gov.nl.ca re FW: Proposed Op-Ed piece….maybe this weekend. Can you please review. It's pretty comprehensive….and direct 17-Dec-18 Kathy Dunderdale
P-01608 CBC news article dated August 26, 2011 re Muskrat doubts can be resolved: Dunderdale 17-Dec-18 Kathy Dunderdale
P-01609 Letter dated August 31, 2011 from James Lyall to Kathy Dunderdale re Panel report and recommendations on proposed Lower Churchill Hydroelectric Generation project and Inuit involvement in the way forward 17-Dec-18 Kathy Dunderdale
P-01610 Letter dated September 16, 2011 from James Lyall to Kathy Dunderdale re Second meeting request - Panel report and recommendations on proposed Lower Churchill Hydroelectric Generation project and Inuit involvement in the way forward 17-Dec-18 Kathy Dunderdale
P-01611 CBC news article dated October 12, 2011 re Debate but no vote on Muskrat Falls says premier 17-Dec-18 Kathy Dunderdale
P-01612 GNL News Release dated November 4, 2011 re Address by the Honourable Kathy Dunderdale, Premier of Newfoundland and Labrador, to the New England-Canada Business Council's 19th Annual Energy, Trade and Technology Conference, November 4, 2011 - Please check against delivery 17-Dec-18 Kathy Dunderdale
P-01613 The Telegram news article dated December 3, 2011 re Muskrat is about just two questions: Dunderdale 17-Dec-18 Kathy Dunderdale
P-01614 Nalcor Energy presentation dated January 2012 re Federal Loan Guarantee ("FLG") - Core Principles to Receive Full Benefit of Guarantee 17-Dec-18 Kathy Dunderdale
P-01615 Speaking Notes for Premier Kathy Dunderdale dated January 31, 2012 to the Board of Trade in St. John's 17-Dec-18 Kathy Dunderdale
P-01616 Nalcor Energy presentation dated February 17, 2012 re Cabinet Retreat 17-Dec-18 Kathy Dunderdale
P-01617 Email dated February 21, 2012, 9:48 AM from Premier to Brenda Haynes, cc Tracy Shute re TRIM Incoming Correspondence : ICOR2012/0422 : Email from Brian Peckford to the Premier regarding his concerns with the process of the Muskrat Falls review 17-Dec-18 Kathy Dunderdale
P-01618 Email dated February 29, 2012, 7:17:09 PM from Charles W. Bown to Robert Thompson re Peckford letter 17-Dec-18 Kathy Dunderdale
P-01619 Handwritten Notes of Andy Wells dated April 5, 2012 re Telephone conversation with Premier Dunderdale on Wednesday, April 4 17-Dec-18 Kathy Dunderdale
P-01620 Email dated April 12, 2012, 2:00:02 PM from Kathy Dunderdale to kmd@gov.nl.ca re FW: Draft Preliminary Cabinet Agenda - comments welcome 17-Dec-18 Kathy Dunderdale
P-01621 VOCM news article dated May 11, 2012 re Nova Scotia Following Our Lead: Premier 17-Dec-18 Kathy Dunderdale
P-01622 Email dated June 5, 2012, 12:27:45 PM from Glenda Power to Heather Maclean, Jacquelyn Howard, News Releases and Milly Brown, cc Josephine Cheeseman, Jennifer Collingwood and Tina Williams re For Approval and Release Today - Premier Announces Board Appointments 17-Dec-18 Kathy Dunderdale
P-01623 GNL News Release dated June 8, 2012 re Minister Announces Board Appointments 17-Dec-18 Kathy Dunderdale
P-01624 Notes of a meeting between Premier Dexter and Premier Dunderdale dated July 12, 2012 17-Dec-18 Kathy Dunderdale
P-01625 Email dated August 13, 2012, 2:21:25 PM from Lynn Hammond to DawnDalley@nalcorenergy.com, Glenda Power and Heather Maclean re Six themes - think we need to discuss these 17-Dec-18 Kathy Dunderdale
P-01626 Nalcor Energy - Lower Churchill presentation dated September 19, 2012 re DG3 Capital Costs Overview 17-Dec-18 Kathy Dunderdale
P-01627 VOCM news article dated September 25, 2012 re Premier and Prime Minister Meet 17-Dec-18 Kathy Dunderdale
P-01628 VOCM news article dated September 26, 2012 re DG3 Numbers Holding Up Loan Guarantee: Premier 17-Dec-18 Kathy Dunderdale
P-01629 Email dated October 1, 2012, 8:43:42 AM from Rodney C. Drover to Christopher Appleby, Mark Bugden, et al re The Telegram - Nalcor CEO wants project decision before year end 17-Dec-18 Kathy Dunderdale
P-01630 Email dated October 3, 2012, 2:14:49 PM from Glenda Power to Doris A. Walsh, Brian Scott and News Releases, cc Jacquelyn Howard re FW: Premier's speaking notes 17-Dec-18 Kathy Dunderdale
P-01631 The Telegram news article dated October 4, 2012 re Premier attacks Quebec in speech 17-Dec-18 Kathy Dunderdale
P-01632 Government of Newfoundland and Labrador presentation dated October 30, 2012 re Review of Muskrat Falls, Labrador Island Transmission HVdc Link & Isolated Island Options by Manitoba Hydro International 17-Dec-18 Kathy Dunderdale
P-01633 Email dated October 30, 2012, 10:08:44 AM from DawnDalley@nalcorenergy.com to Lynn Hammond, cc Charles W. Bown and Heather Maclean re Fact List for Premier 17-Dec-18 Kathy Dunderdale
P-01634 Email dated October 30, 2012, 12:12:16 AM from DawnDalley@nalcorenergy.com to Lynn Hammond, cc Glenda Power, Heather Maclean and Lynette Carroll re MF Overview for Premier 17-Dec-18 Kathy Dunderdale
P-01635 Speaking Notes - Premier Kathy Dunderdale - Muskrat Falls Sanction dated December 17, 2012 17-Dec-18 Kathy Dunderdale
P-01636 Statement of Kathy Dunderdale RE: P-Factor, Strategic Risk and Schedule Risk 17-Dec-18 Kathy Dunderdale
P-01637 Power Purchase and Sale Agreement dated August 12, 2010 among H.Q. Energy Services (U.S.) Inc. as Seller and Central Vermont Public Service Corporation; Green Mountain Power Corporation, Vermont Public Power Supply Authority; Vermont Marble Power Division of OMYA Inc.; City of Burlington, Vermont Electric Department; and The Town of Stowe Electric Department as Buyers 10-Dec-18 Edmund Martin
P-01638 Nalcor Energy - 2012 Business and Financial Report 10-Dec-18 Edmund Martin
P-01639 Newfoundland Power - 2013 Management Discussion and Analysis & Annual Audited Financial Statement dated February 6, 2014 10-Dec-18 Edmund Martin
P-01640 Letter dated March 31, 2014 from Gerard M. Hayes to G. Cheryl Blundon re Newfoundland Power's 2013 Conservation and Demand Management Report (the "Report") 10-Dec-18 Edmund Martin
P-01641 Email dated October 24, 2011, 10:58:51 AM from Vanessa Newhook to Wes Foote re TRIM Briefing Notes : BN-5269 : Union Fenosa Gas (UFGas) Meeting Note_Oct 2011 7-Dec-18 Charles Bown
P-01642 Email dated November 14, 2011, 4:30:20 PM from Charles W. Bown to Heather Maclean, Jerome Kennedy, Diana Dalton and Paul G. Scott, cc Tracy Shute and Tina Williams re Nalcor NTV Interview on PUB filing 10-Dec-18 Edmund Martin
P-01643 Email dated November 15, 2011, 8:19:09 PM from KONeill@nhl.nl.ca to Glenda Power, Heather Maclean and Milly Brown re Interview request from Mike Connors on PUB filing 10-Dec-18 Edmund Martin
P-01644 Email dated November 15, 2011, 9:40:10 AM from Heather Maclean to Charles W. Bown re Nalcor NTV Interview on PUB filing 10-Dec-18 Edmund Martin
P-01645 BC Hydro - Integrated Resource Plan - Appendix 6A - Portfolio Results dated November 2013 10-Dec-18 Edmund Martin
P-01646 BC Hydro - Integrated Resource Plan - Appendix 9A - Load-Resource Balances, Base Resource Plans and Contingency Resource Plans dated November 2013 10-Dec-18 Edmund Martin
P-01647 Minutes of the Three Hundred and Thirty-Ninth Meeting of the Board of Directors of Newfoundland and Labrador Hydro dated May 5, 2006 10-Dec-18 Edmund Martin
P-01648 Consumer Advocate's Submission dated March 2, 2012 to the Board of Commissioners of Public Utilities 17-Dec-18 Kathy Dunderdale
P-01649 House of Assembly Proceedings dated November 29, 2012 - Vol. XLVII No. 61 10-Dec-18 Jerome Kennedy
P-01650 House of Assembly Proceedings dated December 12, 2012 - Vol. XLVII No 68 10-Dec-18 Jerome Kennedy
P-01651 Email dated October 25, 2011, 3:38:53 PM from Vaughn Hammond to Sean Dutton, Sheree P. MacDonald, et al re Information note on social impacts of major project development 11-Dec-18 Edmund Martin
P-01652 Email dated April 3, 2012, 2:38:40 PM from Paula Burt to Heather MacLellan, Diana Dalton, et al, cc Robert Thompson, Julia Mullaley, et al re Social Impacts of Major Project Developments 11-Dec-18 Edmund Martin
P-01653 Email dated April 26, 2011, 2:52:15 PM from dsturge@nalcorenergy.com to Robert Thompson, cc Charles Bown, Ed Martin, Gilbert Bennett and Auburn Warren re Briefing Note Draft 12-Dec-18 Edmund Martin
P-01654 Email dated April 27, 2011, 10:24:23 PM from dharris@nalcorenergy.com to rhenderson@nlh.nl.ca, cc auburnwarren@nalcorenergy.com, dsturge@nalcorenergy.com, gmitchell@nalcorenergy.com, wchamberlain@nalcorenergy.com and phumphries@nalcorenergy.com re Fw: Briefing Note Draft 12-Dec-18 Edmund Martin
P-01655 Email dated April 18, 2011, 11:07:20 PM from Robert Thompson to dsturge@nalcorenergy.com and Charles Bown re Meeting 12-Dec-18 Edmund Martin
P-01656 Presentation by Todd Russell, M.P. dated March 2011 re Where We Stand: Labradorians' views of the Muskrat Falls proposal 17-Dec-18 Kathy Dunderdale
P-01657 Transcript of Jerome Kennedy's handwritten notes dated April 1, April 6, October 30, 2012 13-Dec-18 CIMFP
P-01658 Email dated March 16, 2011, 5:06:16 PM from Heather Maclean to Glenda Power, cc Milly Brown re MF Campaign Communications Plan - March 16, 2011.doc 17-Dec-18 Kathy Dunderdale
P-01659 Email dated March 23, 2011, 4:38:16 PM from Tina Williams to DawnDalley@nalcorenergy.com and Charles W. Bown, cc Heather Maclean re FYI - HOA Issues 17-Dec-18 Kathy Dunderdale
P-01660 Excerpt from the House of Assembly Proceedings dated March 1, 1994 - Vol. XLII No. 2 (Pages 1, 13, 14, 45 and 46) 17-Dec-18 Kathy Dunderdale
P-01661 Excerpt from the House of Assembly Proceedings dated March 3, 1994 - Vol. XLII No. 4 (Pages 1 and 10-21) 17-Dec-18 Kathy Dunderdale
P-01662 Excerpt from the House of Assembly Proceedings dated March 11, 1994 - Vol. XLII No. 10 (Pages 1 and 3) 17-Dec-18 Kathy Dunderdale
P-01663 Excerpt from the House of Assembly Proceedings dated March 24, 1994 - Vol. XLII No. 19 (Pages 1-6) 17-Dec-18 Kathy Dunderdale
P-01664 Excerpt from the House of Assembly Proceedings dated December 11, 1995 - Vol. XLII No. 73 (Pages 1, 9, 20, 21, 23, 24, 28 and 29) 17-Dec-18 Kathy Dunderdale
P-01665 Excerpt from the House of Assembly Proceedings dated December 12, 1995 - Vol. XLII No. 74 (Pages 1-4) 17-Dec-18 Kathy Dunderdale
P-01666 Excerpt from the House of Assembly Proceedings dated December 9, 1999 - Vol. XLIV No. 49 (Pages 1, 8 and 9) 17-Dec-18 Kathy Dunderdale
P-01667 Excerpt from the House of Assembly Proceedings dated December 10, 1999 - Vol. XLIV No. 50 (Pages 1, 17-21 and 32-33) 17-Dec-18 Kathy Dunderdale
P-01668 Excerpt from the House of Assembly Proceedings dated December 13, 1999 - Vol. XLIV No. 51 (Pages 1, 8-9 and 82-84) 17-Dec-18 Kathy Dunderdale
P-01669 Newfoundland and Labrador Hydro - Muskrat Falls Project - Exhibit 106 - Technical Note - Labrador - Island HVdc Link and Island Interconnected System Reliability dated October 30, 2011 17-Dec-18 Peter Alteen
P-01670 Witness Interview Transcript of Chris Huskilson dated December 7, 2018 17-Dec-18 CIMFP
P-01671 Wikipedia List of generating stations in Newfoundland and Labrador 17-Dec-18 Peter Alteen
P-01672 Letter dated June 1, 2018 from Newfoundland Power to Board of Commissioners of Public Utilities re 2019/2020 General Rate Application 17-Dec-18 Peter Alteen
P-01673 Email dated November 30, 2006, 4:08:27 PM from Tracy B. Barron to Carmel Turpin cc Kimberley Mullins and Chris Kieley re Speaking Notes - Minister Dunderdale 18-Dec-18 Kathy Dunderdale
P-01674 Email dated July 16, 2012, 6:26:10 PM from Charles W. Bown to Heather Maclean and Paul G. Scott re Fw: Information Note for Tomorrow's Meeting with NunatuKavut 18-Dec-18 Kathy Dunderdale
P-01675 Emera News Release dated December 17, 2012 re Emera Inc. Approves Sanction of the Maritime Link Project 18-Feb-19 CIMFP
P-01676 Affidavit of Gary Norris dated December 15, 2018 18-Feb-19 CIMFP
P-01677 Grant Thornton Forensic Audit Report to the Commission of Inquiry Respecting the Muskrat Falls Project - Construction Phase dated December 7, 2018 18-Feb-19 Scott Shaffer
P-01678 Williams Engineering Forensic Review in Support of Commission of Inquiry Respecting the Muskrat Falls Project dated November 30, 2018 18-Feb-19 Scott Shaffer
P-01679 Miller Thomson Report to Grant Thornton re Report to the Commission of Inquiry Respecting the Muskrat Falls Project re Specific Questions Related to Astaldi Canada Inc. and Valard Construction LP and the Astaldi Agreement and the Valard Agreement dated November 20, 2018 18-Feb-19 Scott Shaffer
P-01680 RW Block Consulting Report to Grant Thornton re Muskrat Falls - Clarifications to RWBC CH0007 Memorandum dated November 14, 2018 18-Feb-19 Scott Shaffer
P-01681 RW Block Consulting Report to Grant Thornton re Muskrat Falls - CT0327-001 Contract Review dated November 1, 2018 18-Feb-19 Scott Shaffer
P-01682 RW Block Consulting Report to Grant Thornton re Muskrat Falls - Clarifications to RWBC CH0007 Memorandum dated November 26, 2018 18-Feb-19 Scott Shaffer
P-01683 RW Block Consulting Report to Grant Thornton re Muskrat Falls - Additional Areas for RWBC Comment amended November 20, 2018 18-Feb-19 Scott Shaffer
P-01684 Nunatsiavut Government 2016 Report re Lake Melville: Avativut, Kanuittailinnivut (Our Environment, Our Health) Summary for Policymakers 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01685 CBC news article dated September 16, 2016 re Nunatsiavut appeal on Muskrat Falls turned down by provincial government 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01686 Nunatsiavut Government 2016 Report re Lake Melville: Avativut, Kanuittailinnivut (Our Environment, Our Health) Scientific Report 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01687 CBC news article dated October 14, 2016 re Inuk artist on hunger strike to push for clearing of Muskrat Falls reservoir 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01688 CBC news article dated October 23, 2016 re Muskrat Falls workers bused out after protesters occupy site in Central Labrador 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01689 CBC news article dated October 26, 2016 re Protesters occupying Muskrat Falls camp exit, despite some skepticism 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01690 CBC news article dated October 27, 2016 re Muskrat Falls unrest simmered for years: a look back at methylmercury concerns 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01691 CBC news article dated October 27, 2016 re Battle over Muskrat Falls: What you need to know 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01692 CBC news article dated November 6, 2016 re 'He's wrong': Protesters respond to Stan Marshall's Muskrat Falls remarks 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01693 CBC news article dated November 19, 2016 re Muskrat Falls protesters block trucks at North Spur site 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01694 Independent Expert Advisory Committee - Terms of Reference - Version Date: March 24, 2017 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01695 Media Release dated September 26, 2017 re Independent Expert Advisory Committee (IEAC) Issues its First Set of Recommendations to the Minister of Municipal Affairs and Environment 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01696 CBC news article dated November 30, 2017 re Muskrat Falls protesters voice concerns to Nalcor's Stan Marshall in sharing circle 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01697 CBC news article dated February 12, 2018 re North Spur landslide stoking fears of Mud Lake, Happy Valley-Goose Bay residents 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01698 IEAC Independent Expert Committee - Recommendations: Management (Human Health) submitted to the IEAC Oversight Committee dated March 5, 2018 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01699 IEAC Independent Expert Committee - Recommendations: Mitigation submitted to the IEAC Oversight Committee dated March 5, 2018 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01700 IEAC Independent Expert Committee - Recommendations: Monitoring submitted to the IEAC Oversight Committee dated March 5, 2018 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01701 Independent Expert Committee (IEC) - Opinions on Recommendations for Mitigation dated March 7, 2018 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01702 Letter dated April 10, 2018 from Dr. Kenneth Reimer, Independent Expert Advisory Committee to Honourable Eddie Joyce, Minister of Municipal Affairs and Environment re Update on the work of the Committee and to deliver its recommendations 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01703 CBC news article dated April 11, 2018 re Contested Muskrat Falls methylmercury recommendation could cost $742M 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01704 CBC news article dated April 14, 2018 re 'Risky experiment' to remove topsoil from Muskrat Falls reservoir, says Innu nation 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01705 Sign the Petition - Make Muskrat Right - Tell Our Leaders Muskrat Falls Must Be Changed 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01706 Independent Expert Advisory Committee - Timeline - October 25, 2016 to April 10, 2018 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01707 CBC news article dated December 4, 2017 re Nalcor and NunatuKavut strike 'strategic' deal that could affect past, future Labrador developments 27-Feb-19 Todd Russell
P-01708 Email dated December 4, 2017, 9:44:07 AM from karenoneill@nalcorenergy.com to Diana Quinton, cc deannefisher@nalcorenergy.com re Materials for the Community Development Agreement announcement 27-Feb-19 Todd Russell
P-01709 Community Development Agreement dated December 1, 2017, between Nalcor Energy and Nunatukavut Community Council Inc. 27-Feb-19 Todd Russell
P-01710 Affidavit of Chief Jean-Charles Piétacho - Courtesy Translation 18-Feb-19 Jean-Charles Piétacho
P-01711 Fax dated March 29, 2012 from Craig Coady to Chief Jean-Charles Piétacho re Forestry Permit Applications - Lower Churchill Project 18-Feb-19 Jean-Charles Piétacho
P-01712 Email dated April 2, 2012, 10:46 AM from Liette L.B. Boudreau to David Schulze re TR: Consultation - Crown Lands Application #140594, Nalcor Energy 18-Feb-19 Jean-Charles Piétacho
P-01713 Email dated April 2, 2012, 10:41 AM from Liette L.B. Boudreau to David Schulze, cc Jean-Charles J-C.P. Piétacho re TR: Consultation - Crown Lands Application # 140595, Nalcor Energy 18-Feb-19 Jean-Charles Piétacho
P-01714 Email dated April 2, 2012, 10:48 AM from Liette L.B. Boudreau to David Schulze re TR: Consultation - Crown Lands Application #140593, Nalcor Energy 18-Feb-19 Jean-Charles Piétacho
P-01715 Email dated April 17, 2012, 10:22 am from Liette L.B. Boudreau to Bernard Lafontaine, INapess, Jean-Charles J-C.P. Piétacho, Rita R.M. Mestokosho; and Vincent VN. Napish, cc David Schulze and Jean-Paul Lacasse re TR: LCP Application to WRMD#2 - Stream Crossings (C10, C12, C13, C19 and ACC) for South Side Access Road and Access to Construction Complex 18-Feb-19 Jean-Charles Piétacho
P-01716 Fax dated April 27, 2012 from Craig Coady, Forestry Branch to Chef Jean-Charles Piétacho re Permit Applications for Lower Churchill Project 18-Feb-19 Jean-Charles Piétacho
P-01717 Email dated April 27, 2012, 11:27 AM from Liette L.B. Boudreau to Bernard Lafontaine, INapess, Jean-Charles J-C.P. Piétacho, Rita R.M. Mestokosho; and Vincent VN. Napish, cc David Schulze and Andras Mak re TR: Consultation - Crown Lands Application #140743, Nalcor Energy 18-Feb-19 Jean-Charles Piétacho
P-01718 Email dated April 30, 2012, 9:07 AM from Liette L.B. Boudreau to Bernard Lafontaine, INapess, Jean-Charles J-C.P. Piétacho, Rita R.M. Mestokosho; and Vincent VN. Napish, cc David Schulze and Andras Mak re TR: Consultation - Crown Lands Application #140744 18-Feb-19 Jean-Charles Piétacho
P-01719 Email dated April 30, 2012, 9:08 AM from Liette L.B. Boudreau to Bernard Lafontaine, INapess, Jean-Charles J-C.P. Piétacho, Rita R.M. Mestokosho; and Vincent VN. Napish, cc David Schulze and Andras Mak re TR: LCP Application to WRMD#1 - Three Stream Crossings (C7, C8 & C9) for South Side Access Road 18-Feb-19 Jean-Charles Piétacho
P-01720 Letter dated May 11, 2012 from Dionne Schulze to Stephen Pellerin re Energy Transmission Lines Project between Labrador and the island of Newfoundland - CEAR no: 10-03-51746; our file 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01721 Letter dated May 29, 2012 from Aubrey Gover to David Schulze re letter of May 2, 2012 addressing regulatory approval applications 18-Feb-19 Jean-Charles Piétacho
P-01722 Email dated June 4, 2012, 10:46 AM from Brian Harvey to Melissa Nippard re Fw: Projet de Muskrat Falls - demandes de permis; n/d nA 7550-001 18-Feb-19 Jean-Charles Piétacho
P-01723 Letter dated June 12, 2012 from Dionne Schulze to Bill Coulter re Labrador-Island Transmission Link; your file no. CEAR 10-03-51746; Our file no. 7550/001 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01724 Comments of the Innu of Ekuanitshit on the Environmental Impact Statement - Labrador-Island Transmission Link Project - CEAR No. 10-03-51746; Provincial Reg.1407 by David Schulze dated June 12, 2012 18-Feb-19 Jean-Charles Piétacho
P-01725 Letter dated August 6, 2012 from Aubrey Gover to David Schulze re letter of May 30, 2012, further discussing comments regarding the Lower Churchill Hydroelectric Generation Project 18-Feb-19 Jean-Charles Piétacho
P-01726 Letter dated August 30, 2012 from Dionne Schulze to Aubrey Gover re Lower Churchill Hydroelectric Generation Project 18-Feb-19 Jean-Charles Piétacho
P-01727 Letter dated December 11, 2012 from Gilbert Bennett to David Schulze re Response to your letter of December 7, 2012 18-Feb-19 Jean-Charles Piétacho
P-01728 Letter dated January 15, 2013 from Aubrey Gover to David Schulze re letter of August 30, 2012 18-Feb-19 Jean-Charles Piétacho
P-01729 Letter dated January 15, 2013 from David Schulze to Aubrey Gover re Lower Churchill Hydroelectric Generation Project 18-Feb-19 Jean-Charles Piétacho
P-01730 Letter dated April 9, 2013 from Aubrey Gover to David Schulze re letter of January 15, 2013 on behalf of client, Ekuanitshit First Nation 18-Feb-19 Jean-Charles Piétacho
P-01731 Comments of the Innu of Ekuanitshit on the Draft Comprehensive Study Report - Labrador - Island Transmission Link Project - CEAR No. 10-03-51746; Provincial Reg. 1407 by David Schulze dated May 22, 2013 18-Feb-19 Jean-Charles Piétacho
P-01732 Email dated December 14, 2013, 11:00 AM from David Schulze to Krista Rebello, preid, linnes, mcgagnon, renzoni, Kendal Morgan, Tom Sheldon, G Russell, Brian Harvey, Haseen Khan, Paul Carter, Petter Madden and Marion Organ re NE-LCP-TRANSMIT-000623; LCP Permits - Blanket DOEC Permit to Alter a Body of Water - HVdc Line Section 1, Segments 1 and 2 - Labrador ACNXREF 18-Feb-19 Jean-Charles Piétacho
P-01733 Letter dated February 17, 2014 from David Schulze to Ivy Stone re Environmental Assessment of the Labrador-Island Transmission Link Project - Species at Risk Impacts Mitigation and Monitoring Plan, our file 7550-005 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01734 Email dated February 27, 2014, 10:21 AM from Isabelle Schmeizer to John Blake, cc Christine Doucet, Shelley Pardy, John Pisapio, Sara McCarthy, Emily Herdman and Wayne Barney re Concerned about potentially extremely low numbers of RWM caribou 18-Feb-19 Jean-Charles Piétacho
P-01735 Letter dated March 24, 2014 from Ivy Stone to David Schulze re Reply to your letter dated February 17, 2014 concerning the Species at Risk Impacts, Mitigation Plan for Labrador-Island Transmission Link Project (Transmission Project) 18-Feb-19 Jean-Charles Piétacho
P-01736 Letter dated March 26, 2014 from David Schulze to Ivy Stone re Environmental assessment of the Labrador-Island Transmission Link Project - Mitigation and monitoring plan for designated endangered species: File No. 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01737 Letter dated April 17, 2014 from David Schulze to Ivy Stone re Environmental assessment of the Labrador-Island Transmission Link Project - Mitigation and Monitoring Plan for Endangered Species: File No. 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01738 Letter dated April 17, 2014 from Ivy Stone to David Schulze re Reply to your letter dated March 26, 2014 concerning the Species at Risk Impacts, Mitigation and Monitoring Plan for Labrador-Island Transmission Link Project (Transmission Project) 18-Feb-19 Jean-Charles Piétacho
P-01739 Letter dated May 16, 2014 from Ivy Stone to David Schulze re Reply to your April 17, 2014 letter concerning the Species at Risk Impacts, Mitigation and Monitoring Plan for Labrador-Island Transmission Link Project (Transmission Project); Your File 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01740 Letter dated May 22, 2014 from David Schulze to Ivy Stone re Environmental assessment of the Labrador-Island Transmission Link Project - Mitigation and Monitoring Plan for Endangered Species: Our file: 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01741 Letter dated June 16, 2014 from David Schulze to Martha Drake re Hydroelectric power plant project in the Lower Churchill River - Historical Resources Management Program - O/F 7550-001 18-Feb-19 Jean-Charles Piétacho
P-01742 Letter dated June 17, 2014 from Ivy Stone to David Schulze re Reply to your May 22, 2014 letter concerning the Species at Risk Impacts, Mitigation and Monitoring Plan for Labrador-Island Transmission Link Project (Transmission Project); Your File 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01743 Letter dated June 25, 2014 from David Schulze to Ivy Stone re Environmental Assessment of the Labrador-Island Transmission Link Project - Mitigation and Monitoring Plan for Endangered Species: Our file: 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01744 Letter dated July 7, 2014 from Brian Harvey to David Schulze re Hydroelectric Power Plant Project in the Lower Churchill River - Historic Resources Management Program 18-Feb-19 Jean-Charles Piétacho
P-01745 Letter dated July 16, 2014 from Ivy Stone to David Schulze re Reply to your June 25, 2014 letter concerning the Species at Risk Impacts, Mitigation and Monitoring Plan for Labrador-Island Transmission Link Project (Transmission Project); Your File 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01746 Letter dated July 25, 2014 from David Schulze to Ivy Stone re Environmental assessment of the Labrador-Island Transmission Link Project - Species at Risk Impacts Mitigation and Monitoring Plan; our file 7550-005 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01747 Letter dated July 28, 2014 from Brian Harvey to David Schulze re Lower Churchill Hydroelectric Generation Project 18-Feb-19 Jean-Charles Piétacho
P-01748 Letter dated July 28, 2014 from David Schulze to Brian Harvey re Lower Churchill Hydroelectric Development Project - Historic Resources Assessment and Recovery Program, Our file: 7550-001 18-Feb-19 Jean-Charles Piétacho
P-01749 Email dated July 8, 2014, 12:15:22 PM from David Schulze to Brian Harvey, cc Christopher Appleby, Martha Drake, Jean-Charles Pietacho and Karen Hunter re Hydroelectric Power Plant Project in the Lower Churchill River - Historic Resources Management Programme - Our file 7550-001 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01750 Letter dated August 22, 2014 from Brian Harvey to David Schulze re Historic Resources Assessment and Recovery program and proposed Government authorization 18-Feb-19 Jean-Charles Piétacho
P-01751 Letter dated August 22, 2014 from David Schulze to Bas Cleary, Michael J. Alexander and Maurice Landry re Environmental Assessment of the Labrador-Island Transmission Link Project - Endangered Species Act - Mitigation and Monitoring Plan for Endangered Species: Our ref: 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01752 Letter dated August 22, 2014 from David Schulze to Brian Harvey re Hydroelectric Power Project on the Lower Churchill River - Historic Resource Management Program File no. 7550-001 18-Feb-19 Jean-Charles Piétacho
P-01753 Letter dated September 25, 2014 from David Schulze to Ivy Stone re Environmental Assessment of the Labrador-Island Transmission Link Project - Endangered Species Act - Mitigation and Monitoring Plan for Endangered Species, Nalcor document No. ILK-PT-MD-0000-EV-PL-0001-0; Our file 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01754 Letter dated October 3, 2014 from Ivy Stone to David Schulze re Reply to your July 25, 2014 letter concerning the Species at Risk Impacts, Mitigation and Monitoring Plan for Labrador-Island Transmission Link Project (Transmission Project): Your File 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01755 Letter dated October 8, 2014 from David Schulze to Ivy Stone re Environmental Assessment of the Labrador-Island Transmission Link Project - Species at Risk Mitigation and Monitoring Plan; our file 7550-035 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01756 Letter dated October 14, 2014 from David Schulze to Ivy Stone re Environmental Assessment of the Labrador-Island Transmission Link Project - Mitigation and Monitoring Plan for Registered At-risk Species; our file 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01757 Letter dated October 17, 2014 from Bas Cleary to David Schulze re Reply to your August 22 and September 25, 2014 letters concerning the Environmental Assessment of the Labrador-Island Transmission Link Project: Endangered Species Act - Mitigation and Monitoring Plan for Endangered Species. Your file number: 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01758 Letter dated October 21, 2014 from Brian Harvey to David Schulze re Historic Resource Management Plan 18-Feb-19 Jean-Charles Piétacho
P-01759 Letter dated October 23, 2014 from David Schulze to Brian Harvey re Hydroelectric Power Plan Project in the Lower Churchill River - Historic Resources Management Program. Our File: 7550-001 18-Feb-19 Jean-Charles Piétacho
P-01760 Letter dated October 29, 2014 from Ivy Stone to David Schulze re Reply to your October 8, 2014 letter concerning the Environmental Assessment of the Labrador-Island Transmission Link Project - Endangered Species Act - Mitigation and Monitoring Plan for Endangered Species. Your file number 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01761 Letter dated November 19, 2014 from David Schulze to Ivy Stone and Bas Cleary re Environment Assessment of the Labrador-Island Transmission Link Project - Species at Risk Impacts Mitigation and Monitoring; our file 7550-005 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01762 Letter dated December 11, 2014 from Brian Harvey to David Schulze re Lower Churchill Hydroelectric Generation Project - Historic Resources Management Program 18-Feb-19 Jean-Charles Piétacho
P-01763 Letter dated December 16, 2014 from David Schulze to Brian Harvey re Hydroelectric Power Plant Project in the Lower Churchill River - Historic Resources Management Programme. Our file 7550-001 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01764 Letter dated January 30, 2015 from Ivy Stone to David Schulze re Reply to your November 19, 2014 letter concerning the Environment Assessment of the Labrador-Island Transmission link Project: The Species at Risk - Impacts, Mitigation and Monitoring Plan (the "Plan"). Your file number: 7550-005 18-Feb-19 Jean-Charles Piétacho
P-01765 Email dated February 24, 2015, 4:42 PM from John Blake to Ross Firth, cc Shelley Pardy re Media Inquiry - Labradorian Red Wine Caribou 18-Feb-19 Jean-Charles Piétacho
P-01766 Letter dated March 6, 2015 from David Schulze to Brian Harvey re Hydroelectric Power Plant Project in the Lower Churchill River - Historic Resources Management Programme, File 7550-001 18-Feb-19 Jean-Charles Piétacho
P-01767 Letter dated January 18, 2016 from Innu of Ekuanitshit to Honourable Hunter Tootoo re Environment assessment of the Labrador-Island Transmission Link Project, CEAR no. 10-03-51746 (Courtesy Translation) 18-Feb-19 Jean-Charles Piétacho
P-01768 Email dated April 28, 2017, 1:42 PM from Shelley Moores to Sara McCarthy, cc John Pisapio and Blair Adams re Boreal recover plan 18-Feb-19 Jean-Charles Piétacho
P-01769 Nalcor Energy Report - Muskrat Falls Project - Post Sanction - Briefing Note as Requested by Nalcor Legal Counsel McInnes-Cooper 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-01770 Best Practices Principles of Corporate Governance for Crown Corporations dated January 18, 2019 by Professor Guy Holburn 25-Feb-19 Dr. Guy Holburn
P-01771 Public Governance and Accountability of Canadian Crown Corporations: Reformation or Transformation? Dated May 31, 2007 by Peter Aucoin 25-Feb-19 Dr. Guy Holburn
P-01772 1996/1997: Report 2 of the Office of the Auditor General of British Columbia re Crown Corporations Governance Study 25-Feb-19 Dr. Guy Holburn
P-01773 2008/2009: Report 13 of the Office of the Auditor General of British Columbia re Public Sector Governance - A Guide to the Principles of Good Practice - How are We Doing? The Public Reporting of Performance Measures in British Columbia dated December 2008 25-Feb-19 Dr. Guy Holburn
P-01774 2009/2010: Report 6 of the Office of the Auditor General of British Columbia re Making the Right Decisions: Information use by the boards of public sector organizations dated December 2009 25-Feb-19 Dr. Guy Holburn
P-01775 Excerpt from the Report of the Auditor General of Canada - Chapter 18 - Governance of Crown Corporations dated December 2000 25-Feb-19 Dr. Guy Holburn
P-01776 Excerpt from the Report of the Auditor General of Canada - Chapter 7 - Governance of Crown Corporations dated February 2005 25-Feb-19 Dr. Guy Holburn
P-01777 Excerpt from the 2009 March Status Report of the Auditor General of Canada - Chapter 2 - The Governor in Council Appointment Process 25-Feb-19 Dr. Guy Holburn
P-01778 Office of the Auditor General - Manitoba Report re Study of Board Governance in Crown Organizations dated September 2009 25-Feb-19 Dr. Guy Holburn
P-01779 1996 Report of the Auditor General of New Brunswick 25-Feb-19 Dr. Guy Holburn
P-01780 2016 Annual Report of the Office of the Auditor General of Ontario - Volume 1 of 2 25-Feb-19 Dr. Guy Holburn
P-01781 2016 Annual Report of the Office of the Auditor General of Ontario - Follow-Up Reports on Value-for-Money Audits - Volume 2 of 2 25-Feb-19 Dr. Guy Holburn
P-01782 Australian National Audit Office - Public Sector Governance - Volume 1 - Better Practice Guide - Framework, Processes and Practices dated July 2003 25-Feb-19 Dr. Guy Holburn
P-01783 Australian Public Service Commission - Building better governance 25-Feb-19 Dr. Guy Holburn
P-01784 Best Practices Guidelines - BC Governance and Disclosure Guidelines for Governing Boards of Public Sector Organizations by the Board Resourcing and Development Office of the Premier dated February 2005 25-Feb-19 Dr. Guy Holburn
P-01785 Shareholder's Expectations for British Columbia Crown Agencies - Crown Agencies Resource Office - Ministry of Finance dated April 2011 25-Feb-19 Dr. Guy Holburn
P-01786 Building High Performance Boards - The Canadian Coalition for Good Governance 25-Feb-19 Dr. Guy Holburn
P-01787 Crown Agency Accountability Relationships - Highlights from Canada's Federal and Provincial Jurisdictions 25-Feb-19 Dr. Guy Holburn
P-01788 The School of Public Policy, University of Calgary - Volume 6 - Issue 8 - February 2013 - Government-Owned Enterprises in Canada by Daria Crisan and Kenneth J. McKenzie 25-Feb-19 Dr. Guy Holburn
P-01789 Government of Quebec - Chapter G-1.02 - Act Respecting the Governance of State-Owned Enterprises 25-Feb-19 Dr. Guy Holburn
P-01790 Guidelines for Governance of the Electricity Sector in Canada by Professor Guy Holburn dated January 2011 25-Feb-19 Dr. Guy Holburn
P-01791 The School of Public Policy, University of Calgary - Volume 5 - Issue 9 - March 2012 - The Role of Crown Corporations in the Canadian Economy - An Analytical Framework by Edward M. Iacobucci and Michael J. Trebilcock 25-Feb-19 Dr. Guy Holburn
P-01792 Joseph L. Rotman School of Management, University of Toronto - Case Study - "Irrational Exuberance:" The Creation of the CNR, 1917 - 1919 - MGT 2917 - Canadian Business History by Professor Joe Martin 25-Feb-19 Dr. Guy Holburn
P-01793 Report of the Special Advisor on Agencies - Appendix B - Agency Establishment & Accountability Directive - Management Board of Cabinet - Effective January 26, 2010 by the Corporate Policy Branch, Human Resource Management and Corporate Policy Division, Minister of Government Services of Ontario 25-Feb-19 Dr. Guy Holburn
P-01794 OECD Guidelines on Corporate Governance of State-Owned Enterprises - 2015 Edition 25-Feb-19 Dr. Guy Holburn
P-01795 Government of Manitoba - The Crown Corporations Governance and Accountability Act - C.C.S.M. c. C336 25-Feb-19 Dr. Guy Holburn
P-01796 Canada's Public Policy Forum - Crown Corporation Governance - Three ways to manage the tension between autonomy and control dated August 2016 25-Feb-19 Dr. Guy Holburn
P-01797 The Good Governance Standard for Public Services by The Independent Commission on Good Governance in Public Services 25-Feb-19 Dr. Guy Holburn
P-01798 Guidelines for Improved Corporate Governance Excerpt - Summary 25-Feb-19 Dr. Guy Holburn
P-01799 Directors of Crown Corporations: An Introductory Guide to Their Roles and Responsibilities prepared by The Crown Corporations Directorate of the Department of Finance and Treasury Board Secretariat in collaboration with The Conference Board of Canada and the Canadian Centre for Management Development date July 1993 25-Feb-19 Dr. Guy Holburn
P-01800 Treasury Board of Canada Secretariat - Meeting the Expectations of Canadians - Review of the Governance Framework for Canada's Crown Corporations Report to Parliament dated 2005 25-Feb-19 Dr. Guy Holburn
P-01801 Government of Canada - Guidelines for Audit Committees in Crown Corporations and Other Public Enterprises 25-Feb-19 Dr. Guy Holburn
P-01802 United Nations Conference on Trade and Development - Guidance on Good Practices in Corporate Governance Disclosure dated 2006 25-Feb-19 Dr. Guy Holburn
P-01803 Public-Sector Corporate Governance: British Columbia's Best-Practices Reforms 25-Feb-19 Dr. Guy Holburn
P-01804 Email dated November 15, 2018, 4:34:22 PM from Paul Burgess to Angie Brown, David Howe, Kate O'Brien, Georges Bader and Donald Delarosbil re ICS 19-Feb-19 Scott Shaffer
P-01805 Grant Thornton - MFI - Interview Summary of Don Delarosbil dated September 14, 2018 19-Feb-19 Scott Shaffer
P-01806 Grant Thornton - MFI - Interview Summary of Georges Bader dated September 14, 2018 19-Feb-19 Scott Shaffer
P-01807 Letter dated September 10, 2018 from Harold Smith to Grant Thornton re Muskrat Falls Inquiry - CV Request and Follow-up Questions for Ed Martin 25-Feb-19 Scott Shaffer
P-01808 Email dated July 16, 2013, 1:46:28 PM from Todd Stanley to Lynne M. Comeau re FW: IE Contract 18-Feb-19 Scott Shaffer
P-01809 Agreement dated November 29, 2013 between Her Majesty The Queen in Right of Canada, as represented by the Minister of Natural Resources and Her Majesty in Right of Newfoundland and Labrador, as represented by the Minister of Natural Resources, the Minister for Intergovernmental Affairs and the Minister of Finance re Nalcor Energy undertaking an infrastructure project consisting of three components through subsidiary corporations 18-Feb-19 Scott Shaffer
P-01810 GNL Information Note - Cabinet Secretariat dated November 8, 2017 re Muskrat Falls Project CH0032 Amending Agreement 18-Feb-19 Scott Shaffer
P-01811 Email dated June 23, 2017, 3:34:52 PM from Virginia Connors to Heather Connors re SNC-Lavalin Risk Assessment 18-Feb-19 Scott Shaffer
P-01812 Email dated April 10, 2007, 2:04:54 PM from EMartin@nlh.nl.ca to Chris Kieley, Brian Crawley and Robert Thompson, cc GBennett@nlh.nl.ca and Leona Barrington@nlh.nl.ca re Action Items - Today's LC Meeting 18-Feb-19 Jean-Charles Piétacho
P-01813 RW Block Consulting Report to Grant Thornton re Muskrat Falls - CH0007 Contract Review dated November 1, 2018 19-Feb-19 Scott Shaffer
P-01814 Grant Thornton - MFI - Interview Summary of Nick Argirov dated June 22, 2018 18-Feb-19 Scott Shaffer
P-01815 Nalcor Energy - SNC-Lavalin Contract Strategy - Construction of 305kV HVdc T/L dated November 1, 2013 25-Feb-19 Scott Shaffer
P-01816 Labrador-Island Link Limited Partnership and Alstom Renewable Power Canada Inc. - Supply and Install Agreement - EPC Synchronous Condensers at Soldiers Pond - Agreement No. CD0534-001 dated August 15, 2014 12-Aug-19 CIMFP
P-01817 Nalcor Energy Presentation re Lower Churchill Project - 4 - SNC Lavalin Inc. Contract dated May 2018 18-Feb-19 Scott Shaffer (Grant Thornton)
P-01818 Nalcor Energy Presentation re Lower Churchill Project - 6 - Astaldi Contract dated May 2018 18-Feb-19 Scott Shaffer
P-01819 Nalcor Energy Presentation re Lower Churchill Project - 9 - Financial Close/Completion Guarantees/Corea dated May 2018 18-Feb-19 Scott Shaffer
P-01820 Nalcor Energy - Lower Churchill Project - Bid Evaluation and Award Recommendation - CH0031-Supply and Install Mechanical and Electrical Auxiliaries (MF) 18-Feb-19 Scott Shaffer
P-01821 Aug 2013 Final Forecast Cost update presented by the Project team to CEO indicating FFC of $6.9B 15-Mar-19 CIMFP
P-01822 Feb 13, 2015 Briefing deck which indicated project costs between $7.5B and $7.77B presented by Project team to CEO, VP, Finance 15-Mar-19 CIMFP
P-01823 Grant Thornton - MFI - Interview Summary of Jason Kean dated May 11, 2018 21-Feb-19 Scott Shaffer
P-01824 Lower Churchill Project - Muskrat Falls - CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Schedule of Price Breakdown dated September 21, 2012 21-Feb-19 Scott Shaffer
P-01825 SNC-Lavalin Invitation Letter dated September 28, 2012 to All Bidders reference Lower Churchill Project - Project No. 505573 - Request for Proposal No. CH0007 - Construction of Intake and Powerhouse, Spillway and Transmissions Dams - Closing Dale and Closing Time: 28-Jan-2013, 16:00 Hours St. John's, NL time 21-Feb-19 Scott Shaffer
P-01826 Sept 2013 Briefing deck presented by Project team to CEO and VP Cap costs in the range of $6.7B to $6.95B 15-Mar-19 CIMFP
P-01827 Communication of Final Forecast Cost and Schedule 15-Mar-19 CIMFP
P-01828 July 2013 EXCOM Contract Advisory Committee deck and CEO briefing $7.0B 15-Mar-19 CIMFP
P-01829 Mar 2014 Briefing to CEO by Project team plus emails associated with Nalcor Board update and updated AFE's 15-Mar-19 CIMFP
P-01830 Mar 2015 Briefing on costs leading to AFE rev 2 given to CEO, VP and Finance team 15-Mar-19 CIMFP
P-01831 May 23 2014 Briefing deck presented by Project team to CEO $7.27 to $7.5B range 15-Mar-19 CIMFP
P-01832 May 2016 Briefing AFE rev 4 $9.1B 15-Mar-19 CIMFP
P-01833 May 2017 Briefing to CEO and EVP AFE Rev 5 MF $5.5B Project $10.1B 15-Mar-19 CIMFP
P-01834 May 2018 Briefing to CEO and EVP by email 15-Mar-19 CIMFP
P-01835 Email dated March 13, 2013, 1:16:02 AM from John Husch to Jacqueline Mongrut re Announcement: Integration Management Team 18-Feb-19 Scott Shaffer
P-01836 JD Tremblay Journal May 28, 2013 Meeting with Paul Harrington - Risk Discussion 18-Feb-19 Scott Shaffer
P-01837 Email dated May 28, 2013 from Paul Harrington to Paul Harrington, Jean-Daniel Tremblay and Normand Bechard re Rescheduled: Risk discussion (May 28 04:30 PM NDT In my office) 18-Feb-19 Scott Shaffer
P-01838 Grant Thornton - MFI - Interview Summary of Bob Card re May 17, 2018 18-Feb-19 Scott Shaffer
P-01839 Grant Thornton - MFI - Interview Summary of Jean-Daniel Tremblay dated April 10, 2018 18-Feb-19 Scott Shaffer
P-01840 Grant Thornton - MFI - Interview Summary of Paul Lemay dated April 10, 2018 18-Feb-19 Scott Shaffer
P-01841 Grant Thornton - MFI - Interview Summary of Norman Bechard dated May 8, 2018 18-Feb-19 Scott Shaffer
P-01842 Grant Thornton - MFI - Interview Summary of Scott Thon dated June 20, 2018 18-Feb-19 Scott Shaffer
P-01843 Email dated June 15, 2018, 9:26 AM from Sheilagh Murphy to Scott Shaffer, cc. David Malamed, David Howe and Kate O'Brien re SNC-MFI FW: GT Interview - Follow-up questions 18-Feb-19 Scott Shaffer
P-01844 Grant Thornton - MFI - Interview Summary of BJ Ducey dated October 16, 2018 18-Feb-19 Scott Shaffer
P-01845 Email dated October 29, 2013, 6:00 AM from Jason Kean to BJ Ducey, cc Lance Clarke re Estimate Framework 18-Feb-19 Scott Shaffer
P-01846 Nalcor Energy - Muskrat Falls Project - Reasonableness of the Attainability of 2017 First Power dated October 18, 2018 21-Feb-19 Scott Shaffer
P-01847 Westney Consulting Group - Nalcor Energy - An Analysis of SNC-Lavalin's Risk Assessment Report Discussion Document dated December 2017 21-Feb-19 Scott Shaffer
P-01848 NL Hydro Internal Audit Report - 2013 Contracts Award Process dated April 29, 2013 25-Feb-19 Scott Shaffer
P-01849 Nalcor Energy - Lower Churchill Project - Contract Administration Audit Report - Project Number 14-34 25-Feb-19 Scott Shaffer
P-01850 Lower Churchill Project - Internal Audit Project # 14-37 - Report Name: Contracts & Compliance dated December 10, 2015 25-Feb-19 Scott Shaffer
P-01851 Emera Conclusion Memo dated December 18, 2015 from Roberta Hupman and Cathy Thornhill to Jackie Borden and Doug Woodford re Nalcor Internal Audit Reliance Review 25-Feb-19 Scott Shaffer
P-01852 Nalcor Energy - Lower Churchill Project - Muskrat Falls Project - Report Name: Internal Audit Project # 15-07 - Invoice Attest and Payable Audit dated September 22, 2015 25-Feb-19 Scott Shaffer
P-01853 Nalcor Energy - Lower Churchill Project - Internal Audit Project # 15-17 - Report Name: Payment Certificate Review and Compliance dated January 28, 2016 25-Feb-19 Scott Shaffer
P-01854 Nalcor Energy - Lower Churchill Project - Monthly Progress Report - Period Ending September 30, 2013 - Record No: 200-160641-00108 15-Mar-19 CIMFP
P-01855 Nalcor Energy - Lower Churchill Project - Monthly Progress Report - Period Ending January 31, 2014 - Record No: 200-160641-00112 15-Mar-19 CIMFP
P-01856 Nalcor Energy - Lower Churchill Project - Monthly Progress Report - Period Ending July 31, 2015 - Record No: 200-160641-00130 15-Mar-19 CIMFP
P-01857 Nalcor Energy - Lower Churchill Project - Monthly Progress Report - Period Ending June 30, 2016 - Record No: 200-160641-00141 15-Mar-19 CIMFP
P-01858 Labrador Transmission Corporation and Labrador-Island Link Limited Partnership and Alstom Grid Canada, Inc. - Engineer, Procure and Construct Agreement - Construction of AC Substations - Agreement No. CD0502-001 dated August 15, 2014 12-Aug-19 CIMFP
P-01859 Construction Report - Muskrat/LTA Project Finance Agreement dated August 20, 2015 15-Mar-19 CIMFP
P-01860 Construction Report - LIL Project Finance Agreement dated August 20, 2015 15-Mar-19 CIMFP
P-01861 Exhibit 14 - Performance Security - Agreement No: CH0007-0001 called the "Guarantee" dated November 29, 2013 25-Feb-19 Scott Shaffer
P-01862 SNC-Lavalin - Nalcor Energy - Lower Churchill Project - Bid Evaluation Plan - CH0032 - Supply/Install Powerhouse Hydro-Mechanical Equipment 18-Feb-19 Scott Shaffer
P-01863 Muskrat Falls Corporation and Cahill-Ganotec, A Partnership - Supply and Install Agreement - Supply and Install Mechanical and Electrical Auxiliaries (MF) - Agreement No. CH0031-001 dated June 26, 2017 25-Feb-19 Scott Shaffer
P-01864 Muskrat Falls Corporation and Barnard Pennecon Limited Partnership - Civil Works Agreement - Construction of North and South Dams - Agreement No. CH0009 dated August 20, 2015 25-Feb-19 Scott Shaffer
P-01865 Muskrat Falls Corporation and Astaldi Canada Inc. - Civil Works Agreement - Construction of Intake and Powerhouse, Spillway and Transition Dams - Agreement No. CH0007 dated November 29, 2013 25-Feb-19 Scott Shaffer
P-01866 Astaldi Notes - P. Harrington - Overall Timelines and key meetings - provided by Paul Harrington October 24, 2018 25-Feb-19 Scott Shaffer
P-01867 Nalcor Energy - Lower Churchill Project - Bid Evaluation Plan - CH0009 - Construction of North and South Dams dated October 27, 2014 25-Feb-19 Scott Shaffer
P-01868 Bridge Agreement made and executed on July 27, 2016 between Muskrat Falls Corporation and Astaldi Canada Inc. 15-Mar-19 CIMFP
P-01869 CH0007 Completion Contract - Muskrat Falls Corporation and Astaldi Canada Inc. dated December 1, 2016 15-Mar-19 CIMFP
P-01870 Nalcor Energy - Lower Churchill Project - Bid Evaluation and Award Recommendation - CH0009-001 Construction of the North and South Dams dated August 14, 2015 20-Feb-19 Scott Shaffer
P-01871 Nalcor Energy - Lower Churchill Project - SNC Lavalin - Award Recommendation - CH0032 - Supply and Install Powerhouse Hydro/Mechanical Equipment 18-Feb-19 Scott Shaffer
P-01872 Contract: CH0007-001 - Construction of Intake & Powerhouse, Spillway & Transition Dams - Change Orders 25-Feb-19 Scott Shaffer
P-01873 CH0009 - CHR - Change Request 21-Feb-19 Scott Shaffer
P-01874 Lower Churchill Project - Agreement No: CH0007-001 - Construction of Intake & Powerhouse, Spillway & Transition Dams - Change Order between Muskrat Falls Corporation and Astaldi Canada Inc. dated January 29, 2018 21-Feb-19 Scott Shaffer
P-01875 Newfoundland and Labrador Board of Commissioners of Public Utilities - In the Matter of the 2003 General Rate Application filed by Newfoundland and Labrador Hydro - Decision and Order of the Board - Order No. P.U. 14(2004) 12-Aug-19 CIMFP
P-01876 Newfoundland and Labrador Board of Commissioners of Public Utilities - In the Matter of the 2006 General Rate Application filed by Newfoundland and Labrador Hydro - Decision and Order of the Board - Order No. P.U. 8(2007) 12-Aug-19 Environmental Panel
P-01877 Lower Churchill Project - Agreement No: CT0327-001 - Construction of 350kV HVdc Transmission Line - Change Order between Labrador-Island Link Limited Partnership and Valard Construction LP dated March 11, 2015 25-Feb-19 Scott Shaffer
P-01878 Lower Churchill Project - Agreement No: CT0327-013 - HVdc Clearing and Access - Blocks #4, #5 & Partial #6 - Change Order between Labrador-Island Link Limited Partnership and Johnson's Construction Limited - Increase Agreement Value dated December 18, 2015 25-Feb-19 Scott Shaffer
P-01879 Lower Churchill Project - Agreement No: CT0327-015 - Hvdc Clearing and Access - Blocks #9, #10, #11 & #12 - Change Order between Labrador-Island Link Limited Partnership and Johnson's Construction Limited - Increase Agreement Value dated December 18, 2015 25-Feb-19 Scott Shaffer
P-01880 Nalcor Energy - Lower Churchill Project Presentation re Construction Management Task Force dated March 26, 2012 25-Feb-19 Scott Shaffer
P-01881 Lower Churchill Project - Agreement No: CT0327-011 - HVdc Clearing and Access - Section 1 (Block #7 and partial #6) - Change Order between Labrador-Island Link Limited Partnership and C&T Enterprises Ltd. - Additional scope, increased Contract Price, revised completion date, additional equipment, additional subcontractor, additional crushing job dated December 9, 2015 25-Feb-19 Scott Shaffer
P-01882 Nalcor Energy - SNC-Lavalin - Project Cost Status - Project: 505573 : Lower Churchill Project - Period 026 from July 25, 2013 to August 21, 2013 18-Feb-19 Scott Shaffer
P-01883 Nalcor Energy - SNC-Lavalin - Project Cost Status - Project: 505573 : Lower Churchill Project - Period 025 from June 20, 2013 to July 24, 2013 18-Feb-19 Scott Shaffer
P-01884 Muskrat Falls Corporation and Andritz Hydro Canada Inc. - Supply and Install Agreement - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Agreement No. CH0032-001 dated December 18, 2013 25-Feb-19 Scott Shaffer
P-01885 Nalcor Energy - Lower Churchill Project - Muskrat Falls Project - CT0327-001 Agreement for Construction of 350kV HVdc Transmission Line between Labrador - Island Link Limited Partnership and Valard Construction LP dated August 8, 2014 25-Feb-19 Scott Shaffer
P-01886 Nalcor Energy - Lower Churchill Project - Bidder Selection and Preliminary Award Recommendation - CT0327 - Construction of 350KV HVDC Transmission Line dated April 27, 2014 25-Feb-19 Scott Shaffer
P-01887 Deloitte Report re Lower Churchill Project - Team Effectiveness Programme - Phase 2 - Setting the Baseline and Increasing Momentum dated July - September 2012 25-Feb-19 Scott Shaffer
P-01888 Nalcor Energy - Lower Churchill Project - Expression of Interest No. G-002 - Engineering Design and Project Support 21-Feb-19 Scott Shaffer
P-01889 Exhibit 2 - Compensation - Agreement Number: CH0009-001 25-Feb-19 Scott Shaffer
P-01890 Exhibit 2 - Option 2 - FPTCL - Compensation - Agreement Number: CH0009-001 - Labour Component with Target Cost of Labour and LMax and Fixed Price for Non Labour Component dated November 29, 2013 25-Feb-19 Scott Shaffer
P-01891 Exhibit 2 - Compensation - Agreement Number: CH0031-001 25-Feb-19 Scott Shaffer
P-01892 Muskrat Falls Project - Assessment of Implementation of EY Interim Report recommendations dated August 31, 2017 21-Feb-19 Scott Shaffer
P-01893 Nalcor Energy - Internal Audit Memo dated October 26, 2017 from Jackie Borden to Pat Hussey and Dave Pardy, cc Lance Clarke and Scott O'Brien re Site Purchasing Review 25-Feb-19 Scott Shaffer
P-01894 LIL Construction Report for Period Ending November 30, 2013 dated December 20, 2013 15-Mar-19 CIMFP
P-01895 MF/LTA Construction Report for Period Ending November 30, 2013 dated December 20, 2013 15-Mar-19 CIMFP
P-01896 Email dated September 12, 2013, 12:12:48 PM from Rob Hull to Scott Pelley re Fw: Fw: Credit Assessment - CH0007 25-Feb-19 Scott Shaffer
P-01897 Email dated May 23, 2018, 10:42:03 PM from David Howe to Kerri Riddle re Fw: Grant Thornton request S.35 21-Feb-19 Scott Shaffer
P-01898 Email dated November 18, 2018, 5:24:23 PM from Deborah LJ Hutchings to Angie Brown and Scott Shaffer re FW: Response to GT Question PTQ1.10 18-Feb-19 Scott Shaffer
P-01899 SNC-Lavalin Inc. Memorandum dated December 13, 2011 from Luc Chausse to Darren Debourke re Gate 3 Deliverables - Geotechnical Survey, Data Acquisition and Analysis 15-Mar-19 CIMFP
P-01900 Nalcor Energy - Lower Churchill Project - LC-G-002 (Project No. 505573) - 350 kV HVdc Line Geotechnical Baseline - Muskrat Falls to Soldiers Pond dated April 3, 2012 15-Mar-19 CIMFP
P-01901 Email dated June 23, 2016, 10:04:22 AM from Stan Marshall to cathyghaney@nalcorenergy.com re Fwd: Note from Mark Turpin 25-Feb-19 Scott Shaffer
P-01902 Independent Project Analysis Presentation - Mid-Execution Assessment - Nalcor Lower Churchill Project - Presented to Lower Churchill Project Team - Felix Parodi and Lucas Milrod dated December 2015 21-Feb-19 Scott Shaffer
P-01903 Email dated May 28, 2013, 12:22 PM from pharrington@nalcorenergy.com to jasonkean@nalcorenergy.com re Declined: Risk discussion (May 28, 2013 4:30:00 PM, my office) 25-Feb-19 Scott Shaffer
P-01904 Grant Thornton - MFI - Interview Summary of Derrick Sturge dated June 20, 2018 21-Feb-19 Scott Shaffer
P-01905 Grant Thornton - MFI - Interview Summary of Ed Martin dated June 27, 2018 21-Feb-19 Scott Shaffer
P-01906 Grant Thornton - MFI - Interview Summary of Gilbert Bennett dated April 19, 2018 18-Feb-19 Scott Shaffer
P-01907 Grant Thornton - MFI - Interview Summary of Keith Dodson dated November 16, 2018 21-Feb-19 Scott Shaffer
P-01908 Grant Thornton - MFI - Interview Summary of Mark Turpin dated December 2, 2018 21-Feb-19 Scott Shaffer
P-01909 Grant Thornton - MFI - Interview Summary of Paul Harrington dated October 24, 2018 21-Feb-19 Scott Shaffer
P-01910 Grant Thornton PTQ1.22 Questions and Answers 21-Feb-19 Scott Shaffer
P-01911 Nalcor Response to GT Q10.25 dated October 15, 2018 21-Feb-19 Scott Shaffer
P-01912 Astaldi Hours and Concrete Curves - 2013-August 2018 21-Feb-19 Scott Shaffer
P-01913 MF/LTA 2015 Cost Overruns Certificate dated December 14, 2015 21-Feb-19 Scott Shaffer
P-01914 MF/LTA 2016 Cost Overruns Certificate dated December 13, 2016 21-Feb-19 Scott Shaffer
P-01915 Nalcor Response to GT RFI #Q10.21 dated October 18, 2018 21-Feb-19 Scott Shaffer
P-01916 Nalcor Response to GT RFI #Q10.28 dated November 5, 2018 21-Feb-19 Scott Shaffer
P-01917 Nalcor Response to GT RFI #Q10.29 dated November 8, 2018 21-Feb-19 Scott Shaffer
P-01918 Nalcor Energy - Lower Churchill Project - Lower Churchill Construction Projects Benefits Strategy dated March 11, 2014 21-Feb-19 Scott Shaffer
P-01919 Nalcor Energy - Lower Churchill Project - Stewardship Reporting Procedure - Nalcor Doc. No. LCP-PT-MD-0000-PC-PR-0017-01 dated April 23, 2018 21-Feb-19 Scott Shaffer
P-01920 Nalcor Response to GT RFI #Q10.32 dated November 7, 2018 21-Feb-19 Scott Shaffer
P-01921 Nalcor Energy - Lower Churchill Project - Health and Safety Management Plan - Nalcor Doc. No. LCP-PT-MD-0000-HS-PL-0001-01A dated March 10, 2016 21-Feb-19 Scott Shaffer
P-01922 Nalcor Energy - Lower Churchill Project - LCP Reporting Matrix - Nalcor Doc. No. LCP-PT-MD-0000-PC-FR-0002-01 21-Feb-19 Scott Shaffer
P-01923 SNC-Lavalin - Nalcor Energy - Project Cost Status - Project: 505573 : Lower Churchill Project - Period 088 from September 27, 2018 to October 31, 2018 21-Feb-19 Scott Shaffer
P-01924 Nalcor Response to GT RFI #Q10.39 dated November 6, 2018 18-Feb-19 Scott Shaffer
P-01925 Nalcor Response to GT RFI #Q10.46 dated November 8, 2018 18-Feb-19 Scott Shaffer
P-01926 Nalcor Response to GT RFI #Q10.47 dated November 14, 2018 21-Feb-19 Scott Shaffer
P-01927 Memo dated October 25, 2018 from Richard Westney to Angie Brown re Risk Ranges & Responsibilities for DG3 QRA 21-Feb-19 Scott Shaffer
P-01928 Lower Churchill Hydroelectric Generation Project at Muskrat Falls on the Lower Churchill River - Newfoundland and Labrador - Contract CH0007 - Muskrat Falls Corporation/Astaldi Canada Inc. Productivity Study - Phase 2 - Assessment and Report dated March 7, 2015 by Dr. William Ibbs 21-Feb-19 Scott Shaffer
P-01929 Astaldi Cost Control and Productivity Analysis Reports: Observations and Recommendations dated September 25, 2015 by Dr. Williams Ibbs 25-Feb-19 Scott Shaffer
P-01930 Nalcor Energy - Lower Churchill Project - Independent Engineer's Report - Lower Churchill Project dated December 30, 2013 25-Feb-19 Scott Shaffer
P-01931 Letter dated August 29, 2011 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Project Control Schedule - Stages 1 & 2 15-Mar-19 CIMFP
P-01932 Email dated February 16, 2012, 5:10 PM from Clarence Hewitt to Normand Bechard re Nonconformance No. NC-0021 Gate 3 Deliverables Rec. No. L010-S011-200-170331-00160 21-Feb-19 Scott Shaffer
P-01933 LIL Construction Report for Period Ending December 31, 2017 dated January 20, 2018 15-Mar-19 CIMFP
P-01934 Nalcor Energy - SNC-Lavalin - Project Cost Status - Project: 505573 : Lower Churchill Project - Period 060 from May 26, 2016 to June 29, 2016 18-Feb-19 Scott Shaffer
P-01935 Nalcor Energy - SNC-Lavalin - Project Cost Status - Project: 505573 : Lower Churchill Project - Period 081 from March 1, 2018 to March 28, 2018 18-Feb-19 Scott Shaffer
P-01936 Nalcor Energy - Lower Churchill Project - Payment Certificate Procedure dated March 2, 2016 25-Feb-19 Scott Shaffer
P-01937 Nalcor Energy - Lower Churchill Project - Electronic Data Exchange Procedure dated July 15, 2016 25-Feb-19 Scott Shaffer
P-01938 Nalcor Energy - Lower Churchill Project - Accounts Payable Procedure dated November 14, 2017 25-Feb-19 Scott Shaffer
P-01939 Nalcor Energy - Lower Churchill Project - Material Request, Issue, and Return dated April 7, 2014 25-Feb-19 Scott Shaffer
P-01940 Nalcor Energy - Lower Churchill Project - Change Management Plan dated December 23, 2014 18-Feb-19 Scott Shaffer
P-01941 Nalcor Energy - Lower Churchill Project - Overarching Contracting Strategy dated October 25, 2011 25-Feb-19 Scott Shaffer
P-01942 Nalcor Energy - Lower Churchill Project - Overarching Contracting Strategy dated February 29, 2012 25-Feb-19 Scott Shaffer
P-01943 Nalcor Energy - Lower Churchill Project - Procedure for Site Purchases dated April 15, 2014 25-Feb-19 Scott Shaffer
P-01944 Nalcor Energy - Lower Churchill Project - Procedure for Post Award Contract Administration dated February 28, 2014 25-Feb-19 Scott Shaffer
P-01945 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Invitation for Bidder Selection dated October 23, 2013 25-Feb-19 Scott Shaffer
P-01946 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Bid Receipt and Opening dated October 22, 2013 25-Feb-19 Scott Shaffer
P-01947 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Bid Evaluation and Award Recommendation dated October 23, 2013 25-Feb-19 Scott Shaffer
P-01948 LIL Construction Report for period ending March 31, 2014 dated April 20, 2014 15-Mar-19 CIMFP
P-01949 Independent Engineer's Report - Lower Churchill Project - prepared by MWH Americas, Inc. Draft dated November 15, 2013 21-Feb-19 Scott Shaffer
P-01950 Letter dated May 27, 2016 from Lance Clarke to Francesco Rotundi re Astaldi Canada Inc. - Justification for Incremental Compensation - Agreement: CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams 21-May-19 Project Management Team
P-01951 MF/LTA Construction Report for Period Ending December 31, 2017 dated January 20, 2018 15-Mar-19 CIMFP
P-01952 Nalcor Energy - Lower Churchill Project - Material Receiving dated April 2, 2014 25-Feb-19 Scott Shaffer
P-01953 Update on Government's Response to the Lower Churchill River Hydroelectric Generation Project Joint Review Panel Report dated July 11, 2019 (See P-01957, P-01960, P-01961, P-01968, P-01969, P-01971 and P-01973 for Annex to Document) 12-Aug-19 Environmental Panel
P-01954 Nalcor Energy - Lower Churchill Project - Muskrat Falls Generation - Quantitative Cost and Schedule Risk Analysis (Q1-2016) dated June 29, 2016 18-Feb-19 Scott Shaffer
P-01955 MF/LTA Construction Report for Period Ending June 30, 2016 dated July 20, 2016 15-Mar-19 CIMFP
P-01956 MF/LTA Construction Report for Period Ending March 31, 2014 dated April 20, 2014 15-Mar-19 CIMFP
P-01957 Agreement Concerning the Establishment of a Joint Review Panel for the Environmental Assessment of the Lower Churchill Hydroelectric Generation Project between The Government of Canada and the Government of Newfoundland and Labrador dated January 8, 2009 (Annex A to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-01958 Email dated February 21, 2014, 12:38 PM from Suhuyini Abudulai to James Meaney cc Alison Manzer, Charles Newman, joseph.krupski@nrcan-rncan.gc.ca and anoop.kapoor@nrcan.rncan.gc.ca re Nalcor - Interim IE Report [IWOV-Legal.FID1816819] 21-Feb-19 Scott Shaffer
P-01959 The Institute of Internal Auditors Report re External Quality Assessment of the Internal Audit Activity at Nalcor Energy dated June 2013 25-Feb-19 Scott Shaffer
P-01960 Government Response Guidance Document for Joint Review Panel Report on Lower Churchill Hydroelectric General Project by Nalcor Energy dated August 23, 2011 (Annex B to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-01961 Letter dated November 9, 2011 from Bill Parrott to All Deputy Ministers and Equivalent re Draft Government Response to Joint Review Panel's Recommendations - Lower Churchill Hydroelectric Generation Project (Annex C to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-01962 Letter dated June 6, 2016 from Paul Harrington to Stan Marshall re Concerns 6-May-19 Jason Kean
P-01963 Nalcor Energy - Lower Churchill River - Project Change Notice - PCN-0705 Appropriation of Additional Budget Due to Agreement Amendment for CH0007-001 Contract - Construction of Powerhouse and Intake, Spillway and Transition Dams - AFE Rev. 4 dated January 6, 2017 18-Feb-19 Scott Shaffer
P-01964 SNC-Lavalin - Nalcor Energy - Lower Churchill Project - Recommendation for Award - Summary Report - CH0007: Construction of Intake and Powerhouse, Spillway and Transition Dams dated September 24, 2013 19-Feb-19 Scott Shaffer
P-01965 2015 01G in the Supreme Court of Newfoundland and Labrador Trial Division (General) between Constructions Proco Inc. and Astaldi Canada Inc. and Muskrat Falls Corporation and Nalcor Energy dated March 6, 2015 25-Feb-19 Scott Shaffer
P-01966 Nalcor Energy - Lower Churchill Project - Project Execution Plan (Scope and Approach) dated September 22, 2011 25-Feb-19 Scott Shaffer
P-01967 Nalcor Energy - Lower Churchill Project - Project Execution Plan (Scope and Approach) dated March 11, 2014 25-Feb-19 Scott Shaffer
P-01968 Department of Natural Resources - Panel Recommendation # 4.5 - Full clearing of the Muskrat Falls reservoir dated October 14, 2011 (Annex D to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-01970 Nalcor Energy Presentation re Audit & Resource Plan - Internal Audit 2015 - 2019 18-Feb-19 Scott Shaffer
P-01971 Annex A - Status of Environmental Assessment Release Conditions for the Lower Churchill Generation Project (Annex F to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-01972 Curriculum Vitae - Greg Fleming 25-Feb-19 Scott Shaffer
P-01973 LCP FS Permit Registry - October 2018 (Annex G to Exhibit P-01953) 12-Aug-19 Environmental Panel
P-01974 Email dated August 24, 2013, 4:02 PM from Gilbert Bennett to Rob Hull re Fw: Due Diligence CH0007 25-Feb-19 Scott Shaffer
P-01975 Recollections regarding the SNC Risk Analysis Report 25-Feb-19 Scott Shaffer
P-01976 Nalcor Energy - Lower Churchill Project - SNC-Lavalin Inc. -Materials Management Plan dated March 29, 2012 25-Feb-19 Scott Shaffer
P-01977 SNC-Lavalin Risk Assessment - Lower Churchill Project - 505573 dated May 17, 2013 25-Feb-19 Scott Shaffer
P-01978 Lower Churchill Project - Agreement No: CH0007-001 - CHO No. 064 - Construction of Intake & Powerhouse, Spillway & Transition Dams - Change Order between Muskrat Falls Corporation and Astaldi Canada Inc. dated January 22, 2018 18-Feb-19 Scott Shaffer
P-01979 Lower Churchill Project - Agreement No: CH0007-001 - CHO No. 065 - Construction of Intake & Powerhouse, Spillway & Transition Dams - Change Order between Muskrat Falls Corporation and Astaldi Canada Inc. dated January 22, 2018 18-Feb-19 Scott Shaffer
P-01980 Grant Thornton - MFI - Interview Summary of Stan Marshall dated September 13, 2018 18-Feb-19 Scott Shaffer
P-01981 The Telegram news article dated November 19, 2018 re Astaldi Canada-Nalcor Energy dispute hits Muskrat Falls Inquiry 18-Feb-19 Scott Shaffer
P-01982 CBC news article dated October 22, 2018 re Astaldi wants to finish the job after Muskrat Falls workers booted from site 18-Feb-19 Scott Shaffer
P-01983 CBC news article dated October 25, 2018 re Astaldi workers will get paid, premier says, after company fails to meet payroll at Muskrat Falls megaproject 18-Feb-19 Scott Shaffer
P-01984 EY - Muskrat Falls Project - Review of project cost, schedule and related risks - Interim Report dated April 8, 2016 18-Feb-19 Scott Shaffer
P-01985 CBC news article dated February 13, 2015 re Muskrat Falls: Astaldi adapting following dispute over 'dome' 18-Feb-19 Scott Shaffer
P-01986 Interim Independent Engineer's Report - Lower Churchill Project prepared by MWH Americas, Inc. dated November 29, 2013 18-Feb-19 Scott Shaffer
P-01987 The Telegram news article dated September 30, 2017 re SNC-Lavalin report revealed Muskrat Falls risks: premier 18-Feb-19 Scott Shaffer
P-01988 Nalcor Energy - Lower Churchill Project - Understanding Muskrat - Stan Marshall, CEO Nalcor Energy dated February 15, 2018 18-Feb-19 Scott Shaffer
P-01990 GNL News Release dated December 10, 2014 re Ensuring Responsible Governance 26-Feb-19 Paul Davis
P-01991 GNL Presentation - Muskrat Falls Project Oversight Committee - Report for period ended September 2014 dated December 15, 2014 26-Feb-19 Paul Davis
P-01992 GNL - Muskrat Falls Project Oversight Committee - Committee Report - Period Ending September 2014 26-Feb-19 Paul Davis
P-01993 Letter dated December 8, 2014 from Paul Davis to Derrick Dalley re Challenge of guiding the Department of Natural Resources and the Forestry and Agrifoods Agency 26-Feb-19 Paul Davis
P-01994 Email dated March 3, 2015, 9:19:13 AM from Diana Quinton to Charles W. Bown, cc Tracy English re KMs - Independent Engineer's November 2014 Report 26-Feb-19 Paul Davis
P-01995 GNL - Muskrat Falls Project Oversight Committee - Committee Report - Period Ending December 2014 26-Feb-19 Paul Davis
P-01996 GNL Decision/Direction Note - Cabinet Secretariat re Contract Award 2015/2016 - Muskrat Falls Oversight Committee Advisory Services dated March 31, 2015 26-Feb-19 Paul Davis
P-01997 Email dated May 19, 2015, 11:47:08 am from Corey Snook to Paul J. Morris, Paul O Parsons, Leanne Combden, Robert S. Bates and Emily Thompson, cc John Cowan re VOCM - Premier Will Offset Power Costs with Surplus Muskrat Falls Power 26-Feb-19 Paul Davis
P-01998 The Telegram news article dated May 27, 2015 re Muskrat Falls dome metal sent to scrapyard 26-Feb-19 Paul Davis
P-01999 Email dated June 5, 2015, 6:08:30 AM from Diane Quinton to Derrick Dalley, Charles W. Bown, Tracy English, Paul J. Morris, Ian Froude and Debbie Marnell re Premier 'troubled' as Nalcor defends hiring firm facing Muskrat Falls lawsuits 26-Feb-19 Paul Davis
P-02000 Nalcor Energy - Lower Churchill Project Presentation re Cabinet Update - Lower Churchill Project Phase 1 dated June 25, 2015 26-Feb-19 Paul Davis
P-02001 GNL Presentation re Muskrat Falls Project Oversight Committee - Report for period ended March 2015 dated June 25, 2015 26-Feb-19 Paul Davis
P-02002 Amending Agreement Number 2 between Labrador-Island Link Limited Partnership and Valard Construction LP dated June 30, 2017 25-Feb-19 Scott Shaffer
P-02003 GNL - Muskrat Falls Oversight Committee - Committee Report - March 2015 26-Feb-19 Paul Davis
P-02004 The Telegram news article dated July 16, 2015 re Premiers impressed by Muskrat Falls 26-Feb-19 Paul Davis
P-02005 Email dated August 19, 2015, 4:56:55 PM from Diana Quinton to Charles W. Bown, Tracy English, Paul J. Morris, Debbie Marnell, Ian Froude and Derrick Dalley re FW: Draft Comms Plan for Muskrat Falls update 26-Feb-19 Paul Davis
P-02006 Nalcor Energy Presentation - Lower Churchill Phase 1 - August 2015 Project Update 26-Feb-19 Paul Davis
P-02007 Email dated September 14, 2015, 10:39:09 AM from Heather MacLean to Diana Quinton and Donna Ivey, cc Milly Brown, Hugh Donnan, Scott Barfoot and Debbie Marnell re Muskrat Falls Update - Approach 26-Feb-19 Paul Davis
P-02008 Email dated September 18, 2015, 2:16:01 PM from Diana Quinton to Derrick Dalley, Charles W. Bown, Tracy English and Paul J. Morris, cc Ian Froude and Debbie Marnell re Nalcor's Plans for Muskrat Falls Update 26-Feb-19 Paul Davis
P-02009 GNL Presentation - Muskrat Falls Project - Oversight Committee - Update to Cabinet dated September 21, 2015 26-Feb-19 Paul Davis
P-02010 Nalcor Energy - Lower Churchill Project Presentation - Muskrat Falls Project - Cabinet Update dated September 21, 2015 26-Feb-19 Paul Davis
P-02011 Email dated September 24, 2015, 11:23:13 AM from Diana Quinton to Hugh Donnan, Heather MacLean and Milly Brown, cc Donna Ivey, Scott Barfoot and Debbie Marnell re Nalcor's Plans for Muskrat Falls Update 26-Feb-19 Paul Davis
P-02012 GNL Presentation - Muskrat Falls Project - Oversight Committee - Project Update dated September 28, 2015 26-Feb-19 Paul Davis
P-02013 The Telegram news article dated September 29, 2015 re Premier disappointed with Muskrat Falls cost overruns 26-Feb-19 Paul Davis
P-02014 GNL - Muskrat Falls Project - Oversight Committee - Committee Report - August 2015 26-Feb-19 Paul Davis
P-02015 Email dated September 30, 2015, 11:35 AM from Premier's Office to Brenda Haynes, cc Ian Froude re HP TRIM Incoming Correspondence: ICOR2015/1057 : Dwight Ball writes Premier David requesting an updated budget and construction schedule for the Muskrat Falls Project 26-Feb-19 Paul Davis
P-02016 Email dated October 1, 2015, 2:37:03 PM from Linda J. Walsh to Jenna Shelley, James Sheppard, et al re NLIS 6 - Premier Provides Update on Oil and Gas Resources 26-Feb-19 Paul Davis
P-02017 Email dated October 7, 2015, 4:16:04 PM from Premier to Catherine Evans re FW: Ministerial Response to Incoming Correspondence for Premier 26-Feb-19 Paul Davis
P-02018 Email dated October 27, 2015, 3:26:38 PM from Brian Scott to Darrell Hynes, Donna Ivey, et al re Davis delivers campaign-style speech to BoT 26-Feb-19 Paul Davis
P-02019 GNL News Release dated November 2, 2015 re Strong Governance for Crown Corporations 26-Feb-19 Paul Davis
P-02020 Presentation by Professor Guy Holburn - Best Practice Principles of Corporate Governance for Crown Corporations - Report for the Commission of Inquiry Respecting the Muskrat Falls Project dated February 25, 2019 25-Feb-19 Dr. Guy Holburn
P-02021 Email dated October 16, 2013, 5:01:19 PM from Derrick Dalley to Charles W. Bown re Fw: Uncle Gnarley 27-Feb-19 Derrick Dalley
P-02022 Email dated October 18, 2013, 4:36:11 PM from Derrick Dalley to Charles W. Bown re Minister Request 27-Feb-19 Derrick Dalley
P-02023 The Telegram news article dated November 1, 2013 re Muskrat power will be profitable, Dalley says 27-Feb-19 Derrick Dalley
P-02024 Email dated November 1, 2013, 1:58:23 PM from Auburn Warren@nalcorenergy.com to Paul Myrden, cc Donna Brewer, DSturge@nalcorenergy.com, et al re Minister Request 27-Feb-19 Derrick Dalley
P-02025 Email dated November 6, 2013, 5:14:25 PM from Diana Quinton to News Releases, cc Glenda Power, Jacquelyn Howard, Jennifer Collingwood and Tina Williams re REVISED: For immediate release: Motion Defeated to Return Muskrat Falls to the Public Utilities Board 27-Feb-19 Derrick Dalley
P-02026 Email dated November 6, 2013, 9:18 AM from Diane Norris to brianpeckford, cc Premier re TRIM Correspondence-Outgoing: OCOR-11924 : Response to Brian Peckford re: Muskrat Falls 27-Feb-19 Derrick Dalley
P-02027 Email dated November 7, 2013, 5:17:19 PM from Derrick Dalley to Charles W. Bown re UARB Update 27-Feb-19 Derrick Dalley
P-02028 Email dated November 25, 2013, 1:44:35 PM from Diana Quinton to Derrick Dalley and Darrell Hynes re Fw: KMs - Financial Accountability and Benefits to the Province 27-Feb-19 Derrick Dalley
P-02029 GNL News Release dated December 10, 2013 re Investing in Muskrat Falls for an Energized Economy - Premier Announces Completion of Federal Loan Guarantee and Financing 27-Feb-19 Derrick Dalley
P-02030 GNL News Release dated December 24, 2013 re Resource Development Creates a Sustainable Economy in Newfoundland and Labrador - Minister Reflects on Achievements of 2013 27-Feb-19 Derrick Dalley
P-02031 Letter dated December 17, 2013 from Joe Oliver to Derrick Dalley re Letter of August 22, 2013 from Thomas Marshall regarding the condition precedent associated with Aboriginal consultations contained in the Federal Loan Guarantee Term Sheet 27-Feb-19 Derrick Dalley
P-02032 Email dated January 9, 2014, 11:14:48 AM from Diana Quinton to Derrick Dalley, Darrell Hynes, et al re G & M - Muskrat Falls and the power of obstinacy 27-Feb-19 Derrick Dalley
P-02033 Email dated January 13, 2014, 4:00:27 PM from Diana Quinton to Derrick Dalley, cc Darrell Hynes, Charles W. Bown, et al re For approval: Letter to Editor: Globe and Mail (article is below) 27-Feb-19 Derrick Dalley
P-02034 Email dated January 20, 2014, 10:28:49 AM from Paul O Parsons to Paul J. Morris, John Cowan and Rob McGrath re News Release for Approval: Minister Clarifies Information about Capital Cost of the Muskrat Falls Project 27-Feb-19 Derrick Dalley
P-02035 Email dated February 21, 2014, 10:09:52 AM from Derrick Dalley to Charles W. Bown re Muskrat Falls Independent Engineer 27-Feb-19 Derrick Dalley
P-02036 The Telegram news article dated February 25, 2014 re 'We didn't need to see a report' from independent watchdog 27-Feb-19 Derrick Dalley
P-02037 Email dated February 25, 2014, 2:02:55 PM from EMartin@nalcorenergy.com to KONeill@nlh.nl.ca, cc GBennett@nalcorenergy.com, JamesMeaney@nalcorenergy.com and PHarrington@lowerchurchillproject.ca re Some edits to Letter to the Editor and KM from Nalcor for consideration for insertion into the letter 27-Feb-19 Derrick Dalley
P-02038 Email dated February 28, 2014, 4:27:19 PM from Milly Brown to Diana Quinton, Derrick Dalley, et al re Final response for approval 27-Feb-19 Derrick Dalley
P-02039 Email dated March 1, 2014, 10:56:58 AM from Derrick Dalley to Charles W. Bown re The Telegram: Feds won't confirm details of Muskrat Falls watchdog report 27-Feb-19 Derrick Dalley
P-02040 The Telegram news article dated March 14, 2014 re Marshall promises Muskrat Falls oversight committee 27-Feb-19 Derrick Dalley
P-02041 Email dated March 21, 2014, 3:32:55 PM from Derrick Dalley to Charles W. Bown re Fw: News release for final approval: Minister Announces Principles of Oversight Process for the Construction Phase of the Muskrat Falls Project 27-Feb-19 Derrick Dalley
P-02042 Email dated March 23, 2014, 6:16:07 PM from Derrick Dalley to Charles W. Bown re Q&A 27-Feb-19 Derrick Dalley
P-02043 The Telegram news article dated March 24, 2014 re Minister announces beef-up oversight of Muskrat Falls project 27-Feb-19 Derrick Dalley
P-02044 Email dated April 23, 2014, 11:57:45 AM from Derrick Dalley to Charles W. Bown re VOCM 27-Feb-19 Derrick Dalley
P-02045 Letter dated April 23, 2014 from Gilbert J. Bennett to Derrick Dalley re correspondence from Cabot Martin in relation to the North Spur at the Muskrat Falls site and issues relating to dam safety 27-Feb-19 Derrick Dalley
P-02046 Nalcor Energy - Lower Churchill Project presentation - Muskrat Falls Project - Value and Cost Update dated June 25, 2014 27-Feb-19 Derrick Dalley
P-02047 EY Report - Government of Newfoundland and Labrador - Review of Government protocols to oversee the Muskrat Falls Project dated July 25, 2014 27-Feb-19 Derrick Dalley
P-02048 Letter dated July 29, 2014 from Thomas Marshall and Derrick Dalley to Ken Marshall and Ed Martin re The Muskrat Falls Project (the Project) - Reporting to the Muskrat Falls Project Oversight Committee 27-Feb-19 Derrick Dalley
P-02049 Muskrat Falls Oversight Committee Terms of Reference dated July 29, 2014 27-Feb-19 Derrick Dalley
P-02050 GNL Presentation - Muskrat Falls Project Oversight Committee dated July 29, 2014 27-Feb-19 Derrick Dalley
P-02051 GNL - Muskrat Falls Project Oversight Committee - Committee Report - July 2014 27-Feb-19 Derrick Dalley
P-02052 The Honourable Derrick Dalley - Minister of Natural Resources - Speaking Notes for Oversight Announcement dated July 31, 2014 27-Feb-19 Derrick Dalley
P-02053 GNL Information Note - Department of Natural Resources dated August 22, 2014 re Oversight of the Muskrat Falls Hydroelectric Project 27-Feb-19 Derrick Dalley
P-02054 Email dated March 2, 2015, 11:59:18 AM from Ian Froude to Charles W. Bown re KMs: Release of the Independent Engineer's November report 27-Feb-19 Derrick Dalley
P-02055 GNL News Release dated March 13, 2015 re Providing Oversight of the Province's Investment - Progress Continues on the Muskrat Falls Project 27-Feb-19 Derrick Dalley
P-02056 GNL - Muskrat Falls Project Oversight Committee - Committee Report - December 2014 27-Feb-19 Derrick Dalley
P-02057 Email dated March 31, 2015, 7:38:33 PM from Derrick Dalley to Ian Froude re Q to Minister on Twitter from Tom Baird 27-Feb-19 Derrick Dalley
P-02058 Email dated May 27, 2015, 7:19:52 AM from Diana Quinton to Derrick Dalley, Charles Bown, et al re Telegram - Muskrat Falls dome metal sent to scrapyard 27-Feb-19 Derrick Dalley
P-02059 GNL News Release dated July 3, 2015 re Providing Oversight of the Province's Investment - Oversight Committee Continues to Closely Monitor the Muskrat Falls Project 27-Feb-19 Derrick Dalley
P-02060 Email dated September 30, 2015, 1:28:55 PM from Heather MacLean to Diana Quinton and Milly Brown, cc Donna Ivey, Debbie Marnell, et al re For Approval: Response to James McLeod, The Telegram 27-Feb-19 Derrick Dalley
P-02061 GNL News Release dated October 30, 2015 re Supporting Residents in Newfoundland and Labrador - Minister Releases Report on Province's Electricity System 27-Feb-19 Derrick Dalley
P-02062 Independent Review of the 17 May 2017 Churchill River (Labrador) Flood Event by Karl-Erich Lindenschmidt 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-02063 GNL Presentation - Muskrat Falls Project - Rate Mitigation Considerations dated September 20, 2015 26-Feb-19 Paul Davis
P-02064 Fax dated July 26, 2018 from Charlotte Wolfrey to Caitlin Urguhart re multiple documents 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-02065 Letter dated January 12, 2015 re Letter from Dr. Serge Leroueil to the Lower Churchill Project in relation to the North Spur stabilization at Muskrat Falls 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-02066 Uncle Gnarley: Jim Gordon's Final Comments on the North Spur dated July 2, 2018 22-Feb-19 Roberta Benefiel/Majorie Flowers
P-02067 CBC news article dated August 14, 2015 re Racism, benefits agreement focus on Innu protest at Muskrat Falls 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02068 Innu Nation Media Release dated August 17, 2015 re Labrador Innu Leaders Accept Apology from Head of Nalcor for Racism at the Company's Muskrat Falls Site 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02069 CBC news article dated June 13, 2016 re 'This is a message to our leaders': Muskrat Falls protesters appear in court 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02070 Letter dated July 7, 2016 from Grand Chief Anastasia Qupee to Premier Dwight Ball re Muskrat Falls - Methylmercury in Lake Melville 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02071 Letter dated August 16, 2016 from Grand Chief Anastasia Qupee to the Honourable Perry Trimper re Environmental Management Agreement with the Innu Nation 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02072 CBC news article dated October 26, 2016 re N.L. government, Labrador leaders make 'significant' Muskrat Falls progress 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02073 Letter dated May 23, 2017 from Grand Chief Anastasia Qupee to Premier Dwight Ball re Muskrat Falls Project - Your Government's Promises and Obligations to the Innu Nation 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02074 CBC news article dated June 21, 2017 re Nalcor lowering water levels at Muskrat Falls reservoir 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02075 CBC news article dated October 11, 2012 re Nalcor granted injunction against NunatuKavut Community Council 27-Feb-19 Todd Russell
P-02076 CBC news article dated April 6, 2013 re Russell, NunatuKavut members arrested near Muskrat Falls 27-Feb-19 Todd Russell
P-02077 NunatuKavut Press Release dated September 11, 2013 re Nalcor Injunction Effectively Prohibits and Extinguishes Aboriginal Rights, NunatuKavut Appealing 27-Feb-19 Todd Russell
P-02078 NunatuKavut Press Release dated December 4, 2014 re NunatuKavut Wins, NL's Highest Court Throws out Injunction 27-Feb-19 Todd Russell
P-02079 Supreme Court of Newfoundland and Labrador Citation dated December 3, 2014 between NunatuKavut Community Council Inc., Todd Russell and Persons Unknown and Nalcor Energy 27-Feb-19 Todd Russell
P-02080 The Telegram news article dated January 25, 2018 re Letter: Paul Davis must be dreaming in Technicolor 26-Feb-19 Paul Davis
P-02081 Nalcor Energy - Lower Churchill Project Presentation - LC-G-002 RFP Evaluation Checkpoint dated November 23, 2010 1-Mar-19 Pat Hussey
P-02082 SNC-Lavalin - Nalcor Energy - Commitment Package Schedule Status Report - Project: 505573 : Lower Churchill Project dated March 21, 2012 1-Mar-19 Pat Hussey
P-02083 Power Advocate Presentation - Transmission Project Contracting and Packaging Strategy Risk Assessment - Action Items from June 26, 2012 Roundtable 1-Mar-19 Pat Hussey
P-02084 Email dated June 28, 2012, 11:45:52 AM from Mouloud Aitr Ouferoukh to Jean-Daniel Tremblay re LCP Master Package Dictionary 1-Mar-19 Pat Hussey
P-02085 Decision Gate 3 Basis of Estimate - Figure 14-1: Underlying Muskrat Falls Schedule Logic for Project Control Schedule 1-Mar-19 Pat Hussey
P-02086 Approval Matrix for Key Procurement Recommendations dated October 12, 2012 1-Mar-19 Pat Hussey
P-02087 Package Status Report - Awarded Packages dated July 16, 2018 1-Mar-19 Pat Hussey
P-02088 Background Information on Contract Packaging 1-Mar-19 Pat Hussey
P-02089 NunatuKavut Press Release dated April 20, 2016 re New Scientific Report Finds Muskrat Falls Project an Environmental Disaster in the Making; Will Significantly and Adversely Harm Human Health and Well-being 27-Feb-19 Todd Russell
P-02090 NunatuKavut Press Release dated December 17, 2018 re NunatuKavut says Province of NL's Lack of Response to the Independent Expert Advisory Committee Recommendations on Muskrat Falls Outrageous 27-Feb-19 Todd Russell
P-02091 Resume - Pat Hussey 1-Mar-19 Pat Hussey
P-02092 Letter dated May 28, 2007 from Pat Hussey to Newfoundland and Labrador Hydro - Lower Churchill Project re Request for Services 1-Mar-19 Pat Hussey
P-02093 NL Hydro Presentation dated October 7, 2018 re Contracting Strategy - General Overview by P. Hussey 1-Mar-19 Pat Hussey
P-02094 NL Hydro - Agreement 15431-OB for Supply Chain Management Services for the Lower Churchill Project between Energy Corporation of Newfoundland and Labrador and SRL Consulting Inc. dated January 1, 2008 1-Mar-19 Pat Hussey
P-02095 NL Hydro Presentation dated April 21, 2008 re Lower Churchill Project - Project Management Approach (Post-Gate 2) and Contracting Strategy 1-Mar-19 Pat Hussey
P-02096 NL Hydro - Amending Agreement Number 1 dated October 7, 2008 between Energy Corporation of Newfoundland and Labrador and SRL Consulting Inc. 1-Mar-19 Pat Hussey
P-02097 Nalcor Energy - Lower Churchill Project - Amending Agreement Number 3 dated June 25, 2009 between Nalcor Energy and SRL Consulting Inc. 1-Mar-19 Pat Hussey
P-02098 Nalcor Energy - Lower Churchill Project - Amending Agreement Number 4 dated January 15, 2010 between Nalcor Energy and SRL Consulting Inc. 1-Mar-19 Pat Hussey
P-02099 Nalcor Energy - Lower Churchill Project - Amending Agreement Number 5 dated June 29, 2010 between Nalcor Energy and SRL Consulting Inc. 1-Mar-19 Pat Hussey
P-02100 SNC-Lavalin - Component 1 - Muskrat Falls Hydroelectric Development - Part C - Section 4 - Execution Proposal 1-Mar-19 Pat Hussey
P-02101 Nalcor Energy - Lower Churchill Project - Procurement Process for Works, Goods & Services Related to Innu Culture and First Bidding Opportunities for Innu Businesses dated June 21, 2011 1-Mar-19 Pat Hussey
P-02102 LCP Package List dated March 2, 2012 1-Mar-19 Pat Hussey
P-02103 SNC-Lavalin - Nalcor Energy - Lower Churchill Project - LCP Master Package Dictionary List - Register dated May 16, 2012 1-Mar-19 Pat Hussey
P-02104 Email dated June 20, 2012, 7:44:11 PM from Timothy Dorsey to jasonkean@nalcorenergy.com, cc James Cerone re Final Version of Transmission Project Contracting and Packaging Strategy Risk Assessment 1-Mar-19 Pat Hussey
P-02105 Lower Churchill Project - Approval Authority Limits Matrix - Post-Sanction dated January 16, 2013 1-Mar-19 Pat Hussey
P-02106 Appendix A11 - Provincial Benefits Questionnaire - Package Number: CD0508 1-Mar-19 Pat Hussey
P-02107 Nalcor Energy - Communications Support Plan - Innu Community Engagement dated September 26, 2013 1-Mar-19 Pat Hussey
P-02108 Exhibit 13 - Provincial Benefits - Agreement Number: CD0503-001 1-Mar-19 Pat Hussey
P-02109 Opportunity Meeting with Valard / Quanta (August 15 - 16) 1-Mar-19 Pat Hussey
P-02110 Email dated December 22, 2016, 2:39:00 PM from cherylmclean@lowerchurchillproject.ca to paul.rich@innu.ca and anastasia qupee cc Clementine Kuyper, Brian Crawley, Maria Moran and Bob Marshall re Response to Innu Nation's IBA Questions 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02111 Top 14 Contracts (By $$, Including Change Orders) - As of February 7, 2018 1-Mar-19 Pat Hussey
P-02112 Nalcor Energy - Lower Churchill Project - Contract Packaging Development Timeline 1-Mar-19 Pat Hussey
P-02113 Wood MacKenzie - Government Corporation Governance Review - April 2014 25-Feb-19 Dr. Guy Holburn
P-02114 Email dated November 19, 2013, 9:29:24 PM from jamesmeaney@nalcorenergy.com to Meghan Felt, cc Auburn Warren and Jennifer Gray re LCP Capital Cost & Material Contracts Update 26-Feb-19 Paul Davis
P-02115 Azimuth Technical Memorandum dated July 19, 2018 from Randy Baker to Peter Madden, Nalcor Energy re Summary of Post-Exposure Human Health Risk Assessment from Methylmercury in Seafood in Goose Bay and Lake Melville, Labrador 27-Feb-19 Todd Russell
P-02116 Baird Technical Memorandum dated August 2, 2018 from Alex Brunton to Reed Harris re Lake Melville Model Setup and Results 27-Feb-19 Todd Russell
P-02117 Reid Harris Environmental Ltd. Report to Peter Madden dated August 3, 2018 re Updated analysis of predicted increases in methylmercury concentrations and downstreams export from Muskrat Falls Reservoir 27-Feb-19 Todd Russell
P-02118 Azimuth Technical Memorandum dated February 25, 2018 from Randy Baker with G. Mann (L. Melville Mass Balance) to Peter Madden re Evaluation of MeHg Production by Muskrat Falls Reservoir and Implications for Lake Melville - A Top-Down, Mass-Balance Approach 27-Feb-19 Todd Russell
P-02119 Dillon Consulting Memo dated November 20, 2018 from Rob Willis to Jackie Wells re Lower Churchill Hydroelectric Generation Project (LCHGP) Supplementary Human Health Risk Assessment (HHRA) Technical Memo - Overview of HHRA Program Status and Supplementary Assessment of Potential Future Human Exposures and Risks Due to Methylmercury 27-Feb-19 Todd Russell
P-02120 Predicted Increases in Fish Methylmercury Muscle Tissue Concentrations in Goose Bay and Lake Melville submitted to Nalcor Energy by Jim McCarthy, Wood Environment & Infrastructure Solutions dated July 2018 27-Feb-19 Todd Russell
P-02121 Ivey Business School - Energy Policy and Management Centre - Policy Brief dated January 2018 re Improving Governance and Strategy in Ontario's LDC Section 26-Feb-19 Dr. Guy Holburn
P-02122 Lower Churchill Innu Impacts and Benefits Agreement dated November 18, 2011 among Nalcor Energy and Innu Nation and Sheshatshiu Innu First Nation and Mushuau Innu First Nation - Chapter 2 - Education, Training and Employment of Innu (Excerpt from Exhibit P-00300) 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02123 Lower Churchill Innu Impacts and Benefits Agreement dated November 18, 2011 among Nalcor Energy and Innu Nation and Sheshatshiu Innu First Nation and Mushuau Innu First Nation - Chapter 4 - Innu Business Opportunities (Excerpt from Exhibit P-00300) 28-Feb-19 Anastasia Qupee - Clementine Kuyper
P-02124 GNL Information Note - Department of Environment and Conservation re Overview of the Provincial Government's Involvement on Mercury and Associated Downstream Impacts in Relation to the Lower Churchill Project dated November 24, 2015 27-Feb-19 Derrick Dalley
P-02125 Email dated November 26, 2013 from dsturge@nalcorenergy.com to edmartin/nlhydro, Charles Bown, Donna Brewer, P Myrden, cc auburnwarren, rob hull, james meaney, craig hippem, Xeno Martis re Outstanding Business Issues with Canada 27-Feb-19 Derrick Dalley
P-02126 Handwritten Notes - Derrick Sturge 27-Feb-19 Derrick Dalley
P-02127 Email dated November 8, 2011, 6:05:40 AM from pathussey@nalcorenergy.com to paulkennedy@nalcorenergy.com, clarencehewitt@nalcorenergy.com, anthonyjackman@nalcorenergy.com, and mahmoudshublaq@nalcorenergy.com re Fw: IBA presentations 1-Mar-19 Pat Hussey
P-02128 Email dated March 29, 2011, 8:43:08 AM from pathussey@nalcorenergy.com to clarencehewitt@nalcorenergy.com re Fw: Presentation - Section 9 1-Mar-19 Pat Hussey
P-02129 Nalcor Energy - Lower Churchill Project - Muskrat Falls & Island Link Master Contract Package List dated March 3, 2011 1-Mar-19 Pat Hussey
P-02130 Nalcor Energy - Lower Churchill Project - Guidelines for Credit Worthiness Verification dated September 18, 2013 1-Mar-19 Pat Hussey
P-02131 Email dated February 9, 2011, 8:03:12 AM from pathussey@nalcorenergy.com to ian.hendry@snclavalin.com 1-Mar-19 Pat Hussey
P-02132 Email dated October 5, 2012, 1:42:34 PM from ronpower@nalcorenergy.com to lower_churchill_project_staff, cc Paul Harrington, Lance Clarke, normand.bechard@snclavalin.com, joseph.salim@snclavalin.com re LCP Supply Chain: Organizational Announcement 1-Mar-19 Pat Hussey
P-02133 Nalcor Energy - Lower Churchill Project - Request for Proposal (RFP) No. LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services dated July 9, 2010 1-Mar-19 Pat Hussey
P-02134 Compendium of Notes - Construction Management Presentations - SNCL & HATCH - Oct 27 & 29 1-Mar-19 Pat Hussey
P-02135 Lower Churchill Impacts and Benefits Agreement Summary (Note: This exhibit is the same as P-00298 with less redactions) 1-Mar-19 Pat Hussey
P-02136 Email dated January 6, 2011, 8:16:54 AM from pathussey@nalcorenergy.com to lanceclarke@nalcorenergy.com re Emailing: LC-G-002 RFP - Deck for Ed - 16 Dec. 2010 - Final 1-Mar-19 Pat Hussey
P-02137 Email dated December 7, 2010, 4:26:01 PM from ronpower@nalcorenergy.com to lanceclarke@nalcorenergy.com and pathussey@nalcorenergy.com re Presentation 1-Mar-19 Pat Hussey
P-02138 Email dated August 27, 2018, 3:13 PM from johannes.lampe@nunatsiavut.com to jim.goudie@nunatsiavut.com, Bert Pomeroy and Kevin Burt re Reports relating to methylmercury accumulation and transport from the Muskrat Falls reservoir 1-Mar-19 CIMFP
P-02139 Limited Notice to Proceed - Lower Churchill Project: Muskrat Falls - CH0007: Civil Works dated September 24, 2013 between Nalcor Energy and Astaldi Canada Inc. 15-Mar-19 Larry Cavaliere, Ed Knox, Perry Snook, Ken White
P-02140 Uncle Gnarley: Opinions on Newfoundland Politics that Bite dated June 27, 2016 re Design Engineer Baffled by Extent of Muskrat TL Flaw Reports by CBC 15-Mar-19 Larry Cavaliere, Ed Knox, Perry Snook, Ken White
P-02141 Uncle Gnarley: Opinions on Newfoundland Politics that Bite dated April 27, 2017 re Dragging the Report on the Formworks Collapse Out of Nalcor 15-Mar-19 Larry Cavaliere, Ed Knox, Perry Snook, Ken White
P-02142 Curriculum Vitae - Perry Snook 15-Mar-19 Larry Cavaliere, Ed Knox, Perry Snook, Ken White
P-02143 Curriculum Vitae - Larry Cavaliere 15-Mar-19 Larry Cavaliere, Ed Knox, Perry Snook, Ken White
P-02144 Email dated December 12, 2014, 4:22:39 PM from Nikolay Argirov to Craig Martin and Joseph.Krupski@NRCan-RNCan.gc.ca, cc JamesMeaney@lowerchurchillproject@ca and PHarrington@lowerchurchillproject.ca re Upcoming Committee Report and IE references 19-Mar-19 Nik Argirov
P-02145 Letter dated March 1, 2016 from Ronald Penney and David Vardy to Honourable Dwight Ball re Review of Muskrat Falls be extended 19-Mar-19 Nik Argirov
P-02146 Email dated July 31, 2018 from Brendan Paddick to David Vardy re response to email of July 16, 2018 19-Mar-19 Nik Argirov
P-02147 Email dated January 31, 2011, 3:44:34 PM from pharrington@nalcorenergy.com to ronpower@nalcorenergy.com, lanceclarke@nalcorenergy.com, et al re MWH meeting 19-Mar-19 Nik Argirov
P-02148 Email dated February 2, 2012, 2:35:38 Pm from rossbeckwith@nalcorenergy.com to jamesmeaney@nalcorenergy.com and lanceclarke@nalcorenergy.com, cc tracyhoskins@nalcorenergy.com re RFP LC-PM-082: Independent Engineer 19-Mar-19 Nik Argirov
P-02149 Email dated March 20, 2012, 3:00:22 PM from rossbeckwith@nalcorenergy.com to jamesmeaney@nalcorenergy.com, cc lanceclarke@nalcorenergy.com and philipbursey@nalcorenergy.com re LC-PM-082: Independent Engineer 19-Mar-19 Nik Argirov
P-02150 Independent Engineer's Report - Lower Churchill Project - Reference No. RFP LC-PM-082 prepared by MWH re 3-4 Technical Proposal Questionnaire dated November 15, 2013 19-Mar-19 Nik Argirov
P-02151 Email dated May 9, 2012, 5:14:31 PM from rossbeckwith@nalcorenergy.com to Nikolay Argirov, cc Lance Clarke, James Meaney and John Matovich re RFP LC-PM-082: Independent Engineer 19-Mar-19 Nik Argirov
P-02152 Email dated May 23, 2012, 12:16:52 PM from rossbeckwith@nalcorenergy.com to James Meaney and jmatovich@kcpl.ca and lanceclarke@nalcorenergy.com re RFP LC-PM-082: IE 19-Mar-19 Nik Argirov
P-02153 Email dated July 27, 2012, 11:28:37 AM from rossbeckwith@nalcorenergy.com and lanceclarke@nalcorenergy.com re Independent Engineer 19-Mar-19 Nik Argirov
P-02154 Email dated September 12, 2012, 5:48:50 PM from James Meaney to Paul Harrington and Jason Kean, cc Lance Clarke re Canada at IE Kickoff Meeting 19-Mar-19 Nik Argirov
P-02155 Email dated September 12, 2012, 1:50:39 PM from rossbeckwith@nalcorenergy.com to jamesmeaney@nalcorenergy.com, cc Lance Clarke re IE Kickoff Agenda/Canada 19-Mar-19 Nik Argirov
P-02156 Email dated September 17, 2012, 10:28:03 PM from jamesmeaney@nalcorenergy.com to rossbeckwith@nalcorenergy.com, cc Lance Clarke re LC-PM-082: Independent Engineer - Minutes of Meeting 19-Mar-19 Nik Argirov
P-02157 Email dated September 19, 2012, 11:38:05 AM from bbarnes@nalcorenergy.com to lanceclarke@nalcorenergy.com re North Spur 19-Mar-19 Nik Argirov
P-02158 Email dated September 20, 2012, 1:36:15 PM from victoriastanford@nalcorenergy.com to lanceclarke@nalcorenergy.com, cc Peter Madden re MWH Documents update 19-Mar-19 Nik Argirov
P-02159 Email dated September 30, 2012, 8:59:26 PM from jamesmeaney@nalcorenergy.com to rlazarus@justice.gc.ca re Executed MWH contract (confidential) 19-Mar-19 Nik Argirov
P-02160 Email dated October 22, 2012, 9:27:26 PM from James Meaney to John Matovich re MHI report for MWH 19-Mar-19 Nik Argirov
P-02161 Nalcor Energy Presentation re DG3 Capital Costs Overview - Presentation to MWH, Independent Engineer dated October 22, 2012 19-Mar-19 Nik Argirov
P-02162 Email dated October 25, 2012, 3:23:25 PM from jamesmeaney@nalcorenergy.com to petermadden@nalcorenergy.com, cc lanceclarke@nalcorenergy.com re MWH Action items 19-Mar-19 Nik Argirov
P-02163 Email dated October 25, 2012, 5:41:03 PM from James Meaney to Lance Clarke and Paul Harrington, cc Jason Kean re MWH Action Items 19-Mar-19 Nik Argirov
P-02164 Nalcor Energy - Lower Churchill Project - LC-PM-082 - MWH Canada Inc. - Independent Engineer and Operating and Maintenance Services for Lower Churchill Project - Execution Plan dated November 16, 2012 19-Mar-19 Nik Argirov
P-02165 Email dated February 3, 2015, 10:23:04 PM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov re Site Visit Report 19-Mar-19 Nik Argirov
P-02166 Email dated February 19, 2013, 9:19:34 AM from lanceclarke@nalcorenergy.com to jamesmeaney@nalcorenergy.com re MWH Preliminary Comments on DG3 Estimate/Schedule 19-Mar-19 Nik Argirov
P-02167 Email dated March 3, 2013, 7:51:39 PM from jasonkean@nalcorenergy.com to Jason R. Kean re Fw: MWH Preliminary Comments on DG3 Estimate/Schedule 19-Mar-19 Nik Argirov
P-02168 Email dated March 4, 2013, 2:24:55 PM from pharrington@nalcorenergy.com to jasonkean@nalcorenergy.com, cc James Meaney re Responses to MWH re DG3 Estimate 19-Mar-19 Nik Argirov
P-02169 Independent Engineer's Report - Lower Churchill Project - Prepared by MWH Americas, Inc. Draft dated March 22, 2013 19-Mar-19 Nik Argirov
P-02170 Email dated March 22, 2013, 4:04:30 PM from kwinsor@nalcorenergy.com to jamesmeaney@nalcorenergy.com, cc gbennett@nalcorenergy.com, lanceclarke@nalcorenergy.com and pharrington@nalcorenergy.com re IE 19-Mar-19 Nik Argirov
P-02171 Email dated June 13, 2013, 3:09 PM from jamesmeaney@nalcorenergy.com to Derrick Sturge, Gerald Cahill, et al re LCP Governance 7 Control Presentation - Updated Draft 19-Mar-19 Nik Argirov
P-02172 Email dated June 14, 2013, 12:40:33 PM from jamesmeaney@nalcorenergy.com to lanceclarke@nalcorenergy.com re Deck for 2 pm meeting with GNL 19-Mar-19 Nik Argirov
P-02173 Email dated June 14, 2013, 3:56:21 Pm from petermadden@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com re Consolidated Nalcor comments on MWH IE Report 19-Mar-19 Nik Argirov
P-02174 Email dated June 27, 2013, 9:55:34 AM from jamesmeaney@nalcorenergy.com to Paul J. Morris, cc Rob McGrath, Todd Stanley, Rob Hull and Scott Pelley re IE Contract 19-Mar-19 Nik Argirov
P-02175 Email dated July 12, 2013, 3:05:42 PM from Blaise Mitsutama to jamesmeaney@nalcorenergy.com and leighannesutton@nalcorenergy.com, cc Reynold Hokenson, petermadden@nalcorenergy.com, et al re Lower Churchill: Draft of Independent Engineer's Report 19-Mar-19 Nik Argirov
P-02176 Email dated July 18, 2013, 12:36 AM from lanceclarke@lowerchurchillproject.ca to jason kean/nlhydro, cc paulharrington@nlhydro; gilbert bennett/nlhydro and brian crawley/nlhydro re Draft IE Report to Ed/NL 19-Mar-19 Nik Argirov
P-02177 Email dated August 12, 2013, 7:17 PM from James Meaney to Karen O'Neill and Derrick Sturge re FW: URGENT (today) - For posting on the Completed Access Request website - NR/14/2013 19-Mar-19 Nik Argirov
P-02178 MHW IE Report Outstanding Questions Section 1-4 - Response to Inquiry by Nalcor 19-Mar-19 Nik Argirov
P-02179 MHW IE Report Outstanding Questions Section 5-7 - Response to Inquiry by Nalcor 19-Mar-19 Nik Argirov
P-02180 Email dated September 6, 2013, 4:14:28 PM from jamesmeaney@nalcorenergy.com to dawndalley@nalcorenergy.com, cc koneill@nlh.nl.ca and dsturge@nalcorenergy.com re Fw: Questions regarding the Independent Engineer 19-Mar-19 Nik Argirov
P-02181 Email dated September 23, 2013, 10:19 PM from jamesmeaney@nalcorenergy.com to petermadden@lowerchurchillproject.ca, cc Lance Clarke and Paul Harrington re Rey 19-Mar-19 Nik Argirov
P-02182 Email dated September 24, 2013, 8:06 AM from petermadden@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com, cc lanceclarke@lowerchurchillproject.ca re MWH tech session & site visit 19-Mar-19 Nik Argirov
P-02183 Email dated September 24, 2013, 1:39:13 PM from petermadden@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com re List of documents posted for MWH review 19-Mar-19 Nik Argirov
P-02184 Email dated October 1, 2013, 7:51 PM from James Meaney to Meghan Felt and Auburn Warren, cc Jennifer Gray re Limited Notice to Proceed - CH0007 - Civil Works (Confidential) 19-Mar-19 Nik Argirov
P-02185 Email dated October 1, 2013, 10:14 PM from James Meaney to Meghan Felt and Auburn Warren, cc Jennifer Gray re Limited Notice to Proceed - CH0007 - Civil Works (Confidential) 19-Mar-19 Nik Argirov
P-02186 Email dated October 10, 2013, 2:11 PM from Alison Manzer to Reynold Hokenson, Charles Newman and jamesmeaney@nalcorenergy.com, cc Abudulai Suhuyini, Celeste Christensen, et al re Lower Churchill; Nalcor; Contract CH0007; LCRP - Contract CH0007 & Astaldi Selection [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02187 Email dated October 10, 2013, 3:13:55 PM from jamesmeaney@nalcorenergy.com to Alison Manzer, cc Charles Newman re Lower Churchill; Nalcor; Contract CH0007; LCRP - Contract CH0007 & Astaldi Selection [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02188 Email dated October 10, 2013, 3:55 PM from scotto'brien@lowerchurchillproject.ca to james meaney/nlhydro, cc paulharrington/hlhydro and lance clarke/nlhydro re Astaldi Information for MWH 19-Mar-19 Nik Argirov
P-02189 Email dated October 16, 2013, 1:08:42 PM from jamesmeaney@nalcorenergy.com to Charles Newman, cc Lance Clarke, Peter Madden, Scott O'Brien and Suhuyini Abudulai re Fw: Lower Churchill; Nalcor, Contract CH0007; Request for Information [IWOV-Legal.FI1640195] 19-Mar-19 Nik Argirov
P-02190 Email dated October 17, 2013, 9:05:01 AM from jamesmeaney@nalcorenergy.com to lanceclarke@lowerchurchillproject.ca re Fw: Astaldi Information for MWH 19-Mar-19 Nik Argirov
P-02191 Email dated October 17, 2013, 3:41 PM from lanceclarke@lowerchurchillproject.ca to jamesmeaney@nlhydro re Astaldi Information for MWH 19-Mar-19 Nik Argirov
P-02192 Email dated October 24, 2013, 11:18 PM from scotto'brien@lowerchurchillproject.ca to jamesmeaney/nlhydro, cc ed over/lcp/nlhydro, ronadamcyk/lcp/nlhydro, et al re Lower Churchill; Nalcor; Request for Astaldis's Schedule 19-Mar-19 Nik Argirov
P-02193 Email dated October 31, 2013, 10:09 PM from scotto'brien@lowerchurchillproject.ca to robertwoolgar/nlhydro re Fwd: LCRP - Nalcor - Outstanding Items List - October 31 Draft [IWOV-Legal.FID1816602] 19-Mar-19 Nik Argirov
P-02194 Email dated November 1, 2013, 10:16:02 AM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca re URGENT: This afternoon's meeting / MWH issues 19-Mar-19 Nik Argirov
P-02195 Email dated November 1, 2013, 11:42:15 AM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca re Fw: Email from Alison on IE Issues 19-Mar-19 Nik Argirov
P-02196 Email dated November 1, 2013, 11:55:49 AM from jamesmeaney@nalcorenergy.com to lanceclarke@lowerchurchillproject.ca and pharrington@lowerchurchillproject.ca re More from Alison 19-Mar-19 Nik Argirov
P-02197 Email dated November 1, 2013, 10:37:37 PM from jamesmeaney@nalcorenergy.com to Alison Manzer re MWH Meeting on Wednesday 19-Mar-19 Nik Argirov
P-02198 Email dated November 1, 2013, 10:42 PM from Alison Manzer to jamesmeaney@nalcorenergy.com re MWH Meeting on Wednesday 19-Mar-19 Nik Argirov
P-02199 Email dated November 5, 2013, 8:17 AM from Alison Manzer to jamesmeaney@nalcorenergy.com re Please confirm time and place 19-Mar-19 Nik Argirov
P-02200 Email dated November 5, 2013, 11:10 AM from tomchudy@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com, cc Jason Kean, Lance Clarke and Paul Harrington re Fw: MWH comments on Schedule Call 19-Mar-19 Nik Argirov
P-02201 Email dated November 5, 2013, 3:17:47 PM from Bob Ilett to robertwoolgar@lowerchurchillproject.ca, petermadden@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca, cc Scott O'Brien, Ken Sparkes, et al re Fw: Outstanding Items for MWH / Canada Due Diligence 19-Mar-19 Nik Argirov
P-02202 Email dated November 5, 2013, 5:05 PM from georgechehab@lowerchurchillproject.ca to edbush@lowerchurchillproject.ca re Fw: MWH Meeting on Wednesday CORRECT VERSION - New Data 19-Mar-19 Nik Argirov
P-02203 Email dated November 5, 2013, 5:23:56 PM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca and petermadden@lowerchurchillproject.ca re *Confidential: IE Report (October 21) - Email 1 of 2 19-Mar-19 Nik Argirov
P-02204 Email dated November 5, 2013, 5:24:31 PM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca and petermadden@lowerchurchillproject.ca re *Confidential: IE Report (October 21) - Email 2 of 2 19-Mar-19 Nik Argirov
P-02205 Email dated November 6, 2013, 7:11 AM from jamesmeaney@nalcorenergy.com to Derrick Sturge, Auburn Warren, Rob Hull and Craig Hippern re Fw: Agenda for MWH Meeting 19-Mar-19 Nik Argirov
P-02206 Email dated November 6, 2013, 10:22 AM from Ed Martin to Bev Tucker re Fw: Deck re Project Costs 19-Mar-19 Nik Argirov
P-02207 Email dated November 6, 2013, 1:40:55 PM from jamesmeaney@nalcorenergy.com to Joseph Krupski, James Loucks, Reynold Hokenson, Alison Manzer, David Pyper and John Medland re Fw: Astaldi deck (confidential) 19-Mar-19 Nik Argirov
P-02208 Email dated November 6, 2013, 3:26:10 PM from jamesmeaney@nalcorenergy.com to Joseph Lrupski and James loucks cc Reynold Hokenson, Alison Manzer, David Pyper and John Medland re LCP Value Update Deck - November 6, 2013 (Confidential) 19-Mar-19 Nik Argirov
P-02209 Email dated November 6, 2013, 4:05 PM from lanceclarke@lowerchurchillproject.ca to jamesmeaney/nlhydro re Fwd: 19-Mar-19 Nik Argirov
P-02210 Email dated November 6, 2013, 6:01 PM from lanceclarke@lowerchurchillproject.ca to jasonkean/nlhydro re Fwd: MWH Meeting on Wednesday CORRECT VERSION 19-Mar-19 Nik Argirov
P-02211 Email dated November 6, 2013, 10:21 PM from jamesmeaney@nalcorenergy.com to Paul Harrington re Did it go ok today with Canada and IE? 19-Mar-19 Nik Argirov
P-02212 Email dated November 19, 2013, 9:48 AM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca, cc lanceclarke@lowerchurchillproject.ca re IE Contract 19-Mar-19 Nik Argirov
P-02213 Email dated November 14, 2013, 8:13 PM from auburnwarren@nalcorenergy.com to Derrick Sturge, James Meaney, Rob Hull, Craig Hippern and Xero Martis re Fw: URGENT; Updated capital costs 19-Mar-19 Nik Argirov
P-02214 Email dated November 15, 2013, 8:12:50 AM from georgechehab@lowerchurchillproject.ca to jasonkean@lowerchurchillproject.ca, cc jamesmeaney@nalcorenergy.com, auburnwarren@nalcorenergy.com, et al re URGENT: Updated capital costs 19-Mar-19 Nik Argirov
P-02215 Email dated November 15, 2013, 4:10:43 PM from jamesmeaney@nalcorenergy.com to Derrick Sturge, Auburn Warren and Rob Hull re Updated Capital Costs - Note to Ed 19-Mar-19 Nik Argirov
P-02216 Email dated November 19, 2013, 4:09:43 PM from jamesmeaney@nalcorenergy.com to Paul Harrington and Lance Clarke, cc Gilbert Bennett and Peter Madden re Comments on IE report 19-Mar-19 Nik Argirov
P-02217 Email dated November 19, 2013, 9:29:24 PM from jamesmeaney@nalcorenergy.com to Meghan Felt, cc Auburn Warren and Jennifer Gray re LCP Capital Cost & Material Contracts Update 19-Mar-19 Nik Argirov
P-02218 Memorandum dated November 20, 2013 from Alison Manzer to File re Consolidated Comments and Instructions to Independent Engineer November 20, 2013 19-Mar-19 Nik Argirov
P-02219 Email dated November 20, 2013, 11:25:50 AM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca, gbennett@nalcorenergy.com and lanceclarke@lowerchurchillproject.ca, cc Derrick Sturge, Rob Hull, Auburn Warren, Xero Martis and Peter Madden re URGENT: Canada/CBB Memo for Nik/MWH on IE Report 19-Mar-19 Nik Argirov
P-02220 Email dated November 20, 2013, 12:15:32 PM from pharrington@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com, cc Auburn Warren, Derrick Sturge, Gilbert Bennett, Lance Clarke and Peter Madden re URGENT: Canada/CBB Memo for Nik/MWH on IE Report 19-Mar-19 Nik Argirov
P-02221 Email dated November 20, 2013, 10:01:24 PM from jamesmeaney@nalcorenergy.com to petermadden@lowerchurchillproject.ca, cc pharrington@lowerchurchillproject.ca, gbennett@nalcorenergy.com, et al re Revised Comments - IE Report Rev 4 19-Mar-19 Nik Argirov
P-02222 Email dated November 21, 2013, 10:34 AM from jamesmeaney@nalcorenergy.com to paul harrington/nlhydro re MWH Comments to Canada on Schedule 19-Mar-19 Nik Argirov
P-02223 Email dated November 21, 2013, 11:18 AM from Alison Manzer to jamesmeaney@nalcorenergy.com re MWH Comments to Canada on Capital Costs [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02224 Email dated November 21, 2013, 11:26:50 AM from jamesmeaney@nalcorenergy.com to Gilbert Bennett, Lance Clarke, et al re Fw: MWH Comments to Canada on Capital Costs 19-Mar-19 Nik Argirov
P-02225 Email dated November 21, 2013, 2:08:30 PM from jamesmeaney@nalcorenergy.com to Nikolay Argirov, cc Alison Manzer, Anoop Kapoor, et al re Nalcor Key Comments on MWH Draft IE Report Nov 15, 2013 19-Mar-19 Nik Argirov
P-02226 Email dated November 21, 2013, 2:26:53 PM from pharrington@lowerchurchillproject.ca to petermadden@lowerchurchillproject.ca re Comments - IE Report Rev 4 19-Mar-19 Nik Argirov
P-02227 Email dated November 21, 2013, 4:49:17 PM from petermadden@lowerchurchillproject.ca to edbush@lowerchurchillproject.ca, robertwoolgar@lowerchurchillproject.ca, et al re IE Report : Final Step - Detailed Comments 19-Mar-19 Nik Argirov
P-02228 Email dated November 21, 2013, 5:14:55 PM from auburnwarren@nalcorenergy.com to Craig Hippern, James Meaney and meghan.felt@mcinnescooper.com re Fw: Model 19-Mar-19 Nik Argirov
P-02229 Email dated November 21, 2013, 5:51:25 PM from pharrington@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com, cc lanceclarke@lowerchurchillproject.ca, gbennett@nalcorenergy.com and edbush@lowerchurchillproject.ca re Way Forward - Cost and Schedule 19-Mar-19 Nik Argirov
P-02230 Email dated November 21, 2013, 11:06 PM from jamesmeaney@nalcorenergy.com to Auburn Warren and Derrick Sturge, cc Xeno Martis and Rob Hull re Way Forward with IE on Cost and Schedule 19-Mar-19 Nik Argirov
P-02231 Email dated November 22, 2013, 3:53:30 PM from pharrington@lowerchurchillproject.ca to Joseph Krupski, cc Alison Manzer, David Pyper, et al re MWH Calls [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02232 Email dated November 24, 2013, 6:02:57 PM from jamesmeaney@nalcorenergy.com to Nikolay Argirov, cc Paul Harrington, Lance Clarke, et al re Draft IE Report - Nalcor Detailed Comments 19-Mar-19 Nik Argirov
P-02233 Email dated November 25, 2013, 1:44:00 PM from jamesmeaney@nalcorenergy.com to Alison Manzer, David Pyper, et al, cc pharrington@lowerchurchillproject.ca and jasonkean@lowerchurchillproject.ca re LCP Schedule Call with MWH - Presentation for Review 19-Mar-19 Nik Argirov
P-02234 Email dated November 26, 2013, 12:07:59 PM from jamesmeaney@nalcorenergy.com to Alison Manzer, cc Anoop Kapoor, Anne Boudreau, et al re FW: Instructions to MWH from Canada 19-Mar-19 Nik Argirov
P-02235 Email dated November 27, 2013, 5:40:12 PM from jamesmeaney@nalcorenergy.com to Nikolay Argirov, cc Alison Manzer, Charles Newman, et al re IE Report Checkpoint Call - Recap 19-Mar-19 Nik Argirov
P-02236 Email dated November 28, 2013, 8:39 AM from David Pyper to jamesmeaney@nalcorenergy.com re Fw: LCRP - Nalcor - Independent Engineer Report [IWOV-Legal.FID1816816] 19-Mar-19 Nik Argirov
P-02237 Email dated November 28, 2013, 3:52:56 PM from jamesmeaney@nalcorenergy.com to Alison Manzer and Charles Newman, cc Anoop Kapoor, Joseph Krupski, et al re Draft IE Report Nov 27 - Nalcor Comments 19-Mar-19 Nik Argirov
P-02238 Email dated November 30, 2013, 9:16 PM from jamesmeaney@nalcorenergy.com to Alison Manzer, cc Anoop Kapoor, joseph.krupski@nrcan-rncan.gc.ca, et al re Confirmations re Independent Engineer Review Process 19-Mar-19 Nik Argirov
P-02239 Email dated January 22, 2014, 9:28 AM from jamesmeaney@nalcorenergy.com to edbush@lowerchurchillproject.ca re Contractor Reports for MWH 19-Mar-19 Nik Argirov
P-02240 Email dated January 23, 2014, 10:46 AM from jamesmeaney@nalcorenergy.com to Charles Newman re Responses to MWH Comments on Construction Reports Jan 20, 2014 [IWOV-Legal.FID1816818] 19-Mar-19 Nik Argirov
P-02241 Email dated January 24, 2014, 4:43:12 PM from jamesmeaney@nalcorenergy.com to Alison Manzer, Joseph Krupski, et al re Fw: LCP Process & Controls Presentation 19-Mar-19 Nik Argirov
P-02242 Email dated February 18, 2014, 11:47:40 AM from Reynold Hokenson to Charles Newman and jamesmeaney@nalcorenergy.com, cc Anoop Kapoor, Joseph Krupski, et al re Lower Churchill; Nalcor; Draft of Text Pertaining to Claim for CH0006, Bulk Excavation; Third Draw, February 20-27, 2014 19-Mar-19 Nik Argirov
P-02243 Email dated February 29, 2014, 3:38:50 PM from pharrington@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com, cc Ed Bush, Lance Clarke and Gilbert Bennett re Response to MWH on CH0006 Claim 19-Mar-19 Nik Argirov
P-02244 Email dated February 24, 2014, 9:24:40 AM from dawndalley@nalcorenergy.com to Charles Bown re Fw: Nalcor - Interim IE Report [IWOV-Legal.FID1816819] 19-Mar-19 Nik Argirov
P-02245 Email dated February 25, 2014, 4:23:05 PM from pharrington@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca, jasonkean@lowerchurchillproject.ca, et al re Fw: IE Report 19-Mar-19 Nik Argirov
P-02246 Email dated February 26, 2014, 5:19:08 PM from pharrington@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com re Fw: Updated analysis - IE Report dated Dec 2013 19-Mar-19 Nik Argirov
P-02247 Interim Independent Engineer's Report - Lower Churchill Project Phase 1 - Muskrat Falls Generation - Labrador Transmission Assets - Labrador-Island Transmission Link dated December 30, 2013 19-Mar-19 Nik Argirov
P-02248 Email dated March 28, 2014, 2:47 PM from Nikolay Argirov to Alison Manzer and jamesmeaney@nalcorenergy.com re Paul Hewitt [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02249 Email dated March 28, 2014, 8:57 PM from jamesmeaney@nalcorenergy.com to Alison Manzer re Fw: CVs of the new team members - Team NALCOR 19-Mar-19 Nik Argirov
P-02250 Email dated April 11, 2014, 2:42 PM from jamesmeaney@nalcorenergy.com to Alison Manzer re Updates on IE Report Recommendations [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02251 Email dated April 14, 2014, 11:35:42 AM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca, cc edbush@lowerchurchillproject.ca re Canada Inquiry on IE Report Recommendations 19-Mar-19 Nik Argirov
P-02252 Email dated April 14, 2014, 11:56:04 PM from Nikolay Argirov to gbennett@nalcorenergy.com and jamesmeaney@nalcorenergy.com re FW: LCP DG3 Estimate Accuracy 19-Mar-19 Nik Argirov
P-02253 GNL - Natural Resources - April 15, 2014 - Release of Independent's Report - Key Messages 19-Mar-19 Nik Argirov
P-02254 Email dated April 15, 2014, 10:25:44 AM from Nikolay Argirov to pharrington@lowerchurchillproject.ca, cc jamesmeaney@nalcorenergy.com, gbennett@nalcorenergy.com, et al re Please be aware 19-Mar-19 Nik Argirov
P-02255 Email dated April 30, 2014, 4:46 PM from Joseph Krupski to ronpower@lowerchurchillproject.ca and pharrington@lowerchurchillproject.ca, cc amanzer@casselsbrock.com, Anoop Kapoor, et al re Updates on IE Report Recommendations 19-Mar-19 Nik Argirov
P-02256 Email dated May 22, 2014, 12:52 PM from jamesmeaney@nalcorenergy.com to dsturge@nalcorenergy.com, cc gbennett@nalcorenergy.com and pharrington@lowerchurchillproject.ca re Fw: MF Oversight Committee 19-Mar-19 Nik Argirov
P-02257 Nalcor Energy - Lower Churchill Project presentation re Muskrat Falls Project Value and Cost Update for Government of Canada / MWH dated June 20, 2014 19-Mar-19 Nik Argirov
P-02258 Email dated July 11, 2014, 9:14 AM from emartin@nalcorenergy.com to Gilbert Bennett re Fw: Update 19-Mar-19 Nik Argirov
P-02259 Email dated July 24, 2014, 10:03:11 AM from gbennett@nalcorenergy.com to pharrington@lowerchurchillproject.ca and jamesmeaney@nalcorenergy.com re Fw: Scanned documents as requested 19-Mar-19 Nik Argirov
P-02260 Email dated July 24, 2014, 10:26:32 AM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com re Decks used with IE/Canada this week - N Spur 19-Mar-19 Nik Argirov
P-02261 Email dated July 24, 2014, 2:25:11 PM from pharrington@lowerchurchillproject.ca to Gilbert Bennett and Charles Bown, cc jamesmeaney@nalcorenergy.com and nik.argirov@mwhglobal.com re Brief summary of IE Visit 19-Mar-19 Nik Argirov
P-02262 Email dated September 19, 2014, 10:06:08 PM from jamesmeaney@nalcorenergy.com to gbennett@nalcorenergy.com, pharrington@lowerchurchillproject.ca and edbush@lowerchurchillproject.ca re Fw: MWH Site Visit Report 19-Mar-19 Nik Argirov
P-02263 Email dated November 10, 2014, 8:48:51 PM from Nikolay Argirov to Joseph Krupski, Anoop Kapoor and Michael Freeman, cc jamesmeaney@lowerchurchillproject.ca re Review of invoices and payment process - NALCOR 19-Mar-19 Nik Argirov
P-02264 Email dated November 19, 2014, 12:39:40 PM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov re Supporting Documentation for Cost Overrun Certificates 19-Mar-19 Nik Argirov
P-02265 Email dated November 26, 2014, 9:18:07 PM from robertwoolgar@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, cc scottobrien@lowerchurchillproject.ca re Independent Engineer Debrief 19-Mar-19 Nik Argirov
P-02266 Email dated December 4, 2014, 11:03:53 AM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov, cc edbush@lowerchurchillproject.ca and jennifergrandy@lowerchurchillproject.ca re IPS 19-Mar-19 Nik Argirov
P-02267 Email dated December 4, 2014, 11:56 PM from Nikolay Argirov to gbennett@nalcorenergy.com and pharrington@lowerchurchillproject.ca, cc Joseph Krupski and Alison Manzer re FW: Field Trip report 19-Mar-19 Nik Argirov
P-02268 Email dated February 2, 2015, 4:50:05 Pm from pharrington@lowerchurchillproject.ca to jamesmeaney@lowerchurchillproject.ca and stevepellerin@lowerchurchillproject.ca, cc Gilbert Bennett and Karen O'Neill re Draft IE Report - Questions 19-Mar-19 Nik Argirov
P-02269 Email dated February 3, 2015, 9:38:01 PM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov, cc pharrington@lowerchurchillproject.ca and stevepellerin@lowerchurchillproject.ca re Site Visit Report 19-Mar-19 Nik Argirov
P-02270 Email dated February 5, 2015, 4:26:53 PM from Nik Argirov to gregsnyder@lowerchurchillproject.ca, cc John Young and stevepellerin@lowerchurchillproject.ca re Minutes of Meeting in Montreal 19-Mar-19 Nik Argirov
P-02271 Email dated February 24, 2015, 8:30:22 PM from Nikolay Argirov to anthonyembury@lowerchurchillproject.ca to edbush@lowerchurchillproject.ca, jamesmeaney@lowerchurchillproject.ca, et al re Clarifications request - LC-SB-003 19-Mar-19 Nik Argirov
P-02272 Email dated April 7, 2015, 8:27:35 AM from richardsevers@lowerchurchillproject.ca to Nikolay Argirov, cc pharrington@lowerchurchillproject.ca, Steve Pellerin, Frank gillespie and Scott O'Brien re Items for further observation, identified by the IE 19-Mar-19 Nik Argirov
P-02273 Email dated April 14, 2015, 4:36:58 PM from gbennett@nalcorenergy.com to emartin@nalcorenergy.com and dsturge@nalcorenergy.com, cc Paul Harrington and James Meaney re Nik 19-Mar-19 Nik Argirov
P-02274 Email dated April 15, 2015, 2:29:50 PM from stevepellerin@lowerchurchillproject.ca to Nikolay Argirov re Question on Source for Draw Certificate Information 19-Mar-19 Nik Argirov
P-02275 Email dated April 21, 2015, 1:09:25 PM from jamesmeaney@lowerchurchillproject.ca to gbennett@nalcorenergy.com and pharrington@lowerchurchillproject.ca re Fw: Nik [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02276 Email dated April 24, 2015, 12:00:08 PM from jamesmeaney@lowerchurchillproject.ca to gbennett@nalcorenergy.com and pharrington@lowerchurchillproject.ca re Note to MWH on Nik 19-Mar-19 Nik Argirov
P-02277 Email dated April 27, 2015, 8:12 AM from jamesmeaney@lowerchurchillproject.ca to Alison Manzer, James Meaney and Anoop Kapoor re Internal discussions with MWH not going well 19-Mar-19 Nik Argirov
P-02278 Email dated May 2, 2015, 3:40:29 PM from Patrick Corser to jamesmeaney@lowerchurchillproject.ca, cc amanzer@casselsbrock.com, Anoop Kapoor, et al re Nik Argirov / MWH 19-Mar-19 Nik Argirov
P-02279 Email dated May 20, 2015, 2:40 PM from jamesmeaney@lowerchurchillproject.ca to Gilbert Bennett, Paul Harrington, et al re MWH / Nik Update - Email 1 of 2 19-Mar-19 Nik Argirov
P-02280 Email dated May 21, 2015, 1:40 PM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov re No agreement reached 19-Mar-19 Nik Argirov
P-02281 Consulting Services Subcontract dated May 11, 2015 between MWH Canada, Inc. and Argirov Engineering Inc. 19-Mar-19 Nik Argirov
P-02282 Nalcor Energy - Emera presentation re Independent Engineer Meeting dated May 27, 2015 19-Mar-19 Nik Argirov
P-02283 Email dated June 15, 2015, 2:46:43 PM from jamesmeaney@lowerchurchillproject.ca to amanzer@casselsbrock.com re Argirov contract 19-Mar-19 Nik Argirov
P-02284 Email dated June 18, 2015, 11:35:06 AM from Nik Argirov to stevepellerin@lowerchurchillproject.ca re Site Visit in July 19-Mar-19 Nik Argirov
P-02285 Email dated September 11, 2015, 8:53:44 PM from Nik Argirov to jkrupski@nrcan.gc.ca, John Medland, et al re Nalcor - July '15 Site Visit Report 19-Mar-19 Nik Argirov
P-02286 Email dated September 15, 2015, 11:44 AM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov, cc Anoop Kapoor and Joseph Krupski re Fw: Astaldi Monthly Progress Report 19-Mar-19 Nik Argirov
P-02287 Nalcor Energy - Lower Churchill Project presentation re Muskrat Falls Project Update - Government of Canada/Independent Engineer dated September 28, 2015 19-Mar-19 Nik Argirov
P-02288 Email dated October 2, 2015, 4:46:44 PM from stevepellerin@lowerchurchillproject.ca to Nik Argirov, bcc pharrington@lowerchurchillproject.ca re July Trip Report 19-Mar-19 Nik Argirov
P-02289 Email dated October 3, 2015, 7:58:06 AM from jamesmeaney@lowerchurchillproject.ca to Paul Harrington re Revised IE report 19-Mar-19 Nik Argirov
P-02290 Email dated October 16, 2015, 11:20 AM from Alison Manzer to jamesmeaney@nalcorenergy.com, cc xmartis@fasken.com re Cost Overrun (IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02291 Email dated November 9, 2015, 10:14 AM from Alison Manzer to Anoop Kapoor, auburnwarren@nalcorenergy.com, et al re Communication Guidelines (IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02292 Email dated November 18, 2015, 5:02:12 PM from jamesmeaney@lowerchurchillproject.ca to Gilbert Bennett, Paul Harrington, et al, cc anthonyembury@lowerchurchillproject.ca and stevepellerin@lowerchurchillproject.ca re Revised Communication Guidelines with Canada 19-Mar-19 Nik Argirov
P-02293 Email dated November 20, 2015, 2:40:39 PM from stevepellerin@lowerchurchillproject.ca to Nik Argirov, cc pharrington@lowerchurchillproject.ca re September Report Comments 19-Mar-19 Nik Argirov
P-02294 Email dated February 6, 2015, 9:30:26 PM from gbennett@nalcorenergy.com to jamesmeaney@lowerchurchillproject.ca, cc Karen O'Neill, Paul Harrington and Steve Pellerin re IE Site Visit Report Nov 2014 - Final 19-Mar-19 Nik Argirov
P-02295 Email dated March 22, 2016, 5:14:33 PM from Nik Argirov to stevepellerin@lowerchurchillproject.ca, cc Joseph Krupski re Alstom and contractors reporting in general 19-Mar-19 Nik Argirov
P-02296 Email dated May 30, 2016, 11:41:33 AM from pharrington@lowerchurchillproject.ca to Nik Argirov and Julia Mullaley, cc gbennett@nalcorenergy.com, koneill@nlh.nl.ca, et al re No Subject 19-Mar-19 Nik Argirov
P-02297 Email dated May 31, 2016, 8:05:53 PM from Paul Harrington to JamesMeaney@lowerchurchillproject.ca re Contingent Risk - Management Change to LCP 19-Mar-19 Nik Argirov
P-02298 Email dated June 6, 2016, 3:43:37 PM from jamesmeaney@lowerchurchillproject.ca to jamesmeaney@lowerchurchillproject.ca re LCP Cost & Schedule Briefing for Canada/IE 19-Mar-19 Nik Argirov
P-02299 Email dated June 6, 2016, 10:14:57 AM from Paul Harrington to Nik Argirov re I thought common sense would prevail but I was wrong 19-Mar-19 Nik Argirov
P-02300 Email dated June 7, 2016, 12:18:04 PM from jamesmeaney@lowerchurchillproject.ca to Auburn Warren re Contingent Risk - Management Change to LCP 19-Mar-19 Nik Argirov
P-02301 Email dated June 9, 2016, 9:36:31 AM from Gilbert Bennett and JohnMacIsaac@nalcorenergy.com re Fwd: HVdc conductor - Bulging strands 19-Mar-19 Nik Argirov
P-02302 Email dated July 7, 2016, 5:13:21 PM from Paul Harrington to Nik Argirov re Organization 19-Mar-19 Nik Argirov
P-02303 Email dated August 6, 2016, 10:41 PM from gbennett@nalcorenergy.com to michaelladha@nalcorenergy.com re As requested 19-Mar-19 Nik Argirov
P-02304 Email dated August 12, 2016, 4:19:15 PM from jasonkean@lowerchurchillproject.ca to Nikolay Argirov, cc pharrington@lowerchurchillproject.ca, johnmacisaac@nalcorenergy.com, et all, bcc geraldcahill@lowerchurchillproject.ca re Update on the HVdc Conductor 19-Mar-19 Nik Argirov
P-02305 Email dated September 20, 2016, 7:05:17 AM from Nik Argirov to stevepellerin@lowerchurchillproject.ca, cc Joseph Krupski re Nalcor - July '16 IE Site Visit Report 19-Mar-19 Nik Argirov
P-02306 Email dated October 12, 2016, 9:19:51 AM from jamesmeaney@lowerchurchillproject.ca to Nik Argirov, John Medland and Matthew Buffet re Fw: briefing (confidential & privileged) 19-Mar-19 Nik Argirov
P-02307 Email dated November 4, 2016, 10:58 PM from jamesmeaney@lowerchurchillproject.ca to Alison Manzer, cc joseph.krupski@canada.ca, Rene Gallant, Anne Boudreau and Nik Argirov re MWH and IE issue [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02308 Email dated November 12, 2017, 10:48 AM from Tim Harrington to Mike Buckle and John Henley, cc Charles Lavigne and Laurie Hildebrand re [EXTERNAL] FW: Cold Eyes Review Report No. 1 20-Mar-19 Tim Harrington
P-02309 Email dated December 15, 2017, 2:59 Pm from Charles Lavigne to Julie Canuel and Julie Yarn, cc Catherine Hebert, Mike Buckle, Tim Harrington, John Henley and Jeff Butler re [EXPERNAL] CH0031-001 Response to Contractor LTR No. TC006-MFC-0047 - Neutral funding payment 20-Mar-19 Tim Harrington
P-02310 Email dated February 6, 2018, 3:38 PM from Tim Harrington to Laurier Hildebrand, cc Brad Bursey, Charles Lavigne and Mike Buckle re [EXTERNAL] Concession #16 20-Mar-19 Tim Harrington
P-02311 Email dated March 1, 2018, 3:45 PM from John Henley to Tim Harrington, cc Mike Buckle, James Parmiter-PTR and Dan Farrell re [External] 20-Mar-19 Tim Harrington
P-02312 Email dated April 16, 2018, 5:37 PM from John Henley to Tim Harrington and Mike Buckle, cc James Parmiter Re: Change Orders in Dispute 20-Mar-19 Tim Harrington
P-02313 Email dated June 18, 2018, 10:46 AM from Charles Lavigne to Mike Buckle re [EXTERNAL] FW: Pre-Meeting with Nalcor 20-Mar-19 Tim Harrington
P-02314 Email dated January 7, 2019, 11:24 AM from John Henley to Tim Harrington re LCP-CM-TRANSMIT-066502: Component 1 - CH0031-001 Mechanical and Electrical Auxiliaries - Change Order No. 0023 20-Mar-19 Tim Harrington
P-02315 Letter dated February 11, 2019 from Tim Harrington to Scott O'Brien re Supply and Install Mechanical and Electrical Auxiliaries (MF), Agreement CH0031-001 - Notice of Change - Project Extension of Time Ref. No. TC006-MFC-0164 20-Mar-19 Tim Harrington
P-02316 Email dated February 19, 2019 from Joan Dillon to Jim Hawkins, David Burton and Paul Forsey, cc Joan Dillon, Tim Harrington, et al re CH0031-001 - Incurred Cost Report - February 2019 - Issued for Review 20-Mar-19 Tim Harrington
P-02317 Nalcor Energy - Lower Churchill Project - Mechanical and Electrical Auxiliaries - Civil Works Agreement No: 605573-CH0031-001 - Cost Report for period ending February 26, 2019 20-Mar-19 Tim Harrington
P-02318 Uncle Gnarley news article dated July 27, 2015 re Engineers Break Silence on Problems at Muskrat Falls 19-Mar-19 Nik Argirov
P-02319 Uncle Gnarley news article dated June 18, 2018 re Nalcor Allowed to Secretly Censor Reports of Independent Engineer (Part 1) 19-Mar-19 Nik Argirov
P-02320 Uncle Gnarley news article dated June 25, 2018 re Toned Down, Redacted with Deletions: Did Nalcor Write the Independent Engineer's Report? (Part II) 19-Mar-19 Nik Argirov
P-02321 Letter Agreement dated June 16, 2017 from Pat Hussey and Scott O'Brien to Fred J. Cahill re RFP No. CH0031 - Supply and Install Mechanical and Electrical Auxiliaries (MF) - Letter Agreement Pending Formal Agreement 20-Mar-19 Tim Harrington
P-02322 Letter dated June 30, 2017 from Pat Hussey and Scott O'Brien to Fred J. Cahill re RFP No. CH0031: Supply and Install Mechanical and Electrical Auxiliaries (MF) - Extension of Letter Agreement 20-Mar-19 Tim Harrington
P-02323 Letter dated July 7, 2017 from Pat Hussey and Scott O'Brien to Fred J. Cahill re RFP No. CH0031: Supply and Install Mechanical and Electrical Auxiliaries (MF) - Further Extension of Letter Agreement 20-Mar-19 Tim Harrington
P-02324 Nalcor Energy - Lower Churchill Project - Contract Review and Approval re Agreement # CH0031 - Supply and Install Mechanical and Electrical Auxiliaries (MF) dated June 14, 2017 20-Mar-19 Tim Harrington
P-02325 Curriculum Vitae - Timothy Harrington 20-Mar-19 Tim Harrington
P-02326 Amending Agreement No. 1 dated February 21, 2018 between Muskrat Falls Corporation and Cahill-Ganotec 20-Mar-19 Tim Harrington
P-02327 Email dated January 28, 2019, 10:18 AM from Patrick Lamarre to Tim Harrington, Fred Cahill, et al, cc Mike Buckle, Brad Bursey, et al re Talking points for upcoming Nalcor sponsor mtg 20-Mar-19 Tim Harrington
P-02328 Email dated August 1, 2017, 4:56 PM from John Henley to Mike Buckle re [EXTERNAL] FW: Muskrat Falls CH0031 - Key Personnel - Completion Manager 20-Mar-19 Tim Harrington
P-02329 Email dated November 21, 2013, 1:25 Pm from Alison Manzer to jamesmeaney@nalcorenergy.com re Will it just be Nik on call from MWH? [IWOV-Legal.FID1640195] 19-Mar-19 Nik Argirov
P-02330 Williams Engineering Canada re Muskrat Falls Public Inquiry - Expert Witness Services - List of documents reviewed dated January 30, 2019 21-Mar-19 Dr. Jim Gilliland
P-02331 Curriculum Vitae - Jim Gilliland 21-Mar-19 Dr. Jim Gilliland
P-02332 Curriculum Vitae - Brian George 21-Mar-19 Dr. Jim Gilliland
P-02333 Curriculum Vitae - Evelyn Porter 21-Mar-19 Dr. Jim Gilliland
P-02334 Curriculum Vitae - Nat Zaccaria 21-Mar-19 Dr. Jim Gilliland
P-02335 Nalcor Energy - Lower Churchill Project - Project Control Management Plan dated March 9, 2015 21-Mar-19 Dr. Jim Gilliland
P-02336 Nalcor Energy - Lower Churchill Project - Integrated Project Schedule (IPS) dated February 25, 2013 21-Mar-19 Dr. Jim Gilliland
P-02337 The Ibbs Consulting Group, Inc. - Astaldi Cost Control and Productivity Analysis Reports: Observations and Recommendations dated September 11, 2015 21-Mar-19 Dr. Jim Gilliland
P-02338 Reliance Agreement dated November 29, 2013 between Muskrat Falls Corporation, Labrador Transmission Corporation, Labrador-Island Link Ltd Partnership and Her Majesty the Queen in Right of Canada as represented by the Minister of Natural Resources 19-Mar-19 Nik Argirov
P-02339 Assignment, Assumption and Consent Agreement dated December 30, 2016 between MWH Canada, Inc., Argirov Engineering, Inc, Muskrat Falls Corporation, Labrador Transmission Corporation, Labrador - Island Link Limited Partnership and Her Majesty the Queen in Right of Canada as represented by the Minister of Natural Resources 19-Mar-19 Nik Argirov
P-02340 Canada Acknowledgement and Consent dated July 21, 2014 re Providing the Province of Newfoundland and Labrador with access to the Contractor 19-Mar-19 Nik Argirov
P-02341 Consent and Agreement dated September 2015 with effect as of May 11, 2015 - Independent Engineer and Operating and Maintenance Services Agreement for the Lower Churchill Project between Nalcor Energy Inc. and MWH Canada, Inc. dated August 27, 2019 and Reliance Agreement among Inter Alia, Muskrat Falls Corp, Labrador Transmission Corp, Labrador-Island Link Limited Partnership, Labrador Island Link Operating Corp and MWH Canada, Inc. and Her Majesty the Queen in Right of Canada, as represented by the Minister of Natural Resources dated November 29, 2013 19-Mar-19 Nik Argirov
P-02342 Exhibit 9 - Schedule - Agreement Number: CH0031-001 - Interface and Milestone Schedule 20-Mar-19 Tim Harrington
P-02343 Email dated June 27, 2018, 11:57:50 AM from Paul Harrington to nik@argirovglobal.com re Event today at Soldiers Pond 19-Mar-19 Nik Argirov
P-02344 Nalcor Energy - Lower Churchill Project - CH0031 - Cahill-Ganotec Partnership re Monthly Progress Report (July 2017) dated September 26, 2017 20-Mar-19 Tim Harrington
P-02345 Nalcor Energy - Lower Churchill Project - CH0031 - Cahill-Ganotec Partnership re Monthly Progress Report (September 2017) dated October 6, 2017 20-Mar-19 Tim Harrington
P-02346 Nalcor Energy - Lower Churchill Project - CH0031 - Cahill-Ganotec Partnership re Monthly Progress Report (October 2017) dated November 7, 2017 20-Mar-19 Tim Harrington
P-02347 Nalcor Energy - Lower Churchill Project - CH0031 - Cahill-Ganotec Partnership re Monthly Progress Report (November 2017) dated January 11, 2018 20-Mar-19 Tim Harrington
P-02348 Nalcor Energy - Lower Churchill Project - CH0031 - Cahill-Ganotec Partnership re Monthly Progress Report (January 2018) dated February 7, 2018 20-Mar-19 Tim Harrington
P-02349 Nalcor Energy - Lower Churchill Project - CH0031 - Cahill-Ganotec Partnership re Monthly Progress Report (February 2018) dated March 6, 2018 20-Mar-19 Tim Harrington
P-02350 Email dated August 23, 2013, 2:03:06 PM from jamesmeaney@nalcorenergy.com to Paul Morris, cc dawndalley@nalcorenergy.com and mbradbury@nalcorenergy.com re LCP Governance & Controls Deck 21-Mar-19 James Meaney
P-02351 Email dated November 13, 2013, 4:58:33 PM from jamesmeaney@nalcorenergy.com to gbennett@nalcorenergy.com, pharrington@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca re Fw: Line-Up Change at MWH 21-Mar-19 James Meaney
P-02352 Master Definitions Agreement among The Toronto-Dominion Bank and TD Securities Inc. and Goldman, Sachs & Co. and BNY Trust Company of Canada and Computershare Trust Company of Canada and BNY Trust Company of Canada and Nalcor Energy and Labrador-Island Link Holding Corp and Her Majesty the Queen in Right of the Province of Newfoundland and Labrador and Labrador-Island Link Limited Partnership and Labrador-Island Link Operating Corp and Labrador-Island Link General Partner Corporation dated as of November 29, 2013 21-Mar-19 James Meaney
P-02353 LIL Project Finance Agreement among The Toronto-Dominion Bank and BNY Trust Company of Canada and Labrador-Island Link Limited Partnership and Labrador-Island Link Operating Corp dated as of November 29, 2013 21-Mar-19 James Meaney
P-02354 Master Definitions Agreement among The Toronto-Dominion Bank and TD Securities Inc. and Goldman, Sachs & Co. and BNY Trust Company of Canada and Computershare Trust Company of Canada and BNY Trust Company of Canada and Nalcor Energy and Her Majesty the Queen in Right of the Province of Newfoundland and Labrador and Muskrat Falls Corporation and Labrador Transmission Corporation dated as of November 29, 2013 21-Mar-19 James Meaney
P-02355 Email dated January 14, 2014, 7:15 PM from Alison Manzer to jamesmeaney@nalcorenergy.com re Lower Churchill; Nalcor; Meeting January 24th [IWOV-Legal.FID1640195] 21-Mar-19 James Meaney
P-02356 Email dated October 31, 2014, 11:56:19 AM from jamesmeaney@lowerchurchillproject.ca to amanzer@casselsbrock.com re heads up 21-Mar-19 James Meaney
P-02357 Email dated November 25, 2014, 4:56 Pm from jamesmeaney@lowerchurchillproject.ca to Derrick Sturge, cc Scott Pelley and Auburn Warren re Cost Overrun Payment 21-Mar-19 James Meaney
P-02358 Cost Overruns Certificate dated December 8, 2014 from James Meaney to The Toronto-Dominion Bank re Muskrat/LTA project finance agreement 21-Mar-19 James Meaney
P-02359 Email dated December 8, 2014, 3:08 PM from jamesmeaney@lowerchurchillproject.ca to Nikolay Argirov, Joseph Krupski, cc Anoop Kapoor, amanzer@casselsbrock.com, et al re MF/LTA and LIL Cost Overruns Certificates 21-Mar-19 James Meaney
P-02360 Email dated December 8, 2014, 9:23:39 PM from Nikolay Argirov to jamesmeaney@lowerchurchillproject.ca and Joseph Krupski, cc Anoop Kapoor, amanzer@casselsbrock.com, et al re MF/LTA and LIL Cost Overruns Certificates 21-Mar-19 James Meaney
P-02361 MF/LTA Project Finance Agreement among The Toronto-Dominion Bank and BNY Trust Company of Canada and Muskrat Falls Corporation and Labrador Transmission Corporation dated as of November 29, 2013 21-Mar-19 James Meaney
P-02362 Cost Overruns Certificate dated December 10, 2014 from James Meaney to The Toronto-Dominion Bank re LIL project finance agreement 21-Mar-19 James Meaney
P-02363 Lower Churchill Project - Change Order 0017 between Muskrat Falls Corporation and Cahill-Ganotec, a Partnership - CH0031-001 - CHO-CH0031001-0017 re Supply and Install Mechanical and Electrical Auxiliaries (MF) dated September 14, 2018 20-Mar-19 Tim Harrington
P-02364 Lower Churchill Project - Change Order 023 between Muskrat Falls Corporation and Cahill-Ganotec, a Partnership - CH0031-001 - CHO-CH0031001-023 re Supply and Install Mechanical and Electrical Auxiliaries (MF) dated December 11, 2018 20-Mar-19 Tim Harrington
P-02365 Lower Churchill Project - Change Order 025 between Muskrat Falls Corporation and Cahill-Ganotec, a Partnership - CH0031-001 - CHO-CH0031001-025 re Supply and Install Mechanical and Electrical Auxiliaries (MF) dated January 21, 2019 20-Mar-19 Tim Harrington
P-02366 Email dated December 16, 2014, 9:30 PM from jamesmeaney@lowerchurchillproject.ca to gbennett@nalcorenergy.com, cc Dawn Dalley, Ed Bush, Karen O'Neill and Paul Harrington re more OC questions 21-Mar-19 James Meaney
P-02367 Email dated December 17, 2014, 5:00 PM from jamesmeaney@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, cc edbush@lowerchurchillproject.ca, georgechehab@lowerchurchillproject.ca and gbennett@nalcorenergy.com re Cost Variance Response to OC 21-Mar-19 James Meaney
P-02368 Email dated February 4, 2015, 4:18:10 PM from jamesmeaney@lowerchurchillproject.ca to Lotem Shlomit re MWH 21-Mar-19 James Meaney
P-02369 Email dated February 13, 2015, 9:29 PM from jamesmeaney@lowerchurchillproject.ca to Mark Bradbury, cc Gilbert Bennett, Douglas Woodford, et al re Meeting with Craig Martin and E&Y today 21-Mar-19 James Meaney
P-02370 Email dated April 21, 2015, 10:52:52 AM from jamesmeaney@lowerchurchillproject.ca to Alison Manzer re Nik 21-Mar-19 James Meaney
P-02371 Email dated April 29, 2015, 3:00:11 PM from jamesmeaney@lowerchurchillproject.ca to Richard Janega to Paul Harrington and amanzer@casselsbrock.com re Principles for MWH IE Engagement 21-Mar-19 James Meaney
P-02372 Email dated May 15, 2015, 11:14:29 AM from jamesmeaney@lowerchurchillproject.ca to Richard Janega and Lois Smith, cc amanzer@casselsbrock.com and Gilbert Bennett re Meeting with MWH / Nik 21-Mar-19 James Meaney
P-02373 Email dated May 15, 2015, 9:41 AM from Alison Manzer to jamesmeaney@lowerchurchillproject.ca re Nik 21-Mar-19 James Meaney
P-02374 Email dated May 19, 2015, 11:15 PM from jamesmeaney@lowerchurchillproject.ca to Alison Manzer, Anoop Kapoor, et al re Issuance of IE Draw Confirmation Certificates 21-Mar-19 James Meaney
P-02375 Email dated June 4, 2015, 8:58 AM from jamesmeaney@lowerchurchillproject.ca to Paul Harrington re Fw: MWH/Nik Update 21-Mar-19 James Meaney
P-02376 Email dated June 12, 2015, 2:59:00 PM from jamesmeaney@lowerchurchillproject.ca to Alison Manzer re MWH/Nik 21-Mar-19 James Meaney
P-02377 Email dated September 28, 2015, 4:58:11 PM from jamesmeaney@lowerchurchillproject.ca to dawndalley@nalcorenergy.com, cc Steve Pellerin and Paul Harrington re Comment in OC Report on IE Review 21-Mar-19 James Meaney
P-02378 Email dated September 28, 2015, 1:42 Pm from dawndalley@nalcorenergy.com to jamesmeaney@lowerchurchillproject.ca re OC Report - JM Comments 21-Mar-19 James Meaney
P-02379 Email dated October 16, 2015, 11:57 PM from jamesmeaney@lowerchurchillproject.ca to Jason Kean re Fw: Canada Letter on Cost Overrun 21-Mar-19 James Meaney
P-02380 Email dated December 1, 2015, 10:28:55 PM from jamesmeaney@lowerchurchillproject.ca to Xeno Martis re COREA certificates 21-Mar-19 James Meaney
P-02381 LIL 2015 IE Cost Overruns - Confirmation Certificate dated December 14, 2015 21-Mar-19 James Meaney
P-02382 LIL 2015 Cost Overruns Certificate dated December 14, 2015 21-Mar-19 James Meaney
P-02383 MF/LTA 2015 IE Cost Overruns - Confirmation Certificate dated December 14, 2015 21-Mar-19 James Meaney
P-02384 Email dated March 8, 2016, 5:41 PM from jamesmeaney@lowerchurchillproject.ca to Steve Pellerin re Notifying IE Canada, Emera and others 21-Mar-19 James Meaney
P-02385 Email dated March 11, 2016, 11:58:38 AM from jamesmeaney@lowerchurchillproject.ca to stevepellerin@lowerchurchillproject.ca re IE Support of Nalcor Astaldi Approach - for EY data room 21-Mar-19 James Meaney
P-02386 Email dated March 14, 2016, 10:18:54 AM from jamesmeaney@lowerchurchillproject.ca to koneill@nlh.nl.ca re my comments to crawley on management response 21-Mar-19 James Meaney
P-02387 Email dated March 19, 2016, 7:25 PM from jamesmeaney@lowerchurchillproject.ca to Derrick Sturge re updated management response 21-Mar-19 James Meaney
P-02388 Email dated March 19, 2016, 7:05:44 PM from jamesmeaney@lowerchurchillproject.ca to Lance Clarke re Nik 21-Mar-19 James Meaney
P-02389 Letter dated April 12, 2016 from Gilbert J. Bennett to Julia Mullaley re LCMC Management Response to EY Review of Muskrat Falls Project Cost, Schedule and Related Risk - April Report 21-Mar-19 James Meaney
P-02390 Email dated April 26, 2016, 11:02 AM from jamesmeaney@lowerchurchillproject.ca to xmartis@fasken.com, cc Derrick Sturge and Auburn Warren re MF Cancellation….a simpler explanation 21-Mar-19 James Meaney
P-02391 Nalcor Energy - Lower Churchill Project presentation re Muskrat Falls Project - Astaldi Commercial Discussion Update dated July 7, 2016 21-Mar-19 James Meaney
P-02392 Email dated October 13, 2016, 1:51:40 PM from jamesmeaney@lowerchurchillproject.ca to Randy Pelletier and Corey Snook, cc Gilbert Bennett, Alison Manzer and joseph.krupski@canada.ca re IE agreements (confidential) 21-Mar-19 James Meaney
P-02393 LIL 2016 Cost Overruns Certificate dated December 13, 2016 21-Mar-19 James Meaney
P-02394 Email dated February 13, 2017, 4:34:57 PM from jamesmeaney@lowerchurchillproject.ca to smarshall@nalcorenergy.com, cc dsturge@nalcorenergy.com, johnmacisaac@nalcorenergy.com and gbennett@nalcorenergy.com re LCP Update at AGM 21-Mar-19 James Meaney
P-02395 Email dated March 7, 2017, 2:22:24 AM from jamesmeaney@lowerchurchillproject.ca to karenoneill@nalcorenergy.com, cc Deanne Fisher, Dave Jones, et al re Question from NTV re: Emera LIL investment 21-Mar-19 James Meaney
P-02396 Email dated March 30, 2017, 6:56 PM from jamesmeaney@lowerchurchillproject.ca to John Skinner and Colleen Baker re Fwd: FLG2 Agreement and COREA & PFE Acknowledgement 21-Mar-19 James Meaney
P-02397 Email dated October 27, 2018, 11:12:20 PM from jamesmeaney@lowerchurchillproject.ca to dsturge@nalcorenergy.com re Fw: Deck for GT for Jim's review / input 21-Mar-19 James Meaney
P-02398 Email dated October 28, 2018, 12:55:57 PM from jamesmeaney@lowerchurchillproject.ca to Derrick Sturge re Response to GT Question PTQ1.10 21-Mar-19 James Meaney
P-02399 CH0031001 ATCL Tracking as of Change Order 025 20-Mar-19 Tim Harrington
P-02400 Email dated December 20, 2013, 11:07:11 AM from jamesmeaney@nalcorenergy.com to Anoop Kapoor, Joseph Krupski, et al, cc Xeno Martin, anosi@fasken.com, et al re MF/LTA and LIL Construction Reports - December 20, 2013 21-Mar-19 James Meaney
P-02401 Email dated March 17, 2014, 5:27:09 PM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca re Fw: Revised AFE's 21-Mar-19 James Meaney
P-02402 Email dated June 20, 2014, 5:41:36 PM from jamesmeaney@nalcorenergy.com to Alison Manzer, Anne Boudreau, et al re MF/LTA and LIL Construction Reports June 20, 2014 21-Mar-19 James Meaney
P-02403 Email dated July 21, 2014, 5:47:12 PM from edbush@lowerchurchillproject.ca to Alison Manzer, andrew.kitching@rncan-rncan.gc.ca, et al, cc jamesmeaney@nalcorenergy.com re MF/LTA and LIL Construction Reports June 21, 2014 21-Mar-19 James Meaney
P-02404 Email dated December 17, 2014, 3:05:47 PM from jamesmeaney@lowerchurchillproject.ca to edbush@lowerchurchillproject.ca re Oversight Committee Request 21-Mar-19 James Meaney
P-02405 Email dated August 14, 2015, 3:20:08 PM from jamesmeaney@lowerchurchillproject.ca to emartin@nalcorenergy.com, cc Jason Kean, Paul Harrington and Gilbert Bennett re AFE 2 21-Mar-19 James Meaney
P-02406 Email dated September 21, 2015, 4:40:53 PM from jamesmeaney@lowerchurchillproject.ca to Joseph Krupski, cc amanzer@casselsbrock.com, Anoop Kapoor, et al re MF/LTA and LIL Construction Reports 20 Sept 2015 21-Mar-19 James Meaney
P-02407 Email dated October 20, 2015, 7:12:53 PM from jamesmeaney@lowerchurchillproject.ca to Joseph Krupski, cc amander@casselsbrock.com, Anne Boudreau, et al re LIL Construction Report Oct 20 2015 21-Mar-19 James Meaney
P-02408 Email dated December 2, 2015, 9:59:33 PM from jamesmeaney@lowerchurchillproject.ca to pmyrden@gov.nl.ca, cc Paul Morris, Charles Bown, et al, bcc gbennett@nalcorenergy.com re December 2015 COREA Payment 21-Mar-19 James Meaney
P-02409 Email dated June 20, 2016, 3:43:02 PM from jamesmeaney@lowerchurchillproject.ca to Joseph Krupski, cc amanzer@casselsbrock.com, Anne Boudreau, et al re MFLTA and LIL Construction Reports June 20 2016 21-Mar-19 James Meaney
P-02410 Email dated July 20, 2016, 3:04:02 PM from jamesmeaney@lowerchurchillproject.ca to Joseph Krupski and joseph.krupski@canada.ca, cc amanzer@casselsbrock.com, Anne Boudreau, et al re MFLTA and LIL Construction Reports July 20, 2016 21-Mar-19 James Meaney
P-02411 Email dated October 20, 2015, 7:11:33 PM from jamesmeaney@lowerchurchillproject.ca to Joseph Krupski, cc amanzer@casselsbrock.com, Anne Boudreau, et al re MFLTA Construction Report Oct 20 2015 21-Mar-19 James Meaney
P-02412 LCP 2015 Cost Update Chronology draft dated March 19, 2019 21-Mar-19 James Meaney
P-02413 Handwritten Notes - James Meaney - 2013 Notebook 21-Mar-19 James Meaney
P-02414 Handwritten Notes - James Meaney - 2014 Notebook 21-Mar-19 James Meaney
P-02415 Handwritten Notes - James Meaney - 2015 Notebook 21-Mar-19 James Meaney
P-02416 Handwritten Notes - James Meaney - 2016 Notebook 21-Mar-19 James Meaney
P-02417 Email dated May 22, 2015, 9:18 PM from James Meaney to Derrick Sturge, cc Auburn Warren re MF Cost Update 21-Mar-19 James Meaney
P-02418 Email dated June 22, 2015, 5:46 Pm from James Meaney to Gilbert Bennett and Paul Harrington re Ed / Cost Update (confidential) 21-Mar-19 James Meaney
P-02419 Email dated September 21, 2015, 5:20 PM from James Meaney to Derrick Sturge and Auburn Warren re LCP update 21-Mar-19 James Meaney
P-02420 CFA Code of Ethics and Standards of Professional Conduct 25-Mar-19 James Meaney
P-02421 Letter dated June 27, 2012 from Joe Salim to Paul Harrington re Lower Churchill Development Agreement LC-G-002 25-Mar-19 Jean-Daniel Tremblay
P-02422 Email dated January 23, 2013, 9:24:39 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay, cc RonPower@nalcorenergy.com re Feb 5, 6 and 7 Project Risk Review - Roc Cox 25-Mar-19 Jean-Daniel Tremblay
P-02423 Email dated February 6, 2013, 3:59:12 PM from Albert Williams to Bert Peach re Meeting with Nalcor 25-Mar-19 Jean-Daniel Tremblay
P-02424 Email dated April 21, 2013, 10:07:12 AM from Normand Bechard to Thon Scott and Bernard Gagne, cc Serge Guerette and Jean-Daniel Tremblay re FW: Envoi d'un message : Lower Churchill Risk assessment SNC-Lavalin Method April 2013.doc 25-Mar-19 Jean-Daniel Tremblay
P-02425 Email dated May 21, 2013, 11:17:23 AM from Michel Mackay to Scott Thon, cc Claude Letourneau, Marc O'Connor, Philippe Jean and Normand Bechard re Final report sign 25-Mar-19 Jean-Daniel Tremblay
P-02426 Email dated August 3, 2012, 11:25:00 AM from Jean-Daniel Tremblay to Carlos Fernandez re Risk MR 1207 25-Mar-19 Jean-Daniel Tremblay
P-02427 Email dated January 21, 2013, 2:11:02 PM from pharrington@nalcorenergy.com to gbennett@nalcorenergy.com, ronpower@nalcorenergy.com and jasonkean@nalcorenergy.com, cc lanceclarke@nalcorenergy.com and briancrawley@nalcorenergy.com re Phone Call with Joe Salim today 25-Mar-19 Scott Thon
P-02428 Email dated February 1, 2013, 11:10:00 AM from John Husch to Scott Thon re FW: 5th Feb Meeting 25-Mar-19 Scott Thon
P-02429 Email dated February 8, 2013, 3:42:24 PM from pharrington@nalcorenergy.com to gbennett@nalcorenergy.com re Scott Thon 25-Mar-19 Scott Thon
P-02430 Email dated March 2, 2013, 12:38:28 PM from pharrington@nalcorenergy.com to lanceclarke@nalcorenergy.com re Scott Thon 25-Mar-19 Scott Thon
P-02431 Email dated April 23, 2013, 3:38:53 PM from LanceClarke@nalcorenergy.com to PHarrington@nalcorenergy.com, GBennett@nalcorenergy.com, Bernard Gagne, John Husch and Scott Thon re Draft Deck for Thursday 25-Mar-19 Scott Thon
P-02432 Email dated April 24, 2013, 8:25:13 AM from Robert Card to Scott Thon, cc Nicole Girard re Confidential: Lower Churchill Backgrounder 25-Mar-19 Scott Thon
P-02433 Email dated July 26, 2013, 10:43 AM from kwinsor@nalcorenergy.com to Tricia Burton re FW: LCP (From Scott Thon to Gilbert Bennett) 25-Mar-19 Scott Thon
P-02434 Email dated July 26,2 013, 10:42:36 AM from kwinsor@nalcorenergy.com to Tricia Burton re FW: LCP (From Scott Thon to Gilbert Bennett) 25-Mar-19 Scott Thon
P-02435 Email dated February 11, 2019, 2:20 PM from Sheilagh Murphy to Barry Learmonth re SLI MFI Scott Thon Interview with Commission - follow-up 25-Mar-19 Scott Thon
P-02436 Email dated November 19, 2013, 9:30 AM from emartin@nalcorenergy.com to pharrington@lowerchurchillproject.ca, cc Gilbert Bennett and James Meaney re Fw: Insurance costs for determining premium 22-Mar-19 James Meaney
P-02437 Memo dated February 28, 2019 from James Meaney to Board of Directors re Transition to Operations ("TTO") Authorization for Expenditure Revision 22-Mar-19 James Meaney
P-02438 Email dated November 5, 2013, 9:25:50 PM from jasonkean@lowerchurchillproject.ca to emartin@nalcorenergy.com, briancrawley@lowerchurchillproject.ca, et al re Deck re Project Costs 25-Mar-19 James Meaney
P-02439 Curriculum Vitae - Normand Béchard 26-Mar-19 Normand Béchard
P-02440 Curriculum Vitae - Paul Lemay 26-Mar-19 Normand Béchard
P-02443 Letter dated April 23, 2007 from Lance Clarke to Bert Peach re March 15 Clarification Meeting Minutes 26-Mar-19 Normand Béchard
P-02441 Email dated December 18, 2012, 12:12 PM from Heather MacLean to Jerome Kennedy and Charles W. Bown, cc Tracy Shute re FYI: Emera: q and a from Sanction media availability this afternoon 2-Apr-19 Kathy Dunderdale
P-02442 Memorandum of Agreement to Resolve Disputes as to Overlaps of Scopes of Work in Collective Agreements designated in Special Project Orders Enacted under Section 70 of the Labour Relations Act ("Agreement") dated April 7, 2013 3-Apr-19 BJ Ducey/Kelly Williams
P-02444 NL Hydro Presentation re Lower Churchill Project - Project Management Approach (Post-Gate 2) & Contracting Strategy dated April 21, 2008 26-Mar-19 Normand Béchard
P-02445 Email dated February 16, 2009, 12:38:56 PM from Albert Williams to Jean Beaudoin and Tony Allen re Fw: Lower Churchill 26-Mar-19 Normand Béchard
P-02446 Email dated February 20, 2009, 2:31:12 PM from Bert Peach to Albert Williams, Elwood Reid and Hassine Benjannet re FW: Lower Churchill Project, Expression of Interest G-002, Engineering Design and Project Support, Restricted Use and Non-Disclosure Agreement 26-Mar-19 Normand Béchard
P-02447 Email dated February 25, 2009, 2:47:36 PM from Albert Williams to Bert Peach re Fw: Expression of Interest, EOI No. LCP-G-002, Lower Churchill Project, Engineering Design and Project Support 26-Mar-19 Normand Béchard
P-02448 Letter dated July 9, 2010 from Pat Hussey to Albert Williams re Request for Proposal (RFP) No. LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services 26-Mar-19 Normand Béchard
P-02449 Nalcor Energy - Lower Churchill Project - LCP-G-002 - RFP Evaluation Plan for Engineering, Procurement and Construction Management (EPCM) Services dated September 15, 2010 26-Mar-19 Normand Béchard
P-02450 Lower Churchill Project - Engineering, Procurement and Construction Management (EPCM) Services Package LCP-G-002 - 5 - EPCM Evaluation Plan dated October 20, 2010 26-Mar-19 Normand Béchard
P-02451 Email dated December 22, 2010, 2:45:09 PM from DawnDalley@nalcorenergy.com to Ken Morrissey, Robert Thompson, Charles W. Bown and Glenda Power re Fw: Finals 26-Mar-19 Normand Béchard
P-02452 Review Team Report on the LCP EPCM bid assessment (22 Dec 2010) 26-Mar-19 Normand Béchard
P-02453 Email dated January 30, 2011, 10:18:03 PM from pharrington to EMartin@nalcorenergy.com, Gilbert Bennett, Lclarke and Jason Kean re SNC contract 26-Mar-19 Normand Béchard
P-02454 Nalcor Energy - Lower Churchill Project presentation re EPCM Services - First 90 Days - Discussion dated February 4, 2011 26-Mar-19 Normand Béchard
P-02455 Email dated February 14, 2011, 2:41:46 PM from pharrington@nalcorenergy.com to dawndalley@nalcorenergy.com, cc gbennett@nalcorenergy.com; lanceclarke@nalcorenergy.com, pathurssey@nalcorenergy.com, and clarencehewitt@nalcorenergy.com re EPCM Contract 26-Mar-19 Normand Béchard
P-02456 Nalcor Energy - Lower Churchill Project - Phase 1 - Agreement LC-G-002 for EPCM Services - Kickoff Meeting - March 30 - 31, 2011 (Day 1) 26-Mar-19 Normand Béchard
P-02457 Nalcor Energy - Lower Churchill Project - Phase 1 - Agreement LC-G-002 for EPCM Services - Kickoff Meeting - March 30 - 31, 2011 (Day 2) 26-Mar-19 Normand Béchard
P-02458 Email dated April 13, 2011, 10:57:56 AM from Rob McGrath to Paul G. Scott, Vanessa Newhook, et al, cc Dave Liverman, Paul O Parsons, et al re SNC Lavalin note for Premiers Meeting 26-Mar-19 Normand Béchard
P-02459 SNC-Lavalin presentation re Muskrat Falls EPCM Project by Patrick Lamarre 26-Mar-19 Normand Béchard
P-02460 Email dated August 5, 2011, 10:19:13 AM from ronpower@nalcorenergy.com to rkaushik@nalcorenergy.com, cc robertbesaw@nalcorenergy.com re Fw: Local Hiring Concerns 26-Mar-19 Normand Béchard
P-02461 SNC-Lavalin Group Inc. Board of Directors Meeting dated August 5, 2011 - Agenda 26-Mar-19 Normand Béchard
P-02462 Letter dated August 7, 2011 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - SLI - Area Management Execution Approach 26-Mar-19 Normand Béchard
P-02463 Email dated August 29, 2011, 5:17:40 PM from clarencehewitt@nalcorenergy.com to normand.bechard@snclavalin.com, cc lcp - snc, PF_DocumentControl, et al re Project Control Schedule - Stages 1 & 2 Rec. No. L010-S011-200-170331-00109 26-Mar-19 Normand Béchard
P-02464 Letter dated September 14, 2011 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - First Aid Training 26-Mar-19 Normand Béchard
P-02465 Letter dated October 17, 2011 from Ron Power to Norman Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - SLI Construction Signatories to Drawings and Other Documentation 26-Mar-19 Normand Béchard
P-02466 Letter dated October 17, 2011 from Ron Power to Norman Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Company Access to Technical Codes and Standards 26-Mar-19 Normand Béchard
P-02467 Email dated October 27, 2011, 7:33:10 AM from PatHussey@nalcorenergy.com to Christian Asfar, cc Fabien Cuisinier Raynal, Ken Morrison, et al re Posting of bidder lists on the SNC-Lavalin Lower Churchill website 26-Mar-19 Normand Béchard
P-02468 Letter dated November 24, 2011 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Personnel Transition / Succession Planning 26-Mar-19 Normand Béchard
P-02469 Email dated November 24, 2011, 2:53:11 PM from ClarenceHewitt@nalcorenergy.com to Normand Bechard, cc LCP_LCG002@nalcorenergy.com and PF_Document Control - Lower Churchill re Project Control Schedule - Stage 3 Rec. No. L010-S011-200-170331-00128 26-Mar-19 Normand Béchard
P-02470 Nalcor Energy - Lower Churchill Project - LC-G-002 (Project No. 505573) - LCP Risk Management Plan dated November 11, 2011 26-Mar-19 Normand Béchard
P-02471 Email dated December 14, 2011, 1:30:49 PM from ClarenceHewitt@nalcorenergy.com to Normand Bechard re LCP_LCG002@nalcorenergy.com and PF_Document Control - Lower Churchill re SLI Organizational Changes Rec. No. L010-S011-200-170331-00140 26-Mar-19 Normand Béchard
P-02472 SNC-Lavalin - Nalcor Energy - Lower Churchill Project - DG3 Capital Cost Estimate - Basis of Estimate dated December 15, 2011 26-Mar-19 Normand Béchard
P-02473 Nalcor Energy - Lower Churchill Project - LC-G-002 (Project No. 505573) - SNC-Lavalin - LCP Risk Management Requirements for Contractors and Suppliers dated December 8, 2011 26-Mar-19 Normand Béchard
P-02474 Email dated December 16, 2011, 9:44:00 AM from Normand Bechard to Joseph Salim, Marie-Claude Dumas, et al re FW: Rec. No. L010-200-170331-00142 Component 1 Project Manager 26-Mar-19 Normand Béchard
P-02475 Email dated December 16, 2011, 5:30:10 PM from ClarenceHewitt@nalcorenergy.com to Normand Bechard, cc LCP_LCG002@nalcorenergy.com and PF_Document Control - Lower Churchill re C3 Construction Management Replacement Rec. No. L010-S011-200-170331-00144 26-Mar-19 Normand Béchard
P-02476 Email dated January 4, 2012, 10:33:44 AM from clarencehewitt@nalcorenergy.com to normand.bechard@snclavalin.com, cc lcp - snc; pr_Document Control - Lower Churchill re Component 1 - Interim Project Manager Rec. No. L010-S011-200-170331-00147 26-Mar-19 Normand Béchard
P-02477 Email dated January 11, 2012, 9:39:26 AM from davidgreen@nalcorenergy.com to michellealexander@nalcorenergy.com and markpeddle@nalcorenergy.com re Fw: Component 1 - Engineering Execution 26-Mar-19 Normand Béchard
P-02478 Email dated January 16, 2012, 2:56:00 PM from Normand Bechard to Joseph Salin, Patrick Lamarre, et al re FW: Estimate for EPCM Services Rec. No. L010-S011-200-170331-00149 26-Mar-19 Normand Béchard
P-02479 Email dated January 23, 2012, 1:34:12 PM from ClarenceHewitt@nalcorenergy.com to Normand Bechard, cc LCP_LCG002@nalcorenergy.com, PF_Document Control - Lower Churchill, et al re Implementation of PM+ Rec. No. L010-S011-200-170331-00158 26-Mar-19 Normand Béchard
P-02480 Email dated February 3, 2012, 4:34 PM from davidgreen@nalcorenergy.com to victoriastanford@nalcorenergy.com, nicolecollins@nalcorenergy.com and markpeddle@nalcorenergy.com re Fw: Nonconformance No. NC-0022 Transmittal of SLI Deliverables 26-Mar-19 Normand Béchard
P-02481 Email dated February 3, 2012, 4:59 PM from Nick Gillis to Wanda Ryder, cc Normand Bechard, Luc Chausse re FW: Component 3 Construction Manager - Taqueer Ahmad Rec. No. L010-S011-200-170331-00157 26-Mar-19 Normand Béchard
P-02482 Email dated February 16, 2012, 6:39:01 AM from ronpower@nalcorenergy.com to Bob Barnes, Darren Debourke, et al re EPCM Services: Task Force Charter (draft) + other files 26-Mar-19 Normand Béchard
P-02483 Email dated March 1, 2012, 9:39:10 AM from Wanda Ryder to Wanda Ryder, Corresp_Nalcor and Mouloud Ait Ouferoukh, cc, PF_Document Control - Lower Churchill, Nick Gillis, et al re REVISION/CORRECTION: : LC-G-002 - S011-L010-200-170330-00156 - Nonconformance No. OFI-0013 - Gate 3 Deliverables 26-Mar-19 Normand Béchard
P-02484 Email dated March 29, 2012, 11:20:17 AM from ClarenceHewitt@nalcorenergy.com to Normand Bechard, cc LCP_LCG002@nalcorenergy.com, PF_Document Control - Lower Churchill, et al re Proposed Labrador Assignment Conditions Rec. NO. L010-S011-200-170331-00172 26-Mar-19 Normand Béchard
P-02485 Email dated March 31, 2012, 6:58:04 PM from ronpower@nalcorenergy.com to normand.bechard@snclavalin.com, cc lcp-snc, mahmoud.beriaoui@snclavalin.com, et al re Format of Technical Specifications Rec. No. L010-S011-200-170331-00175 26-Mar-19 Normand Béchard
P-02486 Nalcor Energy - Lower Churchill Project presentation re LCP "Task Force" Initiative dated April 24, 2012 26-Mar-19 Normand Béchard
P-02487 Email dated June 11, 2012, 1:36:21 PM from lanceclarke@nalcorenergy.com to Derek Owen re Presentation for Deloitte 26-Mar-19 Normand Béchard
P-02488 Email dated June 20, 2012, 10:54:24 AM from ScottO'Brien@nalcorenergy.com to pharrington and LanceClarke@nalcorenergy.com re I need that write up of the early works ASAP 26-Mar-19 Normand Béchard
P-02489 Email dated June 20, 2012, 11:18:20 AM from ScottO'Brien@nalcorenergy.com to pharrington re I need that write up of the early works ASAP 26-Mar-19 Normand Béchard
P-02490 Email dated June 20, 2012, 5:21 PM from Ed Over to pathussey@nalcorenergy.com re Fw: Procurement 26-Mar-19 Normand Béchard
P-02491 Email dated June 22, 2012, 5:00:20 PM from ClarenceHewitt@nalcorenergy.com to Normand Bechard, cc PF_Document Control - Lower Churchill, LCP_LCG002@nalcorenergy.com, Ed Over and Alfy Hanna re Early Works Construction Management Rec. No. L010-S011-200-170331-00180 26-Mar-19 Normand Béchard
P-02492 Email dated July 17, 2012, 9:41:39 AM from clarencehewitt@nalcorenergy.com to normand.bechard@snclavalin.com, cc PF_Document Control - Lower Churchill,Scott Gillis, et al re Early Works Construction Management Rec. No.: L010-S011-200-170331-00183 26-Mar-19 Normand Béchard
P-02493 Email dated August 7, 2012, 7:47:00 AM from Jean-Daniel Tremblay to Luc Turcotte re FW: CH0007 - PreQual Risk Score 26-Mar-19 Normand Béchard
P-02494 LCP-Final DG3 Estimate dated June 1, 2012 26-Mar-19 Normand Béchard
P-02495 Email dated September 16, 2012, 3:01 Pm from RonPower@nalcorenergy.com to Normand Bechard and Serge Guerette, cc JasonKean@nalcorenergy.com re Fw: MDR - Findings 26-Mar-19 Normand Béchard
P-02496 Email dated September 26, 2012, 6:31 AM from JasonKean@nalcorenergy.com to Serge Guerette, cc Afzal Hussain, Alfy Hanna, et al re C1, C3 and C4 Package Status Review scheduled for Wednesday Sept 26 26-Mar-19 Normand Béchard
P-02497 Email dated September 27, 2012, 5:33:26 PM from clarencehewitt@nalcorenergy.com to ronpower@nalcorenergy.com cc Catherine Rowsell, Faustina Cornick, et al re Fw: Chris Woodmass PAA 26-Mar-19 Normand Béchard
P-02498 Email dated October 1, 2012, 6:10 AM from pathussey@nalcorenergy.com to ronpower@nalcorenergy.com re Fw: Hatch Meeting with Nalcor Energy - September 18, 2012 26-Mar-19 Normand Béchard
P-02499 Letter dated October 15, 2012 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Component 1: Engineering Execution Schedule 26-Mar-19 Normand Béchard
P-02500 Email dated October 15, 2012, 10:40:00 AM from Jean-Daniel Tremblay to Giles Simard re LCP Basis of Estimate 26-Mar-19 Normand Béchard
P-02501 Letter dated January 17, 2012 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Document Registers from Other SLI Projects 26-Mar-19 Normand Béchard
P-02502 Email dated November 7, 2012, 11:41 AM from RonPower@nalcorenergy.com to Normand Bechard, cc PHarrington@nalcorenergy.com, LanceClarke@nalcorenergy.com, et al re AC Switchyards: Change to Contract Strategy Rec. No. L010-S011-200-170331-00202 26-Mar-19 Normand Béchard
P-02503 Email dated November 8, 2012, 8:21:23 AM from ronpower@nalcorenergy.com to rkaushik@nalcorenergy.com re Fw: AC Switchyards: Change to Contract Strategy 26-Mar-19 Normand Béchard
P-02504 Letter dated November 19, 2012 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Muskrat Falls - Site Team 26-Mar-19 Normand Béchard
P-02505 Email dated November 26, 2012, 9:05:00 AM from Normand Bechard to Nick Gillis re FW: Muskrat Falls Site Team Rec. No.: L010-S011-200-170331-00205 26-Mar-19 Normand Béchard
P-02506 Letter dated November 26, 2012 from Normand Bechard to Ron Power re Lower Churchill Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Muskrat Falls Site Team 26-Mar-19 Normand Béchard
P-02507 Letter dated November 29, 2012 from E.J. Martin and Chris Huskilson to Honourable Joe Oliver re Agreement Providing Key Terms and Conditions for the Loan Guarantee for the Financing Debt of the Lower Churchill River Project (the "Guarantee Term Sheet") 27-Mar-19 Derrick Sturge
P-02508 Email dated May 3, 2013, 8:02 PM from dsturge@nalcorenergy.com to auburn warren/nlhydro cc ed martin/nlhydro and rob hull/nlhydro re Sanction Resolution and Final Amendments to the ML-JDA 27-Mar-19 Derrick Sturge
P-02509 Email dated May 22, 2013, 5:26:25 PM from Rob Hull to Jaime O. Connolly re Fw: Resolutions 27-Mar-19 Derrick Sturge
P-02510 Email dated July 23, 2013, 12:27:07 PM from jasonkean@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, cc gbennett@nalcorenergy.com re FFC Deck 27-Mar-19 Derrick Sturge
P-02511 CH0007 Exposure Analysis Final 27-Mar-19 Derrick Sturge
P-02512 Email dated September 12, 2013, 11:54:26 AM from robhull@nalcorenergy.com to dsturge@nalcorenergy.com, cc andrewsinnott@nalcorenergy.com, scottpelley@nalcorenergy.com and jamesmeaney@nalcorenergy.com re Credit Assessment - CH0007 27-Mar-19 Derrick Sturge
P-02513 Nalcor Energy - Certification of Civil Works Agreement - Construction of Intake and Powerhouse, Spillway and Transition Dams - Agreement No. CH0007 signed by Rob Hull dated September 16, 2013 27-Mar-19 Derrick Sturge
P-02514 Confidential Memo dated September 25, 2013 from Andrew Sinnott to Ed Over and Ronald Adamcyk re Creditworthiness Assessment of Bidders for CH0007 27-Mar-19 Derrick Sturge
P-02515 Email dated October 18, 2013, 4:29:35 PM from Ed Martin to Charles Bown re Fw: Fwd: Minister Request 27-Mar-19 Derrick Sturge
P-02516 Email dated October 24, 2013, 2:21:31 PM from dsturge@nalcorenergy.com to ed martin/nlhydro and gilbert bennett@nlhydro, cc james meaney@nlhydro re Capital Cost / Schedule Update 27-Mar-19 Derrick Sturge
P-02517 Email dated October 27, 2013, 9:57 AM from Auburn Warren to Gordon Alexander, Terry O'Rielly and Tom Garner re RFF Recommendation Package 13.10.27.0130.pptx 27-Mar-19 Derrick Sturge
P-02518 Email dated October 27, 2013, 10:20 AM from sturge@nalcorenergy.com to auburnwarren/nlhydro, cc rob hull/nlhydro, jamesmeaney/nlhydro and craig hippern/nlhydro re RFF Recommendation Package 13.10.27.0130.pptx 27-Mar-19 Derrick Sturge
P-02519 Email dated November 1, 2013, 8:52:00 AM from Ed Martin/NLHydro to DSturge@nalcorenergy.com re Minister Marshall info 27-Mar-19 Derrick Sturge
P-02520 Email dated November 1, 2013, 1:35:38 PM from AuburnWarren@nalcorenergy.com to EMartin@nalcorenergy.com, DSturge@nalcorenergy.com, et al, cc TO"Rielly@nlh.nl.ca re Minister Request 27-Mar-19 Derrick Sturge
P-02521 Email dated November 1, 2013, 1:53:58 PM from Ed_Martin/NLHydro to AuburnWarren@nalcorenergy.com, DSturge@nalcorenergy.com, et al, cc Terry O'Rielly/NLHydro re Minister Request 27-Mar-19 Derrick Sturge
P-02522 Email dated November 1, 2013, 1:58 PM from auburnwarren@nalcorenergy.com to Paul Myrden, cc Donna Brewer, dsturge@nalcorenergy.com, et al re Minister Request 27-Mar-19 Derrick Sturge
P-02523 Derrick Sturge Handwritten Notes dated October 31, 2013 to November 25, 2013 27-Mar-19 Derrick Sturge
P-02524 Email dated November 6, 2013, 9:04:22 PM from jasonkean@lowerchurchillproject.ca to auburn warren/nlhydro, cc ed bush/nlhydro, derrick sturge/nlhydro, et al re Update 27-Mar-19 Derrick Sturge
P-02525 Email dated November 8, 2013, 9:06 AM from auburnwarren@nalcorenergy.com to Paul J. Morris, cc Charles Bown, Derrick Sturge, et al re Cost Overruns 27-Mar-19 Derrick Sturge
P-02526 Email dated November 8, 2013, 9:38:11 AM from dsturge@nalcorenergy.com to ed martin/nlhydro re Board Papers 27-Mar-19 Derrick Sturge
P-02527 Email dated November 8, 2013, 10:37 AM from Paul J. Morris to AuburnWarren@nalcorenergy.com, cc Charles Bown, Derrick Sturge, et al re Cost Overruns 27-Mar-19 Derrick Sturge
P-02528 Email dated November 8, 2013, 12:27:23 PM from Paul J. Morris to Derrick Sturge, Auburn Warren, et al, cc Charles Bown and Tracy English re Cost Overruns 27-Mar-19 Derrick Sturge
P-02529 Email dated November 8, 2013, 12:36 PM from dsturge@nalcorenergy.com to ed martin/nlhydro re Board Papers 27-Mar-19 Derrick Sturge
P-02530 Email dated November 11, 2013, 2:45 PM from Charles W. Bown to Derrick Sturge/NL Hydro re EPC 27-Mar-19 Derrick Sturge
P-02531 Email dated November 13, 2013, 10:44:01 AM from auburnwarren@nalcorenergy.com to emartin@nalcorenergy.com cc dsturge@nalcorenergy.com re Board Deck 27-Mar-19 Derrick Sturge
P-02532 Email dated November 13, 2013, 6:39 PM from dsturge@nalcorenergy.com to ed martin/nlhydro cc auburn warren/nlhydro re Board Deck 27-Mar-19 Derrick Sturge
P-02533 Email dated November 13, 2013, 7:51:06 PM from Ed Martin to Derrick Sturge re Fw: Presentation for Thursday's Briefing 27-Mar-19 Derrick Sturge
P-02534 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Project Update dated November 14, 2013 27-Mar-19 Derrick Sturge
P-02535 Email dated November 20, 2013, 6:25 AM from Derrick Sturge to Auburn Warren, Rob Hull and James Meaney re Finance 27-Mar-19 Derrick Sturge
P-02536 Email dated February 6, 2014, 1:05:46 PM from jamesmeaney@nalcorenergy.com to gbennett@nalcorenergy.com and jasonkean@lowerchurchillproject.com, cc dsturge@nalcorenergy.com, scottpelley@nalcorenergy.com and pharrington@lowerchurchillproject.com re Updated AFE / NL Equity Ask - Review with Ed 27-Mar-19 Derrick Sturge
P-02537 Email dated February 15, 2014, 12:29 AM from scottpelley@nalcorenergy.com to jamesmeaney@nlhydro, cc auburn warren/nlhydro; derrick sturge/nlhydro, et al re Reconciliation of equity aske 27-Mar-19 Derrick Sturge
P-02538 Email dated February 16, 2014, 5:44:08 PM from Ed Martin to ed.martin re Fw: Net Income and Equity Ask February 16, 2014 27-Mar-19 Derrick Sturge
P-02539 Email dated February 19, 2014, 2:24 PM from gordonalexander@nlh.nl.ca to auburnwarren@nalcorenergy.com, cc Craig Hippen, Derrick Sturge and Scott Pelley re Fw: Nalcor Deliverables for Finance 27-Mar-19 Derrick Sturge
P-02540 Authorization for Expenditure (AFE) - Labrador-Island Link Limited Partnership - LITL-FIN-2014-01 dated March 6, 2014 27-Mar-19 Derrick Sturge
P-02541 Authorization for Expenditure (AFE) - Labrador-Island Link Limited Partnership - LCPLITL-FIN-2013-01 dated March 6, 2014 27-Mar-19 Derrick Sturge
P-02542 Authorization for Expenditure (AFE) - Labrador Transmission Corporation - LTA-FIN-2014-01 dated March 6, 2014 27-Mar-19 Derrick Sturge
P-02543 Authorization for Expenditure (AFE) - Labrador Transmission Corporation - LCPLTA-FIN-2013-01 dated March 6, 2014 27-Mar-19 Derrick Sturge
P-02544 Labrador Transmission Corporation - Revised Capital & Financing Cost Master AFE's 27-Mar-19 Derrick Sturge
P-02545 Labrador-Island Link Limited Partnership - Revised Capital & Financing Cost Master AFE's 27-Mar-19 Derrick Sturge
P-02546 Muskrat Falls Corporation - Revised Capital & Financing Cost Master AFE's 27-Mar-19 Derrick Sturge
P-02547 The Financial Post new articles dated April 15, 2014 re $7.7B Muskrat Falls hydro project costs rise as start date faces delays, Nalcor Energy CEO says 27-Mar-19 Derrick Sturge
P-02548 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Project Update dated September 4, 2015 27-Mar-19 Derrick Sturge
P-02549 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Cost and Schedule Update dated February 12, 2015 27-Mar-19 Derrick Sturge
P-02550 Email dated August 7, 2015, 4:35:49 PM from JamesMeaney@lowerchurchillproject.ca to DSturge@nalcorenergy.com and AuburnWarren@nalcorenergy.com re Fw: MF Update schedule 27-Mar-19 Derrick Sturge
P-02551 Email dated August 13, 2015, 3:08:02 PM from JamesMeaney@lowerchurchillproejct.ca to LanceClarke@lowerchurchillproject.ca, AuburnWarren@nalcorenergy.com and DSturge@nalcorenergy.com re Fw: Revised MF update schedule 27-Mar-19 Derrick Sturge
P-02552 Email dated August 17, 2015, 9:06:31 PM from emartin@nalcorenergy.com to Charles Bown and Chris Kieley re Presentation 27-Mar-19 Derrick Sturge
P-02553 Email dated August 18, 2015, 2:28:24 PM from JamesMeaney@lowerchurchillproject.ca to DSturge@nalcorenergy.com and AuburnWarren@nalcorenergy.com re LCP cost update 27-Mar-19 Derrick Sturge
P-02554 Email dated August 18, 2015, 5:06:58 PM from emartin@nalcorenergy.com to dawndalley@nalcorenergy.com re Deck on MF 27-Mar-19 Derrick Sturge
P-02555 Email dated September 18, 2015, 4:43:54 PM from JamesMeaney@lowerchurchillproject.ca to DSturge@nalcorenergy.com and AuburnWarren@nalcorenergy.com re LCP Project Update 27-Mar-19 Derrick Sturge
P-02556 Email dated September 21, 2015, 3:09:41 PM from JamesMeaney@lowerchurchillproject.ca to DSturge@nalcorenergy.com and AuburnWarren@nalcorenergy.com re LCP update 27-Mar-19 Derrick Sturge
P-02557 Nalcor Energy presentation re Lower Churchill Project - Governance and Financial Reporting & Controls dated November 2015 27-Mar-19 Derrick Sturge
P-02558 Email dated December 4, 2015, 7:31:31 AM from dsturge@nalcorenergy.com to Charles Bown, cc Ed Martin and Gilbert Bennett re Briefing in still on 27-Mar-19 Derrick Sturge
P-02559 Grant Thornton - MFI - Interview Summary of Derrick Sturge dated June 20, 2018 with D. Sturge Comments dated February 4, 2019 27-Mar-19 Derrick Sturge
P-02560 Email dated March 6, 2019, 3:11:44 PM from JamesMeaney@lowerchurchillproject.ca to DSturge@nalcorenergy.com re Fw: TTO AFE Revision - Memo for LCP Board Meetings Feb 28 27-Mar-19 Derrick Sturge
P-02561 The Telegram news article dated March 7, 2019 re Statements about Muskrat Falls project costs by former minister, CEO at odds 27-Mar-19 Derrick Sturge
P-02562 Email dated March 23, 2019, 10:00 AM from DSturge@nalcorenergy.com to David Buffett re Fw: Potential for CAPEX re-allocation from LCP phase 1 to Phase 2 27-Mar-19 Derrick Sturge
P-02563 Email dated November 29, 2012, 11:44:03 AM from dawndalley@nalcorenergy.com to briancrawley@nalcorenergy.com re SNC Briefing Note 26-Mar-19 Normand Béchard
P-02564 Letter dated December 11, 2012 from Normand Bechard to Ron Power re Lower Churchill Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Muskrat Falls Site Team 26-Mar-19 Normand Béchard
P-02565 Meeting request dated January 11, 2013, 3:52 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay re Accepted: Risk register Review - Coordination & Interface Risks 26-Mar-19 Normand Béchard
P-02566 Meeting request dated January 11, 2013, 3:52 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay re Accepted: Risk register Review - Corporate Risks 26-Mar-19 Normand Béchard
P-02567 Meeting request dated January 11, 2013, 3:52 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay re Accepted: Risk register Review - Environmental & Regulatory Risks 26-Mar-19 Normand Béchard
P-02568 Meeting request dated January 11, 2013, 3:52 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay re Accepted: Risk register Review - Health & Safety Risks 26-Mar-19 Normand Béchard
P-02569 Meeting request dated January 11, 2013, 3:52 PM from JasonKean@nalcorenergy.com to Jean-Daniel Tremblay re Accepted: Risk register Review - Labour Relations Risks 26-Mar-19 Normand Béchard
P-02570 Email dated January 20, 2013, 12:26 PM from RonPower@nalcorenergy.com to JasonKean@nalcorenergy.com, DavidGreen@nalcorenergy.com, et al, cc PHarrington@nalcorenergy.com, Joseph Salim, et al re Document Control Organization: "Project Delivery Team" 26-Mar-19 Normand Béchard
P-02571 Letter dated February 15, 2013 from Ron Power to Normand Bechard re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Muskrat Falls Site Team 26-Mar-19 Normand Béchard
P-02572 Letter dated February 15, 2013 from Normand Bechard to Herve Farcy and Gurinder Girn re Lower Churchill Development - Cement Supply for Lower Churchill/Muskrat Falls project (the "Project") 26-Mar-19 Normand Béchard
P-02573 Email dated March 12, 2013, 12:38:11 AM from Scott Thon to Gilbert Bennett re Deloitte Risk Review 26-Mar-19 Normand Béchard
P-02574 Email dated March 13, 2013, 4:55:13 PM from gbennett@nalcorenergy.com to lanceclarke@nalcorenergy.com and pharrington@nalcorenergy.com re Fw: Deloitte Risk Review 26-Mar-19 Normand Béchard
P-02575 Email dated March 21, 2013, 7:45:48 PM from Scott Thon to Robert Card, cc Nicole Girard and Wendy Darcy re Nalcor Visit Dates 26-Mar-19 Normand Béchard
P-02576 Email dated March 28, 2013, 5:16:09 PM from Wendy Darcy to Scott Thon, cc Tricia Burton re SNC CEO Visit to Nalcor 26-Mar-19 Normand Béchard
P-02577 Email dated April 1, 2013, 3:29:58 Pm from Glenda Power to JanineMcCarthy@nalcorenergy.com and Diana Quinton, cc Milly Brown, Tracey Boland, Jennifer Tulk and Karen O'Neill re Key Messages - Muskrat Falls Procurement 26-Mar-19 Normand Béchard
P-02578 Email dated April 5, 2013, 7:48:00 AM from Robert Card to EMartin@nalcorenergy.com and GBennett@nalcorenergy.com, cc Scott Thon re Call 7:15 AM Toronto time Friday 26-Mar-19 Normand Béchard
P-02579 Email dated April 8, 2013, 3:38:21 PM from Scott Thon to Wendy Darcy, cc Tricia Burton re Call with Gilbert Bennett tomorrow am 26-Mar-19 Normand Béchard
P-02580 Meeting Request for April 17, 2013 3:00 PM from Jean-Daniel Tremblay to Normand Bechard, Serge Guerette, et al, cc Nathalie Gagnon and Nadine Lalonde re SLI Corporate LCP Risk Register 26-Mar-19 Normand Béchard
P-02581 Email dated April 19, 2013, 3:40:15 PM from craighippern@nalcorenergy.com to jamesmeaney@nalcorenergy.com, cc mbradbury@nalcorenergy.com, auburnwarren@nalcorenergy.com and carlarussell@nalcorenergy.com re Deck for Minister re Procurement Process and Due Diligence 26-Mar-19 Normand Béchard
P-02582 Email dated April 21, 2013, 3:15 PM from JasonKean@nalcorenergy.com to Lower_Churchill_Project_Staff@nlh.nf.ca, D_STJ_LowerChurchill_AllUsers, cc Carolos Fernandez, NicoleCollins@nalcorenergy.com, et al re Rollout of Aconex Construction Management Instance 26-Mar-19 Normand Béchard
P-02583 Email dated April 22, 2013, 1:09:00 PM from Michel Mackay to Nadine Lalonde and Nathalie Gagnon re TR: Rev.1Lower Churchill Risk Assessment SNC-Lavalin Method April 2013 (2).doc 26-Mar-19 Normand Béchard
P-02584 Meeting Request dated April 23, 2013, 10:21 AM from Jason Kean to Jean-Daniel Tremblay re Accepted: Risk Meeting 26-Mar-19 Normand Béchard
P-02585 Memorandum dated April 23, 2013 from Michel Mackay to Senior Management re Lower Churchill Project 505573 facts sheet 26-Mar-19 Normand Béchard
P-02586 Email dated April 23, 2013, 8:18:39 AM from briancrawley@nalcorenergy.com to koneill@nlh.nl.ca re Messages 26-Mar-19 Normand Béchard
P-02587 Email dated April 24, 2013, 4:48:37 PM from Wendy Darcy to Scott Thon, cc Tricia Burton re NALCOR meeting tomorrow 26-Mar-19 Normand Béchard
P-02588 Email dated April 25, 2013, 1:05:00 AM from John Husch to Scott Thon re FW: Meeting sheet to discuss 26-Mar-19 Normand Béchard
P-02589 Lower Churchill Project - Executive Summary 26-Mar-19 Normand Béchard
P-02590 Meeting Request for April 25, 2013, 4:00 PM from Scott Thon to Robert Card, gbennett@nalcorenergy.com, et al re NALCOR/SNC Lavalin Sr Executive Meeting - including Lance Clarke 26-Mar-19 Normand Béchard
P-02591 Meeting Request for April 25, 2013, 6:00 PM from Scott Thon to Robert Card, gbennett@nalcorenergy.com, et al re SNC Lavalin/NALCOR dinner 26-Mar-19 Normand Béchard
P-02592 Email dated April 26, 2013, 8:59:46 AM from EMartin@nalcorenergy.com to Robert Card and BTucker@nalcorenergy.com, cc Nicole Girard and Scott Thon re Visit to Montreal 17 May 26-Mar-19 Normand Béchard
P-02593 Email dated May 1, 2013, 8:01 AM from JasonKean@nalcorenergy.com to Robert Horton, Sylvain Nantel and MarkTurpin@nalcorenergy.com, cc ScottO'Brien@nalcorenergy.com, Carlos Fernandez, et al re CH-0006 Change Proposal Review - Estimating Support 26-Mar-19 Normand Béchard
P-02594 Meeting Request for May 7, 2013, 12:30 PM from Scott Thon to kwinsor@nalcorenergy.com and GBennett@nalcorenergy.com re Call with Gilbert Bennett and Scott Thon 26-Mar-19 Normand Béchard
P-02595 Email dated May 7, 2013, 11:49:00 AM from Normand Bechard to John Husch re Lower Churchill - Template 4_3_0 Rev 001_WIP29April2013Mid3_Workshop_byIC.docx, Lower Churchill Risk assessment SNC-Lavalin Method April 2013 REV 06.docx 26-Mar-19 Normand Béchard
P-02596 Email dated May 14, 2013, 11:28:43 AM from briancrawley@nalcorenergy.com to pharrington@nalcorenergy.com re snc deck 26-Mar-19 Normand Béchard
P-02597 Email dated May 15, 2013, 7:18:09 PM from PHarrington@nalcorenergy.com to Serge Guerette and Normand Bechard re Fw: Phone Call with Scott Thon 26-Mar-19 Normand Béchard
P-02598 Email dated May 16, 2013, 6:09:03 PM from Michel Mackay to Claude Letournea, Marc O'Connor, Normand Bechard and Philippe Jean re Lower Churchill 26-Mar-19 Normand Béchard
P-02599 Email dated May 17, 2013, 1:27:59 PM from Scott Thon to Nicole Girard, cc Robert Card re TR: Visit of Ed Martin 26-Mar-19 Normand Béchard
P-02600 Meeting Request for May 22, 2013, 11:30:00 AM from Jason Kean/NLHydro to Jason Kean/NLHydro and Jean-Daniel Tremblay@snclavalin.com re Risk Management Activities 26-Mar-19 Normand Béchard
P-02601 Email dated May 27, 2013, 1:58:51 PM from Scott Thon to John Husch re May 30-31 LCP Sponsor Meeting agenda & prework 26-Mar-19 Normand Béchard
P-02602 Email dated May 29, 2013, 1:46:53 PM from Alex Twells to Scott Thon re Apr LCP Assessment Summary_FINAL.pptx 26-Mar-19 Normand Béchard
P-02603 Email dated May 29, 2013, 5:03 PM from Alex Twells to lanceclarke@nalcorenergy.com, pharrington@nalcorenergy.com, et al re Mt Scio House - venue to tomorrow 26-Mar-19 Normand Béchard
P-02604 Email dated July 2, 2013, 10:18:45 AM from Alex Twells to gbennett@nalcorenergy.com and Scott Thon, cc rdowen, Catherine Parsons Dhamija, et al re Team Effectiveness Program - Sponsor Accountabilities 26-Mar-19 Normand Béchard
P-02605 Email dated July 12, 2013, 7:41:44 PM from Scott Thon to GBennett@nalcorenergy.com, cc Tricia Burton re Fw: LCP 26-Mar-19 Normand Béchard
P-02606 Letter dated September 19, 2013 from Bernard Gagne to Paul Harrington re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amendment to the Agreement 26-Mar-19 Normand Béchard
P-02607 Letter dated September 25, 2013 from Lance Clarke to Bernard Gagne re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Agreement Amendment 26-Mar-19 Normand Béchard
P-02608 Letter dated October 8, 2013 from Bernard Gagne to Paul Harrington re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amendment to the EPCM Contractor Designation 26-Mar-19 Normand Béchard
P-02609 Letter dated October 30, 2013 from Bernard Gagne to Paul Harrington re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amendment to the EPCM Contractor Designation - Notice 26-Mar-19 Normand Béchard
P-02610 Letter dated November 5, 2013 from Lance Clarke to Bernard Gagne re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - EPCM Contractor Designation 26-Mar-19 Normand Béchard
P-02611 Letter dated November 20, 2013 from Bernard Gagne to Paul Harrington re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Amendment to the EPCM Contractor Designation 26-Mar-19 Normand Béchard
P-02612 Email dated November 18, 2014, 5:41:00 PM from Serge Guerette to Thierry Peloquin 26-Mar-19 Normand Béchard
P-02613 Letter dated October 29, 2015 from Ron Power to David Haley re Lower Churchill Phase 1 Development - Agreement LC-G-002 - Invoice Rejection 26-Mar-19 Normand Béchard
P-02614 The Lower Churchill Project - Executive Summary 26-Mar-19 Normand Béchard
P-02615 Email dated June 5, 2016, 1:57:19 PM from Paul Harrington to PHarrington@lowerchurchillproject.ca re Fwd: comments 26-Mar-19 Normand Béchard
P-02616 SNC-Lavalin presentation re Lower Churchill Project - North Spur Information Session dated January 2017 26-Mar-19 Normand Béchard
P-02617 Letter dated January 30, 2017 from Joe Leone to Ron Power re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Engineering Management Quality Review 26-Mar-19 Normand Béchard
P-02618 Email dated May 10, 2017, 10:23:05 AM from Paul Harrington to lance.clarke and Brian Crawley re Fwd: Estimate Chronology 26-Mar-19 Normand Béchard
P-02619 Letter dated June 21, 2017 from Joe Leone to Lance Clarke re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Muskrat Falls - Drawdown of Reservoir 26-Mar-19 Normand Béchard
P-02620 Email dated June 26, 2017, 2:01:58 PM from pathussey@lowerchurchillproject.ca to phussey re Fw: SNC Risk Assessment 26-Mar-19 Normand Béchard
P-02621 Email dated June 27, 2017, 11:53 AM from production@nlnewsnow.ca to mandynorris@nalcorenergy.com, koneill@nlh.nl.ca, et al re NLNewsNow Transcript - Former Nalcor CEO Ed Martin Breaks Silence on Muskrat Falls 26-Mar-19 Normand Béchard
P-02622 Email dated June 28, 2017, 10:32 AM from production@nlnewsnow.ca to mandynorris@nalcorenergy.com, koneill@nlh.nl.ca, et al re NLNewsNow Transcript - Martin Insists He Did Not Read the Report 26-Mar-19 Normand Béchard
P-02623 Email dated June 28, 2017, 2:09:07 PM from Chrysta Collins to Siobhan Coady, Gordon McIntosh, et al re FW: Statement from Stan Marshall, Nalcor CEO 26-Mar-19 Normand Béchard
P-02624 Letter dated June 28, 2017 from Paul Davis to Siobhan Coady re SNC-Lavalin Risk Assessment Lower Churchill Project 505573 26-Mar-19 Normand Béchard
P-02625 Letter dated August 2, 2017 from Michel Tremblay to Premier Dwight Ball re Muskrat Falls Development 26-Mar-19 Normand Béchard
P-02626 Letter from Siobhan Coady to Paul Davis re SNC-Lavalin Risk Assessment Lower Churchill Project 505573 26-Mar-19 Normand Béchard
P-02627 Derrick Sturge Handwritten Notes dated May 8, 2017 to May 11, 2017 27-Mar-19 Derrick Sturge
P-02628 Derrick Sturge Handwritten Notes dated October 28, 2013 to October 31, 2013 27-Mar-19 Derrick Sturge
P-02629 Derrick Sturge Handwritten Notes dated March 7, 2016 to March 23, 2016 27-Mar-19 Derrick Sturge
P-02630 Derrick Sturge Handwritten Notes dated March 5, 2015 to February 8, 2016 27-Mar-19 Derrick Sturge
P-02631 Email dated March 17, 2015, 1:37:43 PM from AuburnWarren@nalcorenergy.com to Donna Brewer, cc Charles W. Bown, Craig Martin, et al re Minister Request - Updates 27-Mar-19 Derrick Sturge
P-02632 Email dated November 20, 2012, 9:04:21 AM from Normand Bechard to Patrick Lamarre re mes preoccupations 26-Mar-19 Normand Béchard
P-02633 SNC-Lavalin - Lower Churchill Project - Proposal - Reinstatement of the Engineering, Procurement and Construction Management Services for Construction of Project Components 1, 3 and 4 of the Lower Churchill Project dated June 2016 26-Mar-19 Normand Béchard
P-02634 Nalcor Energy Presentation re Lower Churchill Project - 11 - SNC Risk Report dated May 2018 26-Mar-19 Normand Béchard
P-02635 Recollections regarding the SNC Risk Analysis Report 26-Mar-19 Normand Béchard
P-02636 Email dated July 12, 2018, 7:59:39 AM from Paul Harrington to PHarrington@lowerchurchillproject.ca re Fwd: Serge's Demobilization Date 26-Mar-19 Normand Béchard
P-02637 Email dated June 13, 2011, 9:37 AM from Jason Kean to Paul Lemay, cc LCP - SNC, lowerchurchill, John Mulcahy and Dave Pardy re Preparation for Decision Gate 3 Estimate Workshop Rec. No. L010-S011-200-170331-00053 28-Mar-19 Paul Lemay
P-02638 Email dated August 22, 2011, 1:16:55 PM from Francois Couturier to Stan Wynne, cc Normand Bechard re Nalcor decision to cancel the HCSS training session & refusal of Daubersmith candidacy 28-Mar-19 Paul Lemay
P-02639 Email dated November 23, 2011, 3:40:10 PM from Nick Gillis to Jean-Daniel Tremblay, cc Paul Lemay re CCE action Item S3-16 - Labour Rates 28-Mar-19 Paul Lemay
P-02640 Email dated May 31, 2012, 10:23:54 PM from jasonkean@nalcorenergy.com to Keith Dodson, cc JasonKean@nalcorenergy.com re Concrete schedule for CH0007 28-Mar-19 Paul Lemay
P-02641 Lower Churchill Project - Final DG3 Estimate as submitted to Nalcor on June 1, 2012 28-Mar-19 Paul Lemay
P-02642 SNC-Lavalin - Nalcor Energy - Lower Churchill Project - EPCM Project Execution Plan dated June 11, 2012 28-Mar-19 Paul Lemay
P-02643 Email dated June 12, 2012, 10:29:43 AM from tonyscott@nalcorenergy.com to scotto'brien@nalcorenergy.com re Fw: Concrete schedule for CH0007 28-Mar-19 Paul Lemay
P-02644 SNC-Lavalin: Muskrat Falls - Lower Churchill River - Structural Concrete Summaries - Summary - Powerhouse & Intakes, Spillway, Transitions dated November 22, 2011 28-Mar-19 Paul Lemay
P-02645 Concrete & Formwork Factors - Powerhouses dated November 8, 2011 28-Mar-19 Paul Lemay
P-02646 Email dated November 8, 2013, 12:27:34 PM from jamesmeaney@nalcorenergy.com to dsturge@nalcorenergy.com, cc Auburn Warren re Fwd: Board Papers 27-Mar-19 Derrick Sturge
P-02647 Email dated November 8, 2013, 3:50:11 PM from auburnwarren@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc George Chehab, Derrick Sturge, et al re Update 27-Mar-19 Derrick Sturge
P-02648 Email dated November 13, 2013, 7:39 PM from auburnwarren@nalcorenergy.com to james meaney/nlhydro, cc craig hippern/nlhydro, thomas.f.garner@ca.pwc.com and gordon alexander/nlhydro re Updated Cost Flow 6531 27-Mar-19 Derrick Sturge
P-02649 Email dated November 20, 2013, 12:46:52 PM from gordonalexander@nlh.nl.ca to torielly@nalcorenergy.com, cc scottpelley@nalcorenergy.com, carolannelutz@nalcorenergy.com, and elizabethlewis@nalcorenergy.com re Fw: Updated Cost Flow 6531 27-Mar-19 Derrick Sturge
P-02650 Email dated February 6, 2014, 4:25:56 PM from jamesmeaney@nalcorenergy.com to geraldcahill@lowerchurchillproject.ca and scottpelley@nalcorenergy.com, bcc dsturge@nalcorenergy.com re Confidential: Fw: Contingency for revised AFE 27-Mar-19 Derrick Sturge
P-02651 Email dated January 16, 2013, 1:41:39 PM from Melissa Jordan to Trevor Kearsey Exchange Exch and Heather Maclean, cc Doris A. Walsh, John Fitzgerald, et al re Telegram - Marshall and Kennedy swap places 1-Apr-19 Tom Marshall
P-02652 GNL Information Note - Natural Resources dated March 5, 2013 re Muskrat Falls Project 1-Apr-19 Tom Marshall
P-02653 Hansard - Forty-Seventh General Assembly of Newfoundland and Labrador - Volume XLVII - First Session - Number 80 dated March 21, 2013 1-Apr-19 Tom Marshall
P-02654 GNL News Release dated April 2, 2013 re CRA Survey Shows Majority of Residents in the Province Support Muskrat Falls 1-Apr-19 Tom Marshall
P-02655 Nalcor Energy presentation re Lower Churchill Project - Federal Loan Guarantee Update dated April 16, 2013 1-Apr-19 Tom Marshall
P-02656 Statement by Honourable Tom Marshall, Minister of Natural Resources dated April 23, 2013 1-Apr-19 Tom Marshall
P-02657 GNL News Release dated May 27, 2013, re Government of Newfoundland and Labrador Moves Forward on Financing of the Muskrat Falls Project 1-Apr-19 Tom Marshall
P-02658 The Telegram news article dated July 26, 2013 re Minister says no need to convince Brian Peckford of anything 1-Apr-19 Tom Marshall
P-02659 Email dated July 23, 2013, 11:30:02 AM from Lesley Clarke to Tracey Boland, Milly Brown, et al, cc Lynette Carroll, Jennifer Collingwood, et al re Chronicle Herald - N.L. government against excess power guarantee 1-Apr-19 Tom Marshall
P-02660 GNL Information Note - Natural Resources dated July 22, 2013 re Emera's Maritime Link Project application to the Utilities and Review Board (UARB) 1-Apr-19 Tom Marshall
P-02661 Email dated August 13, 2013, 4:37:08 PM from Hon. Thomas Marshall to Diana Quinton re Approval requested: Response to Ashley Fitzpatrick 1-Apr-19 Tom Marshall
P-02662 Email dated September 23, 2013, 5:07:20 PM from Tracey Boland to Jennifer L Tulk re Premier on UARB 1-Apr-19 Tom Marshall
P-02663 Email dated October 7, 2013, 9:58:20 AM from Diane Quinton to Hon. Thomas Marshall, cc Larry Wells and Charles W. Bown re FW: Update on Power contract award 1-Apr-19 Tom Marshall
P-02664 Nalcor Energy presentation re Lower Churchill Project - Request for Financing Update - Presentation for Cabinet dated October 9, 2013 1-Apr-19 Tom Marshall
P-02665 Nalcor Energy and Emera Inc. and Nova Scotia Power Incorporated - Energy Access Agreement dated October 20, 2013 1-Apr-19 Tom Marshall
P-02666 The Telegram news article dated October 22, 2013 re Nalcor, Emera agree on plan to sell surplus Muskrat Falls power 1-Apr-19 Tom Marshall
P-02667 GNL Memorandum to Executive Council dated October 24, 2013 re Muskrat Falls Project - Financing Directives to the Public Utilities Board 1-Apr-19 Tom Marshall
P-02668 Email dated October 27, 2013, 8:10:01 PM from Charles W. Bown to Donna Brewer re Minister Request 1-Apr-19 Tom Marshall
P-02669 Email dated October 30, 2013, 3:44:14 PM from Sharon Griffiths to Charles W. Bown re Donna Brewer Called 1-Apr-19 Tom Marshall
P-02670 Email dated November 3, 2013, 6:22 PM from Charles W. Bown to Hon. Thomas Marshall, Larry Wells, et al re Fw: Nalcor MF Oil and Gas Qs from M. Dalley - SP additions r1_KON additions.docx 1-Apr-19 Tom Marshall
P-02671 Email dated October 28, 2013, 2:51:35 AM from auburnwarren@nalcorenergy.com to Ed Martin, Derrick Sturge, et al, cc Charles Bown and Paul J. Morris re Latest materials 27-Mar-19 Derrick Sturge
P-02672 Email dated November 19, 2013, 1:56 PM from pharrington@lowerchurchillproject.ca to jamesmeaney@nalcorenergy.com, cc gbennett@nalcorenergy.com, emartin@nalcorenergy.com, et al re Updated Costs 27-Mar-19 Derrick Sturge
P-02673 Email dated November 22, 2013, 10:46:04 AM from auburnwarren@nalcorenergy.com to Paul Myrden and pmorris@gov.nl.ca re Fw: Proposed Text for Canada 27-Mar-19 Derrick Sturge
P-02674 The Telegram Letter to the Editor dated April 30, 2014 re More questions asked - more questions answered 27-Mar-19 Derrick Sturge
P-02675 Email dated March 9, 2015, 4:09:30 PM from emartin@nalcorenergy.com to Charles Bown re Briefing 27-Mar-19 Derrick Sturge
P-02676 Email dated December 3, 2015, 4:48:26 PM from emartin@nalcorenergy.com to Julia Mullaley, cc Charles Bown re Transition Team Presentation 27-Mar-19 Derrick Sturge
P-02677 Email dated March 23, 2016, 3:13 PM from jamesmeaney@lowerchurchillproject.ca to Derrick Sturge re Meeting - Minister 27-Mar-19 Derrick Sturge
P-02678 Email dated November 25, 2013, 7:12:22 PM from Xeno Martis to CraigHippern@nalcorenergy.com, Auburn Warren, et al, cc Angela Onesi, Felix Gutierrez and Alexandre Gagnon re FW: Outstanding responses [IWOV-Legal.FID1640195] 27-Mar-19 Derrick Sturge
P-02679 Email dated November 4, 2013, 11:28:15 AM from Diana Quinton to Jennifer L Tulk and Tracey Boland, cc Glenda Power, Jacquelyn Howard and Jennifer Collingwood re Key points on Energy Access Agreement 1-Apr-19 Tom Marshall
P-02680 GNL Memorandum to Executive Council dated November 7, 2013 re Muskrat Falls Project - NL Equity Support Agreements and Guarantees for NL Equity Support Agreements 1-Apr-19 Tom Marshall
P-02681 Email dated November 12, 2013, 5:21:58 PM from Charles W. Bown to Paula Burt, cc Michael Harvey and Tracy English re Cabinet Presentation 1-Apr-19 Tom Marshall
P-02682 GNL - Natural Resources - November 19, 2013 - Muskrat Falls - Availability of Information 1-Apr-19 Tom Marshall
P-02683 GNL - Natural Resources - Information Updates for December 3, 2013 1-Apr-19 Tom Marshall
P-02684 Nalcor Energy presentation re Muskrat Falls Project Update dated December 10, 2013 1-Apr-19 Tom Marshall
P-02685 GNL News Release dated January 17, 2014 re Responsible Decisions to Ensure Long-Term Prosperity 1-Apr-19 Tom Marshall
P-02686 Email dated January 27, 2014, 10:29:43 AM from Lesley Clarke to Tracey L Boland, Milly Brown, el al, cc Lynette Carroll, Jennifer Collingwood, et al re Telegram - Marshall promises more than a 'caretaker government' 1-Apr-19 Tom Marshall
P-02687 Email dated February 11, 2014, 2:25:00 PM from Lesley Clarke to Tracey L Boland, Milly Brown and Jeff Paddock, cc Lynette Carroll, Jennifer Collingwood, et al re Southern Gazette - Premier Marshall reaffirms government's path for energy development 1-Apr-19 Tom Marshall
P-02688 Natural Resources QAs re Independent Engineer and Nalcor Oversight dated February 25, 2014 1-Apr-19 Tom Marshall
P-02689 GNL presentation re Muskrat Falls Cost Accountability and Project Oversight - Presentation to Premier dated March 10, 2014 1-Apr-19 Tom Marshall
P-02690 Email dated March 11, 2014, 4:40:44 PM from DSturge@nalcorenergy.com to Donna Brewer, cc AuburnWarren@nalcorenergy.com, Charles W. Bown, et al re FW: Minister Request 28-Mar-19 Derrick Sturge
P-02691 GNL presentation re Muskrat Falls Cost Accountability and Project Oversight - Presentation to Cabinet dated March 13, 2014 1-Apr-19 Tom Marshall
P-02692 The Telegram news article dated April 2, 2014 re Marshall acknowledges a numbers mix-up in the legislature 1-Apr-19 Tom Marshall
P-02693 The Canadian Press news article dated April 15, 2014 re Muskrat Falls project costs going up, power may be delayed, says Nalcor 1-Apr-19 Tom Marshall
P-02694 Nalcor Energy - Lower Churchill Project presentation re Muskrat Falls Project - Independent Engineer Report & Project Overview dated April 15, 2014 1-Apr-19 Tom Marshall
P-02695 Email dated April 23, 2014, 8:13:14 AM from Tracy English to Charles W. Bown and Tina Williams re Muskrat to Continue Until too Expensive: Premier 1-Apr-19 Tom Marshall
P-02696 GNL presentation re Muskrat Falls Oversight - Presentation to Premier dated May 27, 2014 1-Apr-19 Tom Marshall
P-02697 GNL Communications Plan - Executive Council re Release of Oversight Report dated July 15, 2014 1-Apr-19 Tom Marshall
P-02698 The Honourable Tom Marshall - Premier of Newfoundland and Labrador - Speaking Notes for Oversight Announcement dated July 31, 2014 1-Apr-19 Tom Marshall
P-02699 The Telegram news article dated August 1, 2014 re Marshall talks oversight, oversight and more oversight on Muskrat Falls 1-Apr-19 Tom Marshall
P-02700 Email dated September 29, 2014, 3:10:47 PM from AuburnWarren@nalcorenergy.com to Donna Brewer and Charles W. Bown, cc DSturge@nalcorenergy.com, DaveJones@nalcorenergy.com and ElizabethLewis@nalcorenergy.com re Fwd: Minister Request - Updates 1-Apr-19 Tom Marshall
P-02701 Handwritten Notes of Normand Bechard re Meeting with Paul Harrington on risks dated May 28, 2013 27-Mar-19 Normand Béchard
P-02702 Newfoundland and Labrador Regulation 18/12 - Lower Churchill Hydroelectric Generation project Undertaking Order under the Environmental Protection Act (O.C. 2012-061) dated March 15, 2012 2-Apr-19 Kathy Dunderdale
P-02703 Email dated March 13, 2013, 9:24:17 PM from Paul G. Scott to Todd Stanley, Randy Pelletier, et al re Fwd: Emera Sanction [IWOV-Legal.FID1640195] 2-Apr-19 Kathy Dunderdale
P-02704 Email dated March 25, 2013, 4:07:18 PM from DSturge@nalcorenergy.com to EMartin@nalcorenergy.com and Charles W. Bown re Fwd: Heads up - FLG-"sanction" 2-Apr-19 Kathy Dunderdale
P-02705 The Canadian Press news article dated May 27, 2013 re Muskrat Falls deal was a battle: premier 2-Apr-19 Kathy Dunderdale
P-02706 Speaking Notes - Premier Kathy Dunderdale - St. John's Board of Trade dated May 27, 2013 2-Apr-19 Kathy Dunderdale
P-02707 Email dated July 24, 2013, 8:51:34 AM from Rodney C Drover to Clare Bustin, Lesley Clarke, et al re (CoF) CP - Hydro-Quebec's challenge on Churchill Falls will fail, Newfoundland premier says 2-Apr-19 Kathy Dunderdale
P-02708 Email dated July 24, 2013, 8:51:40 AM from Rodney C Drover to Clare Bustin, Lesley Clarke, et al re (CoF) VOCM - Premier Responds to Hydro-Quebec Court Action 2-Apr-19 Kathy Dunderdale
P-02709 Email dated July 25, 2013, 8:47:43 AM from Lesley Clarke to Tracey L Boland, Milly Brown, et al re CP/CBC - N.L. will sell excess hydro to N.S., says Dunderdale 2-Apr-19 Kathy Dunderdale
P-02710 Email dated July 29, 2013, 1:03:37 Pm from Paul J. Morris to Peter Au, Donna Brewer, et al re FW: Chronicle Herald - Dunderdale: Link never hinged on review board decision 2-Apr-19 Kathy Dunderdale
P-02711 The Telegram news article dated September 21, 2013 re Time to pause and reassess Muskrat Falls 2-Apr-19 Kathy Dunderdale
P-02712 The Telegram news article dated October 10, 2013 re Astaldi awarded major Muskrat Falls contract 2-Apr-19 Kathy Dunderdale
P-02713 GNL Information Note - Natural Resources re Muskrat Falls Project dated October 29, 2013 2-Apr-19 Kathy Dunderdale
P-02714 The Telegram news article dated November 9, 2013 re 'Simply put, Muskrat Falls is the best project for the taxpayers and ratepayers of the province.' 2-Apr-19 Kathy Dunderdale
P-02715 The Telegram news article dated November 9, 2013 re Twenty answers on Muskrat Falls from the premier 2-Apr-19 Kathy Dunderdale
P-02716 Nalcor Energy presentation re Overview - Newfoundland and Labrador Agreements dated November 12, 2013 2-Apr-19 Kathy Dunderdale
P-02717 Email dated November 20, 2013, 9:11:27 AM from Lesley Clarkes to Tracey L Boland, Milly Brown, et al, cc Lynette Carroll, Jennifer Collingwood, et al re CBC - Kathy Dunderdale not worried about N.S. Muskrat concerns 2-Apr-19 Kathy Dunderdale
P-02718 The Telegram news article dated November 20, 2013 re Dunderdale says N.S. government needs to 'get up to scratch' on Muskrat Falls 2-Apr-19 Kathy Dunderdale
P-02719 Email dated November 25, 2013, 2:28 PM from Charles W. Bown to Paul Burt, cc Paul Noble re Premier's briefing 2-Apr-19 Kathy Dunderdale
P-02720 Email dated November 25, 2013, 2:51 PM from Charles W. Bown to Paula Burt re Cabinet Presentation 2-Apr-19 Kathy Dunderdale
P-02721 The Telegram news article dated November 29, 2013 re UPDATE: Premier, Nalcor applaud UARB decision 2-Apr-19 Kathy Dunderdale
P-02722 The Telegram news article dated December 6, 2013 re Michael is out to get Muskrat Falls, Dunderdale says 2-Apr-19 Kathy Dunderdale
P-02723 GNL News Release dated December 10, 2013 re Harper Government Announces Final Loan Guarantee for Lower Churchill Projects 2-Apr-19 Kathy Dunderdale
P-02724 GNL News Release dated December 10, 2013 re Speaking Notes delivered by the Honourable Kathy Dunderdale, Premier of Newfoundland and Labrador, on the Finalization of the Federal Loan Guarantee for Muskrat Falls Project 2-Apr-19 Kathy Dunderdale
P-02725 The Telegram news article dated December 11, 2013 re Signed, sealed and delivered 2-Apr-19 Kathy Dunderdale
P-02726 The Telegram news article dated January 6, 2014 re Dunderdale insists province isn't in crisis 2-Apr-19 Kathy Dunderdale
P-02727 Women's Wellbeing in Happy Valley-Goose Bay: Findings of the 2018 Community Wellbeing Survey - A Briefing Note to Intervenors at the Commission of Inquiry Respecting the Muskrat Falls Project dated November 2018 2-Apr-19 Kathy Dunderdale
P-02728 PUB-Nalcor-46 - Muskrat Falls Review 28-Mar-19 Derrick Sturge
P-02729 Answers to Follow-up Questions from the March 2, 2019 interview with Paul Lemay 28-Mar-19 Paul Lemay
P-02730 Answers to second set of follow-up questions from the March 2, 2019 interview with Paul Lemay 28-Mar-19 Paul Lemay
P-02731 Email dated October 29, 2013, 6:00 AM from Jason Kean to BJ Ducey, cc Lance Clarke re Estimate Framework (excerpt from P-01845) 3-Apr-19 BJ Ducey/Kelly Williams
P-02732 Email dated January 15, 2014, 4:25:34 PM from jasonkean@lowerchurchillproject.ca to BJ Ducey, cc gwmurphx and lanceclarke@lowerchurchillproject.ca re Anchoring Back to our Principles in order to Move Forward 3-Apr-19 BJ Ducey/Kelly Williams
P-02733 Memorandum of Understanding dated March 28, 2014 between Lower Churchill Management Corporation and Quanta Services, Inc. and Valard Construction LP 3-Apr-19 BJ Ducey/Kelly Williams
P-02734 Nalcor Energy - Valard - Quanta Services presentation re Settlement Meeting Presentation Materials dated May 4, 2017 3-Apr-19 BJ Ducey/Kelly Williams
P-02735 Letter dated June 6, 2014 from Pat Hussey and Ron Power to Adam Budzinski re Package No. CT0327 Construction of 350 kV HVdc Transmission Line - Letter Agreement Pending Formal Agreement 3-Apr-19 BJ Ducey/Kelly Williams
P-02736 Email dated September 20, 2015, 11:44:18 AM from Dean Sjodin to Marc Quimet, cc Don Bouzane re Direction 3-Apr-19 BJ Ducey/Kelly Williams
P-02737 Nalcor Energy - Lower Churchill Project presentation re HVdc TL: Geotechnical Risk Review - Background, Current Situation, Action Going Forward dated March 30, 2016 3-Apr-19 BJ Ducey/Kelly Williams
P-02738 Email dated July 14, 2016, 2:25:26 PM from pathussey@lowerchurchillproject.ca to phussey re Fw: Slide Deck for Mr. Marshall - meeting at 3pm 3-Apr-19 BJ Ducey/Kelly Williams
P-02739 Email dated January 15, 2017, 6:54 PM from Project Solutions to BJ Ducey, cc Jason Kean and project.solutions@ re Farewell and Thank-you 3-Apr-19 BJ Ducey/Kelly Williams
P-02740 Amending Agreement Number 1 between Labrador-Island Link Limited Partnership and Valard Construction LP dated June 27, 2017 3-Apr-19 BJ Ducey/Kelly Williams
P-02741 Email dated November 23, 2017, 5:25 AM from RosannTaylor@lowerchurchillproject.ca to BJ Ducey, Christ Armstrong, et al, cc PeteJWhelan@lowerchurchillproject.ca, denes.bajzak@bajzaklaw.com et al re CT0319 Executed Amending Agreement #1 - CONFIDENTIAL 3-Apr-19 BJ Ducey/Kelly Williams
P-02742 Curriculum Vitae - John J. Mulcahy 3-Apr-19 John Mulcahy/Mark Turpin
P-02743 McNamara Construction Company - Calculation of Labour Rates effective May 1, 2003 to April 30, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02744 McNamara - Formwork Comparisons - Granite Canal - High Falls dated February 13, 2005 3-Apr-19 John Mulcahy/Mark Turpin
P-02745 IKC-ONE - Nalcor Energy - Lower Churchill Project - CH0006 Bulk Excavation Contract - Request for Equitable Adjustment - Submitted Without Prejudice dated August 27, 2013 3-Apr-19 John Mulcahy/Mark Turpin
P-02746 Nalcor Energy - Lower Churchill Project - RFP Review and Approval re Construction of North and South Dams dated July 24, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02747 Email dated July 28, 2014, 11:13:57 AM from markturpin@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, pathussey@lowerchurchillproject.ca, landclarke@lowerchurchillproject.ca and roylewis@nalcorenergy.com 3-Apr-19 John Mulcahy/Mark Turpin
P-02748 Nalcor Energy - Lower Churchill Project - Bidders List re Construction of North and South Dams dated July 29, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02749 Muskrat Falls Corporation Invitation Letter from Roy Lewis dated August 1, 2014 to All Bidders re Lower Churchill Project - Request for Proposal No.: CH0009 - Construction of North and South Dams - Closing Date: 30-September-2014 16:00 Hours St. John's, NL time 3-Apr-19 John Mulcahy/Mark Turpin
P-02750 Nalcor Energy - Lower Churchill Project - Contract Strategy re CH0009 - Construction of North and South Dams dated July 10, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02751 Email dated August 14, 2014, 11:56:33 AM from roylewis@nalcorenergy.com to abdellah.elbensi@snclavalin.com, Paul Fraser, et al, cc markturnpin@lowerchurchillproject.ca re CH0009 - Construction of North and South Dams - Bid Evaluation Plan 3-Apr-19 John Mulcahy/Mark Turpin
P-02752 Muskrat Falls Corporation Addendum #001 from Roy Lewis to All Bidders re Lower Churchill Project - Request for Proposal No.: CH0009 - Package Title 3-Apr-19 John Mulcahy/Mark Turpin
P-02753 Nalcor Energy - Lower Churchill Project - Bid Evaluation Plan - CH0009 - Construction of North and South Dams dated September 15, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02754 Email dated October 6, 2014, 11:05 AM from Paul Lemay to roylewis@nalcorenergy.com re TR: CH-0009 CONFIDENTIAL 3-Apr-19 John Mulcahy/Mark Turpin
P-02755 Email dated October 9, 2014, 2:36:53 PM from lanceclarke@lowerchurchillproject.ca to Mark Turpin, cc Scott O'Brien and Roy Lewis re CH0009 - Construction of North and South Dams - Bidder Executive Meeting 3-Apr-19 John Mulcahy/Mark Turpin
P-02756 Email dated October 20, 2014, 6:25:10 AM from pathussey@lowerchurchillproject.ca to Ron Power, Mark Turpin, Roy Lewis and Ed Over, cc Scott O'Brien, Lance Clarke and Jason Kean re CH0009 - Bid Evaluation Plan 3-Apr-19 John Mulcahy/Mark Turpin
P-02757 Memo dated October 24, 2014 from Roy Lewis to Jason Kean, cc Pat Hussey re CH0009 - Construction of North and South Dams - Bid Evaluation Plan 3-Apr-19 John Mulcahy/Mark Turpin
P-02758 Nalcor Energy - Lower Churchill Project - Bid Opening Record re CH0009 - Construction of North and South Dames dated October 27, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02759 Email dated November 20, 2014, 7:51:23 AM from Nolan Jenkins to RoyLewis@nalcorenergy.com and markturpin@lowerchurchillproject.ca, cc Don Strickland, Jose Daniel Botero, et al re CH0009 - Conveyor Information 3-Apr-19 John Mulcahy/Mark Turpin
P-02760 CH0009 - Construction of North and South Dams - Bidder 2 - Normalisation dated December 2, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02761 Muskrat Falls Corporation - Lower Churchill Project - Construction of North and South Dams - CH0009 - Bid Evaluation - Discipline Score Sheets - RFP - Labour Relations Evaluation 3-Apr-19 John Mulcahy/Mark Turpin
P-02762 Muskrat Falls Corporation - Lower Churchill Project - Construction of North and South Dams - CH0009 - Main Summary Normalised 3-Apr-19 John Mulcahy/Mark Turpin
P-02763 Muskrat Falls Corporation - Lower Churchill Project - Construction of North and South Dams - CH0009 - Main Summary Normalised (2) 3-Apr-19 John Mulcahy/Mark Turpin
P-02764 Muskrat Falls Corporation - Lower Churchill Project - Construction of North and South Dams - CH0009 - Bid Evaluation - Discipline Score Sheets - RFP - Technical - Summary Evaluation 3-Apr-19 John Mulcahy/Mark Turpin
P-02765 CH0009 - Construction of North and South Dams - Bidder 3 - Normalisation dated December 15, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02766 Construction of North and South Dams - CH0009 - Bid Evaluation Results dated December 15, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02767 Lower Churchill Project - Muskrat Falls - CH0007 - Construction of North and South Dams - Schedule of Price Breakdown dated October 14, 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02768 Email dated January 14, 2015, 5:06:16 PM from edover@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca, cc ronadamcyk@lowerchurchillproject.ca re CH0009 (Bidder 2) 3-Apr-19 John Mulcahy/Mark Turpin
P-02769 Email dated January 20, 2015, 6:08 PM from edover@lowerchurchillproject.ca to kevin.ellerton@barnard-inc.com and Ron Adamcyk re CH0009 - OUR UNDERSTANDING 3-Apr-19 John Mulcahy/Mark Turpin
P-02770 Email dated January 30, 2015, 4:15:52 PM from edover@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca and pathussey@lowerchurchillproject.ca, cc ronadamcyk@lowerchurchillproject.ca re Shortlisting Strategy for CH0009 3-Apr-19 John Mulcahy/Mark Turpin
P-02771 Email dated March 6, 2015, 10:08:32 AM from edover@lowerchurchillproject.ca to ronadamcyk@lowerchurchillproject.ca re CH0009 3-Apr-19 John Mulcahy/Mark Turpin
P-02772 Letter dated March 6, 2015 from Kevin Ellerton to Ed Over re RFP No. CH0009 - Value/Engineering & Cost Savings 3-Apr-19 John Mulcahy/Mark Turpin
P-02773 Email dated March 10, 2015, 10:57:32 AM from Derek Tisdel to edover@lowerchurchillproject.ca and kevin.ellerton@barnard-inc.com, cc bcole@pennecon.com and ronadamcyk@lowerchurchillproject.ca re Revised Proposal 3-Apr-19 John Mulcahy/Mark Turpin
P-02774 Lower Churchill Project - Muskrat Falls - CH0009 - Construction of North and South Dams - Schedule of Price Breakdown - Appendix A2.1 - Rev. B2 with Adjustments dated October 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02775 Email dated April 22, 2015, 3:53:12 PM from markturpin@lowerchurchillproject.ca to ronadamcyk@lowerchurchillproject.ca re Fw: CH0009 - RCC - Potential Cost Savings 3-Apr-19 John Mulcahy/Mark Turpin
P-02776 Email dated April 14, 2015, 2:03 PM from Scott O'Brien to John Mulcahy re Fwd: Target Price Model - Revised to Include Subcontractor Labour 3-Apr-19 John Mulcahy/Mark Turpin
P-02777 Email dated May 23, 2015, 3:54:10 AM from Ken McClintock to Ed Over and johnmulcahy@lowerchurchillproject.ca, cc Scott Obrien re CH0009 Notes 3-Apr-19 John Mulcahy/Mark Turpin
P-02778 Email dated May 23, 2015, 3:24:20 AM from Ken McClintock to johnmulcahy@lowerchurchillproject.ca and Ed Over, cc Scott Obrien re Notes From The Week 3-Apr-19 John Mulcahy/Mark Turpin
P-02779 Lower Churchill Project - Muskrat Falls - CH0009 - Construction of North and South Dams - Schedule of Price Breakdown - Appendix A2.1 - Rev. B2 dated October 2014 3-Apr-19 John Mulcahy/Mark Turpin
P-02780 Email dated May 29, 2015, 7:26:37 PM from edover@lowerchurchillproject.ca to Nolan Jenkins and lknox@hjoc.com, cc scottobrien@lowerchurchillproject.ca, kenmcclintock@lowerchurchillproject.ca and johnmulcahy@lowerchurchillproject.ca re CH0009 Bidder 3 Minutes of Meeting and LCP Deliverables 3-Apr-19 John Mulcahy/Mark Turpin
P-02781 Email dated June 2, 2015, 1:48:23 PM from Ken McClintock to John Mulcahy re Fwd: CH0009 North & South Dams - Pre-Award Audit 3-Apr-19 John Mulcahy/Mark Turpin
P-02782 Email dated June 4, 2015, 11:18:39 AM from Derek Tisdel to edover@lowerchurchillproject.ca, cc bcole@pennecon.com, johnmulcahy@lowerchurchillproject.ca and kenmcclintock@lowerchurchillproject.ca re CH0009 Bidder 2 Minutes of Meeting and LCP Deliverables 3-Apr-19 John Mulcahy/Mark Turpin
P-02783 Lower Churchill Project - Muskrat Falls - CH0009 - Construction of North and South Dams - Schedule of Price Breakdown - For River Diversion in 2016 - Appendix A2.1 - Rev. B3 dated June 6, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02784 Lower Churchill Project - Muskrat Falls - CH0009 - Construction of North and South Dams - Schedule of Price Breakdown - For River Diversion in 2017 - Appendix A2.1 - Rev. B3 dated June 6, 2016 3-Apr-19 John Mulcahy/Mark Turpin
P-02785 Email dated June 8, 2015, 3:02:50 PM from gregsnyder@lowerchurchillproject.ca to kenmcclintock@lowerchurchillproject.ca, cc John Mulcahy re CH0009 Team Evaluation 3-Apr-19 John Mulcahy/Mark Turpin
P-02786 Email dated June 12, 2015, 1:43:51 PM from gregsnyder@lowerchurchillproject to francois.couturier@snclavalin.com, cc johnmulcahy@lowerchurchillproject.ca re CH0009 - RCC Dam Construction 3-Apr-19 John Mulcahy/Mark Turpin
P-02787 Email dated June 18, 2015, 2:20:33 PM from kenmcclintock@lowerchurchillproject.ca to geraldcahill@lowerchurchillproject.ca re CH0009 Review 3-Apr-19 John Mulcahy/Mark Turpin
P-02788 Bidder #3 (Adjusted Submission) dated June 29, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02789 Letter dated June 30, 2015 from Nolan Jenkins to Ed Over re RFP No. CH0009 - Construction of North and South Dams - June 30th 2015 Revised Pricing 3-Apr-19 John Mulcahy/Mark Turpin
P-02790 Lower Churchill Project - Package CH-0009 - North & South Dams - Option (I): River Diversion in 2016 dated June 30, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02791 Appendix A2.2 - Monthly Payment Forecast Schedule - Package Number: CH0009 3-Apr-19 John Mulcahy/Mark Turpin
P-02792 Email dated July 2, 2015, 11:34:23 AM from edover@lowerchurchillproject.ca to ken.mcclintock@lowerchurchillproject.ca and John Mulcahy re Fw: CH0009 Barnard-Pennecon JV Revised Proposal for Craft Labour Target 3-Apr-19 John Mulcahy/Mark Turpin
P-02793 Email dated July 6, 2015, 8:50 Pm from Ken McClintock to johnmulcahy@lowerchurchillproject.ca re Bidder 3 Telecon 3-Apr-19 John Mulcahy/Mark Turpin
P-02794 Email dated July 6, 2015, 8:01:47 AM from johnmulcahy@lowerchurchillproject.ca to stevegoulding@lowerchurchillproject.ca re Fw: Bidder 3 3-Apr-19 John Mulcahy/Mark Turpin
P-02795 Bid Comparison dated July 8, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02796 Email dated July 13, 2015, 10:14:11 AM from edover@lowerchurchillproject.ca to johnmulcahy@lowerchurchillproject.ca and stevegoulding@lowerchurchillproject.ca re Fw: CH0009 Revised Proposal Submission for North and South Dams - Barnard-Pennecon 3-Apr-19 John Mulcahy/Mark Turpin
P-02797 Email dated July 20, 2015, 8:28:10 AM from johnmulcahy@lowerchurchillproject.ca to Ken McClintock re CH0009 Adjustment for Man-Hrs. 3-Apr-19 John Mulcahy/Mark Turpin
P-02798 Email dated July 21, 2015, 5:59:20 AM from Ken McClintock to johnmulcahy@lowerchurchillproject.ca re Bidder 2 CV's 3-Apr-19 John Mulcahy/Mark Turpin
P-02799 Email dated July 21, 2015, 11:43:34 AM from tonyscott@lowerchurchillproject.ca to kenmcclintock@lowerchurchillproject.ca and johnmulcahy@lowerchurchillproject.ca re CH009 Bid Schedule 3-Apr-19 John Mulcahy/Mark Turpin
P-02800 Email dated July 21, 2015, 12:44:35 PM from edover@lowerchurchillproject.ca to ken.mcclintock@lowerchurchillproject.ca and John Mulcahy re Fw: presentation1.docx 3-Apr-19 John Mulcahy/Mark Turpin
P-02801 Letter dated July 23, 2015 from Leonard Knox to Mr. Over re email dated July 21, 2015 relating to CH009 Interface issues 3-Apr-19 John Mulcahy/Mark Turpin
P-02802 CH0009 - Construction of North & South Dams - Status Presentation dated July 24, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02803 Email dated July 24, 2015, 1:17:17 PM from kenmcclintock@lowerchurchillproject.ca to edover@lowerchurchillproject.ca, johnmulcahy@lowerchurchillproject.ca and gregsnyder@lowerchurchillproject.ca re Original Bid Evaluation Plan 3-Apr-19 John Mulcahy/Mark Turpin
P-02804 Email dated July 24, 2015, 1:17:17 PM from kenmcclintock@lowerchurchillproject.ca to edover@lowerchurchillproject.ca, johnmulcahy@lowerchurchillproject.ca and gregsnyder@lowerchurchillproject.ca re Original Bid Evaluation Plan 3-Apr-19 John Mulcahy/Mark Turpin
P-02805 Email dated July 27, 2015, 4:28:59 PM from gregsnyder@lowerchurchillproject.ca to kenmcclintock@lowerchurchillproject.ca, cc johnmulcahy@lowerchurchillproject.ca re Bidder Evaluation - Technical - Revised 3-Apr-19 John Mulcahy/Mark Turpin
P-02806 Email dated July 27, 2015, 1:40:08 PM from Ken McClintock to tonyscott@lowerchurchillproject.ca to johnmulcahy@lowerchurchillproject.ca re FW: Modified per telecon 3-Apr-19 John Mulcahy/Mark Turpin
P-02807 Email dated July 27, 2015, 4:36:26 PM from tonyscott@lowerchurchillproject.ca to johnmulcahy@lowerchurchillproject.ca and kenmcclintock@lowerchurchillproject.ca re Fw: CH0009 Evaluation Plan 3-Apr-19 John Mulcahy/Mark Turpin
P-02808 Email dated July 28, 2015, 8:12:14 AM from tonyscott@lowerchurchillproject.ca to Ken McClintock, cc johnmulcahy@lowerchurchillproject.ca re FW: Modified per telecon 3-Apr-19 John Mulcahy/Mark Turpin
P-02809 Bidder #2 (Submission) dated July 29, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02810 Email dated July 31, 2015, 11:01:25 AM from johnmulcahy@lowerchurchillproject.ca to Ken McClintock re Fwd: CH0009 Barnard-Pennecon Revised Proposal Documents 3-Apr-19 John Mulcahy/Mark Turpin
P-02811 Email dated August 5, 2015, 2:11:44 PM from Ken McClintock to Scott Obrien, cc Ed Over and johnmulcahy@lowerchurchillproject.ca re Award Recommendation Draft 3-Apr-19 John Mulcahy/Mark Turpin
P-02812 Email dated August 12, 2015, 3:23:32 PM from kenmcclintock@lowerchurchillproject.ca to johnmulcahy@lowerchurchillproject.ca re Fw: CH0009 - Barnard-Pennecon Response to Inquiry 3-Apr-19 John Mulcahy/Mark Turpin
P-02813 Email dated August 12, 2015, 4:04:36 PM from kenmcclintock@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca re Justification for BPJV 3-Apr-19 John Mulcahy/Mark Turpin
P-02814 Email dated August 14, 2015, 11:14:42 AM from gbennett@nalcorenergy.com to emartin@nalcorenergy.com re Confidential: CH0009 - Muskrat Falls Dams 3-Apr-19 John Mulcahy/Mark Turpin
P-02815 Email dated August 14, 2:44:23 AM from Ken McClintock to johnmulcahy@lowerchurchillproject.ca re technical 3-Apr-19 John Mulcahy/Mark Turpin
P-02816 Letter dated May 9, 2016 from John Mulcahy to Scott O'Brien re leaving the Lower Churchill Project 3-Apr-19 John Mulcahy/Mark Turpin
P-02817 CH007 Area Powerhouse Schedule 3-Apr-19 John Mulcahy/Mark Turpin
P-02818 Email dated May 3, 2017, 3:58:26 PM from johnmulcahy@lowerchurchillproject.ca to jasono'brien@lowerchurchillproject.ca re Fw: Calculations 3-Apr-19 John Mulcahy/Mark Turpin
P-02819 Letter dated July 17, 2017 from John Mulcahy to Paul Harrington re reason for leaving project 3-Apr-19 John Mulcahy/Mark Turpin
P-02820 CH-007 - Foundation Preparation - Scaling and Water/Air Jet Cleaning 3-Apr-19 John Mulcahy/Mark Turpin
P-02821 CH-007 - Intake Powerhouse 3-Apr-19 John Mulcahy/Mark Turpin
P-02822 CH-007 - Spillway Budget Price 3-Apr-19 John Mulcahy/Mark Turpin
P-02823 CH-009 - Direct Costs - Estimate Work Sheet 3-Apr-19 John Mulcahy/Mark Turpin
P-02824 Bidder Cost Comparison 3-Apr-19 John Mulcahy/Mark Turpin
P-02825 Bidder Cost Comparison 2 3-Apr-19 John Mulcahy/Mark Turpin
P-02826 Recalculation of BPJV Normalization MHRS - North Dam dated March 16 3-Apr-19 John Mulcahy/Mark Turpin
P-02827 Estimate Work Sheet - Access Road - Bulk Excavation 3-Apr-19 John Mulcahy/Mark Turpin
P-02828 Muskrat Falls Corporation - Lower Churchill Project - Construction of North and South Dams - CH0009 - Main Summary - Normalised 3-Apr-19 John Mulcahy/Mark Turpin
P-02829 Muskrat Falls Corporation - Lower Churchill Project - Construction of North and South Dams - CH0009 - Bid Evaluation - Discipline Score Sheets - RFP - Commercial - Summary Evaluation 3-Apr-19 John Mulcahy/Mark Turpin
P-02830 Email dated August 26, 2015 from Brian Forbes to Greg Synder@lowerchurchillproject.ca, cc ToddSmith@lowerchurchillproject.ca re CH0009 - RCC Dam 3-Apr-19 John Mulcahy/Mark Turpin
P-02831 Email dated August 11, 2015, 10:35:52 AM from Ken McClintock to Scott Obrien re Award Recommendation 3-Apr-19 John Mulcahy/Mark Turpin
P-02832 Email dated May 27, 2016, 11:04 PM from ToddSmith@lowerchurchillproject.ca to Brian Forbes, cc GregSnyder@lowerchurchillproject.ca and DarrenProtulipac@lowerchurchillproject.ca re Muskrat Falls - Horizontal Slipforming 3-Apr-19 John Mulcahy/Mark Turpin
P-02833 Email dated May 30, 2016, 1:17 PM from Darren Protulipac to John Mulcahy re Muskrat Falls - Horizontal Slipforming 3-Apr-19 John Mulcahy/Mark Turpin
P-02834 Hatch Report - Nalcor Energy - Lower Churchill Project - Assessment of North Spur Construction Processes dated September 18, 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02835 Question 3.1.1 Personnel Experience/Technical Evaluation 3-Apr-19 John Mulcahy/Mark Turpin
P-02836 Handwritten Notes of Ken McClintock - Pages 17 to 32 3-Apr-19 John Mulcahy/Mark Turpin
P-02837 Handwritten Notes of Ken McClintock - Pages 33 to 48 3-Apr-19 John Mulcahy/Mark Turpin
P-02838 Handwritten Notes of Ken McClintock - Pages 48 to 64 3-Apr-19 John Mulcahy/Mark Turpin
P-02839 Nalcor Energy - Lower Churchill Project - Lower Churchill Project Transmission Construction Collective Agreement between Lower Churchill Transmission Construction Employer's Association Inc. and Internation Brotherhood of Electrical Workers and IBEW Local Union 1620 dated October 20, 2014 3-Apr-19 BJ Ducey/Kelly Williams
P-02840 HVdc Overview Map dated April 1, 2014 3-Apr-19 BJ Ducey/Kelly Williams
P-02841 Nalcor Energy - Lower Churchill Project presentation re Conductor Proud Stranding Investigation - ClaimsPro Briefing dated October 18, 2016 3-Apr-19 BJ Ducey/Kelly Williams
P-02842 Email dated November 8, 2013, 5:21:35 PM from Donna Brewer to Hon. Thomas Marshall, cc Paul Myrden and Peter Au re FW: LC - ESA and ESG - Cost Overrun Provisions 1-Apr-19 Tom Marshall
P-02843 Email dated March 19, 2019, 10:14 PM from Daniel Simmons to Barry Learmonth, cc Kate O'Brien, Admin, Dana Martin re LCP Financing Data Room 1-Apr-19 Tom Marshall
P-02844 Nalcor Energy - Lower Churchill Project - Contract Strategy re CH0009 - Construction of North and South Dams dated May 22, 2014 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02845 Barnard-Pennecon J.V. - Lower Churchill Project Construction of North and South Dams - Request for Proposal No.: CH0009 - Priced Copy 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02846 Letter dated June 30, 2015 from Derek Tisdel to Ed Over re RFP No. CH0009 - Revised Proposal Options 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02847 Lower Churchill Project - CH0009 - North and South Dams - Scope of Work Specification dated July 15, 2015 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02848 Email dated July 30, 2015, 6:41:24 PM from edover@lowerchurchillproject.ca to stevegoulding@lowerchurchillproject.ca, cc johnmulcahy@lowerchurchillproject.ca re Fw: CH0009 Barnard-Pennecon Revised Proposal Documents 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02849 Email dated September 15, 2015, 8:08:32 AM from ronpower@lowerchurchillproject.ca to edover@lowerchurchillproject.ca, cc Ed Bush, Gilbert Bennett, et al re Barnard/Pennecon - Execution Plan 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02850 Uncle Gnarley news article dated July 10, 2017 re New Whistleblower Reveals Nalcor Responsible for Mud Lake Flooding 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02851 EY - CH-0009 Bernard-Pennecon/North & South Dams27 - Meeting Agreements & Actions dated January 2016 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02852 Email dated July 23, 2015, 4:01 PM from edover@lowerchurchillproject.ca to ken.mcclintock@lowerchurchillproject.ca and John Mulcahy re Fw: CH0009 Site Interface Issues 3-Apr-19 John Mulcahy/Mark Turpin
P-02853 Email dated July 9, 2015, 9:02 AM from kenmcclintock@lowerchurchillproject.ca to johnmulcahy@lowerchurchillproject.ca and edover@lowerchurchillproject.ca re Fw: LCP CH0009 - Response to Items Discussed on July 7th Conference Call 3-Apr-19 John Mulcahy/Mark Turpin
P-02854 Email dated July 15, 2015, 5:11:08 PM from edover@lowerchurchillproject.ca to lknox@hjoc.com and Nolan Jenkins, cc ken.mcclintock@lowerchurchillproject.ca and John Mulcahy re Status Update on CH0009 3-Apr-19 John Mulcahy/Mark Turpin
P-02855 Email dated July 31, 2015, 2:27:05 PM from edover@lowerchurchillproject.ca to kenmcclintock@lowerchurchillproject.ca, cc John Mulcahy and ken.mcclintock@lowerchurchillproject.ca re CH0009 articles - rev 28 July 2015 3-Apr-19 John Mulcahy/Mark Turpin
P-02856 Letter dated October 23, 2014 from Jason Kean to Adam Budzinski re CT0327-001 - Response to Letter LTR CT0327-001-0005 Road Access Construction to Date 3-Apr-19 BJ Ducey/Kelly Williams
P-02857 Email dated October 21, 2014, 5:05:28 PM from jasonkean@lowerchurchillproject.ca to abudzinski@valard.com, cc BJ Ducey, Richard Donica, et a re Your Letter 3-Apr-19 BJ Ducey/Kelly Williams
P-02858 Agreement CT0327-001 Construction of 350kV HVdc Transmission Line (MF to SP) - Information Brief on Materially Significant Commercial Issues between Valard Construction LP ("Valard") and Labrador-Island Link Limited Partnership ("Company") dated January 10, 2017 3-Apr-19 BJ Ducey/Kelly Williams
P-02859 SNC-Lavalin - Newfoundland and Labrador Hydro - Lower Churchill Project - Pre-Feed Engineering Services - AC1060 - Field Investigation & Construction Requirements - 230 kV Transmission Line - Muskrat Falls to Gull Island dated February 2008 3-Apr-19 BJ Ducey/Kelly Williams
P-02860 SNC-Lavalin - Newfoundland and Labrador Hydro - Lower Churchill Project - Pre-Feed Engineering Services - AC1060 - Field Investigation & Construction Requirements - 735 kV Transmission Line - Gull Island to Churchill Falls dated February 2008 3-Apr-19 BJ Ducey/Kelly Williams
P-02861 Amec - Nalcor Energy - Lower Churchill Project - DC 1051 - Field Investigation and Construction Infrastructure HVdc Transmission Line - Gull Island to Soldiers Pond - Volume 1 - Geotechnical Report dated June 2009 3-Apr-19 BJ Ducey/Kelly Williams
P-02862 Amec - Nalcor Energy - Lower Churchill Project - DC 1051 - Field Investigation and Construction Infrastructure HVdc Transmission Line - Gull Island to Soldiers Pond - Volume 2 - Corridor and Test Location Maps dated June 2009 3-Apr-19 BJ Ducey/Kelly Williams
P-02863 Nalcor Energy - Lower Churchill Project re 315 kV HVac Geotechnical Baseline - Muskrat Falls to Churchill Falls dated September 14, 2012 3-Apr-19 BJ Ducey/Kelly Williams
P-02864 Handwritten Notes of Derek Tisdel dated July 8, 2015 re Muskrat N & S 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02865 Items worth noting from Labor Agreement which have benefited the owner 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02866 Handwritten Notes of Derek Tisdel dated February 7, 2017 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02867 Handwritten Notes of Derek Tisdel dated April 19, 2018 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02868 Barnard Pennecon Limited Partnership - Lower Churchill Project - CH0009-001 Construction of North South Dams - Change Orders (CO's) dated February 6, 2019 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02869 Barnard-Pennecon J.V. - A13 Attachment 1 - Execution Plan 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02870 Detailed Company Information - Barnard Pennecon GP Ltd. 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02871 Site Assessment - Review of Management & Reporting of Direct & Indirect Labour dated June 25, 2018 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02872 Barnard Pennecon - 2018 North Dam Schedule 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02873 Curriculum Vitae - Aaron Rietveld 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02874 Email dated October 27, 2012, 6:54:22 PM from scotto'brien@nalcorenergy.com to Ed Over, cc jason kean/nlhydro, mike collins/nlhydro and pat hussey/nlhydro re CH0032 Supply and Install Powerhouse-Hydro Mechanical Equipment - Status of Prequalification and RFP 5-Apr-19 Bill Mavromatis
P-02875 Email dated December 11, 2013, 10:39:41 PM from scotto'brien@lowerchurchillproject.ca to Scott O'Brien re Fwd: CH0032 Background info 5-Apr-19 Bill Mavromatis
P-02876 Email dated March 6, 2014, 9:51:58 AM from Frank Gillespie to scottobrien@lowerchurchillproject.ca, cc brucedrover@lowerchurchillproject.ca re Discussions with Andritz RE: CH0032 Performance to Date 5-Apr-19 Bill Mavromatis
P-02877 Andritz Hydro Limited and Canmec Industriel Inc. - Supply and Install Subcontract - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Agreement No. CH0032-01 dated July 10, 2014 5-Apr-19 Bill Mavromatis
P-02878 Letter dated September 10, 2014 from Mathieu Bertrand to Scott O'Brien re AH Letter - PM 001 - Object: CH0032 - Notification of Delays / possible delay to milestone date 5-Apr-19 Bill Mavromatis
P-02879 Letter dated September 24, 2014 from Scott O'Brien to Mathieu Bertrand re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Andritz's Notification of Delays / Possible Delay to Milestone Date 5-Apr-19 Bill Mavromatis
P-02880 Lower Churchill Project - Change Order between Company and Contractor - CH0032-001 - Supply & Install Powerhouse and Spillway Hydro-Mechanical Equipment - Muskrat Falls Corporation and Andritz Hydro Canada Inc. dated November 24, 2014 5-Apr-19 Bill Mavromatis
P-02881 Letter dated December 15, 2014 from Scott O'Brien to Mathieu Bertrand re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Exhibit 9 - Interface and Milestone Schedule - Revision 5-Apr-19 Bill Mavromatis
P-02882 Letter dated December 18, 2014 from Mathieu Bertrand to Scott O'Brien re AH Letter - PM 003 - Object: CH0032 - Response to letter LTR-CH0032001-009 5-Apr-19 Bill Mavromatis
P-02883 Email dated January 7, 2015, 5:54:59 PM from scottobrien@lowerchurchillproject.ca to Frank Gillespie and Bruce Drover re Fwd: CH00032 5-Apr-19 Bill Mavromatis
P-02884 Letter dated January 8, 2015 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - AH Acceleration Proposal - December 18, 2015 - LTR: 0188 5-Apr-19 Bill Mavromatis
P-02885 Email dated January 21, 2015, 12:34:53 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com re Fw: Andritz 5-Apr-19 Bill Mavromatis
P-02886 Email dated January 21, 2015, 2:13:13 PM from ronpower@lowerchurchillproject.ca to frankgillespie@lowerchurchillproject.ca re Andritz 5-Apr-19 Bill Mavromatis
P-02887 Lower Churchill Project - Change Order between Company and Contractor - CH0032-001 - Supply & Install Powerhouse and Spillway Hydro-Mechanical Equipment - Muskrat Falls Corporation and Andritz Hydro Canada Inc. dated March 18, 2015 5-Apr-19 Bill Mavromatis
P-02888 Letter dated March 19, 2015 from Scott O'Brien to Bill Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Change Order No. 06 - Revised Exhibit 9 - Work and Milestone Schedule 5-Apr-19 Bill Mavromatis
P-02889 Email dated March 23, 2015, 8:19:30 AM from lanceclarke@lowerchurchillproject.ca to Pat Hussey re Fwd: Andritz 5-Apr-19 Bill Mavromatis
P-02890 Email dated March 27, 2015 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Delays to Civil Works - Exhibit 9 Interface Milestones - LCP LTR-CH0032001-0009 dated 15-Dec-2014 - LCP LTR-CH0032001-0018 dated 19-Mar-2015 - LCP Change Order CH #06 - revised Exhibit 9 5-Apr-19 Bill Mavromatis
P-02891 Commission of Inquiry Respecting the Muskrat Falls Project - Interview Transcript - Kathy Dunderdale dated February 1, 2019 2-Apr-19 Kathy Dunderdale
P-02892 Letter dated March 31, 2015 from Scott O'Brien re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Your letter AH -Letter-PM-012 5-Apr-19 Bill Mavromatis
P-02893 Letter dated May 26, 2015 from Scott O'Brien to Bill Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - LCP Letter LTR-CH0032001-0021 - Exhibit 9 - Interface Milestones 5-Apr-19 Bill Mavromatis
P-02894 Letter dated May 26, 2015 from Scott O'Brien to Bill Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - LCP Letter LTR-CH0032001-0021 - 90 Day Notification Period to Andritz 5-Apr-19 Bill Mavromatis
P-02895 Letter dated May 29, 2015 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - LCP letter - LTR-CH0032001-0028 Exhibit 9 - Interface Milestones - LCP letter - LTR-CH0032001-0032 - 90 Day Notification Period to Andritz 5-Apr-19 Bill Mavromatis
P-02896 Appendix 4-7 - Nalcor Energy - Lower Churchill Project - CH0032 Site Mobilization dated June 12, 2015 5-Apr-19 Bill Mavromatis
P-02897 Email dated June 25, 2015, 11:43:55 AM from William Mavromatis to Alois Zeuner re Muskrat Falls Gates - Installation Start 5-Apr-19 Bill Mavromatis
P-02898 Email dated July 7, 2015, 11:11:56 AM from William Mavromatis to jdturcotte@canmec.com, cc Mathieu Bertrand re MFG - mobilization schedule 5-Apr-19 Bill Mavromatis
P-02899 Appendix 4-12 - Letter dated July 10, 2015 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - AH Letter AH-PM-021 dated 29 May 2015 - Interface Milestones and 90 Day Notification Period to Andritz - LCP Letter LTR-CH0032001-0032 dated 26 May 2015 - 90 Day Notification Period to Andritz 5-Apr-19 Bill Mavromatis
P-02900 Email dated July 22, 2015, 5:05:14 PM from linetremblay@lowerchurchillproject.ca to edover@lowerchurchillproject.ca 5-Apr-19 Bill Mavromatis
P-02901 Curriculum Vitae - Mark Turpin 3-Apr-19 John Mulcahy/Mark Turpin
P-02902 Email dated July 24, 2015, 11:00:11 AM from brucedrover@lowerchurchillproject.ca to frankgillespie@lowerchurchillproject.ca, scottobrien@lowerchurchillproject.ca, et al re Andritz Mobilization Meeting 5-Apr-19 Bill Mavromatis
P-02903 Appendix 2-6 - Letter dated August 19, 2015 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - 1) Acceleration of Spillway Installation Schedule Proposal - Preliminary 5-Apr-19 Bill Mavromatis
P-02904 Letter dated August 20, 2015 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Contractor Site Mobilization 5-Apr-19 Bill Mavromatis
P-02905 Letter dated September 11, 2015 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Acceleration of Spillway Installation Schedule Andritz Proposal - Preliminary 5-Apr-19 Bill Mavromatis
P-02906 Letter dated October 6, 2015 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Andritz Proposed Spillway Acceleration & River Diversion Bonus Plan dated 28 September 2015 5-Apr-19 Bill Mavromatis
P-02907 Lower Churchill Project - Change Order between Muskrat Falls Corporation and Andritz Hydro Canada Inc. dated November 10, 2015 5-Apr-19 Bill Mavromatis
P-02908 Lower Churchill Project - Change Order Authorization - CH0032001 - Supply & Install Powerhouse and Spillway Hydro-Mechanical Equipment - Muskrat Falls Corporation and Andritz Hydro Canada, Inc. dated November 10, 2015 5-Apr-19 Bill Mavromatis
P-02909 Letter dated November 12, 2015 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Contractor Work Performance and Progress 5-Apr-19 Bill Mavromatis
P-02910 Letter dated November 23, 2015 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment 5-Apr-19 Bill Mavromatis
P-02911 Email dated December 5, 2015, 12:45:44 PM from scottobrien@lowerchurchillproject.ca to Michael Harris re Fwd: Andritz Submission on Acceleration Late Last Night 5-Apr-19 Bill Mavromatis
P-02912 Letter dated December 14, 2015 from Scott O'Brien to William Mavromatis re CH-0032-001 Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Contractor Alleged Changed Site Conditions and Schedule Impacts 5-Apr-19 Bill Mavromatis
P-02913 Andritz Hydro - Supply and Install Agreement - Lower Churchill Project - Muskrat Falls Hydroelectric Development - Agreement No.: CH0032-01 - Revised Proposal for Acceleration of Spillway Installation - Schedule (To meet River Diversion Requirements on or before 15 June 2016) dated December 18, 2015 5-Apr-19 Bill Mavromatis
P-02914 Email dated December 13, 2015, 3:32:39 PM from johnmulcahy@lowerchurchillproject.ca to Scott O'Brien re Update North Spur 3-Apr-19 John Mulcahy/Mark Turpin
P-02915 Letter dated December 18, 2015 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment 5-Apr-19 Bill Mavromatis
P-02916 Email dated January 12, 2016, 11:32:43 AM from Jean-David Turcotte to William Mavromatis, cc Eric Tremblay, Terry Savard, et al re MFG-CNM-HCM-P / Change Conditions and Delay (1994) 5-Apr-19 Bill Mavromatis
P-02917 Letter dated January 25, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment 5-Apr-19 Bill Mavromatis
P-02918 Letter dated February 25, 2016 from Bill Mavromatis to Scott O'Brien re 1) CH0032 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - 2) Spillway Installation Schedule - February 25, 2016 update 5-Apr-19 Bill Mavromatis
P-02919 Letter dated February 29, 2019 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Spillway Installation Schedule - 25-Feb-2016 Update - LTR-CH0032001-001-0258 5-Apr-19 Bill Mavromatis
P-02920 Letter dated March 4, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Performance Default Notice 5-Apr-19 Bill Mavromatis
P-02921 Letter dated March 8, 2016 from Bill Mavromatis to Scott O'Brien re 1) CH0032 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - 2) Company's Letter LTR-CH0032001-0260 - Performance Default Notice - March 4, 2016 5-Apr-19 Bill Mavromatis
P-02922 Letter dated March 18, 2016 from Bill Mavromatis to Scott O'Brien re 1) CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Contractor's Spillway Installation Plan 5-Apr-19 Bill Mavromatis
P-02923 Letter dated March 22, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Spillway Schedule and Acceleration 5-Apr-19 Bill Mavromatis
P-02924 Letter dated March 25, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Change Order No: 10 - Spillway Accelerated Schedule - Contractor's Invoice 5-Apr-19 Bill Mavromatis
P-02925 Letter dated March 31, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Spillway Schedule and Acceleration 5-Apr-19 Bill Mavromatis
P-02926 Letter dated April 4, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Spillway Schedule and Acceleration 5-Apr-19 Bill Mavromatis
P-02927 Letter dated April 8, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Request for Meeting in St. John's - Change Order No. 010 - Spillway Schedule Acceleration 5-Apr-19 Bill Mavromatis
P-02928 Letter dated April 13, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Change Order No. 10 - 1st Invoice - CHO 010 - Invoice and Payment Certificate 5-Apr-19 Bill Mavromatis
P-02929 Letter dated April 20, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Notice of Dispute - CHO 010 - Invoice and Payment Certificate 5-Apr-19 Bill Mavromatis
P-02930 Letter dated April 22, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - SRG Concrete Pour Bay No. 1 - Night Shift 6 April 2016 5-Apr-19 Bill Mavromatis
P-02931 Premier Kathy Dunderdale - Press Conference dated December 10, 2013 2-Apr-19 Kathy Dunderdale
P-02932 Letter dated April 22, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Bay 1 SRG and S1 Concreting Activities 5-Apr-19 Bill Mavromatis
P-02933 Letter dated April 26, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - CHO 010 - Spillway Acceleration - Installation Subcontractor's (Canmec) Letter to Contractor 5-Apr-19 Bill Mavromatis
P-02934 Letter dated April 28, 2016 from Bill Mavromatis to Scott O'Brien re CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Work Stoppage Concrete Pour Bay 1 SRG/SI - 14-Apr-2016 5-Apr-19 Bill Mavromatis
P-02935 Letter dated May 9, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Notice of Dispute - CHO 010 - Invoice and Payment Certificate 5-Apr-19 Bill Mavromatis
P-02936 Email dated May 13, 2016, 9:48:24 AM from William Mavromatis to Steven Hillier and Konstantin Makrogianoudis re FW: Letter 1994-CNM-HAL-095, Milestone I1B readiness impact on Canmec work 5-Apr-19 Bill Mavromatis
P-02937 Letter dated March 17, 2016 from Scott O'Brien to William Mavromatis re Subject Agreement CH0032-001 Supply & Install Powerhouse and Spillway Hydro-Mechanical Equipment - Confirmation of Performance Default 5-Apr-19 Bill Mavromatis
P-02938 Letter dated May 19, 2016 from Peter A. O'Flaherty to Muskrat Falls Corporation re 2016 01G3118 - Plaintiff: Andritz Hydro Canada Inc. - Defendant: Muskrat Falls Corporation 5-Apr-19 Bill Mavromatis
P-02939 Email dated June 2, 2016, 9:30:52 PM from scottobrien@lowerchurchillproject.ca to sro.consulting@ re Fwd: Decision Support Package Final Draft 5-Apr-19 Bill Mavromatis
P-02940 Email dated June 8, 2016, 5:14:50 Pm from William Mavromatis to Randy Skakun, cc Catherine Bohemier re FW: Downstream Spillway Access 5-Apr-19 Bill Mavromatis
P-02941 Email dated June 17, 2016, 11:38:22 AM from linetremblay@lowerchurchillproject.ca to lcpdcc@lowerchurchillproject.ca re CH0032 LTR-CH0032001-0393 5-Apr-19 Bill Mavromatis
P-02942 Email dated July 26, 2016, 4:42:25 PM from Konstantin Makrogianoudis to Sanjoy Upadhyay, Dominique Morin and Marc Gagnon, cc Mario Hamel, Luc Bourbeau, Luisa Sabetta and Mike Wade re Protection Methods for Large Components 5-Apr-19 Bill Mavromatis
P-02943 Email dated August 26, 2016, 4:21:40 PM from lanceclarke@lowerchurchillproject.ca to Colleen Sutton re Fwd: Andritz Road Map 5-Apr-19 Bill Mavromatis
P-02944 Letter dated September 1, 2016 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Adjustment to CHO-06 - Time impact of seasonal shift on the spillway work 5-Apr-19 Bill Mavromatis
P-02945 Email dated September 2, 2016, 11:12:37 PM from Daniel Carrier to Konstantin Makrogianoudis, cc Luc Bourbeau, William Mavromatis, Michael Heldsinger and Dave Cote re Andritz CHR010 Cost Narrative RO.docx 5-Apr-19 Bill Mavromatis
P-02946 Letter dated October 7, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment, Request for Extension of Time - Change Order No. 6 5-Apr-19 Bill Mavromatis
P-02947 Nalcor Energy - Lower Churchill Project - Award Recommendation - CH0032 - Supply and Install Powerhouse Hydro/Mechanical Equipment dated October 16, 2013 5-Apr-19 Bill Mavromatis
P-02948 Nalcor Energy - Lower Churchill Project presentation re Status of CH0030 and CH0032 Packages dated January 6, 2017 5-Apr-19 Bill Mavromatis
P-02949 Email dated January 19, 2017 from Aiden Meade to frankgillespie@lowerchurchillproject.ca, cc scottobrien@lowerchurchillproject.ca re CH0032 - Pleadings 5-Apr-19 Bill Mavromatis
P-02950 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Project - CH0030 Preservation and Storage dated January 2017 5-Apr-19 Bill Mavromatis
P-02951 Email dated January 31, 2017, 9:03:14 AM from ronpower@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca, et al re Andritz: T&G Installation 5-Apr-19 Bill Mavromatis
P-02952 Letter dated January 31, 2017 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Extension of Time - Change Order No. CHO-006 5-Apr-19 Bill Mavromatis
P-02953 Email dated March 2, 2017, 5:27:40 PM from Terry Savard to William Mavromatis, Nicole Hu and Steven Hillier, cc David Charbonneau, Mathieu Bertrand, et al re Letter 1994-CNM-HAL-126, reply to your letter HCM-CNM-116, Changes to Exhibit 9 Dates 5-Apr-19 Bill Mavromatis
P-02954 Email dated April 7, 2017, 5:53:55 PM from William Mavromatis to Konstantin Makrogianoudis re FW: MFG-CNM-HCM-P / Site Downstream Situation 5-Apr-19 Bill Mavromatis
P-02955 Email dated May 10, 2017, 4:34:49 PM from Konstantin Makrogianoudis to Daniel Carrier re Schedule Analysis 5-Apr-19 Bill Mavromatis
P-02956 Andritz Hydro presentation re CHO-010 Request for Compensation dated May 16, 2017 5-Apr-19 Bill Mavromatis
P-02957 Email dated June 26, 2017, 9:06:28 AM from Mario Hamel to Marc Gagnon, Francois Boulet, et al re Andritz comments June 26 Meeting Minutes - 170623 - Turbines Preservation.docx 5-Apr-19 Bill Mavromatis
P-02958 Amending Agreement Number 1 - CH0032 between Muskrat Falls Corporation and Andritz Hydro Canada Inc. dated November 21, 2017 5-Apr-19 Bill Mavromatis
P-02959 Nalcor Energy - Lower Churchill Project - Project Change Notice - PCN-0787 - CH0032-001 Amending Agreement 1 dated November 28, 2017 5-Apr-19 Bill Mavromatis
P-02960 Lower Churchill Project - Change Order between Muskrat Falls Corporation and Andritz Hydro Canada Inc. dated December 1, 2017 5-Apr-19 Bill Mavromatis
P-02961 Email dated December 8, 2017, 5:51:07 AM from Paul Adams to Scott O'Brien, cc Frank Gillespie and pauladams@lowerchurchillproject.ca re additions 5-Apr-19 Bill Mavromatis
P-02962 Email dated December 12, 2017, 4:11:05 PM from pauladams@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, cc Frank Gillespie and Paul Adams re Andritz slide presentation 5-Apr-19 Bill Mavromatis
P-02963 Email dated February 12, 2018, 11:46:49 PM from Jeanne Li to Daniel Carrier, cc Marc Gagnon and Dave Cote re LCP discussion - Re-preservation 5-Apr-19 Bill Mavromatis
P-02964 Email dated May 3, 2018, 11:58:43 AM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com, bcc scottobrien@lowerchurchillproject.ca re Andritz 5-Apr-19 Bill Mavromatis
P-02965 Lower Churchill Project - Change Order between Muskrat Falls Corporation and Andritz Hydro Canada Inc. dated September 18, 2018 5-Apr-19 Bill Mavromatis
P-02966 Nalcor Energy and Emera Inc. Sanction Agreement dated December 17, 2012 3-Apr-19 Kathy Dunderdale
P-02967 Email dated August 13, 2015, 12:23:14 PM from johnmulcahy@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, cc Ken McClintock and Paul Kennedy re CH0009 2-May-19 John Mulcahy
P-02968 Handwritten Notes of Ken McClintock - Pages 1 to 16 2-May-19 John Mulcahy
P-02969 Limited Notice to Proceed - Lower Churchill Project between Muskrat Falls Corporation and Barnard-Pennecon JV LTD dated August 14, 2015 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02970 Excerpt from Mark Turpin's Expense Report dated January 2014 - June 2015 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02971 Letter dated May 25, 2016 from Scott O'Brien to William Mavromatis re Agreement CH0032-001 - Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment 5-Apr-19 Bill Mavromatis
P-02972 Letter dated May 23, 2017 from Aaron Rietveld to Scott O'Brien re CH0009-001 Construction of North and South Dams - DPLP-1418-L-137 - LTR-0343 - Force Majeure Declaration by Company 20-May-2017 4-Apr-19 Aaron Rietveld/Derek Tisdel
P-02973 Letter dated May 23, 2017 from Aaron Rietveld to Scott O'Brien re CH0009-001 Construction of North and South Dams - DPLP-1418-L-137 Rev. 1 - LTR-0343 - Force Majeure Declaration by Company 20-May-2018 5-Apr-19 Aaron Rietveld/Derek Tisdel
P-02974 Letter dated September 20, 2017 from Bill Mavromatis to Scott O'Brien re CH0032: Supply and Install Powerhouse and Spillway Hydro-Mechanical Equipment - Milestones 17 and 18 5-Apr-19 Bill Mavromatis
P-02975 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Project - Spillway Gates - Construction Acceleration dated August 19, 2015 5-Apr-19 Bill Mavromatis
P-02976 Email dated January 11, 2017, 2:30:49 PM from Frank Gillespie to pharrington@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca, et al, cc brucedrover@lowerchurchillproject.ca and richardsevers@lowerchurchillproject.ca re Andritz Status Update Presentation 5-Apr-19 Bill Mavromatis
P-02977 Lower Churchill Project - Change Order between Muskrat Falls Corporation and Andritz Hydro Canada Inc. - CH0030 - Supply & Install Turbines & Generators dated January 30, 2015 5-Apr-19 Bill Mavromatis
P-02978 Lower Churchill Project - Change Order between Muskrat Falls Corporation and Andritz Hydro Canada Inc. - CH0030 - Supply & Install Turbines & Generators dated December 18, 2015 5-Apr-19 Bill Mavromatis
P-02979 Lower Churchill Project - Change Order between Muskrat Falls Corporation and Andritz Hydro Canada Inc. - CH0030 - Supply & Install Turbines & Generators dated October 27, 2017 5-Apr-19 Bill Mavromatis
P-02980 Curriculum Vitae - Bill Mavromatis 5-Apr-19 Bill Mavromatis
P-02981 Email dated May 16, 2016, 4:26:20 PM from brucedrover@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, ronpower@lowerchurchillproject.ca and gbennett@nalcorenergy.com, cc scottobrien@lowerchurchillproject.ca, petertsekouras@lowerchurchillproject.ca, et al re CH0032 Andritz Gates Package Performance Presentation 5-Apr-19 Bill Mavromatis
P-02982 Email dated March 21, 2014, 4:28:05 PM from brucedrover@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, and ronpower@lowerchurchillproject.ca, cc frankgillespie@lowerchurchillproject.ca and scottobrien@lowerchurchillproject.ca re CH0032 Gates Presentation - Update on Andritz 5-Apr-19 Bill Mavromatis
P-02983 Email dated November 2, 2015, 4:34:54 PM from brucedrover@lowerchurchillproject.ca to Frank Gillespie, cc Scott O'Brien re CH0032 - Presentation on AH Issues for Paul 5-Apr-19 Bill Mavromatis
P-02984 Witness Interview Transcript of Paul Lemay dated March 2, 2019 2-May-19 Paul Lemay
P-02985 Email dated May 10, 2013, 4:17 PM from Valerie Murray to lcpdcc@nalcorenergy.com, cc Satish Sud, Ken Morrison, et al re C3 - CD0502 EPC Implementation Plan for ac Substations 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02986 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Project - CD0502 Construction of AC Substations - Interim Bid Evaluation Progress Report dated December 18, 2013 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02987 Email dated February 15, 2014, 11:18:09 AM from ronpower@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca re Alstom - Presentation - Execution Plan 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02988 Email dated May 1, 2014, 11:43:27 AM from anthonyjackman@lowerchurchillproject.ca to edover@lowerchurchillproject.ca re CD0502 Construction of AC Substations - Alstom Bid Clarification Meeting Minutes 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02989 Letter dated May 16, 2014 from Anthony Jackman to Vicki Marks re Bid Validity Period Extension 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02990 Nalcor Energy - Lower Churchill Project presentation re Lower Churchill Project - CD0502 Construction of AC Substations - Bid Evaluation and Award Recommendation dated July 4, 2014 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02991 Email dated July 16, 2014, 8:28:55 AM from darrendebourke@lowerchurchillproject.ca to jasonkean@lowerchurchillproject.ca, cc Paul Harrington re Alstom 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02992 Amendment No. 1 - Lower Churchill Project: HVdc Specialties - CD0501-001 - Converter Stations and Transition Compounds between Labrador-Island Link Limited Partnership and Alstom Grid Canada Inc. dated August 8, 2014 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02993 Nalcor Energy - Lower Churchill Project - Civil Works Contract Plan for Commitment Packages - CD0501 / CD0502 / CD0534 dated November 4, 2014 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02994 Alstom presentation re CHR 2007 / Change of Layouts for MF and SP dated April 28, 2015 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02995 Nalcor Energy - Lower Churchill Project - Grid/Alstom - Draft Bid Evaluation and Award Recommendation - CD 0504 - Civil Works and Buildings HVDC Specialties dated May 22, 2015 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02996 Nalcor Energy - Lower Churchill Project - Minutes of Meeting dated July 16, 2015 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02997 Amending Agreement Number 2 between Labrador-Island Link Limited Partnership and Alstom Grid Canada Inc. dated September 2, 2015 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02998 Nalcor Energy - Lower Churchill Project - Project Execution Plan - Alstom Grid Canada Inc. dated October 16, 2015 3-May-19 Thierry Martin/Laszlo von Lasar (Grid Solutions)
P-02999 Letter dated November 2, 2015 from Thierry Martin to Jean Francois Racine re MFA Site - CWC Schedule Analysis 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03000 Email dated November 4, 2015, 2:13:08 PM from pharrington@lowerchurchillproject.ca to Malcolm Jennings re Alstom & Andritz - Completions Risk 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03001 Email dated November 26, 2015, 5:10:30 PM from darrendebourke@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca re CD0501-001/ CD0502-001 / CD0534-001 - Letter on Commissioning Readiness 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03002 Email dated December 5, 2015, 4:34:34 PM from Walter Feletto to petersturge@lowerchurchillproject.ca, cc Andrew Lambert, donlewis@lowerchurchillproject.ca, et al re Concerns 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03003 Email dated December 8, 2015, 1:06:50 PM from trinatroke@lowerchurchillproject.ca to andre.lambert@alstom.com, Anthony Jackman, et al re Minutes of Meeting - MF&CF Civil Works - 02-Dec-2015 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03004 Email dated January 21, 2016, 10:39:34 AM from darrendebourke@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, cc ronpower@lowerchurchillproject.ca and trinatroke@lowerchurchillproject.ca re MF Switchyard Quality Issues - GIS Bldg Piers 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03005 Email dated January 21, 2016, 8:23:22 PM from Thierry Martin to Denis Lepinay, daniel.lessard@pomerleau.ca, et al, cc Kenza Arab, Walter Feletto, et al re LCP Project / MFA / Advance Letter LTR-CD0504002-ALS-POM-0059 - MFA - GIS Building - Major Safety and Quality Issue 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03006 Email dated January 22, 2016, 10:09:06 AM from devinstanski@lowerchurchillproject.ca to darrendebourke@lowerchurchillproject.ca, cc Malcolm Jennings and Trina Troke re Fwd: Information from Alstom - GE 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03007 Letter dated March 1, 2016 from Thierry Martin to Darren DeBourke re Contractor Performance and Summary of Meeting held on 27-Jan-2016 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03008 Nalcor Energy - Lower Churchill Project - Project Change Notice - PCN-0632 CD0501/CD0502/CD0504 - Strategy for Transfers of Budget relating to Converter Station and ac Switchyard Civil Works dated April 8, 2016 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03009 Lower Churchill Project - Muskrat Falls, CD0502 - Root Cause Analysis (RCA) - Muskrat Falls GIS Building Concrete Pouring Issues dated May 3, 2016 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03010 Email dated May 3, 2016, 9:20:41 PM from Melissa Coombs to anthonyjackman@lowerchurchillproject.ca, pierresasseville@lowerchurchillproject.ca and amandabatten@lowerchurchillproject.ca, cc Gilbert Bennett, Paul Harrington, et al re Approval of PCN-0630 - CD0501/CD0502 - Civil Contracting Strategy Change and Resolution of Other Outstanding Major Change Orders 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03011 Email dated May 9, 2016, 5:57 AM from Hebert Christian to GeorgeKean@lowerchurchillproject.ca, PeterSturge@lowerchurchillproject.ca and DonLewis@lowerchurchillprojecvt.ca, cc Andre Lambert, Walter Feletto, et al re Accommodation issue (URGENT) 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03012 Letter dated May 18, 2016 from Stephen Hall to Darren DeBourke re MFA Site - MFA - Camp accommodations non-availability 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03013 Amendment Agreement Number 3 between Labrador-Island Link Limited Partnership and Grid Solutions Canada ULC dated July 5, 2016 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03014 Amendment Agreement Number 1 between Labrador Transmission Corporation and Grid Solutions Canada ULC dated August 23, 2016 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03015 Amending Agreement Number 4 between Labrador-Island Link Limited Partnership and Grid Solutions Canada ULC dated October 19, 2016 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03016 Letter dated October 20, 2016 from D. Scott Bianchi to Darren DeBourke re Recurrent protests at Muskrat Falls Worksite 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03017 Amending Agreement for CD0501-001 and CD0502-001 between Labrador Transmission Corporation and Grid Solutions Canada ULC dated April 13, 2017 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03018 Amending Agreement for CD0501-001 and CD0502-001 between Labrador Transmission Corporation and Grid Solutions Canada ULC dated December 15, 2017 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03019 Nalcor Energy - Lower Churchill Project presentation re Transmission Link Project - GE Global Performance 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03020 Lower Churchill Project - Muskrat Falls CH0007 - Memorandum by Mauro Palumbo re: Late Start of Construction Activities Due to the Belated Execution of the Contract Agreement 8-May-19 Mauro Palumbo
P-03021 Letter dated December 18, 2013 from Scott O'Brien to Ken Chryssolor/Vittorio Robiati re Contract CH0007-001 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Early Works / Execution Schedule (ASTALDI-EMAIL-000027) 8-May-19 Mauro Palumbo
P-03022 Letter dated June 23, 2014 from Mauro Abbafati to Desmond Tranquilla re LCP Muskrat Falls Contract No. CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Request for Company Representative to be Based at Site for Discussions, Modifications & Approvals 8-May-19 Mauro Palumbo
P-03023 Letter dated August 21, 2014 from Jose Alves to Desmond Tranquilla re LCP Muskrat Falls Contract No. CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Commercial Co-ordination Meeting - Action List 8-May-19 Mauro Palumbo
P-03024 Letter dated October 27, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - Re: Request for Company Representative to be based at Site for Discussions, Modifications & Approvals - Astaldi Letter Aconex # LTR-CH0007001-179 8-May-19 Mauro Palumbo
P-03025 Letter dated February 17, 2015 from Scott O'Brien to Giacomo Orsatti re Agreement No: CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Construction Schedule 8-May-19 Mauro Palumbo
P-03026 Letter dated March 13, 2015 from Scott O'Brien to Giacomo Orsatti re Agreement No: CH0007-001: Construction of Intake and Powerhouse, Spillway and Transition Dams - The Integrated Covered Structure (ICS) 8-May-19 Mauro Palumbo
P-03027 Letter dated May 30, 2015 from Don Delarosbil to Scott O'Brien re LCP Muskrat Falls Contract No: CH0007 - Construction of Intake, Powerhouse, Spillway and Transition Dams - Concrete Temperature Monitoring, Heating and Hoarding 8-May-19 Mauro Palumbo
P-03028 Bridge Agreement between Muskrat Falls Corporation and Astaldi Canada Inc. dated July 27, 2016 8-May-19 Don Delarosbil/Georges Bader
P-03029 Email dated June 25, 2017, 5:41:30 PM from melmelhem@lowerchurchillproject.ca to timothyrossy@lowerchurchillproject.ca re Signed version of Completion Contract 8-May-19 Don Delarosbil/Georges Bader
P-03030 Email dated February 20, 2018 , 4:07:39 PM from MelMelhem@lowerchurchillproject.ca to Michele Scolari, Donald Delarosbil and Georges Bader, cc MichaelHarris@lowerchurchillproject.ca and ScottOBrien@lowerchurchillproject.ca re Copy of signed Settlement Agreement 8-May-19 Don Delarosbil/Georges Bader
P-03031 CH0007 - 2018 Re-Advance Agreement - Muskrat Falls Corporation and Astaldi Canada Inc. dated May 29, 2018 - Amended June 11, 2018 8-May-19 Don Delarosbil/Georges Bader
P-03032 Email dated August 7, 2018, 12:57:26 Pm from ScottOBrien@lowerchurchillproject.ca to Rotundi Francesco, cc Gilbert Bennett, Pharrington@lowerchurchillproject.ca and LanceClarke@lowerchurchillproject.ca re CH)007 Funding Contract - rev 7 August 2018 Version 2 8-May-19 Don Delarosbil/Georges Bader
P-03033 Nalcor Energy Bidders List Review / Approval - Lower Churchill Project - Contract # CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams dated August 27, 2012 8-May-19 Don Delarosbil/Georges Bader
P-03034 Astaldi Canada - Package CH0007 - Pre-Award Record of Site Inspection and Status of Site Conditions dated September 12, 2013 8-May-19 Don Delarosbil/Georges Bader
P-03035 Minutes of Meeting between Astaldi Canada Inc. and Nalcor Energy dated September 14, 2013 8-May-19 Don Delarosbil/Georges Bader
P-03036 Paul Lemay Personal Notes on Bid Review for CH-0007 dated September 23, 2013 8-May-19 Don Delarosbil/Georges Bader
P-03037 Email dated October 17, 2013, 9:30:12 PM from scotto'brien@lowerchurchillproject.ca to marion_e._organ/nlhydro re Fwd: schedule 8-May-19 Don Delarosbil/Georges Bader
P-03038 Email dated October 31, 2013, 5:54:10 PM from EdOver@lowerchurchillproject.ca to Emanuele Triassi and Guido Venturini, cc PHarrington@lowerchurchillproject.ca, LanceClarke@lowerchurchillproject.ca, et al re Extension to the LNTP 8-May-19 Don Delarosbil/Georges Bader
P-03039 Email dated November 2, 2013, 1:34:04 PM from ronpower@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, gbennett@nalcorenergy.com, et al re Astaldi this week: Reflections 8-May-19 Don Delarosbil/Georges Bader
P-03040 Email dated November 7, 2013, 2:33 PM from lanceclarke@lowerchurchillproject.ca to ron power/nlhydro, cc Ed Over and scott o'brien/nlhydro re Astaldi call 8-May-19 Don Delarosbil/Georges Bader
P-03041 Nalcor Energy - Requisition - CH0007-001 - Astaldi Canada Inc. 8-May-19 Don Delarosbil/Georges Bader
P-03042 Letter dated December 9, 2013 from Ken Chryssolor to Scott O'Brien re Approved for Construction Drawings 8-May-19 Don Delarosbil/Georges Bader
P-03043 Letter dated December 13, 2013 from Ken Chryssolor to Ron Adamcyk re LCP Muskrat Falls Contract No. CH0007 - Early Works Schedule, 2 weeks Look Ahead 8-May-19 Don Delarosbil/Georges Bader
P-03044 Letter dated January 23, 2014 from Desmond Tranquilla to Ken Chryssolor re Health & Safety and Quality Personnel and Key Personnel - Agreement No.: CH0007-001 - Agreement Title: Construction of Intake and Powerhouse, Spillway and Transition Dams 8-May-19 Don Delarosbil/Georges Bader
P-03045 Nalcor Energy - Lower Churchill Project - Minutes of Meeting dated January 23, 2014 8-May-19 Don Delarosbil/Georges Bader
P-03046 Letter dated April 7, 2014 from Desmond Tranquilla to Guido Venturini and Vittorio Robiatti re Agreement No: CH0007-001 - Agreement Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - Effect of Problems with Contractor's Subcontractor Labrador Ready Mix 8-May-19 Don Delarosbil/Georges Bader
P-03047 Email dated May 1, 2014, 8:31:20 PM from pharrington@lowerchurchillproject.ca to Ron Power, cc Brian Crawley, Jason Kean and Lance Clarke re Onwards and upwards 8-May-19 Don Delarosbil/Georges Bader
P-03048 Email dated May 28, 2014, 8:22:51 AM from scottobrien@lowerchurchillproject.ca to Robert Woolgar re Fwd: Resignation 8-May-19 Don Delarosbil/Georges Bader
P-03049 Email dated June 3, 2014, 11:03:49 AM from scottobrien@lowerchurchillproject.ca to Brian Crawley and Faustina Cormick re Fwd: Resignation 8-May-19 Don Delarosbil/Georges Bader
P-03050 CH0007 - Muskrat Falls Civil Works dated July 2014 8-May-19 Don Delarosbil/Georges Bader
P-03051 Lower Churchill Project - Analysis of Risks Associated with Astaldi Labour 8-May-19 Don Delarosbil/Georges Bader
P-03052 Letter dated August 28, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Agreement Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - Baseline Control Schedule and Schedule Development Control Plan 8-May-19 Don Delarosbil/Georges Bader
P-03053 Letter dated August 30, 2014 from Jose Alves to Desmond Tranquilla re LCP Muskrat Falls Contract No. CH0007 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Batching Plant Production & Site Concrete Activities 8-May-19 Don Delarosbil/Georges Bader
P-03054 Letter dated August 30, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - Contractor's Safety Operation - Safety Audit 8-May-19 Don Delarosbil/Georges Bader
P-03055 Exhibit 17 - Mutual Release - Nalcor Energy, Astaldi Canada Inc. and Muskrat Falls Corporation dated November 2013 8-May-19 Don Delarosbil/Georges Bader
P-03056 Letter dated August 31, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Batching Plant Production & Site Concrete Activities 8-May-19 Don Delarosbil/Georges Bader
P-03057 Letter dated September 26, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Baseline Control Schedule Conditional Acceptance 8-May-19 Don Delarosbil/Georges Bader
P-03058 Nalcor Energy - Lower Churchill Project - Minutes of Meeting #038 dated November 19, 2014 8-May-19 Don Delarosbil/Georges Bader
P-03059 Letter dated December 8, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - Mr. Bill Knox and Mr. Roy Collier becoming Astaldi employees 8-May-19 Don Delarosbil/Georges Bader
P-03060 Letter dated December 23, 2014 from Scott O'Brien to Jose Alves re Agreement No: CH0007-001 - Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - EMCO Corporation Claim for Lien No. 17552 - 5 December 2014 8-May-19 Don Delarosbil/Georges Bader
P-03061 Nalcor Energy - Lower Churchill Project - CH0007-001 - Construction of Powerhouse, Spillway and Transition Dams - Astaldi Canada - Monthly Progress Report No. 011 - Reporting Period 26-Nov-2014 - 25-Dec-2014 dated February 4, 2015 8-May-19 Don Delarosbil/Georges Bader
P-03062 Nalcor Energy - Lower Churchill Project presentation re Muskrat Falls - Draft Cabinet Presentation dated February 2016 8-May-19 Don Delarosbil/Georges Bader
P-03063 Letter dated March 4, 2015 from G. Orsatti to Scott O'Brien re LCP Muskrat Falls Contract No. CH0007 - Construction of Intake Powerhouse, Spillway and Transition Dams - I.C.S. Temporary Structure Certificate & Resumption of Work 8-May-19 Don Delarosbil/Georges Bader
P-03064 Letter dated March 19, 2015 from G. Orsatti to Scott O'Brien re LCP Muskrat Falls Contract No. CH0007 - Construction of Intake Powerhouse, Spillway and Transition Dams - I.C.S. Temporary Structure Certification and Resumption of Work 8-May-19 Don Delarosbil/Georges Bader
P-03065 Email dated April 3, 2015, 1:39:10 PM from ronpower@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, michaelharris@lowerchurchillproject.ca and edbush@lowerchurchillproject.ca re Fw: As requested 8-May-19 Don Delarosbil/Georges Bader
P-03066 Email dated April 29, 2015, 3:27:00 PM from Emiliano Mancini to Richard Noble and David Steele re Astaldi's schedule issues 8-May-19 Don Delarosbil/Georges Bader
P-03067 CBC News Article dated May 28, 2015 re Abandoning Muskrat Falls 'dome' is Astaldi's decision, Nalcor VP says 8-May-19 Don Delarosbil/Georges Bader
P-03068 Letter dated June 12, 2015 from Scott O'Brien to Don Delarosbil re Agreement No: CH0007-001 - Construction of Intake, Powerhouse, Spillway and Transition Dams, the Path Forward - Letter from Mr. Stefano Cerri, 19 May 2015 8-May-19 Don Delarosbil/Georges Bader
P-03069 Letter dated June 16, 2015 from Scott O'Brien to Don Delarosbil re Agreement No: CH0007-001 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Contractor Management of Sub-Contractors 8-May-19 Don Delarosbil/Georges Bader
P-03070 Email dated June 22, 2015, 6:37:29 PM from emartin@nalcorenergy.com to gbennett@nalcorenergy.com and auburnwarren@nalcorenergy.com re Take a quick look please, I am running out of time 8-May-19 Don Delarosbil/Georges Bader
P-03071 Letter dated July 15, 2015 from Astaldi to Ed Martin re Letter of July 3, 2015 8-May-19 Don Delarosbil/Georges Bader
P-03072 Letter dated July 21, 2015 from Don Delarosbil to Scott O'Brien re Your letter LTR-CH0007001-0601 dated 12 June 2015 8-May-19 Don Delarosbil/Georges Bader
P-03073 Email dated July 31, 2015, 2:38:08 PM from chelseabeckett@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca re Road Map 8-May-19 Don Delarosbil/Georges Bader
P-03074 Letter dated August 16, 2015 from Don Delarosbil to Scott O'Brien re Information Memo - Protest Activity at Muskrat Falls (August 14, 2015) 8-May-19 Don Delarosbil/Georges Bader
P-03075 Letter dated August 17, 2015 from Scott O'Brien to Don Delarosbil re Contractor Letter ACI-MFC-0389 August 16, 2015 8-May-19 Don Delarosbil/Georges Bader
P-03076 Letter dated August 17, 2015 from Scott O'Brien to Don Delarosbil re Company Notice of Force Majeure 8-May-19 Don Delarosbil/Georges Bader
P-03077 Letter dated August 18, 2015 from Scott O'Brien to Don Delarosbil re Contractor Letter 0714, Company Letters 0718, 0719 8-May-19 Don Delarosbil/Georges Bader
P-03078 Letter dated August 19, 2015 from Don Delarosbil to Scott O'Brien re Letter LTR-CH0007001-0714, Letter LTR-CH0007001-0718, Letter LTR-CH0007001-0719 8-May-19 Don Delarosbil/Georges Bader
P-03079 Letter dated September 1, 2015 from Lance Clarke to Francesco Rotundi re Collaborative resolution of critical issues 8-May-19 Don Delarosbil/Georges Bader
P-03080 Letter dated September 11, 2015 from Don Delarosbil to Scott O'Brien re LCP Muskrat Falls Contract No. CH0007 - Construction of Intake Powerhouse, Spillway and Transition Dams - Discount as per Minutes of Meeting dated 14 September 2013 between Astaldi Canada and Nalcor Energy - Agreement No: CH-0007-001 - Exhibit 2, Appendix A, Option 2-FPTCL, Schedule of Price Breakdown 8-May-19 Don Delarosbil/Georges Bader
P-03081 Letter dated October 20, 2015 from Don Delarosbil to Scott O'Brien re Letters 0714, 0716, 0717, 0718, 0719, 0722, 0723, 0727, 0738, 0740, 0744, 0827 8-May-19 Don Delarosbil/Georges Bader
P-03082 Letter dated October 20, 2015 from Don Delarosbil to Scott O'Brien re Letter CH0007001-0827 8-May-19 Don Delarosbil/Georges Bader
P-03083 Letter dated October 30, 2015 from Scott O'Brien to Don Delarosbil re Contractor Letter #ACI-MFC0468 (Aconex No. LTR-CH0007001-846) 8-May-19 Don Delarosbil/Georges Bader
P-03084 Email dated February 5, 2016, 2:15:23 PM from jamesmeaney@lowerchurchillproject.ca to stevepellerin@lowerchurchillproject.ca, cc jasonkean@lowerchurchillproject.ca, lanceclarek@lowerchurchillproject.ca and pharrington@lowerchurchillproject.ca re URGENT ACTION NEEDED_TOP PRIORITY 8-May-19 Don Delarosbil/Georges Bader
P-03085 Email dated February 10, 2016, 2:54:25 PM from emartin@nalcorenergy.com to Charles Bown and Julia Mullaley, cc gbennett@nalcorenergy.com re Astaldi 8-May-19 Don Delarosbil/Georges Bader
P-03086 Email dated February 26, 2016, 1:40:58 PM from Kelvin Parsons to Dwight Ball, cc Tim Murphy re Fw: EY Meeting Notes 8-May-19 Don Delarosbil/Georges Bader
P-03087 Letter dated April 26, 2016 from Astaldi to Stan Marshall re fundamental issues 8-May-19 Don Delarosbil/Georges Bader
P-03088 GNL - Service NL - Occupational Health and Safety Inspections Branch - Inspection / Officer's Report re Astaldi Canada - Draft Tube Number 2 - Muskrat Falls Powerhouse, Goose Bay, NL dated May 30, 2016 8-May-19 Don Delarosbil/Georges Bader
P-03089 Professional Services Agreement for Technical Opinions - Lower Churchill Project - Muskrat Falls between ILF Consultants, Inc and Astaldi Canada Inc dated June 4, 2016 8-May-19 Don Delarosbil/Georges Bader
P-03090 Letter dated June 11, 2016 from Don Delarosbil to Scott O'Brien re Blackade at the south side access road gatehouse 8-May-19 Don Delarosbil/Georges Bader
P-03091 Letter dated June 12, 2016 from Scott O'Brien to Don Delarosbil re Blackade at the South Side Access Road Gatehouse 8-May-19 Don Delarosbil/Georges Bader
P-03092 Letter dated June 13, 2016 from Scott O'Brien to Don Delarosbil re Site Blackade and Protect Event - Resolution of Force Majeure Event 8-May-19 Don Delarosbil/Georges Bader
P-03093 Nalcor Energy - Lower Churchill Project - CH0007-001 - Intake & Powerhouse, Spillway & Transition Dams - Astaldi Canada Inc. - Muskrat Falls - Draft Tube Unit 2 Outlet - Civil General Report - Man Basket Inspection dated June 21, 2016 8-May-19 Don Delarosbil/Georges Bader
P-03094 Letter dated July 27, 2016 from Scott O'Brien to Don Delarosbil re Astaldi Engineering 8-May-19 Don Delarosbil/Georges Bader
P-03095 Letter dated August 24, 2016 from Scott O'Brien to Don Delarosbil re Critical Path Progress 8-May-19 Don Delarosbil/Georges Bader
P-03096 Nalcor Energy - Lower Churchill Project - Muskrat Falls Project - Quality Audit of SuperMetal for Powerhouse Steel Fabrication - Package CH0007 Construction of Intake and Powerhouse, Spillway and Transition Dams - Audit Report No.: ARS-CH0007001-0013 dated August 26, 2016 8-May-19 Don Delarosbil/Georges Bader
P-03097 Letter dated August 30, 2016 from Don Delarosbil to Scott O'Brien re LTR-CH0007001-1380 8-May-19 Don Delarosbil/Georges Bader
P-03098 Letter dated September 9, 2016 from Mark Coben to Giuseppe Mazzucco re Lower Churchill Project - General Report - Site Inspection of Draft Tube Unit 1 Formwork and Falsework 8-May-19 Don Delarosbil/Georges Bader
P-03099 GNL - Service NL - Occupational Health and Safety Inspections Branch - Inspection / Officer's Report re Astaldi Canada - Draft Tube Number 2 - Muskrat Falls Powerhouse, Goose Bay, NL dated September 24, 2016 8-May-19 Don Delarosbil/Georges Bader
P-03100 Letter dated September 26, 2016 from Scott O'Brien to Don Delarosbil re Critical Path Concerns - Downstream Intake Works 8-May-19 Don Delarosbil/Georges Bader
P-03101 Letter dated September 26, 2016 from Scott O'Brien to Don Delarosbil re Schedule Impacts and Indirect Costs 8-May-19 Don Delarosbil/Georges Bader
P-03102 Letter dated September 26, 2016 from Don Delarosbil to Scott O'Brien re Critical Path Concerns - Downstream Intake Works - LTR-CH0007001-1429 8-May-19 Don Delarosbil/Georges Bader
P-03103 Letter dated September 27, 2016 from Scott O'Brien to Don Delarosbil re Critical Path Concerns - Downstream Intake Works - LTR 1429, 1434 8-May-19 Don Delarosbil/Georges Bader
P-03104 Letter dated October 10, 2016 from Don Delarosbil to Scott O'Brien re Critical Path 8-May-19 Don Delarosbil/Georges Bader
P-03105 Letter dated October 16, 2016 from Scott O'Brien to Don Delarosbil re Force Majeure Declaration by Company 8-May-19 Don Delarosbil/Georges Bader
P-03106 Letter dated October 18, 2016 from Scott O'Brien to Don Delarosbil re Schedule Critical Path 8-May-19 Don Delarosbil/Georges Bader
P-03107 Letter dated October 29, 2016 from Scott O'Brien to Don Delarosbil re Contractor Re-Mobilization 8-May-19 Don Delarosbil/Georges Bader
P-03108 Letter dated November 6, 2016 from Don Delarosbil to Scott O'Brien re Potential of additional protests 8-May-19 Don Delarosbil/Georges Bader
P-03109 Letter dated November 21, 2016 from Don Delarosbil to Scott O'Brien re Schedule Critical Path 8-May-19 Don Delarosbil/Georges Bader
P-03110 Email dated December 7, 2016, 2:49:13 PM from Georges Bader to MikeCollins@lowerchurchillproject.ca, ScottOBrien@lowerchurchillproject.ca and TonyScott@lowerchurchillproject.ca, cc Donald Delarosbil and Francesco Rotundi re Andritz delay 8-May-19 Don Delarosbil/Georges Bader
P-03111 Astaldi Canada Inc. - Lower Churchill Project - Final Engineering Assessment Report of Draft Tube 2 Formwork/Falsework Failure dated February 24, 2017 8-May-19 Don Delarosbil/Georges Bader
P-03112 A DB Engineering - Muskrat Falls Generation Project - Unit #2, Pour D2ESB-03, Draft Tube Formwork - Collapse Investigation Report - Prepared for Nalcor Energy Lower Churchill Project - Project No. 160450 dated April 20, 2017 8-May-19 Don Delarosbil/Georges Bader
P-03113 Letter dated April 27, 2017 from Tim Wellert to Don Delarosbil re Lower Churchill Project - Technical Memorandum: Comments on the aDB Collapse Investigation Report 8-May-19 Don Delarosbil/Georges Bader
P-03114 Letter dated April 27, 2017 from Tim Wellert to Don Delarosbil re Lower Churchill Project - Technical Memorandum: Summary Report of Changes to Temporary Structure Work Processes after Draft Tube 2 Failure 8-May-19 Don Delarosbil/Georges Bader
P-03115 Letter dated April 27, 2017 from Tim Wellert to Don Delarosbil re Lower Churchill Project - Technical Memorandum: Summary of Engineering Actions after DT2 Incident 8-May-19 Don Delarosbil/Georges Bader
P-03116 Nalcor Energy - Lower Churchill Project - Final Engineering Assessment Report of Draft Tube #2 Formwork/Falsework Failure dated May 1, 2017 8-May-19 Don Delarosbil/Georges Bader
P-03117 Letter dated May 17, 2017 from Scott O'Brien to Don Delarosbil re Draft Tube Formwork Final Report 8-May-19 Don Delarosbil/Georges Bader
P-03118 Letter dated May 29, 2017 from Scott O'Brien to All MFG Site Contractors - C1 Component re Force Majeure Condition Discontinued 8-May-19 Don Delarosbil/Georges Bader
P-03119 Astaldi Canada Inc. - Lower Churchill Project - Muskrat Falls Loss - Date of the Loss: May 29, 2016 - Preliminary Loss Estimate dated October 17, 2017 8-May-19 Don Delarosbil/Georges Bader
P-03120 Claim Settlement Agreement between Astaldi Canada Inc. and Westport Insurance Corporation, Royal & Sun Alliance Inc. et al dated January 26, 2018 8-May-19 Don Delarosbil/Georges Bader
P-03121 Email dated May 5, 2018, 3:19:00 PM from Georges Bader to PeterTsekouras@lowerchurchillproject.ca re FW: Crane Rail Path Forward 8-May-19 Don Delarosbil/Georges Bader
P-03122 CH0007 - Extraordinary Risk Request for Equitable Compensation - Rev. 0 Submitted to Muskrat Falls Corporation by Astaldi Canada Inc. dated May 23, 2018 8-May-19 Don Delarosbil/Georges Bader
P-03123 Letter dated July 7, 2018 from Scott O'Brien to Don Delarosbil re Removal of Contractor Personnel from Site (LTR-CH0007001-2702) 8-May-19 Don Delarosbil/Georges Bader
P-03124 Letter dated July 7, 2018 from Scott O'Brien to Don Delarosbil re Removal of Contractor Personnel from Site (LTR-CH0007001-2703) 8-May-19 Don Delarosbil/Georges Bader
P-03125 Letter dated July 7, 2018 from Scott O'Brien to Don Delarosbil re Removal of Contractor Personnel from Site (LTR-CH0007001-2704) 8-May-19 Don Delarosbil/Georges Bader
P-03126 Email dated July 8, 2018, 11:43:31 AM from Rotundi Francesco to Lance Clarke re Fwd: removal from site 8-May-19 Don Delarosbil/Georges Bader
P-03127 Email dated August 8, 2018, 4:07:00 PM from Rotundi Francesco to Lance Clarke and scottobrien@lowerchurchillproject.ca re Agreement 8-May-19 Don Delarosbil/Georges Bader
P-03128 Email dated September 14, 2018, 3:43:49 PM from ScottOBrien@lowerchurchillproject.ca to David.Koziel@AIG.com and John.Mcdevitt@LibertyMutual.com, cc Rotundi Francesco and aiden.mdeade@mcinnescooper.com re Letter Concerning Contractor Misrepresentation 8-May-19 Don Delarosbil/Georges Bader
P-03129 Astaldi Notes - P Harrington 8-May-19 Don Delarosbil/Georges Bader
P-03130 Letter dated September 28, 2018 from Scott O'Brien to Don Delarosbil re Notice of Default and Letter dated October 18, 2018 from Scott O'Brien to Don Delarosbil re Contractor Default - Stoppage of Work 8-May-19 Don Delarosbil/Georges Bader
P-03131 Email dated October 25, 2018, 11:13:54 AM from Donald Delarosbil to Stan Marshall, Stinellis Filippo, Gilbert Bennett and Rotundi Francesco re [External] Best for All 8-May-19 Don Delarosbil/Georges Bader
P-03132 Letter dated November 8, 2018 from Scott O'Brien to Don Delarosbil Re Notice of Termination - Company Letter LTR-CH0007001-2879 8-May-19 Don Delarosbil/Georges Bader
P-03133 Letter dated September 16, 2014 from Desmond Tranquilla to Jose Alves re Control Schedule Baseline Document 8-May-19 Don Delarosbil/Georges Bader
P-03134 Letter dated September 28, 2014 from J Alves to D. Tranquilla re Issue of Revised Construction Schedule 8-May-19 Don Delarosbil/Georges Bader
P-03135 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Commercial Proposal Clarification Form dated May 14, 2013 8-May-19 Mauro Palumbo
P-03136 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Commercial Proposal Clarification Form dated May 28, 2013 8-May-19 Mauro Palumbo
P-03137 Email dated September 24, 2013, 3:51:37 PM from Maria Teresa Crepaldi to Guido Venturini, Mario Lanciani, Mauro Palumbo, Maurizio Robasto and Jennifer Hoffman re Package CH0007 Pre Award Record of Site Inspection and Status of Site Conditions 8-May-19 Mauro Palumbo
P-03138 Email dated October 31, 2013, 7:33:10 PM from Guido Venturini to Mauro Palumbo, cc Gabriele Castellucci re Fw: Extension to the NLTP 8-May-19 Mauro Palumbo
P-03139 Email dated November 12, 2013, 7:15:57 PM from Guido Venturini to Emanuele Triassi, cc Jennifer Hoffman, Mario Lanciani, et al re Nalcor Meeting on LNTP Progress Report 8-May-19 Mauro Palumbo
P-03140 Email dated November 25, 2013, 4:21:00 AM from Mauro Palumbo to Lidia Sammartino and Maurizio Robasto re I: Proposed Signing of Contract Agreement with Nalcor on or before 30 Nov, 2013 8-May-19 Mauro Palumbo
P-03141 Email dated December 11, 2013, 12:41:37 PM from Della Libera Federico to Emanuele Triassi, cc Enrico Violato, Ken Chryssolor, et al re R: Subcontractor selection for Power House winter protection 8-May-19 Mauro Palumbo
P-03142 Email dated December 18, 2013, 10:42:08 AM from Frederico Della Libera to Federico Accorsi and Enrico Violato, cc Fabrizio Tonucci, Ken Chryssolor, et al re R: Emailing: Power house ICS comparison Proco-Budget 8-May-19 Mauro Palumbo
P-03143 Email dated December 21, 2013, 9:07:01 AM from Emanuele Triassi to Maurizio Robasto, Jennifer Hoffman, Luigi Vivian and Mauro Palumbo re Fwd: LCP Muskrat Falls - Nalcor Kick-off Meeting 19 Dec 2013 - Astaldi Presentation and Meeting Notes 8-May-19 Mauro Palumbo
P-03144 Email dated June 24, 2014, 7:18:09 AM from Enrico Mongili to Mauro Palumbo re I: Problems from beginning of project 8-May-19 Mauro Palumbo
P-03145 Nalcor Energy - Lower Churchill Project - Bid Evaluation and Award Recommendation - CD0501-001-Supply and Install Agreement for Converter Stations and Transitions Compounds 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03146 GE presentation re LCP - Project Review/Issue Resolution dated November 6, 2017 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03147 GE presentation re Nalcor Project Impacts dated August 17, 2018 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03148 GE Grid Solutions - Tier 1 & 2 Business and Product Offerings 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03149 Letter dated June 5, 201 from Thierry Martin to M. Darren DeBourke re Article 30.7 - Assignment - Change of control - Alstom/GE transaction 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03150 Letter dated July 9, 2015 from Thierry Martin to M. Darren DeBourke re Article 30.7 - Assignment - Change of control - Alstom/GE transaction 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03151 Letter dated November 16, 2015 from Thierry Martin to Darren DeBourke re GE's acquisition of Alstom's energy assets 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03152 Summary of GE Grid - Amending Agreements (CD0501-001 / CD0502-001) dated April 2017 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03153 Amending Agreement for CD0501-001 and CD0502-001 between Labrador Transmission Corporation and GRID Solutions Canada ULC dated January 31, 2019 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03154 Nalcor Energy - Lower Churchill Project - SNC-Lavalin Inc. - 350 kV HVdc Line Geotechnical Baseline - Muskrat Falls to Soldiers Pond dated April 3, 2012 6-May-19 Jason Kean
P-03155 Email dated January 23, 2013, 8:15:22 AM from JasonKean@nalcorenergy.com to KTucker@nalcorenergy.com, Afzal Hussain and Michah Sze, cc PatHussey@nalcorenergy.com, Claude Daneau, et al re Contracting Strategy - CT0327 6-May-19 Jason Kean
P-03156 Email dated March 10, 2013, 2:48:55 PM from JasonKean@nalcorenergy.com to Lower_Churchill_Project_Staff@nlh.nf.ca, D_STJ_LowerChurchill_AllUsers re Information Bulletin - Integrated Project Schedule 6-May-19 Jason Kean
P-03157 Email dated May 17, 2013, 9:36:03 AM from kwinsor@nalcorenergy.com to Wendy Darcy, cc Alex Twells, Mark DePaoli and Tricia Burton re LCP Sponsor workshop 6-May-19 Jason Kean
P-03158 Email dated May 27, 2013, 12:17 PM from ronpower@nalcorenergy.com to lanceclarke@nalcorenergy.com, cc Gilbert Bennett, Jason Kean and Paul Harrington re meeting 30th and 31st May 6-May-19 Jason Kean
P-03159 Email dated May 29, 2013, 10:07 AM from pharrington@nalcorenergy.com to jasonkean@nalcorenergy.com re SLI - Risk 6-May-19 Jason Kean
P-03160 Email dated November 21, 2013, 9:39 AM from Alison Manzer to jamesmeaney@nalcorenergy.com re FW: Lower Churchill; Nalcor; Response to Government Questions of November 12, 2013; Questions 2. Scheduling [IWOV-Legal.FID1640195] 6-May-19 Jason Kean
P-03161 Email dated December 21, 2013, 12:39:16 PM from Jody Rideout to jasonkean@lowerchurchillproject.ca, cc Adam Budzinski re Valard Presentation 16/12/2013 6-May-19 Jason Kean
P-03162 Email dated February 4, 2014, 6:00:40 PM from jasonkean@lowerchurchillproject.ca to rosanntaylor@lowerchurchillproject.ca re Fw: HVdc TL Discussion with Ed 6-May-19 Jason Kean
P-03163 Email dated January 8, 2016, 12:05:05 PM from jasonkean@lowerchurchillproject.ca to Lance Clarke and Keith Dodson, cc Justin Dahl re EY Review 6-May-19 Jason Kean
P-03164 Nalcor Energy - Lower Churchill Project - Project Change Notice - HVdc Clearing and Access - Forecasted Cost Increase for Northern Peninsula (Blocks #9, 10, 11 and 12) dated October 21, 2015 6-May-19 Jason Kean
P-03165 Nalcor Energy - Lower Churchill Project - Minutes of Meeting dated May 11, 2016 6-May-19 Jason Kean
P-03166 Email dated June 5, 2016, 8:42:11 AM from jasonkean@lowerchurchillproject.ca to Paul Harrington, cc Lance Clarke, Jason Kean, et al re Letter to Stan Marshall 6-May-19 Jason Kean
P-03167 Email dated July 26, 2016, 7:12:09 PM from johnmacisaac@nalcorenergy.com re Jim Keating re Fwd: Summary of meeting with Vallard 6-May-19 Jason Kean
P-03168 Email dated October 4, 2016, 7:13:09 AM from jasonkean@lowerchurchillproject.ca to johnmacisaac@nalcorenergy.com re For Your Reference 6-May-19 Jason Kean
P-03169 Letter dated January 4, 2017 from Jason R. Kean to Gilbert Bennett re Notice of Termination of Services 6-May-19 Jason Kean
P-03170 Email dated November 28, 2017, 7:53:57 AM from Project Solutions to pharrington@lowerchurchillproject.ca, cc Jason Kean and lanceclarke@lowerchurchillproject.ca re Some ideas 6-May-19 Jason Kean
P-03171 Email dated December 1, 2017, 4:13:40 PM from Justin Dahl to pharrington@lowerchurchillproject.ca re Requested analysis 6-May-19 Jason Kean
P-03172 Email dated December 18, 2017, 11:34:37 AM from pharrington@lowerchurchillproject.ca to smarshall@nalcorenergy.com re Fw: SNC-L . LCP Risk Assessment Analysis 6-May-19 Jason Kean
P-03173 Nalcor Energy - Lower Churchill Project presentation dated June 2018 re Lower Churchill Project - 12 - Cost Updates and Forecasting 6-May-19 Jason Kean
P-03174 Industrial MegaProjects - Concepts, Strategies, and Practices for Success by Edward W. Merrow 6-May-19 Jason Kean
P-03175 Email dated October 23, 2012, 2:21:18 PM from pharrington@nalcorenergy.com to ktucker@nalcorenergy.com, cc briancrawley@nalcorenergy.com re Wind/Ice loadings updates - Top Priority 6-May-19 Jason Kean
P-03176 AACE International Recommended Practice No. 69R-12 - Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Hydropower Industry dated January 25, 2013 6-May-19 Jason Kean
P-03177 Backgrounder: Key Factors Influencing Capital Costs - Jason Kean dated June 2014 6-May-19 Jason Kean
P-03178 Nalcor Energy - Lower Churchill Project presentation dated June 30, 2016 re HVdc TL: Geotechnical Risk Review - Background, Current Situation, Action Going Forward 6-May-19 Jason Kean
P-03179 Email dated June 4, 2016, 5:02:58 PM from pharrington@lowerchurchillproject.ca to Lance Clarke, Jason Kean, et al re Letter to Stan Marshall 6-May-19 Jason Kean
P-03180 Email dated June 5, 2016, 2:37:11 PM from lance.clarke to Paul Harrington and Brian Crawley re comments 6-May-19 Jason Kean
P-03181 Email dated June 5, 2016, 5:15:50 PM from Paul Harrington to Ron Power, lance.clarke, et al re Fwd: Letter 6-May-19 Jason Kean
P-03182 Email dated June 6, 2016, 8:48:17 AM from Paul Harrington to Brian Crawley re Brian…please use this version to review 6-May-19 Jason Kean
P-03183 Email dated June 6, 2016, 10:43:50 AM from Paul Harrington to PHarrington@lowerchurchillproject.ca re Fwd: comments 6-May-19 Jason Kean
P-03184 OTL: Period Achievements and Priority Focus Areas - Period Ending: 11-Dec-2016 6-May-19 Jason Kean
P-03185 Memo dated March 20, 2017 from Bruce Hallock to John MacIssacs and Greg Fleming re CT-0327-001 Construction of 350 KV HVDC Transmission Line 6-May-19 Jason Kean
P-03186 Email dated June 3, 2017, 11:47 AM from RonPower@lowerchurchillproject.ca to project.solutions re Fw: Notable Achievement - HVdc line - Long Range Mountains 6-May-19 Jason Kean
P-03187 Nalcor Energy - Lower Churchill Project New Release dated June 23, 2017 re Nalcor Energy provides update on Muskrat Falls Project 6-May-19 Jason Kean
P-03188 Nalcor Energy Response to Grant Thornton Question 6.2 dated May 23, 2018 6-May-19 Jason Kean
P-03189 Tower Setting and Stringing Plans - Jason Kean's notes 6-May-19 Jason Kean
P-03190 Muskrat Falls Project: Analysis of OTL DANs (Jason Kean) 6-May-19 Jason Kean
P-03191 GNL Backgrounder - Key Changes Affecting Project Estimate (Jason Kean) 6-May-19 Jason Kean
P-03192 Revised Capital Cost - Cost Growth (Jason Kean) 6-May-19 Jason Kean
P-03193 Nalcor Energy - Lower Churchill Project - Design Philosophy for Emergency Repair of Overhead Transmission 6-May-19 Jason Kean
P-03194 Nalcor Energy - Lower Churchill Project - Operations and Maintenance Philosophy for Design dated April 25, 2011 6-May-19 Jason Kean
P-03195 Overland Transmission Lines: Timeline Significant Events influencing Final Forecast Cost dated November 24, 2017 6-May-19 Jason Kean
P-03196 PUB-Nalcor-14 - Muskrat Falls Review - Question and Answer 6-May-19 Jason Kean
P-03197 PUB-Nalcor-15 - Muskrat Falls Review - Question and Answer 6-May-19 Jason Kean
P-03198 DG3 - Estimate Cost of EPCM Services 6-May-19 Jason Kean
P-03199 Labrador-Island Link Limited Partnership and Alstom Grid Canada, Inc. - Supply and Install Agreement - Converter Stations and Transition Compounds - Agreement No. CD0501-001 dated March 31, 2014 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03200 Exhibit 2 - Compensation - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03201 Exhibit 3 - Coordination Procedures - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03202 Exhibit 4 - Supplier Document Requirements List - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03203 Exhibit 5 - Health and Safety Requirements - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03204 Exhibit 6 - Environmental and Regulatory Compliance Requirements - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03205 Exhibit 7 - Quality Requirement - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03206 Exhibit 8 - Subcontractors, Manufacturers and Material Sources - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03207 Exhibit 9 - Work and Milestone Schedule - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03208 Exhibit 10 - Declaration of Residency - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03209 Exhibit 11 - Company Supplied Documents - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03210 Exhibit 12 - Worksite Conditions - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03211 Exhibit 13 - Provincial Benefits - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03212 Exhibit 14 - Performance Security - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03213 Exhibit 15 - Rules for Arbitration - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03214 Exhibit 16 - Lower Churchill Construction Projects Benefits Strategy - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03215 Exhibit 17 - Joint Cost Savings Initiative for Civil Works - Agreement Number: CD0501-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03216 Email dated November 24, 2016, 10:29:16 AM from philipbursey@lowerchurchillproject.ca to stephenfollett@lowerchurchillproject.ca re Emailing: Exhibit 1, Exhibit 2, Articles (CD0502-001) 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03217 Exhibit 3 - Coordination Procedures - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03218 Exhibit 4 - Supplier Document Requirements List - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03219 Exhibit 5 - Health and Safety Requirements - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03220 Exhibit 6 - Environmental and Regulatory Compliance Requirements - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03221 Exhibit 7 - Quality Requirement - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03222 Exhibit 8 - Subcontractors, Manufacturers and Material Sources - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03223 Exhibit 9 - Schedule - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03224 Exhibit 10 - Declaration of Residency - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03225 Exhibit 11 - Company Supplied Documents - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03226 Exhibit 12 - Worksite Conditions - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03227 Exhibit 13 - Provincial Benefits - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03228 Exhibit 14 - Performance Security - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03229 Exhibit 15 - Rules for Arbitration - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03230 Exhibit 16 - Lower Churchill Construction Projects Benefits Strategy - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03231 Exhibit 17 - Joint Cost Savings Initiative for Civil Works - Agreement Number: CD0502-001 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03232 Nalcor Energy - Lower Churchill Project - Bid Evaluation and Award Recommendation - CD0502 - Construction of AC Substations dated July 25, 2014 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03233 Muskrat Falls Project: TL Scope Cost Growth (OCB to AFE Rev 5) dated November 22, 2017 (Jason Kean) 6-May-19 Jason Kean
P-03234 Understanding the Outcomes of Megaprojects - A Quantitative Analysis of Very Large Civilian Projects by Edward W. Merrow 6-May-19 Jason Kean
P-03235 2009 AACE International - RISK.01 - Recommended Practices for Risk Analysis and Cost Contingency Estimating by John K. Hollmann 6-May-19 Jason Kean
P-03236 2010 AACE International Transactions - RISK.01 - Alternate Methods for Integrated Cost & Schedule Contingency Estimating by John K. Hollmann 6-May-19 Jason Kean
P-03237 2011 AACE International Transactions - RISK.1027 - Estimate Accuracy: Dealing with Reality by John K. Hollmann 6-May-19 Jason Kean
P-03238 2014 AACE International Technical Paper - RISK.1584 - Risk Analysis at the Edge of Chaos by John K. Hollmann 6-May-19 Jason Kean
P-03239 2014 AACE International Technical Paper - RISK.1721 - Variability in Accuracy Ranges: A Case Study in the Canadian Hydropower Industry by John K. Hollmann, Raminder S. Bali, John M. Boots, Chantale Germain, Michel Guevremont and Kelman Kai-man 6-May-19 Jason Kean
P-03240 AACE International - Risk Analysis at the Edge of Chaos by John K. Hollmann 6-May-19 Jason Kean
P-03241 Letter dated November 26, 2018 from Shirley A. Walsh to Cheryl Blundon re The Liberty Consulting Group Report - Analysis of Newfoundland Island Interconnected System Power Supply Adequacy for the Winter of 2018-2019 - Biweekly Update Report 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03242 The Telegram news article dated April 8, 2019 re Russell Wangersky: Muskrat Falls problems go right down the line 3-May-19 Thierry Martin - Laszlo von Lazar (Grid Solutions)
P-03243 Email dated January 23, 2013, 3:29 PM from Jean-Pierre Samon to Guido Venturini, cc Ghislain Fortin re OrgChart Muskrat Falls 18_12 rev GV.xls 8-May-19 Mauro Palumbo
P-03244 Email dated December 10, 2012, 9:27 AM from Jeannot Harvey to Guido Venturini, cc Emanuele Triassi, Fortin Ghislain, et al re Support à L'estimation du projet Muskrat 8-May-19 Mauro Palumbo
P-03245 Email dated February 19, 2013, 6:47:14 AM from Jean-Pierre Samson to Federico Della Libera re TR: Project Labrador 8-May-19 Mauro Palumbo
P-03246 Email dated February 19, 2013, 5:53 AM from Federico Della Libera to Frank Flanagan, cc Carlo Improta, Emanuele Triassi, et al re Muskrat Falls: Labourers unit cost table 8-May-19 Mauro Palumbo
P-03247 Astaldi Canada - Lower Churchill Project - Muskrat Falls Generation Plan - Construction Schedule dated August 16, 2013 8-May-19 Mauro Palumbo
P-03248 Muskrat Falls Project - Contract CH0007 - Tender Phase - Overall tender organization, subcontractors, productivity rates and labour costs used to finalize the offer 8-May-19 Mauro Palumbo
P-03249 Astaldi - Appendix A2.4 - Personnel Rate Schedule - Package Number: CH0007 8-May-19 Mauro Palumbo
P-03250 Astaldi - Planning Concrete Powerhouse dated March 21, 2013 8-May-19 Mauro Palumbo
P-03251 Astaldi - Muskrat Falls Tender Workforce 8-May-19 Mauro Palumbo
P-03252 The Oxford Handbook of Megaproject Management, edited by Bent Flyvbjerg, Chapter 1.2 "Classics in Megaproject Management" 6-May-19 Jason Kean
P-03253 Transmittal dated December 24, 2012, 9:19:08 AM from Leigh Anne Sutton to Reynold Hokenson, cc Jason Kean, bcc Nicole Collins, Sarah Gosse, et al re Issued for Information 6-May-19 Jason Kean
P-03254 Email dated April 29, 2013, 1:47 PM from James Meaney to Craig Hippern re Fw: Data Room Comparisons + notes 6-May-19 Jason Kean
P-03255 Email dated October 26, 2015, 9:18:07 AM from nazmiboran@lowerchurchillproject.ca to keenanhealey@lowerchurchillproject.ca, kumarkandaswamy@lowerchurchillproject.ca and jasonkean@lowerchurchillproject.ca, cc zacharyandrews@lowerchurchillproject.ca, rosanntaylor@lowerchurchillproject.ca and dennislever@lowerchurchillproject.ca re HVdc TL - Review of Foundation Works - Structure S1-70 6-May-19 Jason Kean
P-03256 Nalcor Energy - Lower Churchill Project - Minutes of Meeting dated September 23, 2016 6-May-19 Jason Kean
P-03257 Nalcor Energy - Lower Churchill Project presentation re OTL: Period Achievements and Priority Focus Areas - Period Ending: December 11, 2016 6-May-19 Jason Kean
P-03258 Email dated March 20, 2017, 6:07:39 PM from brucehallock@lowerchurchillproject.ca to John MacIsaac, Greg Fleming and Aidan Meade, cc petejwhelan@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca re Valard Delays and Cost Claims 6-May-19 Jason Kean
P-03259 Email dated May 2, 2019, 8:57 PM from Leonard Knox to Barry Learmonth re Interview with Len Knox 6-May-19 Jason Kean
P-03260 Email dated April 30, 2019, 3:59 Pm from Deborah LJ Hutchings to Michael Collins, cc Irene Muzychka, Adrienne Ding, Gobhina Nagarajah re Jason Kean Questions 6-May-19 Jason Kean
P-03261 Nalcor Energy - Lower Churchill Project presentation dated January 29, 2016 re TL Update - Presentation to Oversight Committee 6-May-19 Jason Kean
P-03262 Nalcor Energy - Lower Churchill Project presentation dated July 14, 2016 re Valard Performance Discussion - CEO Briefing 6-May-19 Jason Kean
P-03263 Nalcor Energy - Lower Churchill Project presentation dated November 29, 2016 re Overland Transmission Update - Presentation to IE & MF Oversight Committee 6-May-19 Jason Kean
P-03264 Nalcor Energy - Lower Churchill Project presentation dated December 7, 2016 re Overland TL - 2017 Look-ahead 6-May-19 Jason Kean
P-03265 Valard News Release dated November 23, 2017 re Valard Construction Completes Historic Churchill Falls - Muskrat Falls and Labrador-Island Transmission Link Project 6-May-19 Jason Kean
P-03266 Email dated December 16, 2016, 6:36 AM from JasonKean@lowerchurchillproject.ca to Project Solutions Inc. re Fw: Milestone - Final Transmission Tower Erection in Labrador 6-May-19 Jason Kean
P-03267 Email dated December 16, 2016, 10:22 AM from JasonKean@lowerchurchillproject.ca to Jason Kean re Fw: MFDC Aconex On Hold Updates, W50 6-May-19 Jason Kean
P-03268 Email dated December 16, 2016, 1:24 PM from JasonKean@lowerchurchillproject.ca to Jason Kean re Fw: LCP-CM-TRANSMIT-04183: CT0327-001 350 kV HVdc Transmission Line Section 1 - MOM - CT0327-001 - Island Planning Workshop - 23-Sep-2016 6-May-19 Jason Kean
P-03269 Nalcor Energy - Lower Churchill Project - Target Milestone Schedule dated October 1, 2012 6-May-19 Jason Kean
P-03270 Nalcor Energy - Lower Churchill Project presentation dated February 4, 2013 re CH0007 Powerhouse and Spillway - Contract - key dates 6-May-19 Jason Kean
P-03271 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Project Change Notice re Change to Diversion Timeline at MF and Overall Schedule Changes for MF Project dated March 7, 2013 6-May-19 Jason Kean
P-03272 Letter dated May 31, 2016 from Jean-Francois Blouin to Stan Marshall re Muskrat Falls project's impasse 8-May-19 Don Delarosbil/Georges Bader
P-03273 Email dated September 14, 2012, 4:20:17 PM from Luc Chausse to DarrenDebourke@nalcorenergy.com, cc Satish Sud, Mohamad Makky, et al re AC Substations - Optimal Contract Approach - Decision Support (DRAFT) 10-May-19 Darren DeBourke
P-03274 Letter dated April 23, 2019 from Deborah Hutchings to Barry Learmonth re Jason Kean - Reply to Summons to Produce dated 11 April 2019 6-May-19 Jason Kean
P-03275 Nalcor Energy - Lower Churchill Project - Construction Management Plan dated May 29, 2012 6-May-19 Jason Kean
P-03276 Letter dated February 1, 2019 from Jamie Chippett to Peter Ralph re Geotechnical Investigation and Environmental Assessment of the Labrador-Island Link 6-May-19 Jason Kean
P-03277 Letter dated April 4, 2014 from Desmond Tranquilla to Guido Venturini, Vittorio Robiatti and Jack Zhou re Revision of Document and Drawing Submittals 8-May-19 Don Delarosbil/Georges Bader
P-03278 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Construction of Intake and Powerhouse, Spillway and Transition Dams Scope of Work Specifications dated September 27, 2013 8-May-19 Don Delarosbil/Georges Bader
P-03279 Email dated March 10, 2014, 11:31:00 AM from David Steele to Paul J. Morris, cc Mike Haycox and Aman Gill re FW: Government Contract for Signing 13-May-19 Michael Kennedy
P-03280 EY presentation dated March 11, 2014 re Government of Newfoundland and Labrador - Review of government protocols to provide cost accountability and project oversight - Muskrat Falls Hydroelectric Project - Kick off meeting 13-May-19 Michael Kennedy
P-03281 Email dated March 19, 2014, 1:16:00 PM from David Steele to Aman Gill re Preliminary Findings _v5 - DS.pptx 13-May-19 Michael Kennedy
P-03282 Email dated March 20, 2014, 2:54:00 PM from David Steele to Mike Haycox, Claude Francoeur, Lynn Healey, Jim Lutes and Charles-Antoine St-Jean, cc Richard Noble and Aman Gill re Government of NL - LCP Oversight Update 13-May-19 Michael Kennedy
P-03283 Email dated March 21, 2014, 6:44:00 PM from David Steele to Paul J. Morris re EY Draft Report 13-May-19 Michael Kennedy
P-03284 EY presentation dated March 21, 2014 re Government of Newfoundland and Labrador - Review of Government protocols to oversee the Lower Churchill Project - Extracted Recommended Information Request 13-May-19 Michael Kennedy
P-03285 Email dated April 2, 2014, 5:58:00 PM from Richard Noble to David Steele, cc Aman Gill re Draft Responses to Potential Nalcor Questions 13-May-19 Michael Kennedy
P-03286 Email dated April 10, 2014, 9:07:21 AM from Richard Noble to Charles-Antoine St-Jean, Aman Gill, David Steele and Mike Haycox, cc Cleo Myers re Quick update LCP project Newfoundland 13-May-19 Michael Kennedy
P-03287 EY presentation dated April 2014 re Government of Newfoundland and Labrador - Oversight Protocol for the LCP - Potential information request items to be reviewed with Nalcor 13-May-19 Michael Kennedy
P-03288 Email dated April 16, 2014, 9:59:09 AM from Richard Noble to Charles-Antoine St-Jean and David Steele re Government of NL/Nalcor press 13-May-19 Michael Kennedy
P-03289 Email dated June 6, 2014, 12:25:00 PM from Richard Noble to David Steele re Comparison of LCP Compliance Checklist with the original data request 13-May-19 Michael Kennedy
P-03290 Email dated June 19, 2014, 12:04:00 PM from Richard Noble to David Steele re Updated Comparison with Typical Assurance Reviews Appended 13-May-19 Michael Kennedy
P-03291 Email dated July 15, 2014, 12:32:22 PM from Richard Noble to David Steele re Richard's information 13-May-19 Michael Kennedy
P-03292 Email dated July 24, 2014, 5:02:00 PM from Richard Noble to David Steele re IPS and Level 3 13-May-19 Michael Kennedy
P-03293 Email dated July 26, 2014, 11:50:00 AM from David Steele to Craig Martin, cc Richard Noble re updated report 13-May-19 Michael Kennedy
P-03294 Email dated September 23, 2014, 10:02:36 AM from Richard Noble to David Steele re quick chat with Craig tomorrow 13-May-19 Michael Kennedy
P-03295 EY report dated October 6, 2014 re Government of Newfoundland and Labrador - Muskrat Falls - Oversight Committee Advisory Services 13-May-19 Michael Kennedy
P-03296 Email dated November 7, 2014, 10:18:34 AM from David Steele to Julie Mullowney re FW: Contract for Advisory Services 13-May-19 Michael Kennedy
P-03297 Email dated November 25, 2014, 8:52:23 AM from Richard Noble to David Steele re Update 13-May-19 Michael Kennedy
P-03298 Email dated November 26, 2014, 11:56:00 PM from Richard Noble to David Steele re Notes from our telecon with Craig Martin re: Draft Report Review 9:30 (5am Pacific) 26/11/2014 13-May-19 Michael Kennedy
P-03299 Email dated November 27, 2014, 9:06:00 AM from Emiliano Mancini to Aman Gill and Richard Noble, cc David Steele re Availability for Gov NL next week 13-May-19 Michael Kennedy
P-03300 Email dated November 27, 2014, 12:25:35 PM from David Steele to Richard Noble re Meeting with Craig 13-May-19 Michael Kennedy
P-03301 Email dated November 27, 2014, 4:22:00 PM from Emiliano Mancini to Richard Noble, cc David Steele re Notes on Craig's report to Oversight Committee 13-May-19 Michael Kennedy
P-03302 Email dated December 1, 2014, 5:33:22 PM from David Steele to Richard Noble re Another quick question 13-May-19 Michael Kennedy
P-03303 Email dated December 4, 2014, 5:48:22 PM from Richard Noble to David Steele re getting concerned 13-May-19 Michael Kennedy
P-03304 Email dated December 5, 2014, 2:36:00 PM from David Steele to Craig Martin re Muskrat Falls - SOW for Project Controls Review_v5.pptx 13-May-19 Michael Kennedy
P-03305 Email dated December 15, 2014, 2:05:00 PM from David Steele to Richard Noble re Next steps 13-May-19 Michael Kennedy
P-03306 Email dated December 19, 2014, 3:53:00 Pm from David Steele to Paul Hickey re Muskrat Falls Oversight_Memo to File_16Dec2014.docx 13-May-19 Michael Kennedy
P-03307 Email dated January 20, 2015, 1:22:18 PM from David.Steele@ca.ey.com to David Steele re Scanned document from David.Steele@ca.ey.com 13-May-19 Michael Kennedy
P-03308 Email dated January 20, 2015, 2:14:00 PM from Richard Noble to David Steele re Scanned document from David.Steele@ca.ey.com 13-May-19 Michael Kennedy
P-03309 Email dated January 20, 2015, 7:33:44 PM from Richard Noble to David Steele re High level summary of result of limiting project review scope.docx 13-May-19 Michael Kennedy
P-03310 Email dated January 22, 2015, 3:07:22 PM from Richard Noble to David Steele, cc Paul Hickey re EY Recommendations to the Muskrat Falls OC.docx 13-May-19 Michael Kennedy
P-03311 Email dated January 22, 2015, 6:37:48 PM from David Steele to Richard Noble, Charles-Antoine St-Jean, Paul Hickey and Jim Lutes re Muskrat Falls - Risk Profile.pptx 13-May-19 Michael Kennedy
P-03312 Email dated January 25, 2015, 11:30:20 PM from Richard Noble to David Steele re Scope Summary RN Comment.docx 13-May-19 Michael Kennedy
P-03313 Email dated February 13, 2015, 9:13:48 AM from Craig Martin to Richard Noble, cc David Steele re Internal Audit and EY Proposed Scopes 13-May-19 Michael Kennedy
P-03314 Email dated February 19, 2015, 5:42:00 PM from Richard Noble to David Steele and Emiliano Mancini re Planning for Gov NL 13-May-19 Michael Kennedy
P-03315 Email dated February 25, 2015, 10:15:00 PM from Richard Noble to Craig Martin, cc Emiliano Mancini and David Steele re FW: LCP - Audit Programs - Schedule and cost 13-May-19 Michael Kennedy
P-03316 Email dated March 6, 2015, 3:03:00 PM from David Steele to Craig Martin, cc Richard Noble and Paul Hickey re Update before I head off on vacation 13-May-19 Michael Kennedy
P-03317 Email dated March 11, 2015, 2:15:45 PM from Emiliana Mancini to CMartin@gov.nl.ca, cc David Steele and Richard Noble re FW: Workplan - update 13-May-19 Michael Kennedy
P-03318 Email dated March 13, 2015, 5:56:57 PM from Emiliano Mancini to alisonball@nalcorenergy.com, cc DouglasWoodford@nalcorenergy.com and Richard Noble re Meeting today at 3pm - Documents 13-May-19 Michael Kennedy
P-03319 Email dated March 14, 2015, 10:37:46 AM from Richard Noble to David Steele and Paul Hickey re Update before I head off on vacation 13-May-19 Michael Kennedy
P-03320 Email dated March 18, 2015, 10:44:32 PM from David Steele to Richard Noble re List of Requested Documents 13-May-19 Michael Kennedy
P-03321 Email dated March 24, 2015, 1:15:00 AM from Emiliano Mancini to MBradbury@nalcorenergy.com, cc alisonball@nalcorenergy.com, David Steele, et al re Proposed E&Y Comments for your review 13-May-19 Michael Kennedy
P-03322 Email dated March 25, 2015, 1:55:23 PM from Emiliano Mancini to CMartin@gov.nl.ca, cc David Steele and Richard Noble re SOW - Review of project controls for cost and schedule - Draft 13-May-19 Michael Kennedy
P-03323 Email dated March 26, 2015, 11:03:41 PM from Emiliano Mancini to CMartin@gov.nl.ca, cc Richard Noble and David Steele re Nalcor's kick of meeting deck 13-May-19 Michael Kennedy
P-03324 Email dated April 9, 2015, 11:29:23 PM from Emiliano Mancini to CMartin@gov.nl.ca, cc David Steele and Richard Noble re Project Controls review - weekly status report 13-May-19 Michael Kennedy
P-03325 Email dated April 14, 2015, 4:48:00 PM from David Steele to Craig Martin re FW: Scanned document from David.Steele@ca.ey.com 13-May-19 Michael Kennedy
P-03326 Email dated April 27, 2015, 1:30:25 PM from Craig Martin to David Steele re Revised SOW 13-May-19 Michael Kennedy
P-03327 Email dated May 6, 2015, 3:56:00 PM from David Steele to Richard Noble and Emiliano Mancini re All meetings minuted 13-May-19 Michael Kennedy
P-03328 Email dated May 7, 2015, 7:11:00 PM from Richard Noble to David Steele and Emiliano Mancini, cc Paul Hickey re When speaking to Craig today… 13-May-19 Michael Kennedy
P-03329 Email dated May 19, 2015, 12:00:00 PM from Emiliano Mancini to alisonball@nalcorenergy.com, cc DouglasWoodford@nalcorenergy.com and Richard Noble re Cost and Schedule Review Update 13-May-19 Michael Kennedy
P-03330 Email dated June 5, 2015, 4:08:00 PM from David Steele to Richard Noble and Emiliano Mancini re Just talked to Craig 13-May-19 Michael Kennedy
P-03331 Email dated June 24, 2015, 9:39:00 AM from David Steele to Craig Martin, cc Richard Noble re Paragraphs with EY suggestions.docx 13-May-19 Michael Kennedy
P-03332 Email dated June 25, 2015, 2:26:00 PM from Richard Noble to David Steele re response to EY Final_June 17_EY response2.docx 13-May-19 Michael Kennedy
P-03333 Email dated August 27, 2015, 12:58:04 AM from Richard Noble to Charles-Antoine St-Jean and David Steele re Draft v2 13-May-19 Michael Kennedy
P-03334 Email dated September 22, 2015, 11:12:00 AM from David Steele to Richard Noble re Discuss Nalcor Feedback 13-May-19 Michael Kennedy
P-03335 Email dated September 27, 2015, 3:42:49 PM from Julia Mullaley to David Steele, cc Craig Martin re Other Assurance Reviews.docx 13-May-19 Michael Kennedy
P-03336 Meeting Request Acceptance dated September 28, 2015, 10:30 AM from David Steele to Richard Noble, Charles-Antoine St-Jean and Paul Hickey re Muskrat Falls Report - update 13-May-19 Michael Kennedy
P-03337 Email dated September 29, 2015, 4:54:00 PM from David Steele to Richard Noble re 2 report option 13-May-19 Michael Kennedy
P-03338 Email dated October 14, 2015, 4:10:00 PM from David Steele to Craig Martin, cc Richard Noble re Update on report 13-May-19 Michael Kennedy
P-03339 Email dated October 26, 2015, 3:01:00 PM from David Steele to Craig Martin re Update on report 13-May-19 Michael Kennedy
P-03340 Email dated December 16, 2015, 9:32:00 PM from Michael Kennedy to Kirsten Tisdale, Paul Hickey, David Steele and Richard Noble re Call from Premier - Confidential 13-May-19 Michael Kennedy
P-03341 Email dated December 18, 2015, 1:23:00 PM from David Steele to Julia Mullaley re Muskrat Falls Project - EY Program Review.pptx 13-May-19 Michael Kennedy
P-03342 Handwritten Notes of Michael Kennedy dated December 20, 2015 to February 17, 2016 13-May-19 Michael Kennedy
P-03343 Email dated January 7, 2016, 10:21:00 AM from David Steele to Melanie Brooks re Initial Meeting - Summary v2.pptx 13-May-19 Michael Kennedy
P-03344 Email dated January 15, 2016, 4:18:16 PM from Julia Mullaley to David Steele re FW: Muskrat Falls Oversight.pdf 13-May-19 Michael Kennedy
P-03345 Email dated January 21, 2016, 4:26:07 PM from Tim Calver to David Steele, cc Thieu Hue Lam re Still little meaningful data from Nalcor 13-May-19 Michael Kennedy
P-03346 Email dated January 21, 2016, 10:21:39 PM from David Steele to Michael Kennedy re Call from Julia 13-May-19 Michael Kennedy
P-03347 Email dated January 22, 2016, 6:52:00 AM from Tim Calver to StevePellerin@lowerchurchillproject.ca re Data room progress 13-May-19 Michael Kennedy
P-03348 Email dated January 22, 2016, 6:55:58 AM from Tim Calver to Sam Wolynjec and Emiliano Mancini, cc Thieu Hue Lam and Richard Noble re Still little meaningful data from Nalcor 13-May-19 Michael Kennedy
P-03349 Email dated January 22, 2016, 7:56:00 AM from Thieu Hue Lam to David Leather, David Steele, et al re Lower Churchill Review Project Status Report to GNL 13-May-19 Michael Kennedy
P-03350 Email dated January 22, 2016, 4:37:00 PM from David Steele to Julia Mullaley, cc cbown@gov.nl.ca re Data flow 13-May-19 Michael Kennedy
P-03351 Email dated January 22, 2016, 5:49:00 PM from Emiliano Mancini to Tim Calver and Sam Wolyniec, cc Richard Noble re Rebaseline risks and checks 13-May-19 Michael Kennedy
P-03352 Email dated January 23, 2016, 10:27:00 AM from David Steele to Julia Mullaley and cbown@gov.nl.ca re Status report 13-May-19 Michael Kennedy
P-03353 Email dated January 23, 2016, 11:49:00 AM from David Steele to Tim Calver re Regarding Nalcor Board Documents 13-May-19 Michael Kennedy
P-03354 Nalcor - Brian Crawley Meeting dated January 27, 2016 13-May-19 Michael Kennedy
P-03355 Email dated January 29, 2016, 10:25:20 AM from David Steele to Tim Calver, Thieu Hue Lam, Michael Kennedy and David Leather re Presentation to GNL - Current EY Delivery Risks_20160128.pptx 13-May-19 Michael Kennedy
P-03356 Email dated February 1, 2016, 5:15:00 PM from David Steele to Julia Mullaley re Request from Ed Martin 13-May-19 Michael Kennedy
P-03357 Email dated February 13, 2016, 10:38:00 AM from David Steele to Tim Calver, Kirsten Tisdale and Michael Kennedy, cc Paul Hickey re GNL - MFP Summary Status - Draft.pptx 13-May-19 Michael Kennedy
P-03358 Handwritten Notes of Michael Kennedy dated February 24, 2016 to March 11, 2016 13-May-19 Michael Kennedy
P-03359 Email dated February 24, 2016, 2:27:41 PM from Tim Calver to StevePellerin@lowerchurchillproject.ca, cc Sam Wolyniec, Chris Congram and Robert Spasyouti re Question on Owner's Costs 13-May-19 Michael Kennedy
P-03360 Email dated February 25, 2016, 12:52:35 PM from Robert Spasyouti to Tim Calver, Chris Congram, Sam Wolyniec and Thieu Hue Lam re Nalcor QAs 13-May-19 Michael Kennedy
P-03361 Email dated February 29, 2016, 4:49:27 PM from Tim Calver to David Steele, Paul Hickey and Kirsten Tisdale, cc Michael Kennedy, David Leather, et al re FW: Feedback 13-May-19 Michael Kennedy
P-03362 Email dated March 1, 2016, 2:33:00 PM from David Steele to Tim Calver re The Story.pptx 13-May-19 Michael Kennedy
P-03363 Email dated March 2, 2016, 10:18:24 AM from Richard Noble to Tim Calver, cc David Steele and Michael Kennedy re P80 13-May-19 Michael Kennedy
P-03364 Email dated March 7, 2016, 8:16:02 PM from Michael Kennedy to Tim Philpotts and Kirsten Tisdale re FW: Updated draft 13-May-19 Michael Kennedy
P-03365 Email dated March 18, 2016, 6:28:55 PM from Tim Calver to PHarrington@lowerchurchillproject.ca, StevePellerin@lowerchurchillproject.ca, et al, cc Michael Kennedy, David Steele and David Leather re Draft interim report 13-May-19 Michael Kennedy
P-03366 Email dated March 21, 2016, 7:46:49 PM from David Leather to Paul Hickey re Message to Nalcor 13-May-19 Michael Kennedy
P-03367 Email dated April 7, 2016, 4:37:00 PM from David Steele to Paul Hickey re meeting with Premier 13-May-19 Michael Kennedy
P-03368 Email dated April 9, 2016, 9:25:02 AM from Paul Hickey to Tim Murphy, cc David Leather, Tim Calver, David Steele and Michael Kennedy re Muskrat Falls Report and Assistance with Astaldi Negotiations 13-May-19 Michael Kennedy
P-03369 Email dated April 12, 2016, 3:36:00 PM from Michael Kennedy to Barry Munro, Murray McDonald and Tim Philpotts re FW: EY Report Issued 13-May-19 Michael Kennedy
P-03370 Email dated April 20, 2016, 10:02:00 AM from David Steele to Tim Calver, Sam Wolyniec, et al re Proposal for final report - DRAFT 19.04 TC v3. pptx 13-May-19 Michael Kennedy
P-03371 Email dated April 21, 2016, 4:53:00 PM from Michael Kennedy to David Steele re Nalcor Transitional Matters 13-May-19 Michael Kennedy
P-03372 Email dated May 1, 2016, 9:44:00 PM from Michael Kennedy to David Steele, David Leather, Paul Hickey and Tim Calver re Prep discussion for SM - CEO 13-May-19 Michael Kennedy
P-03373 Email dated May 9, 2015, 11:15:00 AM from David Steele to Emiliano Mancini, cc Richard Noble re Agenda-Memo to Oversight Committee - 8May2015.docx 13-May-19 Michael Kennedy
P-03374 Handwritten Notes of Michael Kennedy dated June 8, 2016 13-May-19 Michael Kennedy
P-03375 Email dated June 9, 2016, 5:16:59 PM from David Steele to Julia Mullaley re Time sensitive - response requested 13-May-19 Michael Kennedy
P-03376 Email dated June 10, 2016, 5:30:33 AM from Tim Calver to Michael Kennedy, David Leather and Paul Hickey, cc David Steele re Meeting notes 13-May-19 Michael Kennedy
P-03377 Email dated June 15, 2016, 2:38:00 PM from Paul Hickey to David Leather, cc David Steele, Michael Kennedy and Tim Calver re Update from Meeting with Premier's Office 13-May-19 Michael Kennedy
P-03378 iMessage Conversation dated April 16, 2018, 5:08:53 PM with Paul Harrington, Scott O'Brien, Ron Power, Lance Clarke and Jason Kean 7-May-19 Jason Kean
P-03379 iMessage Conversation dated March 26, 2019 between Ron Power and Jason Kean 7-May-19 Jason Kean
P-03380 Nalcor Energy - Lower Churchill Project - LTA - LITL Quantitative Cost and Schedule Risk Analysis (Q1-2016) 7-May-19 Jason Kean
P-03381 Email dated August 22, 2016, 11:11:00 PM from David Steele to Paul Hickey re FW: Muskrat meeting 13-May-19 Michael Kennedy
P-03382 Email dated September 6, 2016, 2:04:45 PM from Tim Calver to David Steele, David Leather, Michael Kennedy and Paul Hickey re MF deck 13-May-19 Michael Kennedy
P-03383 Email dated September 6, 2016, 6:25:00 PM from Paul Hickey to Tim Calver re MF deck 13-May-19 Michael Kennedy
P-03384 Email dated September 27, 2016, 9:49:54 PM from David Steele to Julia Mullaley re Muskrat - alignment on next steps 13-May-19 Michael Kennedy
P-03385 Email dated October 18, 2016, 8:55:29 PM from Paul Hickey to Kirsten Tisdale and David Steele re Checking in re NL 13-May-19 Michael Kennedy
P-03386 Email dated December 11, 2016, 9:18:00 PM from Michael Kennedy to Paul Carter, cc David Steele re Muskrat Falls 13-May-19 Michael Kennedy
P-03387 Email dated January 11, 2017, 2:43:00 PM from David Steele to Damian Joy and Michael Kennedy, cc Paul Hickey and Tim Calver re Ongoing Assurance 13-May-19 Michael Kennedy
P-03388 Email dated January 13, 2017, 9:36:27 AM from David Steele to Tim Calver re Will sched a call shortly, but… 13-May-19 Michael Kennedy
P-03389 Email dated January 18, 2017, 2:49:45 PM from David Steele to WalterParsons@gov.nl.ca, cc Paul Hickey re EY Proposed SOW 13-May-19 Michael Kennedy
P-03390 Email dated February 1, 2017, 11:50:37 AM from Michael Kennedy to Tim Calver, Damian Joy and David Steele re Muskrat Falls 13-May-19 Michael Kennedy
P-03391 Email dated March 3, 2017, 3:23:24 AM from Paul Hickey to Michael Kennedy re Update re Muskrat Falls 13-May-19 Michael Kennedy
P-03392 Email dated March 22, 2017, 1:40:00 PM from Paul Hickey to Jim Lutes, cc Barry Munro re Muskrat Falls Project 13-May-19 Michael Kennedy
P-03393 Email dated May 1, 2017, 11:43:54 AM from Kirsten Tisdale to David Steele re Muskrat Falls & Clerk 13-May-19 Michael Kennedy
P-03394 Email dated May 11, 2017, 1:05:00 PM from David Steele to Paul Hickey and Michael Kennedy re FW: UPDATED VERSION - EY Independent Assurance 13-May-19 Michael Kennedy
P-03395 Email dated May 15, 2017, 11:08:06 AM from Paul Hickey to David Steele and Michael Kennedy re Meeting with Charles Bown 13-May-19 Michael Kennedy
P-03396 Email dated June 2, 2017, 3:04:00 PM from David Steele to Paul Carter and Charles Bown re SOW 13-May-19 Michael Kennedy
P-03397 Email dated June 13, 2017, 2:04:00 AM from Michael Kennedy to David Steele, Tim Calver and Sam Wolyniec, cc Paul Hickey, Damian Joy and Neal Argent re Muskrat Review 13-May-19 Michael Kennedy
P-03398 Email dated June 27, 2017, 12:02:00 PM from David Steele to Charles Bown, cc Michael Kennedy re Update 13-May-19 Michael Kennedy
P-03399 Email dated June 28, 2017, 11:42:00 AM from David Steele to Johna Thompson re FW: Muskrat Review 13-May-19 Michael Kennedy
P-03400 Email dated July 13, 2017, 3:24:00 PM from Michael Kennedy to JamesMeaney@lowerchurchillproject.ca to StevePellerin@lowerchurchillproject.ca and Damian Joy re Meetings on Friday 13-May-19 Michael Kennedy
P-03401 Email dated July 19, 2017, 4:16:10 PM from Sam Wolyniec to Mitchell Curley, Michael Kennedy and Damian Joy re Muskrat Falls Update Presentation.pptx 13-May-19 Michael Kennedy
P-03402 Email dated July 20, 2017, 11:24:00 AM from Mitchell Curley to TanyaPower@lowerchurchillproject.ca re Latest AFE Reasons for Increases 13-May-19 Michael Kennedy
P-03403 Email dated August 18, 2017, 11:08:08 AM from David Steele to Paul Hickey, Michael Kennedy and Damian Joy re OC feedback 13-May-19 Michael Kennedy
P-03404 Email dated August 25, 2017, 10:21:00 AM from David Steele to Johna Thompson re Ministerial Briefing.pptx 13-May-19 Michael Kennedy
P-03405 Email dated August 25, 2017, 5:40:23 PM from Paul Hickey to David Steele and Michael Kennedy re Notes from Ministerial Briefing 13-May-19 Michael Kennedy
P-03406 Email dated August 28, 2017, 10:03:45 AM from David Steele to Damian Joy, cc Paul Hickey re FW: Notes from Ministerial Briefing 13-May-19 Michael Kennedy
P-03407 Email dated August 28, 2017, 6:29:00 AM from Michael Kennedy to David Steele, Paul Hickey and Damian Joy re Latest version and comments from client 13-May-19 Michael Kennedy
P-03408 Email dated August 31, 2017, 9:34:21 AM from Paul Hickey to Paul Carter, cc David Steele re Report 13-May-19 Michael Kennedy
P-03409 Email dated September 26, 2017, 9:15:00 PM from Michael Kennedy to Michael Kennedy 13-May-19 Michael Kennedy
P-03410 Muskrat Falls Project Oversight Committee - EY Services Expenditures as of December 2017 13-May-19 Michael Kennedy
P-03411 Email dated April 17, 2015, 4:58:13 PM from Emiliano Mancini to CMartin@gov.nl.ca, cc Richard Noble and David Steele re LCP Project Controls Review - weekly update 13-May-19 Michael Kennedy
P-03412 Email dated April 24, 2015, 12:29:00 PM from Emiliano Mancini to CMartin@gov.nl.ca, cc Richard Noble and David Steele re MFP Project Controls Review - weekly update Apr 20th 13-May-19 Michael Kennedy
P-03413 Email dated May 5, 2015, 11:06:55 PM from Emiliano Mancini to David Steele and Richard Noble re Tomorrow's breakfast debriefing 13-May-19 Michael Kennedy
P-03414 Email dated May 8, 2015, 3:12:12 PM from Emiliano Mancini to David Steele and Richard Noble re All meetings minuted 13-May-19 Michael Kennedy
P-03415 Email dated May 26, 2015, 2:47:00 PM from Emiliano Mancini to Richard Noble and David Steele re briefing with Craig - Valard performance 13-May-19 Michael Kennedy
P-03416 Email dated June 8, 2015, 3:34:00 PM from David Steele to Craig Martin, cc Emiliano Mancini and Richard Noble re Latest Version 13-May-19 Michael Kennedy
P-03417 Email dated June 24, 2015, 5:50 PM from Richard Noble to Emiliano Mancini re FW: Response to "Preliminary Findings" 13-May-19 Michael Kennedy
P-03418 Email dated June 25, 2015, 4:11:55 PM from David Steele to Craig Martin, cc Richard Noble re EY's review and response to Nalcor's comments 13-May-19 Michael Kennedy
P-03419 Email dated August 12, 2015, 10:10:00 PM from David Steele to Craig Martin, cc Richard Noble and Harman Khurana re Draft Report 13-May-19 Michael Kennedy
P-03420 Email dated August 31, 2015, 11:32:00 AM from David Steele to Harman Khurana and Craig Martin re Draft Report 13-May-19 Michael Kennedy
P-03421 Email dated September 28, 2015, 10:58:10 AM from Julia Mullaley to David Steele, cc Craig Martin re FW: Response to EY Report from Nalcor 13-May-19 Michael Kennedy
P-03422 Email dated October 28, 2015, 5:41:00 PM from Richard Noble to Craig Martin, cc David Steele, Charles-Antoine St-Jean and Paul Hickey re Updated Draft Reports 13-May-19 Michael Kennedy
P-03423 Email dated December 18, 2015, 2:38:20 PM from Richard Noble to David Steele, cc Michael Kennedy, Kirsten Tisdale and Paul Hickey re Reports 13-May-19 Michael Kennedy
P-03424 EY presentation dated December 29, 2015 re Muskrat Falls Project - Executive Level Internal Briefing - Draft Confidential - Strictly EY Eyes Only 13-May-19 Michael Kennedy
P-03425 Email dated January 26, 2016, 2:09:47 PM from David Leather to David Steele and Tim Calver, cc Michael Kennedy re Meeting with Ed Martin 13-May-19 Michael Kennedy
P-03426 Email dated January 30, 2016, 9:46:22 AM from Tim Calver to David Steele, David Leather and Michael Kennedy, cc Thieu Hue Lam re Meeting with Paul Harrington 13-May-19 Michael Kennedy
P-03427 Email dated February 5, 2016, 3:55:20 PM from Tim Calver to StevePellerin@lowerchurchillproject.ca and PHarrington@lowerchurchillproject.ca, cc Sam Wolyniec, David Steele and Michael Kennedy re EY slides 13-May-19 Michael Kennedy
P-03428 Email dated February 11, 2016, 9:39:08 PM from Sam Wolyniec to Chris Congram and Emiliano Mancini, cc Tim Calver re FW: Notes of today's discussion 13-May-19 Michael Kennedy
P-03429 Email dated February 12, 2016, 12:41:00 PM from David Steele to Julia Mullaley re GNL - MFP Summary Status - Draft.pptx 13-May-19 Michael Kennedy
P-03430 Email dated December 6, 2016, 11:57:00 PM from Michael Kennedy to Paul Hickey, David Steele, Tim Calver and Kirsten Tisdale re Muskrat Falls - Notes from meeting with Paul Carter and Bern Coffey 13-May-19 Michael Kennedy
P-03431 Email dated April 5, 2017, 12:13:35 AM from Michael Kennedy to Neal Argent, Malcolm Bairstow, Chris Matthews and Claus Jensen, cc Damian Joy re Muskrat Falls 13-May-19 Michael Kennedy
P-03432 Email dated January 26, 2016, 11:59:05 AM from David Leather to Thieu Hue Lam, cc Sam Wolyniec, David Steele, Michael Kennedy and Tim Calver re Gilbert Bennett meeting 13-May-19 Michael Kennedy
P-03433 Email dated January 31, 2016, 5:26:47 PM from Tim Calver to David Leather and Michael Kennedy, cc David Steele, Sam Wolyniec, Emiliano Mancini, Chris Congram and Thieu Hue Lam re Pre read for coming week 13-May-19 Michael Kennedy
P-03434 Contractor Team Evaluation - O'Connell-Dragados JV and Barnard 14-May-19 Ken McClintock
P-03435 Contract Team Evaluation - Barnard 14-May-19 Ken McClintock
P-03436 Email dated September 15, 2014, 3:56:17 PM from roylewis@nalcorenergy.com to lanceclarke@lowerchurchillproject.ca, cc markturpin@lowerchurchillproject.ca re CH0009 - Construction of North and South Dams - RFP 14-May-19 Ken McClintock
P-03437 Instructions to Bidders - Package Number: CH0009 14-May-19 Ken McClintock
P-03438 Email dated April 1, 2019, 1:30 PM from Andy Fitzgerald to Barry Learmonth re James Meaney 15-May-19 Charles Bown
P-03439 GNL Cabinet Directive dated April 26, 2012 re Legislative Amendments Required to Advance the Implementation of the Muskrat Falls Project 15-May-19 Charles Bown
P-03440 GNL Information Note - Department of Natural Resources dated October 4, 2012 re Consultant's Review of Nalcor-NLH Commercial Term Sheet 15-May-19 Charles Bown
P-03441 GNL Information Note - Department of Natural Resources dated January 7, 2013 re Muskrat Falls Project Workplan for 2013 15-May-19 Charles Bown
P-03442 Email dated May 15, 2013, 2:50:59 pm from Rob McGrath to Ashley E. McCarthy, Paul O Parsons and Phil McCarthy re workplan update 15-May-19 Charles Bown
P-03443 Email dated October 9, 2013, 7:49:45 AM from Charles W. Bown to EMartin@nalcorenergy.com re comments on Presentation 15-May-19 Charles Bown
P-03444 Email dated October 27, 2013, 12:34:17 PM from Charles W. Bown to Tracy English, Diana Quinton and Paul J. Morris, cc Tina Williams, Dawn Dalley and KONeill@nlh.nl.ca re Comments on 20 Questions response 15-May-19 Charles Bown
P-03445 Email dated November 11, 2013, 4:55:47 PM from Charles W. Bown to Paul J. Morris, Donna Brewer, Peter Au and Paul Myrden, cc Tracy English and Rob McGrath re Oversight 15-May-19 Charles Bown
P-03446 Email dated November 11, 2013, 7:38:53 PM from Charles W. Bown to Donna Brewer, Paul J. Morris, et al re EPC 15-May-19 Charles Bown
P-03447 Email dated November 21, 2013, 3:22:28 PM from AuburnWarren@nalcorenergy.com to BFowler@blg.com, Charles W. Bown, et al re Business issue Debrief 15-May-19 Charles Bown
P-03448 Email dated March 5, 2014, 4:43:31 PM from Charles W. Bown to charleswesleybown re FW: Electricity Review and Oversight 15-May-19 Charles Bown
P-03449 GNL Briefing Note - Department of Finance - 2015-16 Budget Process 15-May-19 Charles Bown
P-03450 GNL News Release dated December 21, 2015 re Media Advisory: Announcement of a Review of Muskrat Falls Project 15-May-19 Charles Bown
P-03451 GNL News Release dated December 21, 2015 re Response Management of the Province's Investment - Government Opens Books on Muskrat Falls Project 15-May-19 Charles Bown
P-03452 GNL News Release dated December 21, 2015 re Responsible Oversight Committee Releases Review of Muskrat Falls Project Cost and Schedule Management Processes and Controls 15-May-19 Charles Bown
P-03453 GNL News Release dated April 14, 2016 re 2016 Budget Speech - Restoring Fiscal Confidence and Accountability 15-May-19 Charles Bown
P-03454 Email dated April 16, 2016, 5:17:37 PM from Charles W. Bown to Julia Mullaley and Todd Stanley re Fw: Presentation to Caucus 15-May-19 Charles Bown
P-03455 Email dated June 9, 2016, 5:15:19 PM from Charles W. Bown to Siobhan Coady, Diana Quinton, Megan Sheppard and Tracy English re Fw: Protect at Muskrat Falls Construction Site 15-May-19 Charles Bown
P-03456 Email dated June 12, 2016, 2:33:57 PM from Charles W. Bown to Siobhan Coady, Diana Quinton, Megan Sheppard and Tracy English re Fw: Final update blockade at MF site has ended - update June 12 at 2:00 pm NST 15-May-19 Charles Bown
P-03457 Email dated October 6, 2016, 6:37:31 PM from Charles W. Bown to Siobhan Coady, Lesley Clarke, Megan Sheppard, Diana Quinton and Walter Parsons re Statement from Nalcor 15-May-19 Charles Bown
P-03458 Email dated October 17, 2016, 4:45:23 PM from Charles W. Bown to Siobhan Coady, Diana Quinton, Megan Sheppard and Walter Parsons re FW: Muskrat Falls concerns must be addressed now, says President 15-May-19 Charles Bown
P-03459 Email dated October 19, 2016, 9:30:14 AM from Colleen G. Janes to Charles W. Bown and John Tompkins re FW: Letter from the Honourable Minister Trimper 15-May-19 Charles Bown
P-03460 Email dated October 21, 2016, 4:02:08 PM from Charles W. Bown to Bernard Coffey re OCOR-23982 Discussion Questions - Enhanced Federal Loan Guarantee.DOC 15-May-19 Charles Bown
P-03461 Email dated October 23, 2016, 3:54:16 PM from Donna Brewer to Dennis Sharpe, Craig Martin and Gillian Skinner re Fw: GRS - Major Investment Projects Unit 15-May-19 Charles Bown
P-03462 GNL News Release dated December 6, 2016 re Charles Bown to lead Major Projects and Initiatives Unit from The Way Forward 15-May-19 Charles Bown
P-03463 Email dated March 30, 2017, 5:10:30 PM from Angela Onesi to amanzer@casselsbrock.com, anne.boudreau@ic.gc.ca, et al re FLG2 Agreement and COREA & PFE Acknowledgement 15-May-19 Charles Bown
P-03464 AC Substations - Optimal Contract Approach - Decision Support submitted to Nalcor Energy by Power Advocate Canada Ltd. Dated September 7, 2012 10-May-19 Darren DeBourke
P-03465 Memorandum dated September 14, 2012 from L. Chausse/M. Makky to Darren Debourke, cc R. Power, N. Bechard and J. Kean re Lower Churchill Project - AC Substations Optimate Contract Approach 10-May-19 Darren DeBourke
P-03466 Email dated October 2, 2013, 10:35 PM from James Meaney to Scott Pelley re LCP Equity Forecast for NL 15-May-19 Financial Close
P-03467 Email dated October 16, 2013, 10:07 PM from James Meaney to Derrick Sturge and Auburn Warren, cc Rob Hull 15-May-19 Financial Close
P-03468 Email dated October 18, 2013, 11:51:03 AM from jamesmeaney@nalcorenergy.com to John Matovich re RFF Path Forward - Key Points for Tomorrow's Discussion 15-May-19 Financial Close
P-03469 Email dated October 18, 2013, 4:28:12 PM from Paul J. Morris to Charles W. Bown and Tracy English re FW: Minister Request 15-May-19 Financial Close
P-03470 Email dated October 18, 2013, 4:30:09 PM from Charles W. Bown to Derrick Dalley, cc Darrell Hynes re Fw: Minister Request 15-May-19 Financial Close
P-03471 Email dated November 1, 2013, 2:02:15 PM from Charles W. Bown to Sharon Griffiths re Fw: Minister Request 15-May-19 Financial Close
P-03472 Email dated November 1, 2013, 5:53 PM from jamesmeaney@nalcorenergy.com to georgechehab@lowerchurchillproject.ca, cc Jason Kean and Lance Clarke re FFC analysis (Sept) 15-May-19 Financial Close
P-03473 Paul Myrden Handwritten Notes (1) 15-May-19 Financial Close
P-03474 Paul Myrden Handwritten Notes (2) 15-May-19 Financial Close
P-03475 Paul Myrden Handwritten Notes (3) 15-May-19 Financial Close
P-03476 Email dated November 4, 2013, 10:52:57 AM from AuburnWarren@nalcorenergy.com to Donna Brewer, cc DSturge@nalcorenergy.com, Paul Myrden, et al, re Minister Request - Split of IDC/AFUDC/Financing Fees/Reserves/Other 15-May-19 Financial Close
P-03477 Email dated November 4, 2013, 6:32 PM from Xeno Martis to AuburnWarren@nalcorenergy.com, CraigHippern@nalcorenergy.com, et al, cc Xeno Martin re Fw: The Cost Overruns Event of Default [IWOV-Legal.FID1640195] 15-May-19 Financial Close
P-03478 Email dated November 8, 2013, 9:12 AM from Paul Myrden to Paul J. Morris, Charles W. Bown, Todd Stanley, Donna Brewer, Peter Au and Rob McGrath, cc Tracy English re Cost Overruns 15-May-19 Financial Close
P-03479 Economic Policy Committee - Agenda dated November 12, 2013 15-May-19 Financial Close
P-03480 Email dated November 13, 2013, 11:08:00 AM from Paul Myrden to MBradbury@nalcorenergy.com and Paul J. Morris, cc ScottPelley@nalcorenergy.com, RobHull@nalcorenergy.com, et al re Equity Funding Protocol 15-May-19 Financial Close
P-03481 Email dated November 15, 2013, 3:48 PM from jamesmeaney@nalcorenergy.com to kentlegge@nalcorenergy.com and gbennett@nalcorenergy.com, cc geraldcahill@lowerchurchillproject.ca, colleenbaker@lowerchurchillproject.ca, et al re Information for NL Dept Finance 15-May-19 Financial Close
P-03482 Email dated November 15, 2013, 8:33 PM from jamesmeaney@nlacorenergy.com to gillianandrews@gov.nl.ca, cc Ann Marie Miller, David J. Drover, et al re Fw: Subsequent Event (confidential) 15-May-19 Financial Close
P-03483 Email dated November 18, 2013, 11:02 AM from jamesmeaney@nalcorenergy.com to Gerald Cahill and Colleen Baker, cc Paul Kennedy and Philip Bursey re Fw: Information for NL Dept Finance 15-May-19 Financial Close
P-03484 Email dated November 18, 2013, 11:52 AM from jamesmeaney@nalcorenergy.com to gbennett@nalcorenergy.com, pharrington@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca re Fw: Note from Ed on Capital Costs 15-May-19 Financial Close
P-03485 Email dated November 18, 2013, 11:57 AM from jamesmeaney@nalcorenergy.com to pharrington@lowerchurchillproject.ca, cc gbennett@nalcorenergy.com and lanceclarke@lowerchurchillproject.ca re Fw: Note from Ed on Capital Costs 15-May-19 Financial Close
P-03486 Email dated November 18, 2013, 2:00 PM from jamesmeaney@nalcorenergy.com to gbennett@nalcorenergy.com, cc Lance Clarke and Paul Harrington re Note from Ed on Capital Costs 15-May-19 Financial Close
P-03487 Email dated November 18, 2013, 2:23 PM from jamesmeaney@nalcorenergy.com to geraldcahill@lowerchurchillproject.ca and colleenbaker@lowerchurchillproject.ca and philipbursey@lowerchurchillproject.ca re Fw: Information for NL Dept Finance 15-May-19 Financial Close
P-03488 Letter dated December 11, 2013 from Desmond Tranquilla to Ken Chryssolor/Vittoria Robiati re Contract CH0007-001 - Construction of Intake and Powerhouse, Spillway and Transition Dams - Approved for Construction Drawings 9-May-19 Mauro Palumbo
P-03489 Email dated November 8, 2013, 8:47:54 AM from Paul J. Morris to Todd Stanley, Donna Brewer, Paul Myrden and Yvonne A Power, cc Peter Au, Charles W. Bown and Tracy English re LC - ESA and ESG - Cost Overrun Provisions 15-May-19 Financial Close
P-03490 Email dated November 20, 2013, 10:38 AM from scottpelley@nalcorenergy.com to dawndalley@nalcorenergy.com re 3:00 with Ed re Shareholder 15-May-19 Financial Close
P-03491 Email dated November 21, 2013, 10:11 PM from jamesmeaney@nalcorenergy.com to Xeno Martis, derrick sturge/nlhydro, auburn warren/nlhydro and rob hull/nlhydro re Fwd: Way Forward with IE on Cost and Schedule 15-May-19 Financial Close
P-03492 Email dated November 21, 2013, 10:32 PM from auburnwarren@nalcorenergy.com to Derrick Sturge and James Meaney, cc Xeno Martis and Rob Hull re Way Forward with IE on Cost and Schedule 15-May-19 Financial Close
P-03493 Email dated November 21, 2013, 11:13 AM from jamesmeaney@nalcorenergy.com to Alison Manzer re MWH Comments to Canada on Capital Cost 15-May-19 Financial Close
P-03494 Email dated November 22, 2013, 11:13:21 AM from Paul Myrden to Donna Brewer re FW: Proposed Text for Canada 15-May-19 Financial Close
P-03495 Email dated December 9, 2013, 12:51:46 PM from Paul Myrden to Yvonne A Power and Donna Brewer re Briefing with Premier today @ 3:00 pm 15-May-19 Financial Close
P-03496 Email dated February 11, 2014, 11:49:19 AM from Donna Brewer to Paul J. Morris, cc Tansy Mundon, Charles W. Bown and Paul Myrden re FW: Minister Request 15-May-19 Financial Close
P-03497 Email dated November 11, 2014, 11:54:07 AM from Charles W. Bown to Tracy English re Fw: Minister Request 15-May-19 Financial Close
P-03498 Email dated March 10, 2014, 11:01:46 AM from DSturge@nalcorenergy.com to Donna Brewer, cc AuburnWaren@nalcorenergy.com, Charles W. Bown and JamesMeaney@nalcorenergy.com re Minister Request 15-May-19 Financial Close
P-03499 Email dated Mardch 12, 2014, 8:19:24 AM from Pauline Blanche to Charles W. Bown, cc Philip Ivemey re Nalcor 15-May-19 Financial Close
P-03500 Email dated March 12, 2014, 1:11:43 PM from Donna Brewer to Paul Myrden, cc Peter Au re Nalcor MF project equity.xlsx 15-May-19 Financial Close
P-03501 Email dated July 30, 2014, 1:40:48 PM from Jennifer Collingwood to Milly Brown, cc Kevin J. Guest re KM/QA 15-May-19 Financial Close
P-03502 Email dated July 30, 2014, 1:44 PM from koneill@nlh.nl.ca to emartin@nalcorenergy.com re Fw: Latest Draft 15-May-19 Financial Close
P-03503 Email dated July 30, 2014, 4:34:18 PM from KONeill@nlh.nl.ca to Jacquelyn Howard, cc DawnDalley@nalcorenergy.com re Wondering if you could share the comms materials on the OC report release? 15-May-19 Financial Close
P-03504 Email dated July 30, 2014, 4:41:03 PM from koneill@nlh.nl.ca to Tina Newhook re FW: Additional QA: Can you please provide responses to these questions? 15-May-19 Financial Close
P-03505 Email dated July 30, 2014, 8:29:27 PM from Milly Brown to Julia Mullaley, Charles W. Bown and Donna Brewer re Over sight KMs and Q and As 15-May-19 Financial Close
P-03506 Email dated July 30, 2014, 8:38:46 PM from gbennett@nalcorenergy.com to Charles Bown, cc Ed Martin and Karen ONeill re MF Costs 15-May-19 Financial Close
P-03507 Email dated July 31, 2014, 8:46:45 AM from Jennifer Collingwood to Craig Martin, Julia Mullaley and Milly Brown, cc Jacquelyn Howard re Oversight - news release and KM/QA 15-May-19 Financial Close
P-03508 Email dated November 20, 2016, 12:01 PM from Mark Ellis to Darren Debourke, cc Trina Troke re Confidential: Re: Summary / Outcome of yesterdays meeting with CFLCo 10-May-19 Darren DeBourke
P-03509 Email dated November 23, 2016, 8:15 AM from Darren Debourke to Greg Fleming re Travel Justification for PES and Montpellier P&C FAT 10-May-19 Darren DeBourke
P-03510 Letter dated August 5, 2015 from Darren DeBourke to Thierry Martin re Exhibit 17 - Contractor's Responsibility for the Execution of the Civil Works 10-May-19 Darren DeBourke
P-03511 Letter dated August 11, 2015 from Darren DeBourke to Thierry Martin re Monthly Progress Reports 10-May-19 Darren DeBourke
P-03512 Letter dated August 17, 2015 from Darren DeBourke to Thierry Martin re CD0501-001-Supply and Install Converter Stations and Transition Compounds - CD0502-001-Construction of ac Substations - Notification of Force Majeure at Muskrat Falls Worksite 10-May-19 Darren DeBourke
P-03513 Letter dated August 18, 2015 from Darren DeBourke to Thierry Martin re CD0501-001-Supply and Install Converter Stations and Transition Compounds - CD0502-001-Construction of ac Substations - End of Force Majeure at Muskrat Falls Worksite 10-May-19 Darren DeBourke
P-03514 Letter dated January 22, 2016 from Darren DeBourke to Thierry Martin re Contractor Performance - Action Plan for Immediate Change to Ensure Successful Project Delivery 10-May-19 Darren DeBourke
P-03515 Letter dated February 3, 2016 from Darren DeBourke to Thierry Martin re Contractor Performance and summary of Meeting held on January 27, 2016 10-May-19 Darren DeBourke
P-03516 Letter dated February 18, 2016 from Darren DeBourke to Thierry Martin re Schedule Workshop Concerns and Next Steps 10-May-19 Darren DeBourke
P-03517 Letter dated March 9, 2016 from Thierry Martin to Darren DeBourke re Contractor Performances / ongoing actions 10-May-19 Darren DeBourke
P-03518 Letter dated March 16, 2016 from Darren DeBourke to Thierry Martin re Monthly Progress Report Status 10-May-19 Darren DeBourke
P-03519 Letter dated April 12, 2016 from Thierry Martin to Darren DeBourke re Contractor Performance & Ongoing Actions - Improvement Plan 10-May-19 Darren DeBourke
P-03520 Letter dated April 19, 2016 from Darren DeBourke to Thierry Martin re Contractor Performance and Ongoing Actions - Improvement Plan 10-May-19 Darren DeBourke
P-03521 Letter dated May 20, 2016 from Darren DeBourke to Stephen Hall re Muskrat Falls Accommodation Complex 10-May-19 Darren DeBourke
P-03522 Letter dated May 25, 2016 from Darren DeBourke to Stephen Hall re Outstanding Monthly Progress Reports 10-May-19 Darren DeBourke
P-03523 Nalcor Energy - Lower Churchill Project presentation dated May 27, 2016 re Lower Churchill Project - GE Grid Steering Committee 10-May-19 Darren DeBourke
P-03524 Letter dated June 13, 2016 from Darren DeBourke to Stephen Hall re CD0501-001-Supply and Install Converter Stations and Transition Compounds - CD0502-001-Construction of ac Substations - End of Force Majeure at Muskrat Falls Worksite 10-May-19 Darren DeBourke
P-03525 Letter dated September 29, 2016 from Darren DeBourke to Scott Bianchi re Requirement by Contractor to Provide Compliant Monthly Progress Reports 10-May-19 Darren DeBourke
P-03526 Letter dated October 16, 2016 from Darren DeBourke to Scott Bianchi re Notification of Force Majeure at Muskrat Falls 10-May-19 Darren DeBourke
P-03527 Letter dated October 17, 2016 from Darren DeBourke to Scott Bianchi re End of Force Majeure at Muskrat Falls 10-May-19 Darren DeBourke
P-03528 Letter dated October 20, 2016 from Darren DeBourke to Scott Bianchi re Notification of Force Majeure at Muskrat Falls 10-May-19 Darren DeBourke
P-03529 Letter dated October 24, 2016 from Darren DeBourke to Scott Bianchi re Instruction to Demobilize from Muskrat Falls Worksite due to Force Majeure Situation 10-May-19 Darren DeBourke
P-03530 Letter dated October 26, 2016 from Darren DeBourke to Scott Bianchi re Force Majeure Events at Muskrat Falls 10-May-19 Darren DeBourke
P-03531 Nalcor Energy - Lower Churchill Project - Minutes of Meeting dated November 4, 2016 10-May-19 Darren DeBourke
P-03532 Letter dated November 9, 2016 from Darren DeBourke to Scott Bianchi re End of Force Majeure at Muskrat Falls 10-May-19 Darren DeBourke
P-03533 Email dated March 3, 2016, 9:21 AM from Darren DeBourke to Stephen Hall, cc Paul Harrington, bcc Trina Troke re Action Plans 10-May-19 Darren DeBourke
P-03534 Nalcor Energy - Lower Churchill Project - Procurement Management Plan dated February 2, 2012 14-May-19 Des Tranquilla
P-03535 Email dated August 20, 2013, 4:53:03 PM from geraldcahill@lowerchurchillproject.ca to marionorgan@lowerchurchillproject.ca re Fw: Delegation of Authority 14-May-19 Des Tranquilla
P-03536 Email dated March 12, 2014, 10:15:27 AM from desmondtranquilla@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, cc mikecollins@lowerchurchillproject.ca, neilferguson@lowerchurchillproject.ca, et al re Management Responsibility and Communication of the Astaldi Package 14-May-19 Des Tranquilla
P-03537 Email dated April 6, 2014, 2:02:28 PM from desmondtranquilla@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, cc robertwoolgar@lowerchurchillproject.ca, mikecollins@lowerchurchillproject.ca, et al 14-May-19 Des Tranquilla
P-03538 Email dated November 21, 2014, 2:49 PM from desmondtranquilla@lowerchurchillproject.ca to Carlos Fernandez, cc Bruce Hallock, Ed Bush, et al re Cost vs Progress 14-May-19 Des Tranquilla
P-03539 Email dated August 2, 2011, 7:55 PM from Auburn Warren to Ed Martin and Robert Thompson re Fw: Shareholder… 15-May-19 Charles Bown
P-03540 Email dated June 4, 2013, 3:37 PM from auburnwarren@nalcorenergy.com to Charles Bown, cc derrick sturge/nlhydro and Paul J. Morris re FLG CPs 15-May-19 Charles Bown
P-03541 Email dated October 6, 2013, 2:28 PM from Ed Martin to Charles Bown re Fw: Cabinet 15-May-19 Charles Bown
P-03542 Email dated October 27, 2013, 11:30 PM from Ed Martin to Charles Bown, Gilbert Bennett and Dawn Dalley re Some thoughts 15-May-19 Charles Bown
P-03543 Email dated November 3, 2013, 7:37 PM from Ed Martin to Charles Bown 15-May-19 Charles Bown
P-03544 Email dated November 11, 2013, 7:46 PM from Charles Bown to DSturge@nalcorenergy.com re EPC 15-May-19 Charles Bown
P-03545 Email dated November 22, 2013, 11:13:21 AM from Paul Myrden to Donna Brewer re FW: Proposed Text for Canada 15-May-19 Charles Bown
P-03546 Email dated November 30, 2013, 2:20:04 PM from Charles W. Bown to Julia Mullaley and Paula Burt re Fw: Latest from Alison 15-May-19 Charles Bown
P-03547 Email dated February 20, 2014, 6:53 PM from Ed Martin to Karen O'Neill, Dawn Dalley, et al re Meeting tomorrow 15-May-19 Charles Bown
P-03548 Email dated March 10, 2014, 10:50 AM from dsturge@nalcorenergy.com to Donna Brewer, cc Charles Bown, auburnwarren@nlhydro, and jamesmeaney@nlhydro re Minister Request 15-May-19 Charles Bown
P-03549 Email dated April 16, 2014, 10:38 AM from Ed Martin to Dawn Dalley, Charles Bown and Gilbert Bennett re Fw: Long time no contact 15-May-19 Charles Bown
P-03550 Email dated April 25, 2014, 8:23 AM from dawndalley@nalcorenergy.com to Charles Bown, cc Ed Martin re VOCM 15-May-19 Charles Bown
P-03551 Email dated June 24, 2014, 9:32 PM from Charles W. Bown to Ed Martin, Dawn Dalley, et al re Muskrat Falls presentation 15-May-19 Charles Bown
P-03552 Email dated June 24, 2014, 10:03 PM from koneill@nlh.nl.ca to Charles Bown and Diana Quinton, cc emartin@nalcorenergy.com, dawndalley@nalcorenergy.com and gbennett@nalcorenergy.com re Draft speaking notes and public presentation on MF value/cost 15-May-19 Charles Bown
P-03553 Nalcor Energy - Lower Churchill Project presentation dated June 24, 2014 re Muskrat Falls Project - Independent Engineer Overview 15-May-19 Charles Bown
P-03554 Email dated July 24, 2014, 9:41 AM from gbennett@nalcorenergy.com to Charles Bown re Risk 15-May-19 Charles Bown
P-03555 Email dated July 30, 2014, 8:39 PM from gbennett@nalcorenergy.com to Charles Bown, cc Ed Martin and Karen O'Neill re MF Costs 15-May-19 Charles Bown
P-03556 Email dated December 14, 2014, 1:13 PM from dawndalley@nalcorenergy.com to Charles Bown re Questions and Answers Updated 15-May-19 Charles Bown
P-03557 Email dated February 4, 2015, 3:40 PM from pharrington@lowerchurchillproject.ca to Charles Bown, cc gbennett@nalcorenergy.com re meeting with Craig Martin 15-May-19 Charles Bown
P-03558 Email dated March 27, 2015 from pharrington@lowerchurchillproject.ca to Craig Martin, cc Gilbert Bennett and Charles Bown re Status on Current MF Oversight Committee Requests 15-May-19 Charles Bown
P-03559 Email dated April 26, 2015, 12:51:58 PM from emartin@nalcorenergy.com to Charles Bown re Fwd: Value to Shareholder Presentation 15-May-19 Charles Bown
P-03560 Email dated May 25, 2015, 8:29:00 AM from gbennett@nalcorenergy.com to Charles Bown re Integrated cover 15-May-19 Charles Bown
P-03561 Email dated June 24, 2015, 5:46:43 PM from emartin@nalcorenergy.com to Charles Bown re Cabinet Presentation for Tomorrow 15-May-19 Charles Bown
P-03562 Email dated August 11, 2015, 1:57:04 PM from koneill@nlh.nl.ca to Charles Bown, cc gbennett@nalcorenergy.com re FW: MF Update schedule 15-May-19 Charles Bown
P-03563 Email dated August 13, 2015, 8:53 PM from koneill@nlh.nl.ca to Charles Bown re CHANGE IN PROTEST SITUATION - Update on Protest Activity at two Muskrat Falls work sites - Update as of 5:30 pm NST Aug 13 15-May-19 Charles Bown
P-03564 Email dated September 11, 2015, 11:34:50 PM from auburnwarren@nalcorenergy.com to Charles Bown cc Ed Martin, Dawn Dalley, Derrick Sturge, Dave Jones and Dave Jones re Rate Smoothing 15-May-19 Charles Bown
P-03565 Nalcor Energy - Lower Churchill Project presentation dated September 16, 2015 re Project Update - Oversight Committee 15-May-19 Charles Bown
P-03566 Email dated September 26, 2015, 6:54 PM from dawndalley@nalcorenergy.com to Charles Bown re Fwd: Commercially sensitive comments in the E&Y report 15-May-19 Charles Bown
P-03567 Email dated September 26, 2015, 11:52 PM from emartin@nalcorenergy.com to Charles Bown re Still up? 15-May-19 Charles Bown
P-03568 Email dated September 28, 2015, 2:54 PM from auburnwarren@nalcorenergy.com to koneill@nlh.nl.ca, cc Dave Jones, Dawn Dalley, et al re Rates/Bills Data - DG3 vs 2014 vs Now 15-May-19 Charles Bown
P-03569 Email dated December 20, 2015, 12:56 PM from pharrington@lowerchurchillproject.ca to Charles Bown re Call to Canada/IE on Monday PM 15-May-19 Charles Bown
P-03570 Email dated January 22, 2016, 9:09 AM from gbennett@nalcorenergy.com to Charles Bown re Follow up on EY request regarding Board minutes, etc. 15-May-19 Charles Bown
P-03571 Email dated January 22, 2016, 5:36:43 PM from emartin@nalcorenergy.com to Julia Mullaley, cc Charles Bown re Draft Cabinet Presentation 15-May-19 Charles Bown
P-03572 Email dated February 8, 2016, 8:41 PM from emartin@nalcorenergy.com to Charles Bown re MF Bullet points 15-May-19 Charles Bown
P-03573 Email dated February 8, 2016, 10:45 PM from emartin@nalcorenergy.com to Charles Bown re MF Bullet points 15-May-19 Charles Bown
P-03574 Email dated February 24, 2016, 4:05 PM from emartin@nalcorenergy.com to Charles Bown, cc Derrick Sturge re Fw: Governance Deck 15-May-19 Charles Bown
P-03575 Email dated June 16, 2016, 2:44 PM from auburnwarren@nalcorenergy.com to Charles Bown, Craig Martin, and Donna Brewer, cc dsturge@nalcorenergy.com, davejones@nalcorenergy.com, et al re Additional information for Province 15-May-19 Charles Bown
P-03576 Nalcor Energy - Lower Churchill Project presentation dated June 23, 2016 re Lower Churchill Project - Briefing the Oversight Committee 15-May-19 Charles Bown
P-03577 Email dated August 2, 2016, 5:02:25 PM from Charles W. Bown to Julia Mullaley and Krista Quinlan re Fw: Key Messages and Q&As re: Astaldi bridge document 15-May-19 Charles Bown
P-03578 GNL Information Note - Department of Natural Resources dated September 27, 2016 re September 23 Meeting on Enhanced Federal Loan Guarantee (FLG2) 15-May-19 Charles Bown
P-03579 Email dated December 4, 2009, 1:24:22 PM from elizabethgray@nalcorenergy.com to kentlegge@nalcorenergy.com and robhull@nalcorenergy.com, cc carolannelutz@nalcorenergy.com and gmitchell@nalcorenergy.com re Upper Churchill Redress Agreement 15-May-19 Charles Bown
P-03580 Email dated August 14, 2015, 4:35:14 PM from emartin@nalcorenergy.com to Charles Bown re LCP Deck - Commercially Sensitive and Confidential 15-May-19 Charles Bown
P-03581 Contract of Employment dated January 25, 2017 between Her Majesty the Queen in Right of Newfoundland and Labrador and Charles Bown 15-May-19 Charles Bown
P-03582 Letter dated October 29, 2015 from Ernst & Young to Julia Mullaley re Review of Muskrat Falls Project Cost and Schedule Management Processes and Controls 13-May-19 Michael Kennedy
P-03583 Letter dated October 29, 2015 from Ernst & Young to Julia Mullaley re Review of Muskrat Falls Project Cost and Schedule Management Processes and Controls (Full) 13-May-19 Michael Kennedy
P-03584 Letter dated December 18, 2015 from Gilbert Bennett to Julia Mullaley re Review of Muskrat Falls Project Cost and Schedule Management Processes and Controls 13-May-19 Michael Kennedy
P-03585 EY presentation dated December 20, 2015 re Government of Newfoundland and Labrador - Request for EY to Review Project Cost, Schedule and Associated Risk of the Muskrat Falls Project 13-May-19 Michael Kennedy
P-03586 Muskrat Falls Oversight Committee - Review of Project Cost and Schedule Forecast and Related Risk 13-May-19 Michael Kennedy
P-03587 Muskrat Falls Oversight Committee - Review of Implementation of the Recommendations from the EY Interim Report dated April 8, 2016 13-May-19 Michael Kennedy
P-03588 Letter dated August 31, 2017 from Stan Marshall to Charles Bown re Response to EY Report 13-May-19 Michael Kennedy
P-03589 Nalcor Briefing Note dated March 7, 2016 re Implications of Cancelling or Significantly Delaying the Muskrat Falls Project 15-May-19 Charles Bown
P-03590 GNL Information Note - Department of Environment and Conservation dated August 24, 2016 re Methylmercury Mitigation Workshop and Human Health Risk Assessment Plan for Lower Churchill Generation Project 15-May-19 Charles Bown
P-03591 GNL Decision/Direction Note - Department of Environment and Climate Change dated September 20, 2016 re Methylmercury Workshop Outcome Assessment regarding the Lower Churchill Generation Project 15-May-19 Charles Bown
P-03592 EY Contract and Billing Summary dated March 6, 2014 to June 2, 2017 13-May-19 Michael Kennedy
P-03593 EY presentation dated March 11, 2016 re Muskrat Falls Project Review - Budget Status Report 13-May-19 Michael Kennedy
P-03594 Excerpt from Scott O'Brien's text messages dated April 2, 2019 14-May-19 Des Tranquilla
P-03595 Email dated November 22, 2011, 10:46:40 AM from Paul G. Scott to Rob McGrath and Philip Ivimey re FW: Upper Churchill Redress Agreement - Settlement Payments 15-May-19 Charles Bown
P-03596 Email dated January 29, 2012, 8:17:04 PM from Paul G. Scott to Charles W. Bown 15-May-19 Charles Bown
P-03597 GNL Memorandum to Executive Council dated February 16, 2012 re Funding of the Churchill Fall Hydro Electric Development Redress Agreement 15-May-19 Charles Bown
P-03598 GNL Cabinet Secretariat Analysis dated February 21, 2012 re Funding of the Churchill Falls Hydro Electric Development Redress Agreement 15-May-19 Charles Bown
P-03599 Email dated November 26, 2012, 5:03:22 PM from James Meaney to Derrick Sturge and Charles Bown re NR-Can 15-May-19 Charles Bown
P-03600 Email dated November 26, 2012, 5:17:16 PM from Derrick Sturge to Charles Bown re NR-Can 15-May-19 Charles Bown
P-03601 Email dated November 14, 2013, 11:03:45 AM from dsturge@nalcorenergy.com to Ed Martin re FLG CP Status 15-May-19 Charles Bown
P-03602 Email dated November 14, 2013, 11:08:07 AM from dsturge@nalcorenergy.com to Auburn Warren and Ed Martin, cc Charles Bown re FLG CP Status 15-May-19 Charles Bown
P-03603 Email dated May 16, 2013, 4:35:47 AM from Charles W. Bown to Jamie Chippett, cc Tracy English re Fw: Methyl Mercury Speaking Points.doc 15-May-19 Charles Bown
P-03604 MIT Technology Review dated July 21, 2016 re Full Scale of Olympic Financial Disasters Revealed 15-May-19 Michael Kennedy
P-03605 Email dated November 19, 2013, 2:25 PM from jamesmeaney@nalcorenergy.com to Derrick Sturge, Auburn Warren, Rob Hull and Craig Hippern re Fw: Updated Capital Costs 15-May-19 Financial Close
P-03606 Email dated November 9, 2013, 11:50 AM from jamesmeaney@nalcorenergy.com to Home re Fw: Variance Explanation for Feds 15-May-19 Financial Close
P-03607 Email dated November 28, 2013, 4:02:59 PM from jamesmeaney@nalcorenergy.com to edbush@lowerchurchillproject.ca, cc Ed Bush, George Chehab and Paul Harrington re MF/LTA/LIL Budgets 15-May-19 Financial Close
P-03608 Email dated November 8, 2013, 10:56:46 PM from jamesmeaney@nalcorenergy.com to georgechehab@lowerchurchillproject.ca, cc Ed Bush, Jason Kean, Lance Clarke and Paul Harrington, bcc Auburn Warren re Variance Explanation for Feds 15-May-19 Financial Close
P-03609 Email dated November 19, 2013, 9:16:29 PM from jamesmeaney@nalcorenergy.com to John Bate and darren.marsh@aon.ca, cc Marilyn Leonard, Rob Hull, Paul Harrington and Lance Clarke re Updated Capital Costs for Insurance Submissions (Confidential) 15-May-19 Financial Close
P-03610 Email dated November 18, 2013, 2:12:07 PM from JamesMeaney@nalcorenergy.com to Paul Myrden re Fw: Cost Overruns - The language for s.4.10 of the FLG Term Sheet [IWOV-Legal.FID1640195] 15-May-19 Financial Close
P-03611 Email dated November 20, 2013, 12:05:12 PM from Xeno Martis to CraigHippern@nalcorenergy.com, Auburn Warren, et al, cc Angela Onesi, Felix Gutierrez, et al re FW: NL - Cost Overruns 15-May-19 Financial Close
P-03612 Email dated November 17, 2013, 2:46:26 AM from Linda L. Bertoldi to Paul Myrden, Randy Pelletier, et al, cc Linda L. Bertoldi and Bruce E. Fowler re FW: Cost Overruns - The language for s.4.10 of the FLG Term Sheet [IWOV-Legal.FID1640195] 15-May-19 Financial Close
P-03613 Email dated November 16, 2013, 1:56:05 PM from DSturge@nalcorenergy.com to Donna Brewer, Paul Myrden, et al re Fw: Cost Overruns - The language for s.4.10 of the FLG Term Sheet [IWOV-Legal.FID1640195] 15-May-19 Financial Close
P-03614 Email dated November 25, 2013, 4:20:23 PM from Tansy Mundon to Paul Myrden, Donna Brewer, et al re Mid Year Update Qs and As.docx 15-May-19 Financial Close
P-03615 Email dated November 12, 2013, 9:38:27 AM from Todd Stanley to Charles W. Bown, cc Randy Pelletier, Meaghan McConnell, et al re NL IGA 15-May-19 Financial Close
P-03616 Email dated jasonkean@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca re Fw: Meeting in Toronto 21-May-19 Ron Power
P-03617 Letter dated September 27, 2013 from Ed Bush to Jason Kean re Project Management Support Services - Lower Churchill Project - Project Controls Manager 21-May-19 Ron Power
P-03618 Master Services Agreement - LC-PM-149 for Professional Services for Lower Churchill Project between Nalcor Energy and PMX Inc. dated September 30, 2013 21-May-19 Ron Power
P-03619 Nalcor Energy - Lower Churchill Project - Purchase Order dated October 10, 2013 re LCP01714 - Professional Services - Ed Bush 21-May-19 Ron Power
P-03620 Email dated October 29, 2013, 10:10:31 AM from scotto'brien@lowerchurchillproject.ca to robert.woolgar/nlhydro and faustina corrnick/nlhydro re Fwd: Resume for Senior Contracts Administrator - Mel Melhem 21-May-19 Ron Power
P-03621 Nalcor Energy - Lower Churchill Project - Purchase Order dated November 27, 2013 re LCP01780 - Professional Services - Mel Melhem 21-May-19 Ron Power
P-03622 Email dated January 30, 2014, 8:03:53 AM from ronpower@lowerchurchillproject.ca to jasonkean@lowerchurchillproject.ca re Senior Planner CVs 21-May-19 Ron Power
P-03623 Nalcor Energy - Lower Churchill Project - Requisition dated January 30, 2014 re Extension of Ed Bush 21-May-19 Ron Power
P-03624 Nalcor Energy - Lower Churchill Project Change Order dated February 12, 2014 re LCP01714 - Professional Services - Ed Bush 21-May-19 Ron Power
P-03625 Email dated February 24, 2014, 3:27:32 PM from nancysharron@lowerchurchillproject.ca to colleensutton@lowerchurchillproject.ca, cc faustinacornick@lowerchurchillproject.ca re Fw: Contract Administrator CVs 21-May-19 Ron Power
P-03626 Email dated February 28, 2014, 2:47:12 PM from jasonkean@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca re Fw: Proposal for Senior Planner - Component 1 21-May-19 Ron Power
P-03627 Assignment Agreement between Nalcor Energy and PMX Inc. dated March 5, 2014 21-May-19 Ron Power
P-03628 Nalcor Energy - Lower Churchill Project Purchase Order dated March 18, 2014 re LCP01913 - Professional Services - Andrew Whitty 21-May-19 Ron Power
P-03629 Change Order dated December 4, 2014 re LCP01780 - Professional Services - Mel Melhem 21-May-19 Ron Power
P-03630 Change Order dated December 19, 2014 re LCP02346 - Professional Services - Anthony Embury 21-May-19 Ron Power
P-03631 Email dated April 13, 2015, 3:13:40 PM from scottobrien@lowerchurchillproject.ca to Ron Power re Resume for Peter Tsekouras 21-May-19 Ron Power
P-03632 Purchase Change Order dated July 10, 2015 re LCP01927 - Professional Services - Hicham Geres 21-May-19 Ron Power
P-03633 Personnel Requisition - Renewal dated June 20, 2016 re Peter Tsekouras 21-May-19 Ron Power
P-03634 Letter dated April 23, 2019 from Deborah Hutchings to Barry Learmonth re Ron Power - Reply to Summons to Produce dated 11 April 2019 21-May-19 Ron Power
P-03635 Response to GT RFI #Q10.34 dated November 7, 2018 21-May-19 Project Management Team
P-03636 Gilbert Bennett - Travel Authorizations - 2012 - 2018 21-May-19 Project Management Team
P-03637 Scott O'Brien - Travel Authorizations - 2012 - 2018 21-May-19 Project Management Team
P-03638 Email dated September 26, 2015, 5:38:30 PM from dawndalley@nalcorenergy.com to pharrington@lowerchurchillproject.ca to Ed Martin, Gilbert Bennett, Karen O'Neill, Lance Clarke and Steve Pellerin re Commercially sensitive comments in the E&Y report 21-May-19 Project Management Team
P-03639 Email dated March 28, 2014, 10:13:46 AM from jamesmeaney@nalcorenergy.com to Paul J. Morris, cc Derrick Sturge, Mark Bradbury, et al re Muskrat Falls Oversight 21-May-19 Project Management Team
P-03640 Email dated April 10, 2014, 2:50:28 PM from jamesmeaney@nalcorenergy.com to Alison Manzer re NL MF oversight / IE process 21-May-19 Project Management Team
P-03641 Email dated May 26, 2014, 3:54:49 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com re Report for Government - re oversight 21-May-19 Project Management Team
P-03642 Email dated October 20, 2014, 9:17:21 AM from jamesmeaney@lowerchurchillproject.ca to dsturge@nalcorenergy.com re Fw: Oversight Committee (OC) 21-May-19 Project Management Team
P-03643 Email dated November 27, 2014, 1:14:34 PM from pharrington@lowerchurchillproject.ca to Ed Bush and Brian Crawley, cc Brian Crawley and George Chehab re confirmation 21-May-19 Project Management Team
P-03644 Email dated November 28, 2014, 1:29:59 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com, cc jamesmeaney@lowerchurchillproject.ca, koneill@nlh.nl.ca and edbush@lowerchurchillproject.ca re OC and IE meeting today 21-May-19 Project Management Team
P-03645 Email dated December 7, 2014, 1:27:51 PM from pharrington@lowerchurchillproject.ca to koneill@nlh.nl.ca and janinemccarthy@nalcorenergy.com, cc Ed Bush, Gilbert Bennett, James Meaney and Robert Woolgar re Update Q & As from OC 21-May-19 Project Management Team
P-03646 Email dated December 23, 2014, 6:07 PM from jamesmeaney@lowerchurchillproject.ca to Paul Harrington, cc Gilbert Bennett re Oversight Committee 21-May-19 Project Management Team
P-03647 Email dated March 18, 2015, 9:57:16 AM from mbradbury@nalcorenergy.com to jamesmeaney@lowerchurchillproject.ca, cc stevepellerin@lowerchurchillproject.ca, alisonball@nalcorenergy.com and douglaswoodford@nalcorenergy.com re OC Meeting on EY Scope, etc. 21-May-19 Project Management Team
P-03648 Email dated June 22, 2015, 11:34:32 AM from pharrington@lowerchurchillproject.ca to emartin@nalcorenergy.com, cc Charles Bown and Gilbert Bennett, bcc lanceclarke@lowerchurchillproject.ca re Report feedback as requested 21-May-19 Project Management Team
P-03649 Email dated September 25, 2015, 1:03:47 PM from pharrington@lowerchurchillproject.ca to dawndalley@nalcorenergy.com, cc Ed Martin and Gilbert Bennett re E&Y and OC questions 21-May-19 Project Management Team
P-03650 Email dated September 26, 2015, 9:23 PM from gbennett@nalcorenergy.com to Paul Harrington re Commercially sensitive comments in the E&Y report 21-May-19 Project Management Team
P-03651 Email dated September 28, 2015, 10:20 PM from jamesmeaney@lowerchurchillproject.ca to Dawn Dalley, cc Gilbert Bennett, Lance Clarke, Paul Harrington and Steve Pellerin re Draft Report 21-May-19 Project Management Team
P-03652 Nalcor Energy - Lower Churchill Project presentation dated January 2016 re Ernst & Young Cost and Schedule Forecast Review 21-May-19 Project Management Team
P-03653 Email dated January 14, 2016, 4:27 PM from emartin@nalcorenergy.com to Gilbert Bennett, Paul Harrington and Lance Clarke re Revised wording 21-May-19 Project Management Team
P-03654 Email dated February 2, 2016, 8:59:33 AM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com and emartin@nalcorenergy.com, cc lanceclarke@lowerchurchillproject.ca and briancrawley@lowerchurchillproject.ca re EY Information Requests 21-May-19 Project Management Team
P-03655 Email dated February 9, 2016, 10:09:10 AM from pharrington@lowerchurchillproject.ca to jmullaley@gov.nl.ca, cc Charles Bown, Gilbert Bennett and Steve Pellerin re Follow up to EY meeting 21-May-19 Project Management Team
P-03656 Email dated February 29, 2016, 4:19:27 PM from pharrington@lowerchurchillproject.ca re Feedback 21-May-19 Project Management Team
P-03657 Email dated March 12, 2016, 11:01 AM from pharrington@lowerchurchillproject.ca to koneill@nlh.nl.ca, cc Brian Crawley, Deanne Fisher, et al re EY & OC Report Release - Comms Review Karen/Deanne 21-May-19 Project Management Team
P-03658 Letter dated November 16, 2018 from Shirley A. Walsh to Cheryl Blundon re Newfoundland and Labrador Hydro - the Board's Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System - Reliability and Resource Adequacy Study - November 2018 21-May-19 Project Management Team
P-03659 The Liberty Consulting Group - Review of Newfoundland and Labrador Hydro Power Supply Adequacy and Reliability Prior to and Post Muskrat Falls - Final Report - Executive Summary dated August 19, 2016 21-May-19 Project Management Team
P-03660 Uncle Gnarley news article dated March 25, 2019 re More Pre-Sanction Fraud or Incompetence? 21-May-19 Project Management Team
P-03661 Email dated March 18, 2018, 3:54 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com and karenoneill@nalcorenergy.com, cc ronpower@lowerchurchillproject.ca re Pam Frampton article 21-May-19 Project Management Team
P-03662 Letter dated October 16, 2016 from Scott O'Brien to Aaron Rietveld re Force Majeure Declaration by Company 21-May-19 Project Management Team
P-03663 Stakeholder Updated - Blockade at Muskrat Falls Main Gate - Started October 16, 2016 dated October 26, 2016 21-May-19 Project Management Team
P-03664 Letter dated October 20, 2016 from Aaron Rietveld to Scott O'Brien re Force Majeure Declaration by Company 21-May-19 Project Management Team
P-03665 Nalcor Energy - Project Management Project - Project Change Notice dated November 7, 2016 re PCN-0690 Muskrat Falls - Demonstrations and Protests (October 2016) 21-May-19 Project Management Team
P-03666 Nalcor Energy - Project Management Project - Project Change Notice dated January 16, 2017 re PCN-0706 Creation of a Commitment Package for Potential Costs Associated with Future Protests at the Muskrat Falls Site 21-May-19 Project Management Team
P-03667 SNC-Lavalin - Nalcor Energy - Project Cost Status - Project: 505573 : Lower Churchill Project - Period 071 from April 27, 2017 to May 31, 2017 21-May-19 Project Management Team
P-03668 Letter dated May 3, 2016 from Don Delarosbil to Scott O'Brien re Lack of Resources - Ironworkers 21-May-19 Project Management Team
P-03669 Westney Consulting Group presentation dated June 2018 re Lower Churchill Project - Muskrat Falls Generation - Updated Risk Assessment - Discussion Document 21-May-19 Project Management Team
P-03670 Email dated September 21, 2014, 3:28:58 PM from pharrington@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca re Ron's Concerns re Astaldi 21-May-19 Project Management Team
P-03671 Nalcor Energy - Lower Churchill Project presentation dated January 20, 2016 re Astaldi Update 21-May-19 Project Management Team
P-03672 Justification for incremental compensation 21-May-19 Project Management Team
P-03673 Letter dated July 22, 2017 from Don Delarosbil to Scott O'Brien re Tone of recent letters 21-May-19 Project Management Team
P-03674 Nalcor Energy - Lower Churchill Project - Internal Audit Project # 17-30 - Report Name: Lower Churchill Project Conflict of Interest Audit dated April 23, 2018 21-May-19 Ron Power
P-03675 Nalcor Energy - Lower Churchill Project - CH0007 Management Report - Week #26 - Reporting Period: June 24, 2018 to June 28, 2018 21-May-19 Ron Power
P-03676 Curriculum Vitae - Ronald Power 21-May-19 Ron Power
P-03677 Montreal Engineering Company Limited - Federal Republic of Nigeria - National Electric Power Authority - Jebba Hydroelectric Development - Contract No. 14 NEP 5838-8 for General Civil Works - Sanction No. 42-104-02-14 - Volume 1 dated January 31, 1979 21-May-19 Ron Power
P-03678 Petro-Canada 2008 Salary and Benefits Summary 21-May-19 Ron Power
P-03679 Scope of Work and Technical Attachments 21-May-19 Ron Power
P-03680 Form Letter dated February XX, 2009 from Clifford C. Rowe re Expression of Interest (EOI) No. "G-002" - Engineering Design and Project Support Agreement - Lower Churchill Project Development 21-May-19 Ron Power
P-03681 Lower Churchill Project - Contract Packages List & Engineering Deliverables by Package dated January 20, 2009 21-May-19 Ron Power
P-03682 SNC-Lavalin - Hydroelectric Projects over $100,000,000 dated April 8, 2009 21-May-19 Ron Power
P-03683 SNC-Lavalin - Major Civil Engineering Projects over $1,000,000,000 dated April 8, 2009 21-May-19 Ron Power
P-03684 Letter dated December 19, 2011 from Normand Béchard to Ron Power re Lower Churchill Development - Agreement LC-G-002 - Engineering, Procurement and Construction Management (EPCM) Services - Component 1 Project Manager 21-May-19 Ron Power
P-03685 Exhibit 3 - Scope of Services 21-May-19 Ron Power
P-03686 Email dated April 17, 2012, 7:13 PM from Ron Power to Geoff Marshall, LCP - SNC, et al, re Information Systems (IS/IT) Task Force 21-May-19 Ron Power
P-03687 SNC Resumes received - Postings July 24, 2014 to February 1, 2019 - Report updated February 4, 2019 21-May-19 Ron Power
P-03688 Nalcor Energy - Lower Churchill Project - SNC-Lavalin - Trip Evaluation Report - Contractor Project Site Visits - Related Package Number: CH0007 - Package Title: Intake, Powerhouse, Spillway and Transition Dams dated April 14, 2013 21-May-19 Ron Power
P-03689 Nalcor Energy - Astaldi Canada Final Presentation dated September 4, 2013 re Muskrat Falls Generation 21-May-19 Ron Power
P-03690 Astaldi Subs 21-May-19 Ron Power
P-03691 Email dated November 12, 2018, 10:57 AM from Ron Power to Scott O'Brien, Paul Harrington, et al re Some History re Astaldi's Project Managers 21-May-19 Ron Power
P-03692 Letter dated May 15, 2014 from Scott O'Brien to Guido Venturini re Contact Information - Construction Supervision Personnel 21-May-19 Ron Power
P-03693 Letter dated December 8, 2014 from Desmond Tranquilla to Jose Alves re Agreement No: CH0007-001 - Title: Construction of Intake and Powerhouse, Spillway and Transition Dams - Mr. Bill Knox and Mr. Roy Collier becoming Astaldi employees (with Construction Flowchart - Effective January 2015) 21-May-19 Ron Power
P-03694 Photos of Construction Site provided by Ron Power dated April 25 or 26, 2014 21-May-19 Ron Power
P-03695 Position held in 2013/2014 spreadsheet (provided by Ron Power) 21-May-19 Ron Power
P-03696 Agreement 15436-OB for Professional Services for The Lower Churchill Project between Newfoundland and Labrador Hydro and RJP Services dated January 21, 2008 21-May-19 Ron Power
P-03697 Amending Agreement Number 1 between Newfoundland and Labrador Hydro and RJP Services Inc. dated December 5, 2008 21-May-19 Ron Power
P-03698 Amending Agreement Number 3 between Nalcor Energy and RJP Services Inc. dated July 21, 2011 21-May-19 Ron Power
P-03699 Email dated August 11, 2013, 2:11:19 PM from ronpower@lowerchurchillproject.ca to markmcgrath@lowerchurchillproject.ca, cc scotto'brien@lowerchurchillproject.ca re Resumes: Ron and Scott 21-May-19 Ron Power
P-03700 Amending Agreement Number 7 between Lower Churchill Management Corporation and RJP Services Inc. dated July 7, 2014 21-May-19 Ron Power
P-03701 Amending Agreement Number 8 between Lower Churchill Management Corporation and RJP Services Inc. dated June 10, 2015 21-May-19 Ron Power
P-03702 Amending Agreement Number 10 between Lower Churchill Management Corporation and RJP Services Inc. dated May 18, 2017 21-May-19 Ron Power
P-03703 Email dated May 11, 2016, 9:14:24 PM from ronpower@lowerchurchillproject.ca to Paul Harrington, bcc Ron Power re Pls send me your personal emails…I want to send you some info 21-May-19 Ron Power
P-03704 Email dated September 3, 2013, 5:40:09 PM from ronpower@lowerchurchillproject.ca to paulharrington/nlhydro, cc bob barnes/nlhydro re North Spur 21-May-19 Ron Power
P-03705 Email dated November 26, 2014, 4:48:37 PM from ronpower@lowerchurchillproject.ca to scotto'brien@lowerchurchillproject.ca, pharrington@lowerchurchillproject.ca, et al re Confidential: Fw: S011-L010-200-170330-00222 North Spur Design & Request for Hydro Geological Studies 25 Nov 2013 21-May-19 Ron Power
P-03706 Nalcor Energy - Lower Churchill Project - Muskrat Falls Generation Plan - Construction Phase dated January 1, 2016 21-May-19 Ron Power
P-03707 Email dated November 7, 2013, 2:53 PM from ronpower@lowerchurchillproject.ca to scotto'brien@lowerchurchillproject.ca re Fw: Astaldi progress question 21-May-19 Ron Power
P-03708 Email dated November 15, 2013, 3:15:44 PM from scotto'brien@lowerchurchillproject.ca to desmond_tranquilla/nlhydro re Astaldi 21-May-19 Ron Power
P-03709 Email dated January 14, 2014, 8:41:48 AM from pharrington@lowerchurchillproject.ca to scotto'brien@lowerchurchillproject.ca, ronpower@lowerchurchillproject.ca, et al re Astaldi Concerns 21-May-19 Ron Power
P-03710 Email dated January 16, 2014, 2:19:32 PM from ronpower@lowerchurchillproject.ca to pathussey@lowerchurchillproject.ca, pharrington@lowerchurchillproject.ca, et al re Fw: Astaldi RCC Experience - summary note 21-May-19 Ron Power
P-03711 Email dated March 30, 2014, 3:48:40 PM from pharrington@lowerchurchillproject.ca to ron_power/nlhydro re Confidential: Fw: Astaldi Steering Committee Meeting - outcome 21-May-19 Ron Power
P-03712 Email dated April 18, 2014, 4:01:15 PM from pharrington@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca, cc Ed Bush, Ed Over, et al re Astaldi 21-May-19 Ron Power
P-03713 Email dated October 8, 2014, 7:49:56 AM from scottobrien@lowerchurchillproject.ca to Ron Power, cc Ed Bush re Astaldi ICS Schedule 21-May-19 Ron Power
P-03714 Email dated November 20, 2014 from edbush@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca, scottobrien@lowerchurchillproject.ca, et al, cc georgechehab@lowerchurchillproject.ca re Astaldi Cost Analysis 21-May-19 Ron Power
P-03715 Email dated November 20, 2014, 9:07:17 AM from ronpower@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca, et al re Confidential: For Info 21-May-19 Ron Power
P-03716 Email dated November 30, 2014, 9:27:48 PM from ronpower@lowerchurchillproject.ca to Paul Harrington re I have every confidence in you 21-May-19 Ron Power
P-03717 Email dated January 26, 2015, 9:50:50 AM from ronpower@lowerchurchillproject.ca to Ron Power, bcc Ron Power re Fwd: More Notes 21-May-19 Ron Power
P-03718 Email dated January 29, 2015, 4:36:51 PM from pharrington@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca, cc Brian Crawley, Ed Bush, et al re Astaldi cash flow 21-May-19 Ron Power
P-03719 Email dated February 1, 2015, 12:27:08 PM from ronpower@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca re Hi Ron just checking in 21-May-19 Ron Power
P-03720 Email dated March 5, 2015, 3:16:13 PM from Mike Harris to brucehallock@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca, et al re Confidential 21-May-19 Ron Power
P-03721 Email dated March 17, 2015, 5:20 PM from ronpower@lowerchurchillproject.ca to michaelharris@lowerchurchillproject.ca re Fw: Astaldi: Revised Monthly Report No. 1 Fw: NE-LCP-TRANSMIT-017207: INFORMATION (WF-006757) Component 1 - CH0007 - Construction of Intake, Powerhouse Spillway and Transition Dams - Astaldi Document for Review PM-A06 (Due 26-Apr-2014) Lead Reviewe... 21-May-19 Ron Power
P-03722 Email dated August 4, 2015, 7:35:43 AM from pharrington@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca re Your insight on the schedule 21-May-19 Ron Power
P-03723 Email dated June 3, 2016, 3:33 PM from Richard Harding to Scott O'Brien, ronaldpower re Final Report_Optimization Schedule Study 21-May-19 Ron Power
P-03724 Email dated August 8, 2016, 4:36:46 PM from ronpower@lowerchurchillproject.ca to gbennett@nalcorenergy.com, cc pharrington@lowerchurchillproject.ca, lanceclarke@lowerchurchillproject.ca, et al re CH0007 Replacement Contractor Strategy 21-May-19 Ron Power
P-03725 Email dated August 30, 2016, 3:03:53 PM from ronpower@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, briancrawley@lowerchurchillproject.ca, et al re Fw: CH0007-001 Concrete - 2014-2015 21-May-19 Ron Power
P-03726 Email dated November 13, 2016, 8:42:57 PM from ronpower@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, cc gbennett@nalcorenergy.com, lanceclarke@lowerchurchillproject.ca and scottobrien@lowerchurchillproejct.ca re Proseccl - Plan B: Bid Evaluation and Award Recommendation - Slide Deck 21-May-19 Ron Power
P-03727 Email dated September 21, 2014, 2:07:50 PM from pharrington@lowerchurchillproject.ca to edover@lowerchurchillproject.ca, ronpower@lowerchurchillproject.ca, et al, cc lanceclarke@lowerchurchillproject and gbennett@nalcorenergy.com re Meeting with Barnard - Bozeman Montana 21-May-19 Ron Power
P-03728 Email dated October 20, 2015, 6:28:52 PM from ronpower@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca, cc robertwoolgar@lowerchurchillproject.ca, pharrington@lowerchurchillproject.ca, et al re Barnard-Pennecon Org. Chart 21-May-19 Ron Power
P-03729 Email dated October 21, 2015, 9:03:48 PM from ronpower@lowerchurchillproject.ca to Paul Harrington, cc Jason Kean, Scott O'Brien, et al re CH0009 org chart issues 21-May-19 Ron Power
P-03730 Email dated October 22, 2015, 11:56:41 AM from pharrington@lowerchurchillproject.ca to ronpower@lowerchurchillproject.ca re Barnard issue 21-May-19 Ron Power
P-03731 Email dated May 12, 2017, 9:14 AM from Dr. Malcolm Dunstan to Power re Sent to your personal email 21-May-19 Ron Power
P-03732 Excerpt from Scott O'Brien's text messages dated March 22, 2019 21-May-19 Ron Power
P-03733 Email dated December 18, 2017, 10:47 AM from LanceClarke@lowerchurchillproject.ca re Fwd: Keeyask Project - PUB Report 21-May-19 Ron Power
P-03734 Email dated November 8, 2012, 2:07:21 PM from LanceClarke@nalcorenergy.com to Alex Twells, cc Norman Bechard, RonPower@nalcorenergy.com, et al re Phase III 23-May-19 Lance Clarke
P-03735 Email dated March 4, 2013, 8:42:38 AM from LanceClarke@nalcorenergy.com to PHarrington@nalcorenergy.com, RonPower@nalcorenergy.com, et al, cc David Clarke, DavidClark@nalcorenergy.com, et al re RDC Ratification is Official 23-May-19 Lance Clarke
P-03736 Email dated March 14, 2013, 8:34 AM from lanceclarke@nalcorenergy.com to paulharrington/nlhydro, cc gilbertbennett/nlhydro re Deloitte Risk Review 23-May-19 Lance Clarke
P-03737 May 1, 2012 - May 1, 2017 Lower Churchill Project Transmission Construction Collective Agreement between Lower Churchill Transmission - Construction Employers' Association Inc. and International Brotherhood of Electrical Works and IBEW Local Union 1620 dated January 28, 2013 23-May-19 Lance Clarke
P-03738 May 2012 - 2017 Lower Churchill Reservoir Clearing Collective Agreement between Lower Churchill Reservoir Clearing Employers' Association Inc. and Labourers' International Union of North America and Construction and General Labourers' Union, Rock and Tunnel Workers Local 1208 dated March 28, 2013 23-May-19 Lance Clarke
P-03739 May 2012 - 2017 Collective Agreement between Muskrat Falls Employers' Association Inc. and Resource Development Trades Council of Newfoundland and Labrador for the Construction of The Lower Churchill Hydroelectric Generation Project at Muskrat Falls on the Lower Churchill River Newfoundland and Labrador dated March 14, 2013 23-May-19 Lance Clarke
P-03740 Email dated May 29, 2013, 9:34 AM from pharrington@nalcorenergy.com to gbennett@nalcorenergy.com and lanceclarke@nalcorenergy.com, cc jasonkean@nalcorenergy.com and briancrawley@nalcorenergy.com re SLI - Risk 23-May-19 Lance Clarke
P-03741 Muskrat Falls Corporation and Astaldi Canada Inc. - Civil Works Agreement - Construction of Intake and Powerhouse, Spillway and Transition Dams - Agreement No. CH0007 dated November 29, 2013 (Full Document) 23-May-19 Lance Clarke
P-03742 Nalcor Energy - Lower Churchill Project presentation dated June 2015 re Lower Churchill Project - Astaldi CH-0007 - Review of Project to Date (~18 months in) 23-May-19 Lance Clarke
P-03743 Email dated September 30, 2015, 11:15:45 AM from Pete Oppenheim to stevegoulding@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca, cc Keith Dodson and Justin Dahl re FW: Ibbs/Nalcor data points 23-May-19 Lance Clarke
P-03744 Astaldi reply to MFC's summary response to Justification for Incremental Compensation dated May 27, 2016 23-May-19 Lance Clarke
P-03745 Tanya Power - LinkedIn Profile 24-May-19 Tanya Power
P-03746 Nalcor Energy - Lower Churchill Project - Integrated Project Schedule (IPS) dated April 3, 2013 24-May-19 Tanya Power
P-03747 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending October 31, 2013 24-May-19 Tanya Power
P-03748 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending May 2, 2014 24-May-19 Tanya Power
P-03749 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending June 25, 2014 24-May-19 Tanya Power
P-03750 Nalcor Energy - Lower Churchill Project - Technical Interface Management Plan dated June 27, 2014 24-May-19 Tanya Power
P-03751 Nalcor Energy - Lower Churchill Project - Project Risk Management Plan dated October 23, 2014 24-May-19 Tanya Power
P-03752 Nalcor Energy - Lower Churchill Project - Information Management Plan dated May 13, 2015 24-May-19 Tanya Power
P-03753 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending May 25, 2015 24-May-19 Tanya Power
P-03754 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending June 25, 2015 24-May-19 Tanya Power
P-03755 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending July 25, 2015 24-May-19 Tanya Power
P-03756 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending August 25, 2015 24-May-19 Tanya Power
P-03757 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending September 25, 2015 24-May-19 Tanya Power
P-03758 Nalcor Energy - Lower Churchill Project presentation re Integrated Project Schedule (IPS) - Monthly Schedule and Progress Analysis - Cut off Date: 28 Oct 2015 24-May-19 Tanya Power
P-03759 Nalcor Energy - Lower Churchill Project presentation re Integrated Project Schedule (IPS) - Monthly Schedule and Progress Analysis - Cut off Date: 25 Nov 2015 24-May-19 Tanya Power
P-03760 Nalcor Energy - Lower Churchill Project presentation re Integrated Project Schedule (IPS) - Monthly Schedule and Progress Analysis - Cut off Date: 30 Dec 2015 24-May-19 Tanya Power
P-03761 Nalcor Energy - Lower Churchill Project - Monthly Forecast Approval Form for period ending April 25, 2016 24-May-19 Tanya Power
P-03762 Nalcor Energy - Lower Churchill Project - Procedure for Incurred Cost dated June 3, 2016 24-May-19 Tanya Power
P-03763 Nalcor Energy - Lower Churchill Project - Component Construction Progress and Performance Management Procedure dated July 27, 2016 24-May-19 Tanya Power
P-03764 Cost Approval Form for period ending July 2016 24-May-19 Tanya Power
P-03765 Cost Approval Form for period ending November 2016 24-May-19 Tanya Power
P-03766 Cost Approval Form for period ending December 2016 24-May-19 Tanya Power
P-03767 Cost Approval Form for period ending May 2017 24-May-19 Tanya Power
P-03768 Cost Approval Form for period ending June 2017 24-May-19 Tanya Power
P-03769 Nalcor Energy - Lower Churchill Project - Management of Manpower Forecast dated September 11, 2017 24-May-19 Tanya Power
P-03770 Nalcor Energy - Lower Churchill Project - Project Work Breakdown Structure and Code of Accounts dated October 15, 2017 24-May-19 Tanya Power
P-03771 Cost Approval Form for period ending January 2018 24-May-19 Tanya Power
P-03772 Nalcor Energy - Lower Churchill Project - Project Control Management Plan dated April 6, 2018 24-May-19 Tanya Power
P-03773 Nalcor Energy - Lower Churchill Project - Technical Interface Management Plan dated April 18, 2018 24-May-19 Tanya Power
P-03774 Nalcor Energy - Lower Churchill Project presentation dated May 2018 re Lower Churchill Project - Project Controls 24-May-19 Tanya Power
P-03775 Nalcor Energy - Lower Churchill Project - Change Management Procedure dated September 28, 2018 24-May-19 Tanya Power
P-03776 Nalcor Energy - Lower Churchill Project - Project Change Management Plan dated December 19, 2011 24-May-19 Tanya Power
P-03777 Nalcor Energy - Lower Churchill Project - Procedure for Cost Control dated May 10, 2016 24-May-19 Tanya Power
P-03778 Nalcor Energy - Lower Churchill Project - Procedure for Cost Control dated May 3, 2018 24-May-19 Tanya Power
P-03779 Memorandum dated April 9, 2019 from Tanya Power to McInnes Cooper re Summary of Management Outlook Cost Decks located in Response to a Request from Inquiry Counsel 24-May-19 Tanya Power
P-03780 Excerpt from Paul Harrington's text messages dated April 1, 2019 21-May-19 Ron Power
P-03781 Email dated January 24, 2011, 2:10:11 PM from ronpower@nalcorenergy.com to pathussey@nalcorenergy.com, lanceclarke@nalcorenergy.com, et al re Role Descriptions 21-May-19 Ron Power
P-03782 Letter dated April 23, 2019 from Deborah Hutchings to Barry Learmonth re Lance Clarke - Reply to Summons to Produce dated 11 April 2019 23-May-19 Lance Clarke
P-03783 Email dated February 23, 2011, 1:54:21 PM from colleensimpson@nalcorenergy.com to ronpower@nlacorenergy.com, cc markmcgrath@nalcorenergy.com and catherinerowsell@nalcorenergy.com re Area Manager - HVdc Specialty Installations & Switchyard 21-May-19 Ron Power
P-03784 Email dated November 22, 2013, 9:34:23 AM from ronpower@lowerchurchillproject.ca to robertwoolgar@lowerchurchillproject, cc pharrington@lowerchurchillproject.ca and scotto'brien@lowerchurchillproject.ca re Northspur discussion 21-May-19 Ron Power
P-03785 Email dated November 26, 2013, 4:48:37 PM from ronpower@lowerchurchillproject.ca to scotto'brien@lowerchurchillproject.ca, pharrington@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca, cc jasonkean@lowerchurchillproject.ca, gbennett@nalcorenergy.com and clarencehewit@lowerchurchillproject.ca re Confidential: Fw: S011-L010-200-170330-00222 NORTH SPUR Design & Request for Hydro Geological Studies 25 Nov 2013 21-May-19 Ron Power
P-03786 Astaldi Canada - Nalcor Energy - Lower Churchill Project - Package CH0007 - Core Technical Proposal - Appendix A13 - Execution Plan dated April 16, 2013 21-May-19 Ron Power
P-03787 Large Hydro Projects - Contract Size Information dated April 9, 2019 21-May-19 Ron Power
P-03788 List of Contract Admins / Contract Coordinators per Rev. B4 Org. Charts dated October 10, 2013 21-May-19 Ron Power
P-03789 PMX Personnel Not Hired 21-May-19 Ron Power
P-03790 Email dated August 24, 2016, 12:49 PM from Paul Harrington re Update 21-May-19 Ron Power
P-03791 Email dated May 2, 2014, 1:59:33 PM from lance.clarke to lanceclarke@nalcorenergy.com 23-May-19 Lance Clarke
P-03792 Email dated May 12, 2014, 5:13:09 PM from scottobrien@lowerchurchillproject.ca to Paul Harrington, cc Lance Clarke, Ed Bush, Gilbert Bennett, Jason Kean and Ron Power re EOI for CH0009 23-May-19 Lance Clarke
P-03793 Email dated May 13, 2014, 2:57:28 PM from lanceclarke@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca and scottobrien@lowerchurchillproject.ca re Astaldi Draft 23-May-19 Lance Clarke
P-03794 Email dated June 3, 2014, 2:50:37 PM from markturpin@lowerchurchillproject.ca to Scott O'Brien, Lance Clarke, Ron Power, Scott O'Brien, Paul Harrington and Pat Hussey re Update CH0009 - following meeting Friday 30th May 23-May-19 Lance Clarke
P-03795 Nalcor Energy - Lower Churchill Project presentation dated February 2016 re Muskrat Falls - Draft Cabinet Presentation 23-May-19 Lance Clarke
P-03796 Email dated May 28, 2015, 2:12:09 PM from lanceclarke@lowerchurchillproject.ca to Chelsea Beckett re Astaldi Notes 4 23-May-19 Lance Clarke
P-03797 Email dated May 28, 2015, 2:17:00 PM from lanceclarke@lowerchurchillproject.ca to Chelsea Beckett re Astaldi Notes 5 23-May-19 Lance Clarke
P-03798 Email dated July 16, 2015, 10:15:20 AM from lanceclarke@lowerchurchillproject.ca to Chelsea Beckett re Other notes for file 23-May-19 Lance Clarke
P-03799 Email dated July 16, 2015, 10:16:22 AM from lanceclarke@lowerchurchillproject.ca to Chelsea Beckett re Other Astaldi notes 23-May-19 Lance Clarke
P-03800 Email dated July 16, 2016, 2015, 10:17:09 AM from lanceclarke@lowerchurchillproject.ca to Chelsea Beckett re Other notes 23-May-19 Lance Clarke
P-03801 Email dated November 2, 2015, 3:21:23 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com and lanceclarke@lowerchurchillproject.ca, cc scottobrien@lowerchurchillproject.ca and ronpower@lowerchurchillproject.ca re Andritz - Gates 23-May-19 Lance Clarke
P-03802 Email dated June 7, 2016, 10:10:27 AM from Paul Harrington to Nik Argirov re Fwd: Just met with Stan 23-May-19 Lance Clarke
P-03803 Astaldi Completions Agreement DSP - Binder 1 23-May-19 Lance Clarke
P-03804 Astaldi Completions Agreement DSP - Binder 2 23-May-19 Lance Clarke
P-03805 Email dated January 4, 2017, 9:03:23 AM from jamesmeaney@lowerchurchillproject.ca to dsturge@nalcorenergy.com re Fw: Resignation: Deputy General Project Manager - J. Kean 23-May-19 Lance Clarke
P-03806 Email dated May 28, 2015, 2:21:38 PM from lanceclarke@lowerchurchillproject.ca to Chelsea Beckett re Astaldi Notes 6 23-May-19 Lance Clarke
P-03807 Email dated June 14, 2018, 10:40:36 PM from Paul Harrington to Lance Clarke re ASTALDI 23-May-19 Lance Clarke
P-03808 Scope of Services Summary - Lance Clarke 23-May-19 Lance Clarke
P-03809 Location of Project Managers during Project Construction (provided by Ron Power) 23-May-19 Ron Power
P-03810 May 2012 - 2017 Lower Churchill Reservoir Clearing Collective Agreement between Lower Churchill Reservoir Clearing Employers' Association Inc. and Labourers' International Union of North America and Construction and General Labourers' Union, Rock and Tunnel Workers Local 1208 dated June 15, 2013 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03811 Newfoundland and Labrador Regulation 67/13 - Lower Churchill Hydroelectric Generation Project - Special Project Order under the Labour Relations Act (O.C. 2013-189) dated June 17, 2013 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03812 Newfoundland and Labrador Regulation 68/13 - Lower Churchill Project Transmission Construction - Special Project Order under the Labour Relations Act (O.C. 2013-188) dated June 17, 2013 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03813 Newfoundland and Labrador Regulation 69/13 - Lower Churchill Reservoir Clearing - Special Project Order under the Labour Relations Act (O.C. 2013-190) dated June 17, 2013 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03814 May 1, 2012 - May 1, 2017 Lower Churchill Project Transmission Construction Collective Agreement between Lower Churchill Transmission - Construction Employers' Association Inc. and International Brotherhood of Electrical Works and IBEW Local Union 1620 - Revision 2 dated April 14, 2014 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03815 May 1, 2012 - May 1, 2017 Lower Churchill Project Transmission Construction Collective Agreement between Lower Churchill Transmission - Construction Employers' Association Inc. and International Brotherhood of Electrical Works and IBEW Local Union 1620 - Revision 3.1 dated August 15, 2014 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03816 Letter dated October 17, 2017 from Carol Ann Molloy to Pat McCormack re Grievance # 273 Settlement 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03817 Nalcor Energy - Lower Churchill Project - Collective Agreement between Muskrat Falls Employers' Association Inc. and Resource Development Trades Council of Newfoundland and Labrador dated May 9, 2018 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03818 Muskrat Falls Arbitration Log dated September 3, 2013 to February 7, 2019 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03819 Resource Development Trades Council presentation re Muskrat Falls Grievance Updated - March 29, 2013 to April 8, 2019 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03820 Clark Labour and Training Solutions presentation re Development of a Labour Framework for Bull Arm Fabrication 23-May-19 Lance Clarke
P-03821 Email dated April 7, 2014, 2:53:04 PM from SaraHussey@lowerchurchillproject.ca to cps re 15012-OB Amending Agreement No. 8 23-May-19 Lance Clarke
P-03822 Email dated June 6, 2016, 9:49:20 PM from Keith Dodson to Lance Clarke re Current situation 23-May-19 Lance Clarke
P-03823 Sworn Statement dated November 29, 2013 by Julia Mullaley 29-May-19 Julia Mullaley
P-03824 Email dated June 16, 2014, 11:23:14 AM from Julia Mullaley to Jacquelyn Howard and Paula Burt, cc Charles W. Bown re Update on MF capital cost 29-May-19 Julia Mullaley
P-03825 Email dated July 7, 2014, 3:53:15 PM from Julia Mullaley to Catherine Evans and Mabel MacPherson re FW: Meeting and Update with Premier 29-May-19 Julia Mullaley
P-03826 Internal Memorandum dated May 8, 2015 re Notes from the meeting with Julia Mullaley and Craig Martin on May 6, 2015 29-May-19 Julia Mullaley
P-03827 Email dated June 23, 2015, 12:47:19 PM from Julia Mullaley to Milly Brown, cc Craig Martin re Tom Baird (@BairdTom) mentioned you in conversation on Twitter! 29-May-19 Julia Mullaley
P-03828 Meeting Request for August 18, 2015, 11:00 AM from Paul A Davis to Charles W. Bown, Ross Wiseman, et al re Ed Martin - Muskrat Falls Update 29-May-19 Julia Mullaley
P-03829 Email dated September 28, 2015, 11:02:08 AM from Heather MacLean to Paula Burt and Julia Mullaley, cc Joe Browne re Info for distribution to Cabinet for MF conversation this afternoon 29-May-19 Julia Mullaley
P-03830 Email dated September 29, 2015, 12:15:29 AM from Milly Brown to Kevin Penney and Alison Macleod-Boland re Fw: Draft 29-May-19 Julia Mullaley
P-03831 Email dated October 15, 2015, 2:12:58 PM from Craig Martin to Julia Mullaley and Charles W Bown re FW: Update on report 29-May-19 Julia Mullaley
P-03832 Email dated December 20, 2015, 1:25:22 PM from Julia Mullaley to Tracy King, Paul Myrden, et al re Final report and Nalcor Response 29-May-19 Julia Mullaley
P-03833 Email dated January 15, 2016, 4:48:23 PM from David Steele to Julia Mullaley re FW: Scanned document from David.Steele@ca.ey.com 29-May-19 Julia Mullaley
P-03834 GNL presentation dated March 10, 2016 re Summary of EY Interim Report - March 2016 29-May-19 Julia Mullaley
P-03835 Email dated April 12, 2016, 9:18:37 AM from Julia Mullaley to Tim Murphy, Kelvin Parsons, et al re Fw: Summary - Reasons why not to shut down MF 29-May-19 Julia Mullaley
P-03836 Email dated April 22, 2016, 1:58:00 PM from David Steele to Julia Mullaley re Muskrat Falls - Discussion regarding next steps 29-May-19 Julia Mullaley
P-03837 Email dated June 13, 2016, 11:41:12 AM from Julia Mullaley to PHarrington@lowerchurchillproject.ca, cc GBennett@nalcorenergy.com, JasonKean@lowerchurchillproject.ca, et al re EY 29-May-19 Julia Mullaley
P-03838 Email dated August 10, 2016, 9:29:46 PM from Julia Mullaley to Siobhan Coady re Fw: MF Update 29-May-19 Julia Mullaley
P-03839 Email dated August 11, 2016, 9:05:15 PM from Charles W. Bown to Julia Mullaley and Cindy Hussey re KM's Nalcor 29-May-19 Julia Mullaley
P-03840 Email dated September 6, 2016, 2:31:00 PM from David Steele to Julia Mullaley re EY report - MRF 29-May-19 Julia Mullaley
P-03841 Nalcor Energy - Lower Churchill Project - Labour Model Recommendations Report ("Report") dated February 10, 2011 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03842 Review of Special Project Order Legislation in Newfoundland and Labrador dated February 29, 2012 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03843 List of Unions and Brief Description of Work 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03844 Email dated December 22, 2015, 10:32:15 AM from briancrawley@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca and gbennett@nalcorenergy.com re Detailed summary of grievances - project to date 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03845 Memorandum of Understanding dated May 31, 2016 between Lower Churchill Transmission Construction Employers' Association Inc. ("Association") and International Brotherhood of Electrical Workers and IBEW Local Union 1620 ("Union") re Travel Time 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03846 Email dated September 16, 2016, 5:09:54 PM from Donald Delarosbil to scottobrien@lowerchurchillproject.ca re Fwd: Letter Stan Marshall 30-May-19 Scott O'Brien
P-03847 Email dated November 20, 2017, 1:05:57 PM from Donald Delarosbil to ScottOBrien@lowerchurchillproject.ca re Disputed Items 30-May-19 Scott O'Brien
P-03848 Email dated December 8, 2017, 2:42:07 PM from Donald Delarosbil to ScottOBrien@lowerchurchillproject.ca re Confidential Commercial Negotiations 30-May-19 Scott O'Brien
P-03849 Email dated January 29, 2018, 11:39:46 AM from Donald Delarosbil to ScottOBrien@lowerchurchillproject.ca re 20 million change order 30-May-19 Scott O'Brien
P-03850 Email dated February 6, 2018, 10:38:08 AM from Donald Delarosbil to ScottOBrien@lowerchurchillproject.ca to Lance Clarke, Francesco Rotundi and Georges Bader re 2017 Claims Agreement 30-May-19 Scott O'Brien
P-03851 Email dated June 24, 2014, 4:41:47 PM from Charles W. Bown to Julia Mullaley, Paula Burt and Tracy English re Fw: Presentation for Cabinet tomorrow morning 29-May-19 Julia Mullaley
P-03852 Email dated July 3, 2014, 8:56:10 PM from Julia Mullaley to Milly Brown and Darrell Hynes re Fw: Quebec 29-May-19 Julia Mullaley
P-03853 Letter dated July 31, 2014 from Julia Mullaley to Derrick Sturge re Additional Auditing Procedures 29-May-19 Julia Mullaley
P-03854 Email dated September 27, 2015, 4:17:39 PM from dawndalley@nalcorenergy.com to Julia Mullaley re Report with our comments 29-May-19 Julia Mullaley
P-03855 Email dated September 27, 2015, 7:56:20 PM from dawndalley@nalcorenergy.com to Julia Mullaley re Report with our comments 29-May-19 Julia Mullaley
P-03856 Email dated February 24, 2016, 3:04:17 PM from Julia Mullaley to Siobhan Coady re FW: Astaldi Options Analysis 29-May-19 Julia Mullaley
P-03857 Email dated March 5, 2016, 8:56:45 PM from emartin@nalcorenergy.com to Julia Mullaley re This week 29-May-19 Julia Mullaley
P-03858 Email dated March 15, 2016, 1:33 PM from David Leather to Julia Mullaley, cc Paul Hickey re Comments on Nalcor's Negotiating Strategy 29-May-19 Julia Mullaley
P-03859 Email dated April 10, 2019, 9:54 AM from Peter Ralph to Julia Mullaley re Minute of Council 29-May-19 Julia Mullaley
P-03860 RSNL 1990 Chapter L-1 - Labour Relations Act - An Act Respecting Labour Relations in the Province 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03861 Email dated August 11, 2013, 1:49:29 PM from ronpower@lowerchurchillproject.ca to scotto'brien@lowerchurchillproject.ca re CV - a few edits - pls review 30-May-19 Scott O'Brien
P-03862 Email dated February 11, 2011, 3:56 PM from colleensimpson@nalcorenergy.com to ronpower@nalcorenergy.com re Area Mgr-Muskrat Falls Dams and Spillways 30-May-19 Scott O'Brien
P-03863 Email dated April 11, 2014, 6:15:51 AM from pathussey@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca re Confidential 30-May-19 Scott O'Brien
P-03864 Email dated August 14, 2014, 8:37:18 AM from scottobrien@lowerchurchillproject.ca to Scott O'Brien re Fwd: Letter from Gilbert 7 August 30-May-19 Scott O'Brien
P-03865 Email dated November 9, 2015, 3:51 PM from scottobrien@lowerchurchillproject.ca to Grant Horwood, Robert Woolgar, et al re CH0008 - Winter Shutdown 30-May-19 Scott O'Brien
P-03866 Email dated December 13, 2015, 5:17:29 PM from scottobrien@lowerchurchillproject.ca to Lance Clarke re Confidential: Update North Spur 30-May-19 Scott O'Brien
P-03867 Email dated June 23, 2014, 2:47:07 PM from Scott O'Brien to Ron Power and Robert Woolgar re Fwd: Astaldi Update - Notes from Today's Meeting 30-May-19 Scott O'Brien
P-03868 Email dated July 16, 2014, 6:43:04 PM from scottobrien@lowerchurchillproject.ca to Gilbert Bennett, Ron Power and Paul Harrington re Fwd: Astaldi Action Plan VEO Prep - 15-July-2014 rev 1 30-May-19 Scott O'Brien
P-03869 Email dated June 9, 2015, 11:12:31 AM from scottobrien@lowerchurchillproject.ca to Ron Power and Ed Bush re Fwd: Astaldi Schedule 30-May-19 Scott O'Brien
P-03870 Email dated April 13, 2016, 3:24:57 PM from scottobrien@lowerchurchillproject.ca to Lance Clarke re Fwd: C! schedule 30-May-19 Scott O'Brien
P-03871 Email dated July 17, 2014, 9:39:15 AM from lanceclarke@lowerchurchillproject.ca to Paul Harrington, cc Scott O'Brien, Gilbert Bennett and Ron Power re Astaldi Action Plan VEO Prep - 15-July-2014 rev 1 30-May-19 Scott O'Brien
P-03872 Email dated July 17, 2014, 4:29:28 PM from ronpower@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca, cc Gilbert Bennett and Paul Harrington re Fwd: Astaldi Action Plan VEO Prep - 15-July-2014 rev 1 30-May-19 Scott O'Brien
P-03873 Email dated October 31, 2013, 5:43:10 PM from edover@lowerchurchillproject.ca to frankgillespie@lowerchurchillproject.ca and scotto'brien@lowerchurchillproject.ca re Fw: CH0032 - Approved LNTP - Signed by both parties 30-May-19 Scott O'Brien
P-03874 Memo dated January 25, 2016 from Julia Mullaley to Premier re Nalcor entering into discussions with Astaldi 29-May-19 Julia Mullaley
P-03875 Letter dated May 3, 2019 from Michael Gillingham to Barry Learmonth re Newfoundland and Labrador Building and Construction Trades Council and Resource Development Trades Council of Newfoundland and Labrador 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03876 Email dated August 22, 2016, 12:15:19 PM from Paul Carter to Nina Goudie, cc Suzanne Williams, Julia Mullaley, et al re Welcome 3-Jun-19 Paul Carter
P-03877 Email dated September 7, 2016, 11:48:26 AM from Paul Carter to StevePellerin@lowerchurchillproject.ca re Some early questions 3-Jun-19 Paul Carter
P-03878 Email dated September 21, 2016, 10:52:26 AM from Paul Carter to David Steele, cc Julia Mullaley re Muskrat - alignment on next steps 3-Jun-19 Paul Carter
P-03879 Email dated October 5, 2016, 5:14:09 PM from David Steele to Paul Carter re Tomorrow 3-Jun-19 Paul Carter
P-03880 Email dated November 12, 2016, 11:17:38 AM from Paul Carter to Bernard Coffey re KM's OC report 3-Jun-19 Paul Carter
P-03881 Email dated November 16, 2016, 4:28:59 PM from Paul Carter to Krista Quinlan and Bernard Coffey re FW: Note on cofferdam at Muskrat Falls 3-Jun-19 Paul Carter
P-03882 Email dated November 22, 2016, 8:01:07 AM from Paul Carter to StevePellerin@lowerchurchillproject.ca re Report 3-Jun-19 Paul Carter
P-03883 Email dated November 22, 2016, 2:44:09 PM from Paul Carter to Bernard Coffey re FW: NDP NR - Government must establish proper oversight for Nalcor 3-Jun-19 Paul Carter
P-03884 Email dated November 22, 2016, 3:11:23 PM from Paul Carter to Bernard Coffey re FW: July '16 IE Ste Visit Report 3-Jun-19 Paul Carter
P-03885 Email dated November 23, 2016, 7:34:22 PM from Paul Carter to Charles W. Bown, cc Krista Quinlan and Bernard Coffey re briefing 3-Jun-19 Paul Carter
P-03886 Email dated November 23, 2016, 3:30:37 PM from Paul Carter to Bernard Coffey re Summary 3-Jun-19 Paul Carter
P-03887 Email dated December 3, 2016, 12:57:16 PM from Paul Carter to Bernard Coffey re Fw: Nalcor - Update on cofferdam 3-Jun-19 Paul Carter
P-03888 GNL Draft Information Note - Cabinet Secretariat dated December 7, 2016 re Muskrat Falls Oversight Committee November 29-31 Site Visits and Meetings 3-Jun-19 Paul Carter
P-03889 Letter dated December 14, 2016 from Paul Q. Carter to Gilbert Bennett re Independent Engineer July 2016 Site Visit Report Dated November 2, 2016 3-Jun-19 Paul Carter
P-03890 Email dated December 14, 2016 from Paul Carter to gbennett@nalcorenergy.com, cc stevepellerin@lowerchurchillproject.ca re Oversight Committee Letter 3-Jun-19 Paul Carter
P-03891 Email dated February 9, 2017, 4:46:35 PM from Paul Carter to Bernard Coffey, cc Krista Quinlan re FW: Daily Updates 3-Jun-19 Paul Carter
P-03892 Email dated March 10, 2017, 8:55:22 AM from Paul Carter to Bernard Coffey, cc Charles Bown, Diana Quinton, et al re FW: November-Dec IE Trip report 3-Jun-19 Paul Carter
P-03893 Email dated March 31, 2017, 2:28:16 PM from Paul Carter to gbennett@nalcorenergy.com, cc StevePellerin@lowerchurchillproject.ca re North Spur 3-Jun-19 Paul Carter
P-03894 Email dated April 22, 2017, 11:06:33 AM from Paul Carter to Bernard Coffey re New Document: MFG Project Unit #2, Pour D2ESB-03, Draft Tube Formwork Collapse Investigation Report 3-Jun-19 Paul Carter
P-03895 Email dated May 12, 2017, 10:23:10 AM from Paul Carter to Charles Bown re FW: Attached letter from Gilbert Bennett 3-Jun-19 Paul Carter
P-03896 Email dated May 28, 2017, 9:27:00 PM from David Steele to Charles Bown and Paul Carter, cc Paul Hickey and Michael Kennedy re Muskrat Falls - EY SOW 3-Jun-19 Paul Carter
P-03897 Email dated June 2, 2017, 3:26:58 PM from Charles Bown to David Steele and Paul Carter re SOW 3-Jun-19 Paul Carter
P-03898 Email dated July 14, 2017, 12:26:39 PM from Paul Carter to Vanessa Newhook, Vanessa Newhook and Cory Grandy re EY 3-Jun-19 Paul Carter
P-03899 Email dated July 20, 2017, 9:18:37 AM from Paul Carter to gbennett@nalcorenergy.com and StevePellerin@lowerchurchillproject.ca re North Spur Letter 3-Jun-19 Paul Carter
P-03900 Email dated Paul Carter to Carolyn Jarvis, Charles Bown, et al re FW: Letter from Premier Dwight Ball 3-Jun-19 Paul Carter
P-03901 Email dated August 30, 2017, 3:16:11 PM from Paul Carter to David Steele re FW: Comments on EY 3-Jun-19 Paul Carter
P-03902 Email dated August 31, 2017, 1:06:18 PM from Paul Carter to Carolyn Jarvis, Charles Bown, et al re EY report 3-Jun-19 Paul Carter
P-03903 Email dated October 31, 2017, 10:48:09 AM from jason muise to Charles Bown, cc Paul Carter, Carolyn Jarvis re Committee Quarterly Report 3-Jun-19 Paul Carter
P-03904 Guiding Principles that differentiates the Project dated March 5, 2012 27-May-19 Pat McCormick/ Dave Wade/ Tom Walsh
P-03905 Email dated May 2, 2014, 4:18 PM from Cindy Hussey to Craig Martin, cc Renee Tinkov re Draft Contract 3-Jun-19 Craig Martin
P-03906 Email dated May 27, 2014, 8:34:27 PM from David Steele to Craig Martin re OC Objectives and Role_v1.docx 3-Jun-19 Craig Martin
P-03907 Email dated May 30, 2014, 2:04:04 PM from Cindy Hussey to Renee Tinkov and Suzanne Williams, cc Craig Martin, Tracy King and Julia Mullaley re C. Martin Contract - Schedule A 3-Jun-19 Craig Martin
P-03908 Nalcor Energy - Lower Churchill Project presentation dated June 24, 2014 re Muskrat Falls Project - Value and Cost Update 3-Jun-19 Craig Martin
P-03909 Email dated July 24, 2014, 4:38:10 PM from Craig Martin to Charles W. Bown re Fw: IPS and Level 3 3-Jun-19 Craig Martin
P-03910 Email dated July 24, 2014, 4:58:00 PM from Richard Noble to Craig Martin re Follow up to that note 3-Jun-19 Craig Martin
P-03911 Email dated September 17, 2014, 3:35:21 PM from Craig Martin to Jim re MWH Update 3-Jun-19 Craig Martin
P-03912 Email dated October 2, 2014, 6:30:32 AM from Craig Martin to JamesMeaney@lowerchurchillproject.ca re RFP 3-Jun-19 Craig Martin
P-03913 Email dated November 28, 2014, 4:59:26 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com, koneill@nlh.nl.ca and briancrawley@lowerchurchillproject.ca, cc James Meaney and Craig Martin re Deck used with OC today 3-Jun-19 Craig Martin
P-03914 Email dated December 16, 2014, 10:44:11 PM from gbennett@nalcorenergy.com to Craig Martin and Charles Bown, cc jamesmeaney@lowerchurchillproject.ca re Questions re report 3-Jun-19 Craig Martin
P-03915 Email dated December 17, 2014, 5:00:05 PM from JamesMeaney@lowerchurchillproject.ca to Craig Martin, cc GBennett@nalcorenergy.com, PHarrington@lowerchurchillproject.ca and EdBush@lowerchurchillproject.ca re Cost Variances 3-Jun-19 Craig Martin
P-03916 Email dated January 7, 2015, 12:19 PM from gbennett@nalcorenergy.com to Craig Martin, cc Charles Bown and Paul Harrington re Meeting this Thursday 3-Jun-19 Craig Martin
P-03917 Email dated January 16, 2015, 11:59:00 AM from David Steele to Craig Martin re Muskrat Falls - SOW for Project Controls Review_draft_Jan15.pptx 3-Jun-19 Craig Martin
P-03918 Email dated February 23, 2015, 12:24:00 PM from David Steele to Craig Martin re FW: Scanned document for David.Steele@ca.ey.com 3-Jun-19 Craig Martin
P-03919 Email dated March 12, 2015, 9:11 AM from Craig Martin to Milly Brown and Julia Mullaley re News release for review: Muskrat Falls Remains on Time and on Budget 3-Jun-19 Craig Martin
P-03920 Email dated March 19, 2015, 1:11:03 PM from Craig Martin to stevepellerin@lowerchurchillproject.ca re FYI 3-Jun-19 Craig Martin
P-03921 Email dated March 28, 2015, 2:45:13 PM from jamesmeaney@lowerchurchillproject.ca to Craig Martin, cc shewalsh@deloitte.ca and Steve Pellerin re Deloittes Additional Procedures Draft Report 3-Jun-19 Craig Martin
P-03922 Email dated April 22, 2015, 9:37:27 AM from mbradbury@nalcorenergy.com to Craig Martin, cc jackieborden@nalcorenergy.com re my call 3-Jun-19 Craig Martin
P-03923 Email dated May 7, 2015, 2:00 PM from Clerk of Executive Council to Charles W. Bown, Donna Brewer, et al cc Paula Burt, Cindy Hussey, et al re EXECUTIVE APPOINTMENT 3-Jun-19 Craig Martin
P-03924 Email dated June 23, 2015, 2:53 PM from pharrington@lowerchurchillproject.ca to Craig Martin, cc stevepellerin@lowerchurchillproject.ca re IE References 3-Jun-19 Craig Martin
P-03925 Email dated September 28, 2015, 3:22:36 PM from Craig Martin to Dawn Dalley, cc Julia Mullaley re Draft Report 3-Jun-19 Craig Martin
P-03926 Email dated September 28, 2015, 6:34:26 PM from Craig Martin to Dawn Dalley re Fw: MF Oversight Committee Report and IE references 3-Jun-19 Craig Martin
P-03927 Email dated September 28, 2015, 10:12:29 PM from Craig Martin to DawnDalley@nalcorenergy.com re MF Oversight Committee Report and IE references 3-Jun-19 Craig Martin
P-03928 Email dated September 28, 2015, 10:35:29 PM from David Steele to Paul Hickey re FW: Update from EY 3-Jun-19 Craig Martin
P-03929 Email dated November 9, 2015, 3:58:57 PM from dawndalley@nalcorenergy.com to Harman Khurana, cc Steve Pellerin and Craig Martin re Updated Draft Reports 3-Jun-19 Craig Martin
P-03930 Email dated November 25, 2015, 8:38:47 AM from stevepellerin@lowerchurchillproject.ca to Harman Khurana re Updated Draft Reports 3-Jun-19 Craig Martin
P-03931 Email dated December 21, 2015, 8:59 AM from Craig Martin to Julia Mullaley re Fw: Q & A Update 3-Jun-19 Craig Martin
P-03932 Email dated January 3, 2016, 11:22:44 AM from David Steele to Julia Mullaley re Detailed Supplement 3-Jun-19 Craig Martin
P-03933 Email dated February 13, 2016, 4:28:03 PM from Craig Martin to Julia Mullaley, Charles W. Bown and Cory Grandy re Oversight Steering Meeting next week 3-Jun-19 Craig Martin
P-03934 Email dated March 16, 2016, 10:47:04 AM from Craig Martin to pharrington@lowerchurchillproject.ca re FW: MF reports 3-Jun-19 Craig Martin
P-03935 Email dated November 19, 2016, 1:02:50 PM from Craig Martin to auburnwarren@nalcorenergy.com re COREA issues.docx 3-Jun-19 Craig Martin
P-03936 GNL News Release dated April 10, 2017 re New Muskrat Falls Oversight Committee Members Announced 3-Jun-19 Craig Martin
P-03937 Email dated August 7, 2017, 7:19:00 AM from robhull@nalcorenergy.com to Jim Haynes, Elizabeth Lewis, et al re Draft Terms of Reference 3-Jun-19 Craig Martin
P-03938 GNL Memorandum to Executive Council dated August 31, 2011 re Memorandum of Principles Outlining Commercial Arrangements to Enable Financing of Phase One of the Lower Churchill Project 29-May-19 Julia Mullaley
P-03939 Letter dated May 27, 2019 from Iris Power to Honourable Richard LeBlanc re Julia Mullaley's black notebooks 29-May-19 Julia Mullaley
P-03940 GNL Information Note dated December 2, 2013 re Lower Churchill Project - Contingent Equity Funding of Cost Overruns 29-May-19 Julia Mullaley
P-03941 Nalcor Energy - Lower Churchill Project dated March 21, 2019 re Muskrat Falls Generation Project - Safety Performance - 2 Years LTI Free 30-May-19 Scott O'Brien
P-03942 Astaldi monthly room counts from forecast vs Lab Catering vs BMRS - August 2013 to October 2018 30-May-19 Scott O'Brien
P-03943 Average Response Time for CONs & SQYs - 2015 - 2018 30-May-19 Scott O'Brien
P-03944 CBTU Conference 2019 - First-Ever CBTU Distinction Awards Recognize Industry Changemakers in Apprenticeship, Health and Safety and Community Benefits dated April 29, 2019 30-May-19 Scott O'Brien
P-03945 Muskrat Falls Project - Achieving Safety Success Together - Muskrat Falls Project Recognized with Health and Safety Distinction Award dated April 30, 2019 30-May-19 Scott O'Brien
P-03946 Nalcor Energy - Lower Churchill Project CH0007 Management Report - Week #07 - Report Period: February 11, 2018 to February 17, 2018 30-May-19 Scott O'Brien
P-03947 Astaldi Concession Request / Site Queries Response Time from January 2014 until termination 30-May-19 Scott O'Brien
P-03948 Scott O'Brien - Out-of-Province Travel - 2012 to 2018 30-May-19 Scott O'Brien
P-03949 Agreement LC-PM-058 for Professional Services for Lower Churchill Project between Nalcor Energy and SRO Consulting Services dated March 16, 2011 30-May-19 Scott O'Brien
P-03950 Amending Agreement Number 1 dated April 19, 2012 between Nalcor Energy and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03951 Amending Agreement Number 3 dated April 23, 2013 between Nalcor Energy and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03952 Amending Agreement Number 2 dated June 27, 2013 between Nalcor Energy and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03953 Assignment Agreement dated February 26, 2014 to Scott O'Brien re Assignment of Agreements listed in Schedule A between Nalcor Energy and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03954 Amending Agreement Number 4 dated April 17, 2014 between Lower Churchill Management Corporation and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03955 Amending Agreement Number 5 dated April 17, 2015 between Lower Churchill Management Corporation and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03956 Amending Agreement Number 6 dated March 23, 2016 between Lower Churchill Management Corporation and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03957 Amending Agreement Number 7 dated March 23, 2017 between Lower Churchill Management Corporation and SRO Consulting Services Inc. 30-May-19 Scott O'Brien
P-03958 Muskrat Falls Corporation - Lower Churchill Project - Muskrat Falls Generation Facility - Authorization for Expenditure (AFE) dated March 6, 2014 5-Jun-19 Paul Harrington
P-03959 Muskrat Falls Corporation - Lower Churchill Project - Muskrat Falls Generation Facility - Authorization for Expenditure (AFE) dated March 6, 2014 (Revised) 5-Jun-19 Paul Harrington
P-03960 August 2015 Briefing Deck by CEO (EJM) VP (GB) to the Premier, Minister of Finance, Julia Mullaley, Charles Bown. Cap cost of $7.65B (leading to AFE rev 2) 5-Jun-19 Paul Harrington
P-03961 Email dated September 4, 2015, 8:20:11 AM from pharrington@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca re Fw: draft deck for tomorrow's excomm 5-Jun-19 Paul Harrington
P-03962 Email dated June 21, 2012, 7:19:30 AM from Patrick Lamarre to Joseph Salim re Performance issue 5-Jun-19 Paul Harrington
P-03963 Email dated July 12, 2018, 4:16:41 PM from pharrington@lowerchurchillproject.ca to scottobrien@lowerchurchillproject.ca and ronpower@lowerchurchillproject.ca re Fw: [External] URGENT 5-Jun-19 Paul Harrington
P-03964 Email dated July 22, 2013, 11:06 PM from EMartin@nalcorenergy.com to Paul Harrington, cc GBennett@nalcorenergy.com re Tonight's discussion 5-Jun-19 Paul Harrington
P-03965 Email dated May 20, 2016, 5:33 PM from traceypennell@nalcorenergy.com to koneill@nlh.nl.ca and markking@nalcorenergy.com, cc annmalone@nalcorenergy.com re ATIPP - final response 5-Jun-19 Paul Harrington
P-03966 Email dated June 4, 2017, 3:45:23 PM from pharrington@lowerchurchillproject.ca to smarshall@nalcorenergy.com, gbennett@nalcorenergy.com and lanceclarke@lowerchurchillproject.ca re Fw: Draft Update from Stan 5-Jun-19 Paul Harrington
P-03967 Email dated April 30, 2018, 4:12:20 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com, cc scottobrien@lowerchurchillproject.ca re Progress Update meeting with Stan 5-Jun-19 Paul Harrington
P-03968 Email dated June 5, 2016, 5:16 PM from Paul Harrington to Ron Power, lance.clarke, et al re Fwd: Letter 5-Jun-19 Paul Harrington
P-03969 Email dated November 28, 2013, 10:00 AM from pharrington@lowerchurchillproject.ca to robertwoolgar@lowerchurchillproject.ca, ronpower@lowerchurchillproject.ca, and scotto'brien@lowerchurchillproject.ca, cc bobilett@lowerchurchillproject.ca, regisbouchard@lowerchurchillproject.ca, gbennett@nalcorenergy.com re IE report comments - urgent 5-Jun-19 Paul Harrington
P-03970 Email dated September 1, 2015, 3:28:46 PM from pharrington@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca, stevepellerin@lowerchurchillproject.ca and gbennett@nalcorenergy.com re IE 5-Jun-19 Paul Harrington
P-03971 Email dated June 11, 2015, 10:09 AM from anthonyembury@lowerchurchillproject.ca to georgechehab@lowerchurchillproject.ca, tomchudy@lowerchurchillproject.ca, et al re Fw: Draft Findings - "CONFIDENTIAL" 5-Jun-19 Paul Harrington
P-03972 Email dated January 17, 2016, 1:51:07 PM from pharrington@lowerchurchillproject.ca to lanceclarke@lowerchurchillproject.ca, cc Brian Crawley, Jason Kean and Steve Pellerin re Plan for next week 5-Jun-19 Paul Harrington
P-03973 Email dated March 11, 2016, 8:42 AM from jamesmeaney@lowerchurchillproject.ca to Auburn Warren re FLG 2 5-Jun-19 Paul Harrington
P-03974 Email dated March 15, 2013, 8:07:08 AM from ronpower@nalcorenergy.com to Francois Couturier, cc Jason Kean and Normand Bechard re Fw: Announcement: Integrated Management Team 5-Jun-19 Paul Harrington
P-03975 Email dated March 30, 2013, 5:05 PM from Ed Martin to Paul Harrington and Gilbert Bennett, cc Lance Clarke re Meeting with Bob Card and Scott Thon April 25th 5-Jun-19 Paul Harrington
P-03976 Email dated July 22, 2013, 11:14:38 PM from Paul Harrington to Brian Crawley re Fwd: Tonight's discussion 5-Jun-19 Paul Harrington
P-03977 Email dated April 18, 2014, 1:00:40 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com and emartin@nalcorenergy.com re Fw: Astaldi 5-Jun-19 Paul Harrington
P-03978 Email dated May 7, 2014, 10:31 PM from gbennett@nalcorenergy.com to pharrington re ASTALDI 5-Jun-19 Paul Harrington
P-03979 Email dated April 8, 2015, 12:01:01 PM from pharrington@lowerchurchillproject.ca to edbush@lowerchurchillproject.ca, ronpower@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca, cc jasonkean@lowerchurchillproject.ca and briancrawley@lowerchurchillproject.ca re Checking First 5-Jun-19 Paul Harrington
P-03980 Email dated May 4, 2015, 5:02:17 PM from edbush@lowerchurchillproject.ca to pharrington@lowerchurchillproject.ca, cc ronpower@lowerchurchillproject.ca, scottobrien@lowerchurchillproject.ca, et al re Astaldi Performance Targets - April 2015 5-Jun-19 Paul Harrington
P-03981 Email dated August 2, 2015, 10:52:50 AM from lanceclarke@lowerchurchillproject.ca to Paul Harrington re Astaldi Advance 5-Jun-19 Paul Harrington
P-03982 Email dated August 7, 2016, 1:36:07 PM from pharrington@lowerchurchillproject.ca to gbennett@nalcorenergy.com and lanceclarke@lowerchurchillproject.ca, cc scottobrien@lowerchurchillproject.ca and ronpower@lowerchurchillproject.ca re Scott meeting with Don D- Friday 5-Jun-19 Paul Harrington
P-03983 Email dated March 29, 2018, 10:08 AM from pharrington@lowerchurchillproject.ca to smarshall@nalcorenergy.com and gbennett@nalcorenergy.com, cc lanceclarke@lowerchurchillproject.ca, scottobrien@lowerchurchillproject.ca and ronpower@lowerchurchillproject.ca re Astaldi Challenges 5-Jun-19 Paul Harrington
P-03984 Email dated June 24, 2013, 10:50:19 AM from ronpower@lowerchurchillproject.ca to scotto'brien@lowerchurchillproject.ca, cc pharrington@lowerchurchillproject.ca, jasonkean@lowerchurchillproject.ca, et al re Acceleration of Engineering Design Work for South Dam, Cofferdams and North RCC Dam 5-Jun-19 Paul Harrington
P-03985 - 01 Email dated May 12, 2019, 2:53:57 PM from Daniel Simmons to Michael Collins, cc Admin, Irene Muzychka, et al re FW: $100 million revenue NPV increase - EAA 4-Jun-19 Auburn Warren
P-03985 - 02 Attachment to Email dated May 12, 2019, 2:53:57 PM from Daniel Simmons to Michael Collins, cc Admin, Irene Muzychka, et al re FW: $100 million revenue NPV increase - EAA 4-Jun-19 Auburn Warren
P-03986 Email dated October 6, 2013, 7:12 PM from torielly@nalcorenergy.com to Rob Henderson and Auburn Warren, cc Kevin Goulding re Long Term Island Interconnected Fuel and Power Purchase 4-Jun-19 Auburn Warren
P-03987 Email dated October 7, 2013, 8:52:57 PM from torielly@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc gordonalexander@nlh.nl.ca re MF COD - Impact of Delay on Fuel Costs 4-Jun-19 Auburn Warren
P-03988 - 01 Email dated October 7, 2013, 11:18 AM from torielly@nalcorenergy.com to kevingoulding@nlh.nl.ca re Long Term Island Interconnected Fuel and Power Purchase Forecast 4-Jun-19 Auburn Warren
P-03988 - 02 Attachment to Email dated October 7, 2013, 11:18 AM from torielly@nalcorenergy.com to kevingoulding@nlh.nl.ca re Long Term Island Interconnected Fuel and Power Purchase Forecast 4-Jun-19 Auburn Warren
P-03988 - 03 Attachment to Email dated October 7, 2013, 11:18 AM from torielly@nalcorenergy.com to kevingoulding@nlh.nl.ca re Long Term Island Interconnected Fuel and Power Purchase Forecast 4-Jun-19 Auburn Warren
P-03989 Waterfall DG3 vs RFF Analysis Excel Spreadsheet 4-Jun-19 Auburn Warren
P-03990 - 01 Email dated April 15, 2019, 4:48:52 PM from Daniel Simmons to Michael Collins, cc Admin and Dana Martin re [Potential Junk/Spam] FW: [External] FW: $300 million savings 4-Jun-19 Auburn Warren
P-03990 - 02 Attachment to Email dated April 15, 2019, 4:48:52 PM from Daniel Simmons to Michael Collins, cc Admin and Dana Martin re [Potential Junk/Spam] FW: [External] FW: $300 million savings 4-Jun-19 Auburn Warren
P-03991 - 01 Delay in LC COD IE Spreadsheet - 2017 and 2018 Strategist Output 4-Jun-19 Auburn Warren
P-03992 - 01 Email dated October 26, 2013, 10:31:09 PM from torielly@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc gordonalexander@nlh.nl.ca re Fw: Package 4-Jun-19 Auburn Warren
P-03992 - 02 Attachment to Email dated October 26, 2013, 10:31:09 PM from torielly@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc gordonalexander@nlh.nl.ca re Fw: Package 4-Jun-19 Auburn Warren
P-03992 - 03 Attachment to Email dated October 26, 2013, 10:31:09 PM from torielly@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc gordonalexander@nlh.nl.ca re Fw: Package 4-Jun-19 Auburn Warren
P-03992 - 04 Attachment to Email dated October 26, 2013, 10:31:09 PM from torielly@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc gordonalexander@nlh.nl.ca re Fw: Package 4-Jun-19 Auburn Warren
P-03992 - 05 Attachment to Email dated October 26, 2013, 10:31:09 PM from torielly@nalcorenergy.com to auburnwarren@nalcorenergy.com, cc gordonalexander@nlh.nl.ca re Fw: Package 4-Jun-19 Auburn Warren
P-03993 Waterfall DG3 vs. RFF Analysis v3 Excel Spreadsheet 4-Jun-19 Auburn Warren
P-03994 Net benefits analysis for DG3 final with ML carbon induced water mgmt and new export02 spreadsheet 4-Jun-19 Auburn Warren
P-03995 Email dated May 25, 2019, 11:10:47 AM from Daniel Simmons to Michael Collins, cc Dana Martin and Admin re MFI Request 029 4-Jun-19 Auburn Warren
P-03996 Big Benefit Scenario with UARB (AGA Added) spreadsheet 4-Jun-19 Auburn Warren
P-03997 Energy Marketing Revenue Recall energy sold to UARB spreadsheet 4-Jun-19 Auburn Warren
P-03998 Revenue and Tariff Model - (Spreadsheet password - NRUBUA) 4-Jun-19 Auburn Warren
P-03999 Revenue and Tariff Model - (V2) (Spreadsheet password - NRUBUA) 4-Jun-19 Auburn Warren
P-04000 Energy Marketing Revenue Recall energy sold to UARB (converted to Base C) spreadsheet 4-Jun-19 Auburn Warren
P-04001 Data Room Email Notifications Received by Paul Carter (MFOC) 3-Jun-19 Craig Martin
P-04002 Email dated April 1, 2019, 9:14 PM from TanyaPower@lowerchurchillproject.ca to Paul Carter, cc StevePellerin@lowerchurchillproject.ca, RosanneWilliams@lowerchurchillproject.ca and James Meaney@lowerchurchillproject.ca re Power Development - OC Deck and Project Cumulative Incurred Variance Explanation 3-Jun-19 Craig Martin
P-04003 Email dated March 29, 2019, 11:15 AM from RosanneWilliams@lowerchurchillproject.ca to Paul Carter, cc TanyaPower@lowerchurchillproject.ca and StevePellerin@lowerchurchillproject.ca re Power Supply PPT 3-Jun-19 Craig Martin
P-04004 Paul Carter Email Log dated May 24, 2019 3-Jun-19 Craig Martin
P-04005 Oversight Committee Funding 2014-15 to 2019-20 - effective May 30, 2019 3-Jun-19 Craig Martin
P-04006 Email dated July 12, 2017, 2:57:58 PM from Paul Carter to Jason Muise, cc Charles Bown re SNC Risk Assessment - 2013 3-Jun-19 Paul Carter
P-04007 Email dated July 21, 2014, 3:22:06 PM from Craig Martin to Charles W. Bown re FW: Nalcor - Final Document Request Recommendation 3-Jun-19 Craig Martin
P-04008 Email dated July 28, 2014, 3:52:35 PM from Xeno Martis to Alison Manzer, Randy Pelletier and JamesMeaney@nalcorenergy.com, cc Alexander Gagnon, Craig Martin, et al re NL IE reliance letter signed by ProjectCo's [IWOV-Legal.FID1640195] 3-Jun-19 Craig Martin
P-04009 Email dated June 8, 2015, 9:12:00 AM from Richard Noble to David Steele and Craig Martin, cc Emiliano Mancini re Meeting 3-Jun-19 Craig Martin
P-04010 Email dated June 23, 2015, 8:40 AM from Craig Martin to David Steele and Richard Noble re Response to "Preliminary Findings" 3-Jun-19 Craig Martin
P-04011 Email dated January 12, 2016, 4:02 PM from Craig Martin to Tim Murphy and Julia Mullaley re Deck 3-Jun-19 Craig Martin
P-04012 Email dated July 6, 2017, 5:14:54 PM from Jason Muise to Donna Brewer, Gordon McIntosh, et al re SNC Risk Assessment - 2013 3-Jun-19 Craig Martin
P-04013 GNL presentation dated March 15, 2019 re Muskrat Falls Project Oversight Committee - Quarterly Project Update - Period Ending December 31, 2018 3-Jun-19 Paul Carter
P-04014 GNL Information Note dated December 9, 2016 re Muskrat Falls Oversight Committee November 29 - December 1, 2016 Site Visits and Meetings 3-Jun-19 Paul Carter
P-04015 Handwritten Notes of Paul Harrington dated January 7, 2016 5-Jun-19 Paul Harrington
P-04016 PRIMS Estimate Assessment Model - Final Strategic Risk Ranging - June 11, 2012 5-Jun-19 Paul Harrington
P-04017 PRIMS Estimate Assessment Model - LCP Strategic Risk Ranging after June 4, 2012 5-Jun-19 Paul Harrington
P-04018 Lower Churchill Project - Tactical Cost Risk Assessment - Ranging after May 23, 2012 5-Jun-19 Paul Harrington
P-04019 Lower Churchill Project - Tactical Cost Risk Assessment - Ranging after May 25, 2012 5-Jun-19 Paul Harrington
P-04020 Email dated May 9, 2019, 1:26:45 PM from Richard Westney to Michael Collins re Worst case value for productivity 5-Jun-19 Paul Harrington
P-04021 Nalcor Energy - 73rd Board of Directors Meeting dated December 18, 2013 - Wayne Chamberlain 5-Jun-19 Paul Harrington
P-04022 Email dated May 29, 2019, 12:28:14 PM from Michael Collins to Richard Westney re Worst case value for productivity 5-Jun-19 Paul Harrington
P-04023 Email dated May 30, 2019, 11:06:05 AM from Michael Collins to Richard Westney re Worst case value for productivity 5-Jun-19 Paul Harrington
P-04024 Email dated June 1, 2019, 5:21:13 PM from Richard Westney to Michael Collins re Worst case value for productivity 5-Jun-19 Paul Harrington
P-04025 Letter dated January 18, 2019 from Matthew Craig to Dave Vardy re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/954/2018) 4-Jun-19 Auburn Warren
P-04026 CBC news article dated April 21, 2019 re Nalcor chair says board lost confidence of government 11-Jun-19 Cathy Bennett
P-04027 Email dated June 19, 2016, 10:46:13 AM from Keith Dodson to Paul Harrington and Lance Clarke re Path Forward 5-Jun-19 Paul Harrington
P-04028 Nalcor Energy - Lower Churchill Project - Construction Management Plan dated April 2, 2014 5-Jun-19 Paul Harrington
P-04029 Email dated November 15, 2011, 6:43:27 PM from Cathy Bennett to Tom Clift, Ed Martin, Ken Marshall and Gerry Shortall, cc Cathy Bennett re Status of Meeting with Premier 11-Jun-19 Cathy Bennett
P-04030 Email dated September 19, 2012, 8:18:00 PM from Cathy Bennett to Ed Martin and Dawn Dalley re FW: Follow up to Last Night's discussion 11-Jun-19 Cathy Bennett
P-04031 Email dated October 3, 2012, 10:17:32 PM from Martin Sullivan to Catherine Squire re Fwd: Wednesday Update Project Foundation 11-Jun-19 Cathy Bennett
P-04032 Email dated December 18, 2015, 4:31:06 PM from auburnwarren@nalcorenergy.com to Donna Brewer, Craig Martin and Charles Bown, cc emartin@nalcorenergy.com and dsturge@nalcorenergy.com re FLG Slides for Minister Bennett - Dec 18 2015.ppt 11-Jun-19 Cathy Bennett
P-04033 Chronology provided by Cathy Bennett - December 22 to April 20 11-Jun-19 Cathy Bennett
P-04034 Memo dated June 17, 2017 from Siobhan Coady to Cathy Bennett, cc Greg Mercer re Nalcor Update 11-Jun-19 Cathy Bennett
P-04035 Email dated March 6, 2016, 6:37:58 PM from Paul Harrington to Jason Kean and lanceclarke@lowerchurchillproject.ca re Fwd: Feedback on decks .. Urgent 6-Jun-19 Paul Harrington
P-04036 Email dated February 23, 2016, 3:22:00 PM from Robert Spasyouti to Joe Telebar, cc Thieu Hue Lam, Michael Kennedy, David Steels and Paul Hickey re Lower Churchill Ring Fence 5-Jun-19 Paul Harrington
P-04037 Email dated January 18, 2016, 1:15:10 PM from Paul McCarthy to David Steele, Michael Kennedy, et al re ACTION REQUIRED: Muskrat Falls Ring Fence Procedures Agreement 5-Jun-19 Paul Harrington
P-04038 Email dated January 13, 2016, 12:04:34 PM from emartin@nalcorenergy.com to July Mullaley and Charles Bown, cc gbennett@nalcorenergy.com, pharrington@lowerchurchillproject.ca and lanceclarke@lowerchurchllproject.ca re Wording 5-Jun-19 Paul Harrington
P-04039 Email dated January 11, 2016, 5:37:18 PM from pharrington@lowerchurchillproject.ca to briancrawley@lowerchurchillproject.ca and lanceclarke@lowerchurchillproject.ca, cc gbennett@nalcorenergy.com re Fw: Clearance to start to populate Data room and share data/decks etc. 5-Jun-19 Paul Harrington
P-04040 Email dated May 20, 2010, 12:09:59 PM from pharrington@nalcorenergy.com to phumphries@nalcorenergy.com re Fw: Sign off Case 8 5-Jun-19 Paul Harrington
P-04041 Muskrat Falls Oversight Committee - Review of Project Cost and Schedule Forecast and Related Risk dated January 14, 2016 (Signed) 6-Jun-19 Paul Harrington
P-04042 Non-Disclosure Agreement dated January 18, 2016 between Ernst & Young and Nalcor Energy 6-Jun-19 Paul Harrington
P-04043 Muskrat Falls - I Believe in the Power of Newfoundland and Labrador dated October 13, 2012 11-Jun-19 Cathy Bennett
P-04044 Curriculum Vitae - John H. MacIsaac 11-Jun-19 John MacIsaac
P-04045 Email dated May 18, 2016, 10:04:20 PM from Paul Harrington to JohnMacIsaac@nalcorenergy.com to JasonKean@lowerchurchillproject.ca and Gilbert Bennett re Meetings 11-Jun-19 John MacIsaac
P-04046 Memo dated June 1, 2016 from John MacIsaac to Stan Marshall, cc Gilbert Bennett and Mike Roberts re Brief update note - Leadership Alignment Meeting on forth coming Project Restructure 11-Jun-19 John MacIsaac
P-04047 Email dated July 8, 2016, 9:30:59 AM from Paul Harrington to Nik Argirov re Organization 11-Jun-19 John MacIsaac
P-04048 Email dated January 5, 2017, 3:32:17 PM from johnmacisaac@nalcorenergy.com to James Meaney, cc Gilbert Bennett and Derrick Sturge re Contingent Risk - Management Change to LCP 11-Jun-19 John MacIsaac
P-04049 Letter dated July 20, 2018 from Jason Kean to Stanley Marshall re Assertions made surrounding the circumstances of the resignation of J. Kean 11-Jun-19 John MacIsaac
P-04050 Nalcor Energy - Lower Churchill Project - Project Change Notice - PCN-0429 Additional 10% of Foundations for HVdc dated March 27, 2015 11-Jun-19 John MacIsaac
P-04051 Nalcor Energy - Lower Churchill Project - Project Change Notice - PCN-0531 Geotechnical Field Investigation for HVdc Line dated October 7, 2015 11-Jun-19 John MacIsaac
P-04052 Email dated December 3, 2016, 9:17:45 AM from johnmacisaac@nalcorenergy.com to Greg Fleming and Stephen Follett re Fwd: Draft MoM - GE Steering Committee 11-Jun-19 John MacIsaac
P-04053 Email dated November 1, 2013 from Derrick Sturge to Ed Martin re Minister Marshall info 12-Jun-19 Edmund Martin
P-04054 Nalcor Energy 79th Board of Directors Meeting dated November 28, 2014 10-Jun-19 Ken Marshall
P-04055 Lower Churchill Project - Master AFE's 10-Jun-19 Ken Marshall
P-04056 Email dated March 28, 2012, 1:31:46 PM from Cathy Bennett to Ed Martin, cc Tom Clift, ken.marshall and g.shortall re Update from the Chair 11-Jun-19 Cathy Bennett
P-04057 Email dated June 19, 2014, 1:44:25 PM from koneill@nlh.nl.ca to emartin@nalcorenergy.com and dawndalley@nalcorenergy.com, cc jamesmeaney@nalcorenergy.com and briancrawley@lowerchurchillproject.ca re Final deck for Premier Marshall 21-Jun-19 Gilbert Bennett
P-04058 Letter dated February 16, 2019 from Daniel W. Simmons to Kate O'Brien re Gilbert Bennett Interview 21-Jun-19 Gilbert Bennett
P-04059 Letter dated February 12, 2018 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/31/2018) 21-Jun-19 Gilbert Bennett
P-04060 Letter dated November 13, 2018 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/812/2018) 21-Jun-19 Gilbert Bennett
P-04061 Letter dated December 12, 2018 from Suzanne Hollett re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/903/2018) 21-Jun-19 Gilbert Bennett
P-04062 Letter dated January 15, 2019 from Matthew Craig re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/947/2018) 21-Jun-19 Gilbert Bennett
P-04063 Letter dated January 16, 2019 from Matthew Craig re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/946/2018) 21-Jun-19 Gilbert Bennett
P-04064 Letter dated January 23, 2019 from Matthew Craig re Your request for access to information under Part II of the Access to Information and Protection of Privacy Act, 2015 (File #: PB/972/2018) 21-Jun-19 Gilbert Bennett
P-04065 CBC news article dated April 30, 2012 re Opposition questions SNC-Lavalin's link to Muskrat Falls 12-Jun-19 Edmund Martin
P-04066 The Telegram news article dated July 11, 2014 re Muskrat Falls remains the best option 12-Jun-19 Edmund Martin
P-04067 CBC news article dated September 14, 2014 re Muskrat Falls prompts Harvard research on mercury levels 12-Jun-19 Edmund Martin
P-04068 The Telegram news article dated January 14, 2015 re Mercury concerns covered in assessment: Nalcor 12-Jun-19 Edmund Martin
P-04069 The Telegram news article dated September 10, 2015 re Nunatsiavut and Nalcor at odds over mercury 12-Jun-19 Edmund Martin
P-04070 CBC news article dated December 1, 2015 re Mercury levels from Muskrat Falls pose threat, says environmental panelist 12-Jun-19 Edmund Martin
P-04071 CBC news article dated March 11, 2016 re No thanks! Nunatsiavut rebuffs request to talk about mercury in Lake Melville 12-Jun-19 Edmund Martin
P-04072 CBC news article dated April 18, 2016 re Nalcor downplays study findings into methylmercury fears at Muskrat Falls 12-Jun-19 Edmund Martin
P-04073 Email dated June 23, 2017, 4:33:58 PM from JohnMacIsaac@nalcorenergy.com to Dwight Ball, Heather Jacobs, et al, cc DeanneFisher@nalcorenergy.com and JohnMacIsaac@nalcorenergy.com re Preliminary Response from yesterdays take aways RE: Transformer Movement in July 11-Jun-19 John MacIsaac
P-04074 Email dated June 24, 2016, 1:35 PM from RonPower@lowerchurchillproject.ca to Ron Power re Fwd: CH00031 Balance of Plant Muskrat Falls Contract 11-Jun-19 John MacIsaac
P-04075 Summary of June 2017 CT0327-001 Contract Value (Valard) 11-Jun-19 John MacIsaac
P-04076 Email dated June 22, 2016, 1:21 PM from Paul Harrington to John MacIsaac, Gilbert Bennett, Derrick Sturge and Lance Clarke re CH00031 Balance of Plant Muskrat Falls Contract 11-Jun-19 John MacIsaac
P-04077 Letter dated November 14, 2016 from Paul Kennedy to Greg Fleming re Agreement Name: Master Services Agreement 11-Jun-19 John MacIsaac
P-04078 Consultant Agreement LC-PM-226 for Commissioning Services and Personnel for Lower Churchill Project between Lower Churchill Management Corporation and Rising Edge Technologies Ltd. dated October 31, 2017 11-Jun-19 John MacIsaac
P-04079 Amending Agreement Number 02 dated March 22, 2018 between Lower Churchill Management Corporation and Rising Edge Technologies Ltd. 11-Jun-19 John MacIsaac
P-04080 Government of Newfoundland and Labrador Transportation Policy 12-Jun-19 Edmund Martin
P-04081 CBC news article dated April 20, 2016 re Ed Martin steps down from Nalcor helm amid government criticism 12-Jun-19 Edmund Martin
P-04082 The Telegram news article dated February 20, 2017 re Timeline: The Ed Martin Severance Scandal 12-Jun-19 Edmund Martin
P-04083 Uncle Gnarley news article dated May 16, 2016 re Vardy/Penney appalled by Nalcor Briefing Note on Muskrat Falls Project 12-Jun-19 Edmund Martin
P-04084 Nalcor Energy - Lower Churchill Project - Travel Authorizations for Edmund Martin 12-Jun-19 Edmund Martin
P-04085 Email dated February 20, 2010, 8:33:05 PM from Don Burrage to Felix Collins, Ken Morrissey, et al re Fw: QC Innu to hunt in Labrador to protest New Dawn 12-Jun-19 Edmund Martin
P-04086 Nalcor Energy - Lower Churchill Project - Monthly Progress Report - Period ending August 31, 2015 12-Jun-19 Edmund Martin
P-04087 Nalcor Energy Eighty-Fifth Meeting of Board of Directors dated June 25, 2015 12-Jun-19 Edmund Martin
P-04088 January 2016 Cabinet Briefing Deck with an Astaldi focus 12-Jun-19 Edmund Martin
P-04089 Nalcor Energy Organizational Charts 18-Jun-19 Brendan Paddick
P-04090 Statement by Honourable Siobhan Coady, Minister of Natural Resources dated November 29, 2016 re Appointments Announced to the Board of Directors of Nalcor Energy 18-Jun-19 Brendan Paddick
P-04091 GNL News Release dated November 29, 2016 re Improving Management Oversight - Nalcor Energy Board of Directors Appointments Announced 18-Jun-19 Brendan Paddick
P-04092 Listing of 2017 Board Meetings and Attendees 18-Jun-19 Brendan Paddick
P-04093 Nalcor Energy - Mandate - Safety, Health, Environment and Community Committee dated September 2017 18-Jun-19 Brendan Paddick
P-04094 Letter dated October 2, 2017 from Brendan Paddick to Honourable Premier Dwight Ball re Nalcor's use of "embedded" contractors on the Lower Churchill Project (LCP) and the Corporation's withholding of billing rates for those contractors in response to an Access to Information request 18-Jun-19 Brendan Paddick
P-04095 Letter dated October 13, 2017 from Premier Dwight Ball to Brendan Paddick re embedded contractors and the disclosure of their billing rates 18-Jun-19 Brendan Paddick
P-04096 Letter dated May 16, 2018 from Siobhan Coady to Brendan Paddick re Allegations against Nalcor Energy and its Employees 18-Jun-19 Brendan Paddick
P-04097 Excerpt from Nalcor Energy Business and Financial Report 2016 - Corporate Governance (pages 34-40) 18-Jun-19 Brendan Paddick
P-04098 Excerpt from Nalcor Energy Annual Report 2017 - Corporate Governance (pages 52-58) 18-Jun-19 Brendan Paddick
P-04099 Excerpt from Nalcor Energy Annual Report 2018 - Corporate Governance (pages 37-43) 18-Jun-19 Brendan Paddick
P-04100 Clarification re Exhibit P-01829 dated June 13, 2019 14-Jun-19 Edmund Martin
P-04101 Curriculum Vitae - George F. Jergeas 18-Jun-19 Dr. George Jergeas
P-04102 University of Calgary presentation dated June 19, 2019 re Analysis of Industry Best Practices by Dr. George F. Jergeas to the Commission of Inquiry Respecting the Muskrat Falls Project 18-Jun-19 Dr. George Jergeas
P-04103 International Journal of Project Management - Do classics exist in megaproject management? 18-Jun-19 Dr. George Jergeas
P-04104 Megaproject Planning and Management: Essential Readings - edited by Bent Flyvbjerg Dr. George Jergeas
P-04105 Email dated June 16, 2019, 5:23 PM from Gail Boland to Peter Ralph, Iris M. Power and Paul Carter, cc Denise Hanrahan re The Notebooks of Donna Brewer 17-Jun-19 Financial Close
P-04106 Email dated May 18, 2016, 3:23:36 PM from lanceclarke@lowerchurchillproject.ca to Ron Power re Fwd: Governance change 21-Jun-19 Gilbert Bennett
P-04107 Email dated June 2, 2016, 11:25:01 AM from Paul Harrington to Gilbert Bennett re Fwd: PM Contract Changes 21-Jun-19 Gilbert Bennett
P-04108 Email dated June 21, 2016, 6:22:42 PM from Paul Harrington to Gilbert Bennett, cc Lance Clarke re We need to talk 21-Jun-19 Gilbert Bennett
P-04109 GNL Information Note - Department of Natural Resources dated November 13, 2015 re Nalcor Board Governance 18-Jun-19 Brendan Paddick
P-04110 GNL Memorandum to Executive Council dated November 2, 2016 re Nalcor Energy Board Appointments 18-Jun-19 Brendan Paddick
P-04111 Email dated January 17, 2017, 11:28:09 AM from Nena Abundo to Lynn Sullivan re FW: mandate letter 18-Jun-19 Brendan Paddick
P-04112 Nalcor Energy - One Hundred and Twelfth Meeting of Board of Directors dated September 29, 2017 18-Jun-19 Brendan Paddick
P-04113 Email dated November 23, 2017 from abrophy@nalcorenergy.com to carlarussell@nalcorenergy.com, cc sonyawhite@nalcorenergy.com re Fw: 114th Nalcor Energy Board Papers - tomorrow's meeting at 11:30 am 18-Jun-19 Brendan Paddick
P-04114 Curriculum Vitae - Brendan Paddick 18-Jun-19 Brendan Paddick
P-04115 Nunatsiavut Government News Release dated September 9, 2014 re Health study to explore links between Inuit diet and mercury exposure in Lake Melville 20-Jun-19 Environmental Panel
P-04116 Email dated September 9, 2015, 4:36:23 PM from Bert Pomeroy to bcc applybyc@gov.nl.ca re News Release: Outraged with Nalcor's Response 20-Jun-19 Environmental Panel
P-04117 Email dated October 16, 2015, 11:34:16 AM from GBennett@nalcorenergy.com to Carl McLean, cc Colleen G. Janes, Aubrey Gover and KathyKnight@nalcorenergy.com re Harvard Mercury Research report 20-Jun-19 Environmental Panel
P-04118 Letter dated November 9, 2015 from Darryl Shiwak to Colleen Janes re Harvard University mercury research results in relation to Muskrat Falls hydroelectric development in Labrador - protecting Inuit lands and health 20-Jun-19 Environmental Panel
P-04119 Email dated November 26, 2015, 10:36:06 AM from Aubrey Gover to Michelle Watkins and Brian Harvey, cc Ron Bowles and Janice Barnes re FW: ENVC Emerging Issue Note - Mercury 20-Jun-19 Environmental Panel
P-04120 Letter dated December 17, 2015 from Darryl Shiwak to Perry Trimper re Muskrat Falls development and the impending downstream impacts on Inuit health 20-Jun-19 Environmental Panel
P-04121 Letter dated January 6, 2016 from Perry Trimper to Darryl Shiwak re Harvard Research Paper on Methylmercury 20-Jun-19 Environmental Panel
P-04122 Letter dated January 21, 2016 from Perry Trimper to Darryl Shiwak re gathering of technical experts in Happy Valley-Goose Bay to discuss methylmercury. 20-Jun-19 Environmental Panel
P-04123 Nunatsiavut Government News Release dated March 10, 2016 re Facts 'indisputable'; no value to hold workshop on downstream effects of Muskrat Falls, says Shiwak 20-Jun-19 Environmental Panel
P-04124 GNL Information Note - Department of Environment and Conservation dated March 15, 2016 re Workshop and status of the Human Health Risk Assessment Plan / Environmental Effects Monitoring Plan on Lower Churchill Generation Project 20-Jun-19 Environmental Panel
P-04125 Email dated April 18, 2016, 1:40:00 PM from Dwight Ball to Premier of NL re FW: NEWS RELEASE - Flooding of Lake Melville must not be allowed if full clearing not carried out 20-Jun-19 Environmental Panel
P-04126 The Telegram news article dated April 23, 2016 re Methylmercury in Lake Melville at issue, for everyone 20-Jun-19 Environmental Panel
P-04127 Letter dated April 27, 2016 from Darryl Shiwak to Perry Trimper re Lake Melville scientific report and summary for policymakers 20-Jun-19 Environmental Panel
P-04128 GNL presentation re Human Health Risk Assessment Plan & Methylmercury - Lower Churchill 20-Jun-19 Environmental Panel
P-04129 Letter dated June 14, 2016 from Perry Trimper to Peter Madden re Human Health Risk Assessment Plan (HHRAP) - Lower Churchill Hydroelectric Generation Project 20-Jun-19 Environmental Panel
P-04130 GNL News Release dated June 14, 2016 re Environmental Assessment Bulletin 20-Jun-19 Environmental Panel
P-04131 GNL News Release dated June 14, 2016 re Protecting Human Health and the Environment 20-Jun-19 Environmental Panel
P-04132 Letter dated June 21, 2016 from Perry Trimper to Darryl Shiwak re Human Health Risk Assessment Plan (HHRAP) - Lower Churchill Hydroelectric Generation Project 20-Jun-19 Environmental Panel
P-04133 Email dated June 23, 2016, 12:31:06 PM from Bert Pomeroy re Trimper misleading public, says Shiwak 20-Jun-19 Environmental Panel
P-04134 Letter dated June 30, 2016 from Premier Dwight Ball to Grand Chief Anastasia Qupee re public commitments to reconvene experts regarding the potential for methylmercury in Lake Melville associated with Muskrat Falls 20-Jun-19 Environmental Panel
P-04135 Letter dated June 30, 2016 from Premier Dwight Ball to Johannes Lampe re public commitments to reconvene experts regarding the potential for methylmercury in Lake Melville associated with Muskrat Falls 20-Jun-19 Environmental Panel
P-04136 Letter dated June 30, 2016 from Premier Dwight Ball to Todd Russell re public commitments to reconvene experts regarding the potential for methylmercury in Lake Melville associated with Muskrat Falls 20-Jun-19 Environmental Panel
P-04137 Letter dated July 15, 2016 from Johannes Lampe to Premier Dwight Ball re Muskrat Falls project - Downstream Impacts - proposed meeting 20-Jun-19 Environmental Panel
P-04138 Letter dated July 22, 2016 from Perry Trimper to Johannes Lampe re proposed methylmercury workshop 20-Jun-19 Environmental Panel
P-04139 Letter dated August 12, 2016 from Darryl Shiwak to Perry Trimper re appeal decision of June 14, 2016 to approve Nalcor Energy's Human Health Risk Assessment Plan (HHRAP) for the Lower Churchill Hydroelectric Generation Project (the Project) (Reg. 1305) 20-Jun-19 Environmental Panel
P-04140 Email dated August 25, 2016, 1:39:32 PM from Brian Harvey to Martin Goebel, Bas Cleary and Paul A. Carter, cc Aubrey Gover and Christopher Appleby re Raw Notes - MeHg Meeting - HVGB.docx 20-Jun-19 Environmental Panel
P-04141 Email dated September 7, 2016, 8:58:04 AM from Paul A. Carter to Wayne Thistle, cc Jane Kirk re ECCC Comments pdf converted: Draft Workshop Report - Methylmercury Mitigation & Muskrat Falls (Aug 4, 2016 in Goose Bay) 20-Jun-19 Environmental Panel
P-04142 Letter dated September 11, 2016 from Perry Trimper to Darryl Shiwak re Appeal on Human Health Risk Assessment Plan (HHRAP) - Lower Churchill Hydroelectric Generation Project 20-Jun-19 Environmental Panel
P-04143 Letter dated September 20, 2016 from Johannes Lampe to Hon. Dwight Ball re mitigating impacts from methylmercury flowing into Lake Melville before flooding of the Muskrat Falls reservoir begins 20-Jun-19 Environmental Panel
P-04144 Email dated September 27, 2016, 9:06:08 AM from Wayne Thistle to Martin Goebel, cc Bas Cleary, Paul A. Carter and Brian Harvey re Final Report - Scientific Workshop - August 4, 2016 20-Jun-19 Environmental Panel
P-04145 Email dated September 29, 2016, 12:26:27 PM from Bert Pomeroy re NEWS RELEASE - Progress made during Muskrat Falls meeting with Province 20-Jun-19 Environmental Panel
P-04146 GNL News Release dated September 29, 2016 re the September 26 meeting with the Nunatsiavut Government on their concerns relating to methylmercury 20-Jun-19 Environmental Panel
P-04147 Email dated October 6, 2016, 4:31:15 PM from Diana Quinton to Siobhan Coady, Charles W. Bown, et al re Here are updated messages from Environment on methylmercury 20-Jun-19 Environmental Panel
P-04148 Email dated October 14, 2016, 4:46:04 PM from Bert Pomeroy to Bert Pomeroy re NEWS RELEASE - President Lampe calls on premier to halt Muskrat Falls 20-Jun-19 Environmental Panel
P-04149 GNL Information Note - Department of Environment and Climate Change/Labrador and Aboriginal Affairs dated October 16, 2016 re Update on Discussions with the Nunatsiavut Government (NG) regarding Methylmercury 20-Jun-19 Environmental Panel
P-04150 Letter dated October 18, 2016 from Perry Trimper to Johannes Lampe re Muskrat Falls Flooding, Mitigation Measures, Monitoring Program and Oversight Roles 20-Jun-19 Environmental Panel
P-04151 Email dated October 20, 2016, 9:21:52 AM from Paula Hayes-Butt to bcc Joy Buckle, Andrew Caddell, et al re CBC - Nalcor ordered to increase clearing at Muskrat Falls reservoir 20-Jun-19 Environmental Panel
P-04152 GNL News Release dated October 19, 2016 re Protecting Human Health and the Environment 20-Jun-19 Environmental Panel
P-04153 Email dated October 20, 2016, 3:39:54 PM from Bert Pomeroy re Muskrat Falls position has not changed, says President Lampe 20-Jun-19 Environmental Panel
P-04154 Email dated October 21, 2016, 1:11 PM from Fanny Hoddinott to president@harvard.edu, cc Premier and karoff@seas.harvard.edu re Letter from the Honourable Perry Trimper 20-Jun-19 Environmental Panel
P-04155 The Telegram news article dated October 26, 2016 re Indigenous leaders reach compromise with government; tell protesters 'go home' 20-Jun-19 Environmental Panel
P-04156 GNL News Release dated October 26, 2016 re Provincial Government and Indigenous Leaders Make Significant Progress on Muskrat Falls Issues 20-Jun-19 Environmental Panel
P-04157 Nunatsiavut Government statement dated October 27, 2016 re Protecting our health, culture and way of life 20-Jun-19 Environmental Panel
P-04158 Letter dated October 28, 2016 from Michel Tremblay to Scott O'Brien re Lower Churchill, Phase 1 Development - Agreement LC-G-002 - Engineering Procurement and Construction Management (EPCM) Services - Muskrat Falls - Partial Impoundment during Construction 20-Jun-19 Environmental Panel
P-04159 Email dated November 1, 2016, 4:43:18 PM from Lesley Clarke to Charles W. Bown, Siobhan Coady, et al re CBC - 'We are doing the right thing': Nalcor CEO speaks out after Muskrat Falls protests 20-Jun-19 Environmental Panel
P-04160 Letter dated November 30, 2016 from Darryl Shiwak to Siobhan Coady re Muskrat Falls Initial Impoundment Requirements 20-Jun-19 Environmental Panel
P-04161 Letter dated December 23, 2016 from Siobhan Coady to Darryl Shiwak re Muskrat Falls Initial Impoundment Requirements 20-Jun-19 Environmental Panel
P-04162 GNL Information Note - Department of Environment and Climate Change (ECC) dated February 16, 2017 re Independent Expert Advisory Committee (IEAC) Terms of Reference (TOR) Progress Update 20-Jun-19 Environmental Panel
P-04163 GNL Decision/Direction Note - Department of Municipal Affairs and Environment dated March 31, 2017 re Independent Expert Advisory Committee (IEAC) Terms of Reference (TOR) 20-Jun-19 Environmental Panel
P-04164 Email dated May 19, 2017, 1:30:14 PM from Connie K. Shea to Jamie Chippett re BN/2017/0070 : Information Note - IEAC progress update May 19 2017 20-Jun-19 Environmental Panel
P-04165 GNL News Release dated August 4, 2017 re Chair Appointed to Independent Expert Advisory Committee 20-Jun-19 Environmental Panel
P-04166 Letter dated August 15, 2017 from Johannes Lampe to Hon. Dwight Ball re current situation in relation to the water levels of the Muskrat Falls reservoir and the view of Nalcor Energy that methylmercury production is not taking place in the impounded area 20-Jun-19 Environmental Panel
P-04167 GNL Information Note - Department of Municipal Affairs and Environment dated December 5, 2017 re Results of the Methylmercury Monitoring Program at Muskrat Falls 20-Jun-19 Environmental Panel
P-04168 Independent Expert Advisory Committee (IEAC) Oversight Committee (OC) - Briefing Package for circulation to OC Members in advance of the January 24, 2018 meeting dated January 17, 2018 20-Jun-19 Environmental Panel
P-04169 Independent Expert Advisory (IEC) Committee - Suggestions for Targeted Mitigation Action - Scenarios A and B dated January 23, 2018 20-Jun-19 Environmental Panel
P-04170 Letter dated March 28, 2018 from Eddie Joyce to Stan Marshall re Independent Experts Advisory Committee 20-Jun-19 Environmental Panel
P-04171 Email dated April 13, 2018, 4:55:00 PM from Martin Goebel to Jamie Chippett, Haseen Khan and Erin Shea re Evaluation of the Scientific Submissions to the IEC on Mitigation 20-Jun-19 Environmental Panel
P-04172 Letter dated April 24, 2018 from Grand Chief Gregory Rich and Deputy Grand Chief Etienne Rich to Eddie Joyce re recommendations made by the Independent Expert Advisory Committee ("IEAC") 20-Jun-19 Environmental Panel
P-04173 GNL presentation dated May 16, 2018 re Methylmercury at Muskrat Falls 20-Jun-19 Environmental Panel
P-04174 Email dated May 31, 2018, 4:58:45 PM from Erin Shea to Andrew Parsons re FYI - KMs - IEAC Final Recommendations 20-Jun-19 Environmental Panel
P-04175 Letter dated July 6, 2018 from Tony Andersen to Andrew Parsons re Independent Expert Advisory Committee (IEAC) recommendations 20-Jun-19 Environmental Panel
P-04176 Innu Nation news release dated August 7, 2018 re Innu Nation Challenges University of Toronto Associate Professor Deborah Cowen - Muskrat Falls Open Letter to Prime Minister Justin Trudeau Offensive and Factually Incorrect 20-Jun-19 Environmental Panel
P-04177 Email dated August 9, 2018, 2:23:31 PM from Jamie Chippett to Andrew Parsons and Erin Shea re FW: IEAC Recommendations 20-Jun-19 Environmental Panel
P-04178 Letter dated August 13, 2018 from Tony Andersen to Andrew Parsons re Independent Expert Advisory Committee (IEAC) recommendations 20-Jun-19 Environmental Panel
P-04179 Email dated August 15, 2018, 7:45:27 PM from Ken Reimer to Jamie Chippett re IEAC 20-Jun-19 Environmental Panel
P-04180 Nunatsiavut Government News Release dated August 31, 2018 re Premier's lack of action on Muskrat Falls commitments a step back fro reconciliation, says President Lampe 20-Jun-19 Environmental Panel
P-04181 CBC news article date September 9, 2018 re Nunatsiavut president slams 'empty words' two years after landmark Muskrat agreement 20-Jun-19 Environmental Panel
P-04182 Email dated September 13, 2018, 3:35 PM from Martin Goebel to Connie K. Shea re In on MeHg 20-Jun-19 Environmental Panel
P-04183 Email dated September 30, 2018, 9:47:17 PM from Ken Reimer to Jamie Chippett re Muskrat Falls 20-Jun-19 Environmental Panel
P-04184 GNL presentation dated November 6, 2018 re Technical Briefing: IEAC's Methylmercury Recommendations 20-Jun-19 Environmental Panel
P-04185 Letter dated November 15, 2018 from Todd Russell to Graham Letto re the Independent Expert Advisory Committee (IEAC) recommendations relative to the Muskrat Falls Project 20-Jun-19 Environmental Panel
P-04186 The Labradorian news article dated December 27, 2018 re Premier says decision on Muskrat Falls clearing will be made soon 20-Jun-19 Environmental Panel
P-04187 GNL presentation dated January 9, 2019 re Response to the Independent Experts Advisory Committee's Methylmercury Recommendations 20-Jun-19 Environmental Panel
P-04188 Email dated January 17, 2019, 9:34:59 AM from John Cowan to Siobhan Coady re FW: Wetland Capping Initiative 20-Jun-19 Environmental Panel
P-04189 Email dated February 13, 2019, 3:28:47 PM from GBennett@nalcorenergy.com to Jamie Chippett and Paul Carter, cc DeanneFisher@nalcorenergy.com re Wetland Capping Initiative 20-Jun-19 Environmental Panel
P-04190 The Telegram news article dated February 28, 2019 re Muskrat Falls Inquiry: Weren't aware of reports, Nunatsiavut representatives say 20-Jun-19 Environmental Panel
P-04191 Email dated April 9, 2019, 9:35:03 AM from Erin Shea to Graham Letto, cc Jamie Chippett, Susan Squires, et al re QP Note - IEAC - Meeting 20-Jun-19 Environmental Panel
P-04192 Letter dated June 4, 2018 from Brendan Paddick to Siobhan Coady re allegations of wrongdoing at Nalcor Energy 18-Jun-19 Brendan Paddick
P-04193 GNL Methylmercury and Muskrat Falls: Sharing and Understanding Our Varied Perspectives - Scientific Workshop - St. John's, NL dated March 22, 2016 20-Jun-19 Environmental Panel
P-04194 Meeting Note - Department of Environment and Conservation - Premier Ball Meeting with Nunatsiavut Government dated June 26, 2016 20-Jun-19 Environmental Panel
P-04195 GNL Information Note - Department of Environment and Climate Change (ECC) dated August 29, 2016 re Methylmercury Mitigation Workshop and Human Health Risk Assessment Plan for the Lower Churchill Generation Project 20-Jun-19 Environmental Panel
P-04196 Email dated March 12, 2013, 11:15:38 AM from KONeill@nlh.nl.ca to Charles W. Bown, Tracy English and Heather Maclean, cc DawnDalley@nalcorenergy.com and GBennett@nalcorenergy.com re Briefing note on North Spur 20-Jun-19 Environmental Panel
P-04197 Permit to Alter a Body of Water dated July 10, 2013 to Peter Madden re Lower Churchill Muskrat Falls - Dams, Powerhouse, Spillway and North Spur Stabilization 20-Jun-19 Environmental Panel
P-04198 Email dated July 9, 2014, 2:01:08 PM from Deborah Thomas to Jamie Chippett re KM's 20-Jun-19 Environmental Panel
P-04199 Email dated July 31, 2014, 9:48:39 AM from Martin Goebel to Haseen Khan re Landslides in vicinity of LCP 20-Jun-19 Environmental Panel
P-04200 Letter dated August 28, 2014 from Paula Dawe to Peter Madden re Information Requirements Concerning the Lower Churchill Falls Project 20-Jun-19 Environmental Panel
P-04201 GNL Information Note - Department of Environment and Conservation dated September 12, 2014 re Permit to Alter a Body of Water - Lower Churchill Project (LCP) 20-Jun-19 Environmental Panel
P-04202 Dr. Stig Bernander Presentation dated October 30, 2014 re Quick Clay and the North Spur 20-Jun-19 Environmental Panel
P-04203 Email dated November 7, 2014, 4:23:20 PM from Martin Goebel to Haseen Khan, cc Deborah Thomas re FW: Key Messages on North Spur/Dam Safety 20-Jun-19 Environmental Panel
P-04204 Email dated November 10, 2014, 8:40:39 AM from Haseen Khan to Martin Goebel re Key Messages on North Spur/Dam Safety 20-Jun-19 Environmental Panel
P-04205 Email dated July 14, 2015, 10:40:53 AM from Paula V. Dawe to Haseen Khan re NALCOR Dam Safety timeline 20-Jun-19 Environmental Panel
P-04206 Nalcor Energy - Lower Churchill Project - SNC Lavalin - CH0008 - North Spur Stabilization Works Dynamic Analysis Study dated December 11, 2015 20-Jun-19 Environmental Panel
P-04207 GNL Information Note - Department of Environment and Conservation dated April 18, 2016 re Lower Churchill Project - Muskrat Falls - North Spur 20-Jun-19 Environmental Panel
P-04208 Nalcor Energy - Lower Churchill Project - Muskrat Falls Dam Related Emergency (Full Supply Construction Phase) - Emergency Preparedness Plan dated June 30, 2016 20-Jun-19 Environmental Panel
P-04209 Nalcor Energy - Lower Churchill Project - Muskrat Falls Dam Related Emergency (Winter Headpond Construction Phase) - Emergency Preparedness Plan dated June 30, 2016 20-Jun-19 Environmental Panel
P-04210 Email dated March 21, 2017, 2:14:27 PM from Erin Shea to Jamie Chippett, cc Lynn Robinson and Martin Goebel re FYI: NR KMs - Dam Safety at Muskrat Falls 20-Jun-19 Environmental Panel
P-04211 Email dated May 12, 2017, 10:23:08 AM from Paul Carter to Charles Bown re FW: Attached letter from Gilbert Bennett 20-Jun-19 Environmental Panel
P-04212 Letter dated July 20, 2017 from Paul Q. Carter to Gilbert Bennett re North Spur Stability 20-Jun-19 Environmental Panel
P-04213 Letter dated August 17, 2017 from Gilbert Bennett to Paul Carter re North Spur Stability - Letter Dated 20 July 2017 20-Jun-19 Environmental Panel
P-04214 GNL Information Note - Department of Municipal Affairs and Environment dated October 6, 2017 re Muskrat Falls Independent Dam Safety Program Audit 20-Jun-19 Environmental Panel
P-04215 Letter dated December 19, 2012 from Gilbert Bennett to David Schulze re request for further information on the Joint Review Panel Recommendation 15.5 - Lower Churchill Project Monitoring and Community Liaison Committee 21-Jun-19 Gilbert Bennett
P-04216 Letter dated February 4, 2013 from Gilbert Bennett to Chef Piétacho re Government of Newfoundland and Labrador's commitment to ensure consultations with Indigenous groups, collectives and other relevant stakeholders to answer the concerns of the public and communicate the follow-up results (Translation) 21-Jun-19 Gilbert Bennett
P-04217 Canadian Environmental Assessment Agency - Labrador-Island Transmission Link - Comprehensive Study Report dated June 2013 21-Jun-19 Gilbert Bennett
P-04218 Letter dated July 8, 2013 from David Schulze to Bill Coulter re Request for comments on the Comprehensive Study Report for the power transmission lines between Labrador and the island of Newfoundland, CEAA ref. no. 51746; Our file 7550-005 (Translation) 21-Jun-19 Gilbert Bennett
P-04219 Letter dated July 8, 2013 from David Schulze to Gilbert Bennett re Hydroelectric power generation project on the Lower Churchill River, our file 7550-001; Provincial authorizations permitting the construction of power transmission lines between Labrador and the island of Newfoundland, our file 7550-005 (Translation) 21-Jun-19 Gilbert Bennett
P-04220 Letter dated July 8, 2013 from David Schulze to Marion Organ re Provincial authorizations permitting the construction of power transmission lines between Labrador and the island of Newfoundland, our file 7550-005 (Translation) 21-Jun-19 Gilbert Bennett
P-04221 Letter dated July 26, 2013 from Marion Organ to David Schulze re Reply to your letter dated July 8, 2013 concerning the Labrador-Island Transmission Link Project (Transmission Project) 21-Jun-19 Gilbert Bennett
P-04222 Email dated July 28, 2013, 8:21 PM from David Schulze to GBennett@nalcorenergy.com and Labrador-Island,TransmissionLink [CEAA], cc MarionOrgan@lowerchurchillproject.ca, Patrick Marrie, et al re Demande de commentaires sur le rapport d'etude approfondie pour le projet de ligne de transport d'energie entre le Labrador et lile de Terre-Neuve 21-Jun-19 Gilbert Bennett
P-04223 Letter dated November 16, 2017 from Suzanne Hollett re Your requests for access to information under Part II of the Access to Information under Part II of the access to Information and Protection of Privacy Act, 2015 (File #: PB/763/2017) 21-Jun-19 Gilbert Bennett
P-04224 GNL Information Note - Department of Environment and Conservation dated May 16, 2016 re Methylmercury Workshop and Status of the Human Health Risk Assessment Plan/Environmental Effects Monitoring Plan on the Lower Churchill Project 20-Jun-19 Environmental Panel
P-04225 Ministerial Decision on Nalcor's HHRA Plan within the Muskrat Falls Environmental Effects Monitoring Program - Communications Plan dated May 26, 2016 20-Jun-19 Environmental Panel
P-04226 Nalcor Energy - Lower Churchill Project - Muskrat Falls - Soil and Vegetation Removal from the Future REservoir Area - Targeted Scenarios dated March 22, 2018 20-Jun-19 Environmental Panel
P-04227 GNL Cabinet Presentation dated April 10, 2019 re Independent Experts Advisory Committee recommendations and related Minute of Council 20-Jun-19 Environmental Panel
P-04228 Email dated April 8, 2019, 6:02 PM from Aubrey Gover to Graham Letto, Siobhan Coady and Randy Edmunds, cc Jamie Chippett and Kerry Chaytor re IEAC 20-Jun-19 Environmental Panel
P-04229 Responsibility Matrix and Status of Recommendations of the Joint Review Panel 20-Jun-19 Environmental Panel
P-04230 Azimuth presentation dated June 8 re Mercury '101' 20-Jun-19 Environmental Panel
P-04231 Azimuth presentation dated June 28 re Muskrat Falls Reservoir and the Canadian Reservoirs Comparison Matrix 20-Jun-19 Environmental Panel
P-04232 Baird/Reed Harris presentation to Government of Newfoundland and Labrador dated June 28, 2018 re Goose Bay/Lake Melville Model to Methylmercury in Water 20-Jun-19 Environmental Panel
P-04233 Reed Harris presentation dated June 28, 2018 re Predicted Increases in Methylmercury Concentrations in Goose Bay and Lake Melville Waters Following the Creation of Muskrat Falls Reservoir 20-Jun-19 Environmental Panel
P-04234 Wood presentation dated June 2018 re Lower Churchill River Physical Ecosystem: General Overview 20-Jun-19 Environmental Panel
P-04235 Wood presentation dated June 2018 re Predicted MeHg in Downstream Food Web 20-Jun-19 Environmental Panel
P-04236 Azimuth presentation dated June 28 re Summary of Human Health Risks and Methylmercury - Overview of Baseline and Predicted Exposure Scenarios for Lake Melville and Hg in Hair Summary 20-Jun-19 Environmental Panel
P-04237 Azimuth presentation dated June 28 re MeHg Generation in MFR - Summary of Water Results - December 2017 - May 2018 20-Jun-19 Environmental Panel
P-04238 GNL Meeting Note - Environment and Climate Change/Labrador and Aboriginal Affairs - Premier Ball Meeting with the Nunatsiavut Government dated September 26, 2016 20-Jun-19 Environmental Panel
P-04239 Tab 2 - Letter from Andrew Parsons to Stan Marshall re IEAC Recommendations on Methylmercury at Muskrat Falls 20-Jun-19 Environmental Panel
P-04240 Tab 4 - Email dated January 7, 2019, 7:59 AM from Erin Shea to Jamie Chippett re Fwd: PowerPointPresentation on IEAC Recommendations 20-Jun-19 Environmental Panel
P-04241 Tab 5 - Email dated January 7, 2019, 12:39 PM from Jamie Chippett to Valerie Glynn re New IEAC deck 20-Jun-19 Environmental Panel
P-04242 Tab 7 - GNL Information Note - Department of Municipal Affairs and Environment dated January 10, 2019 re Government's Response to the IEAC Recommendations on Methylmercury 20-Jun-19 Environmental Panel
P-04243 Tab 8 - Email dated January 23, 2019, 12:07 PM from Martin Goebel to Valerie Glynn re Minister Letto to Stan Marshall 20-Jun-19 Environmental Panel
P-04244 Tab 11 - Email dated January 16, 2019, 4:56 PM from Peter Miles to DeanneFisher@nalcorenergy.com, John Cowan and Jason Card re Wetland Capping Initiative 20-Jun-19 Environmental Panel
P-04245 Tab 12 - Email dated January 21, 2019, 12:31 AM from John Cowan to Corey Snook re FW: Wetland Capping Initiative 20-Jun-19 Environmental Panel
P-04246 Tab 13 - Email dated January 22, 2019, 4:35 PM from Martin Goebel to Ali Askary re 146 20-Jun-19 Environmental Panel
P-04247 Tab 14 - Letter from Graham Letto to Stan Marshall re IEAC Recommendations on Methylmercury at Muskrat Falls 20-Jun-19 Environmental Panel
P-04248 Tab 15 - Email dated February 11, 2019, 8:25 PM from Jamie Chippett to Erin Shea re FOR REVIEW: km - IEAC 20-Jun-19 Environmental Panel
P-04249 Tab 17 - Email dated April 8, 2019, 11:45 PM from Erin Shea to Jamie Chippett re FOR APPROVAL: QP Note - IEAC - Meeting 20-Jun-19 Environmental Panel
P-04250 GNL Information Note - Municipal Affairs and Environment dated March 6, 2019 re Response to the recommendations of the Independent Expert Advisory Committee 20-Jun-19 Environmental Panel
P-04251 Timeline for Methylmercury Actions - March 22, 2016 to January 10, 2019 20-Jun-19 Environmental Panel
P-04252 Timeline for Methylmercury Actions - March 22, 2016 to June 13, 2019 20-Jun-19 Environmental Panel
P-04253 GNL Information Note - Labrador Affairs Secretariat dated January 11, 2019 re Lower Churchill Project Permitting 20-Jun-19 Environmental Panel
P-04254 Handwritten Notes of Paul Carter dated February 11, 2019 20-Jun-19 Environmental Panel
P-04255 Elizabeth Day's Notes - Lower Churchill Meeting dated January 14, 2019 and February 11, 2019 20-Jun-19 Environmental Panel
P-04256 Krista Quinlan's Notes - Lower Churchill Meeting dated January 14, 2019 and February 11, 2019 20-Jun-19 Environmental Panel
P-04257 Letter dated September 25, 2014 from David Schulze to Michael J. Alexander and Maurice Landry re Environmental Assessment of the Labrador-Newfoundland Island Power Line Project, CEAR No. 10-03-51746; Mitigation and monitoring plan for species listed under the Endangered Species Act, Nalcor document No. ILK-PT-MD-0000-EV-PL-0001-0; Or file #7550-005 20-Jun-19 Environmental Panel
P-04258 Recovery Strategy for Three Woodland Caribou Herds (Rangifer tarandus caribou; Boreal population) in Labrador 20-Jun-19 Environmental Panel
P-04259 Nalcor Energy - Lower Churchill Project - Labrador-Island Transmission Link - Species at Risk - Impacts Mitigation and Monitoring Plan - B2 20-Jun-19 Environmental Panel
P-04260 Handwritten Notes of Jamie Chippett (various dates) 20-Jun-19 Environmental Panel
P-04261 Nalcor Energy - 78th Board of Directors Meeting dated October 2, 2014 21-Jun-19 Gilbert Bennett
P-04262 Excerpt from James Meaney iMessages dated February 13, 2019 to February 15, 2019 21-Jun-19 Gilbert Bennett
P-04263 Email dated May 6, 2019, 9:11:49 PM from Daniel Simmons to Michael Collins, cc Gobhina Nagarajah, Irene Muzychka and Dana Martin re Followups from Gilbert Bennett Interview 21-Jun-19 Gilbert Bennett
P-04264 Email dated May 6, 2019, 9:16:37 PM from Daniel Simmons to Michael Collins cc Gobhina Nagarajah, Irene Muzychka and Dana Martin re Tower Weights and Quantities at Bid and Final 21-Jun-19 Gilbert Bennett
P-04265 Letter dated December 3, 2008 from Gilbert Bennett to Bob Barnes and Paul Harrington re Reliability design return period for the Labrador-Island HVdc Link 21-Jun-19 Gilbert Bennett
P-04266 Email dated January 23, 2012, 11:22 AM from bbarnes@nalcorenergy.com to pharrington@nalcorenergy.com, ronpower@nalcorenergy.com, et al, cc colleensutton@nalcorenergy.com re Basis of Design to line up with DG-3 21-Jun-19 Gilbert Bennett
P-04267 Nalcor Energy - Lower Churchill Project - Basis of Design dated October 4, 2012 21-Jun-19 Gilbert Bennett
P-04268 Email dated February 21, 2012, 6:59:16 AM from kentlegge@nalcorenergy.com to carolannelutz@nalcorenergy.com and elizabethgray@nalcorenergy.com re Fw: Redress 21-Jun-19 Gilbert Bennett
P-04269 Email dated November 30, 2011, 4:39:19 PM from Gilbert Bennett to Mary Hatherly re Fw: Briefing document for Friday meeting re Redress Payments 21-Jun-19 Gilbert Bennett
P-04270 Email dated May 8, 2019, 1:26:22 PM from Dana Martin to Daniel Simmons and Michael Collins, cc Gobhina Nagarajah and Irene Muzychka re Followups from Gilbert Bennett Interview [IWOV-Active.FID3881181] 21-Jun-19 Gilbert Bennett
P-04271 Email dated November 13, 2011, 10:55 AM from mbradbury@nalcorenergy.com to davepardy@nalcorenergy.com, cc kentlegge@nalcorenergy.com, alisonball@nalcorenergy.com, et al re Fw: Redress Settlement Payments 21-Jun-19 Gilbert Bennett
P-04272 Letter dated March 9, 2012 from Thomas J. O'Rielly to Maureen P. Greene re Reference from Lieutenant-Governor in Council on the Muskrat Falls Project (the "Muskrat Falls Review") 21-Jun-19 Gilbert Bennett
P-04273 Muskrat Falls Project - Exhibit 97 - Review of Existing Meteorological Studies Conducted on the Labrador-Island Transmission Link - Nalcor Energy - Lower Churchill Project dated September 2011 21-Jun-19 Gilbert Bennett
P-04274 Email dated November 28, 2013, 9:39 PM from scotto'brien@lowerchurchillproject.ca to ronpower/nlhydro, cc jasonkean/nlhydro and clarencehewitt/nlhydro re *Confidential: Fw: S011-L010-200-170330-00222 NORTH SPUR Design & Request for Hydro Geological Studies 25 Nov 2013 21-Jun-19 Gilbert Bennett
P-04275 Aecon-Flatiron-Barnard JV - Lower Churchill Project - Package 0007 - Appendix A13-Site Executive Plan 21-Jun-19 Gilbert Bennett
P-04276 Hatch - Nalcor Energy - Final Report for Examination of 2017 Ice Jam Event dated September 18, 2017 21-Jun-19 Gilbert Bennett
P-04277 Letter dated July 24, 2018 from Peter Madden to Haseen Khan re Amendment Request for Permit to Alter a Body of Water ALT6933-2013 - Muskrat Falls Generation Site 21-Jun-19 Gilbert Bennett
P-04278 Memorandum dated July 31, 2018 from Krista Trowbridge to Peter Madden re NE-LCP-MEMO-003455: Re: Amendment Request for ALT6933 - Wetland Capping 21-Jun-19 Gilbert Bennett
P-04279 House of Assembly Proceedings, Vol. XLVII No. 26 dated May 3, 2012 21-Jun-19 Gilbert Bennett
P-04280 The Telegram news article dated August 11, 2011 re Shuttering Holyrood station 21-Jun-19 Gilbert Bennett
P-04281 Memo dated May 1, 2019 from Regis Bouchard to File, Greg Snyder, et al re North Spur - Downstream Slope Stability - Sensitivity Analysis Addendum to the Post Construction Assessment Report (PCA) 21-Jun-19 Gilbert Bennett
P-04282 SNC-Lavalin - Nalcor Energy - Lower Churchill Project - Engineering Report - North Spur - Post Construction Assessment dated September 7, 2018 21-Jun-19 Gilbert Bennett
P-04283 Nalcor Energy - Lower Churchill Project - North Spur Stabilization Works - Construction Report dated January 27, 2019 21-Jun-19 Gilbert Bennett
P-04284 Information Note: Joint Review Panel Recommendations Regarding Reservoir Preparation and Clearing 21-Jun-19 Gilbert Bennett
P-04285 Background Information - Lower Churchill Project and MethylMercury Levels in the Lower Churchill River System 21-Jun-19 Gilbert Bennett
P-04286 Email dated October 31, 2016, 7:47:57 AM from Cathy Lockyer to Paul A. Carter re Final Workshop Report - Methylmercury Mitigation & Muskrat Falls (Aug 4, 2016 in Goose Bay) by Wayne Thistle 21-Jun-19 Gilbert Bennett
P-04287 Email dated September 23, 2016, 3:27:09 PM from janinemccarthy@lowerchurchillproject.ca to deannefisher@nalcorenergy.com re Background Info 21-Jun-19 Gilbert Bennett
P-04288 Email dated August 19, 2016, 5:49:10 PM from Peter Madden to petermadden@lowerchurchillproject.ca re Methyl Mercury Letter 21-Jun-19 Gilbert Bennett
P-04289 Email dated March 20, 2015, 5:42:33 PM from fletcherbaltz@lowerchurchillproject.ca to kevinmiller@lowerchurchillproject.ca, cc Brad Hadley, David Riffe, et al re North Spur Security Plan/Risk Registry 21-Jun-19 Gilbert Bennett
P-04290 Muskrat Falls Projects - Exhibit 85 - Reliability Study of Transmission Lines on the Avalon and Connaigre Peninsula dated April 1996 21-Jun-19 Gilbert Bennett
P-04291 EA Commitment: EA-LITL-0013 25-Jun-19 Gilbert Bennett
P-04292 Tab 10 - Email dated January 16, 2019, 9:51 AM from DeanneFisher@nalcorenergy.com to Peter Miles, John Cowan and Jason Card re Wetland Capping Initiative 27-Jun-19 Siobhan Coady
P-04293 Email dated January 24, 2016, 10:24:50 AM from Tim Murphy to Dwight Ball, cc Kelvin Parsons re Confidential: Food for Thought Memo re: Tuesday's P&P Meeting 27-Jun-19 Siobhan Coady
P-04294 Nalcor Energy - Lower Churchill Project presentation dated January 2016 re Muskrat Falls Update - Draft Cabinet Presentation 27-Jun-19 Siobhan Coady
P-04295 Email dated February 28, 2016, 4:33:31 Pm from Tim Murphy to Paul Hickey re Chat 27-Jun-19 Siobhan Coady
P-04296 Email dated February 29, 2016, 5:51:19 PM from Siobhan Coady to Julia Mullaley re Fw: Tweets re MF Oversight Committee 27-Jun-19 Siobhan Coady
P-04297 Email dated March 4, 2016, 3:53:22 PM from Siobhan Coady to Kelvin Parsons re Confidential: Ed Martin's Current Employment Contract 27-Jun-19 Siobhan Coady
P-04298 Email dated March 11, 2016, 8:35:04 AM from Siobhan Coady to Tim Murphy re Memo 27-Jun-19 Siobhan Coady
P-04299 Email dated March 18, 2016, 8:25:37 PM from Siobhan Coady to Tim Murphy, Kelvin Parsons and Julia Mullaley re Fw: Updated materials - EY Report 27-Jun-19 Siobhan Coady
P-04300 Email dated March 18, 2016, 11:27:41 PM from Siobhan Coady to Dwight Ball, Julia Mullaley, Kelvin Parsons and Tim Murphy re Astaldi Letter 27-Jun-19 Siobhan Coady
P-04301 Email dated March 18, 2016, 9:09 PM from EMartin@nalcorenergy.com to Julia Mullaley and Siobhan Coady, cc GBennett@nalcorenergy.com, PHarrington@lowerchurchillproject.ca and LanceClarke@lowerchurchillproject.ca re Fwd: Astaldi letter 27-Jun-19 Siobhan Coady
P-04302 Email dated March 30, 2016, 3:46:32 PM from Siobhan Coady to Diana Quinton, cc Charles W. Bown and Megan Sheppard re Posting: October EY report and EY contract 27-Jun-19 Siobhan Coady
P-04303 Email dated September 20, 2016, 2:30 PM from Colleen G. Janes to Perry Trimper re MeHg Presentation to Premier 27-Jun-19 Siobhan Coady
P-04304 Tab 1 - GNL presentation dated November 1, 2018 re Technical Briefing: IEAC's Methylmercury Recommendations 27-Jun-19 Siobhan Coady
P-04305 Email dated January 9, 2017, 10:04:08 AM from Walter Parsons to Diane Carroll re FW: HP TRIM CORRESPONDENCE-OUTGOING : OCOR-24927 : Response to Vardy re EY Ernst and Young 27-Jun-19 Siobhan Coady
P-04306 Office of the Auditor General - Review of Severance - Mr. Edmund J. Martin dated February 2017 27-Jun-19 Siobhan Coady
P-04307 GNL Memorandum to Executive Council dated March 3, 2017 re Additional Federal Loan Guarantee for Muskrat Falls 27-Jun-19 Siobhan Coady
P-04308 GNL Background Note - Muskrat Falls Project Overview - Department of Natural Resources dated July 27, 2017 re To provide a Muskrat Falls Project Summary and Update 27-Jun-19 Siobhan Coady
P-04309 Letter dated July 28, 2017 from Premier Dwight Ball to Michel Tremblay re Muskrat Falls Development 27-Jun-19 Siobhan Coady
P-04310 GNL News Release dated August 31, 2017 re Minister Coady Releases EY Report 27-Jun-19 Siobhan Coady
P-04311 GNL Memorandum to Executive Council dated November 1, 2017 re Review of the Decision to Sanction and the Execution of the Muskrat Falls Project 27-Jun-19 Siobhan Coady
P-04312 Email dated November 28, 2017, 10:44:36 AM from Corey Snook to Christine Boland, Robyn J. Montague and Mark Janes re FW: Power Points - Wind and Electricity Concepts 27-Jun-19 Siobhan Coady
P-04313 GNL Memorandum to Executive Council dated November 10, 2017 re Reference Questions on Electricity Rate Mitigation for the Board of Commissioners of Public Utilities (PUB) 27-Jun-19 Siobhan Coady
P-04314 GNL News Release dated March 26, 2018 re Government Adopts Open Access Framework for Transmitting Electricity 27-Jun-19 Siobhan Coady
P-04315 Newfoundland and Labrador Regulation 42/18 - Open Access Transmission Regulations under the Electrical Power Control Act, 1994 and the Public Utilities Act (O.C. 2018-088) dated May 31, 2018 27-Jun-19 Siobhan Coady
P-04316 Bill 2 - An Act to Amend the Electrical Power Control Act, 1994 and the Public Utilities Act 27-Jun-19 Siobhan Coady
P-04317 CBC news article dated August 22, 2018 re Ratepayers won't be on hook for 'tremendous burden' of Muskrat Falls, Ball promises 27-Jun-19 Siobhan Coady
P-04318 The Telegram news article dated August 22, 2018 re Ratepayers won't pay for Muskrat Falls, somehow: premier 27-Jun-19 Siobhan Coady
P-04319 CBC news article dated September 5, 2018 re 'Need not fret' at the prospect of doubling electricity rates, says premier 27-Jun-19 Siobhan Coady
P-04320 Tab 3 - GNL presentation dated November 13, 2018 re Technical Briefing: IEAC's Methylmercury Recommendations 27-Jun-19 Siobhan Coady
P-04321 Tab 9 - Email dated January 16, 2019, 9:31 AM from Jamie Chippett to GBennett@nalcorenergy.com, cc DeanneFisher@nalcorenergy.com and smarshall@nalcorenergy.com re Wetland Capping initiative 27-Jun-19 Siobhan Coady
P-04322 GNL - Protecting you from the Cost Impacts of Muskrat Falls dated April 2019 27-Jun-19 Siobhan Coady
P-04323 Minutes - Muskrat Falls Project Oversight Committee dated October 25, 2018 25-Jun-19 Gilbert Bennett
P-04324 Minutes - Muskrat Falls Project Oversight Committee dated December 4, 2018 25-Jun-19 Gilbert Bennett
P-04325 GNL News Release dated April 15, 2019 re Premier Ball Releases Plan to Protect Residents from the Cost Impacts of Muskrat Falls 27-Jun-19 Siobhan Coady
P-04326 The Telegram news article dated April 11, 2017 re Coady beefs up Muskrat Falls oversight 27-Jun-19 Siobhan Coady
P-04327 The Telegram news article dated July 22, 2017 re Paying for past mistakes 27-Jun-19 Siobhan Coady
P-04328 Nalcor Energy presentation dated December 15, 2015 re Financial Overview 27-Jun-19 Siobhan Coady
P-04329 Email dated March 17, 2016, 8:44:48 AM from jamesmeaney@lowerchurchillproject.ca to Derrick Sturge re Meeting last night 27-Jun-19 Siobhan Coady
P-04330 Memo dated September 11, 2018 from Rob Hull to Members of the Board of Directors, Nalcor Energy re Rate Mitigation Update 27-Jun-19 Siobhan Coady
P-04331 Environmental Assessment Commitments for Lower Churchill Hydro Generation Project - Status Update and High Level Description of Supporting Documentation dated June 2019 26-Jun-19 Gilbert Bennett
P-04332 Environmental Assessment Commitments for Lower Churchill Project Labrador Island Transmission Link - Status Update and High Level Description of Supporting Documentation dated June 2019 26-Jun-19 Gilbert Bennett
P-04333 Kelvin Parsons handwritten notes dated December 4, 2015 to February 22, 2016 27-Jun-19 Siobhan Coady
P-04334 Curriculum Vitae - Jennifer Fiddian-Green 28-Jun-19 Jennifer Fiddian-Green
P-04335 Grant Thornton Report to the Commission of Inquiry Respecting the Muskrat Falls Project - Additional Scope of Work - Review of Specific Expenditures dated April 22, 2019 - Updated May 7, 2019 28-Jun-19 Jennifer Fiddian-Green
P-04336 Nalcor Energy - Lower Churchill Project - Internal Audit Project # 16-09 - Report Name: LCP Rotational Travel Audit dated July 5, 2016 28-Jun-19 Jennifer Fiddian-Green
P-04337 Labrador - Island Link Limited Partnership and H.J. O'Connell Construction Limited - Civil Works Agreement - Construction of Earthworks at Soldier's Pond - Agreement No. CD0503-002 dated October 18, 2013 28-Jun-19 Jennifer Fiddian-Green
P-04338 Nalcor Energy - Code of Conduct and Business Ethics Handbook 28-Jun-19 Jennifer Fiddian-Green
P-04339 Lower Churchill Project - Purchase Order: CT0355-030-003 Inland Trucking Service dated January 7, 2016 28-Jun-19 Jennifer Fiddian-Green
P-04340 Nalcor Energy Internal Audit Memo dated June 4, 2018 from Jackie Borden to Scott O'Brien, cc Ron Power re MF Review - Sea Cans 28-Jun-19 Jennifer Fiddian-Green
P-04341 Agreement LC-PM-121 for Professional Services for Lower Churchill Project between Nalcor Energy and 60472 Newfoundland and Labrador dated February 4, 2013 28-Jun-19 Jennifer Fiddian-Green
P-04342 Nalcor Energy Internal Audit Memo dated December 15, 2017 from Jackie Borden to Stan Marshall, cc Gilbert Bennett re Muskrat Falls Site Review - Confidential 28-Jun-19 Jennifer Fiddian-Green
P-04343 CBC news article dated June 24, 2016 re It's official: Muskrat Falls a boondoggle, says Stan Marshall 28-Jun-19 Stan Marshall
P-04344 Island Interconnected System - Five Year Operating Data - 2011-2015 21-Jun-19 Gilbert Bennett
P-04345 Letter dated April 15, 2019 from Stig Bernander and Lennart Elfgren to Siobhan Coady re Investigation of the Safety of the North Spur 27-Jun-19 Siobhan Coady
P-04346 Letter dated February 26, 2019 from David Vardy, Ron Penney and Des Sullivan to Siobhan Coady re Risks arising from the North Spur 27-Jun-19 Siobhan Coady
P-04347 Letter dated October 2, 2018 from Stig Bernander and Lennart Elfgren to Siobhan Coady re Investigation of the Safety of the North Spur 27-Jun-19 Siobhan Coady
P-04348 Letter dated March 14, 2019 from James L. Gordon to Siobhan Coady re correction to statement made in letter to Dr. Elfgren and Dr. Bernander of March 12, 2019 27-Jun-19 Siobhan Coady
P-04349 End-of-visit statement by the United Nations Special Rapporteur on human rights and hazardous substances and wastes, Baskut Tuncak on his visit to Canada, 24 May to 6 June 2019 27-Jun-19 Siobhan Coady
P-04350 Grant Thornton Presentation to the Commission of Inquiry Respecting the Muskrat Falls Project dated June 28, 2019 re Additional Scope of Work - Review of Specific Expenditures 28-Jun-19 Jennifer Fiddian-Green
P-04351 GNL presentation dated December 14, 2015 re NL Electricity Rates and the Muskrat Falls Project 27-Jun-19 Siobhan Coady
P-04352 Nalcor Energy - CEO Speaking Notes - Muskrat Falls Cost and Schedule Update News Conference dated June 24 28-Jun-19 Stan Marshall
P-04353 Nalcor Energy - Lower Churchill Project presentation dated June 22, 2016 re Muskrat Falls Project Update 28-Jun-19 Stan Marshall
P-04354 The Liberty Consulting Group - Sixth Quarterly Monitoring Report on the Integration of Power Supply Facilities to the Island Interconnected System dated May 22, 2019 presented to the Board of Commissioners of Public Utilities Newfoundland and Labrador 28-Jun-19 Stan Marshall
P-04355 CBC news article dated April 21, 2016 re Stan Marshall, Nalcor's new CEO, 'deeply troubled' by Muskrat Falls 28-Jun-19 Stan Marshall
P-04356 Email dated April 20, 2016, 6:26:56 PM from Tim Murphy to Nancy O'Connor, Dwight Ball, Siobhan Coady, Kelvin Parsons, Julia Mullaley, cc Carla Foote and Diana Quinton re For Review - April 21 Draft Comms Materials 28-Jun-19 Stan Marshall
P-04357 Email dated April 25, 2016, 9:26:12 AM from Tim Calver to David Steele, David Leather, et al re FW: Suggested Approach to Discussion with New Nalcor CEO, Stan Marshall 28-Jun-19 Stan Marshall
P-04358 GNL News Release dated April 21, 2016 re Responsible Management of the Province's Investment 28-Jun-19 Stan Marshall
P-04359 CBC news article dated February 12, 2018 re What the swift collapse of some Labrador caribou can tell us about endangered species 28-Jun-19 Stan Marshall
P-04360 CBC news article dated June 25, 2019 re PCs accuse government of 'deliberate' inaction on methylmercury at Muskrat 28-Jun-19 Stan Marshall
P-04361 Email dated February 1, 2012, 6:08:15 PM from Heather Maclean to Jerome Kennedy, Charles W. Bown, et al re Fw: Manitoba Hydro International Report further evidence that a full PUB review of Muskrat Falls is needed 4-Jul-19 Dwight Ball
P-04362 Email dated February 6, 2012, 11:53:38 AM from Jacquelyn Howard to Heather Maclean, Glenda Power and Milly Brown, cc Josephine Cheeseman and Jennifer Collingwood re FW: Public Utilities Board review of Muskrat Falls not addressing alternatives: Ball 4-Jul-19 Dwight Ball
P-04363 Email dated March 7, 2012, 5:31:09 PM from Jacquelyn Howard to Heather Maclean, Tina Williams, Glenda Power and Milly Brown, cc Jennifer Collingwood and Josephine Cheeseman re FW: Kennedy Avoids Opposition Request for Documents 4-Jul-19 Dwight Ball
P-04364 Email dated March 15, 2012, 7:25:44 PM from Jacquelyn Howard to Heather Maclean, Melony O'Neill and Glenda Power, cc Milly Brown, Josephine Cheeseman and Jennifer Collingwood re Fw: Government dismisses Joint Review Panel recommendations 4-Jul-19 Dwight Ball
P-04365 Email dated May 31, 2012, 3:52:11 PM from Jennifer Collingwood to Glenda Power, Milly Brown, et al re FW: Muskrat power too expensive for US markets 4-Jul-19 Dwight Ball
P-04366 Email dated June 11, 2012, 3:27:24 PM from Heather Maclean to Jerome Kennedy, Charles W. Bown and Tracy Shute re fyi: Nalcor appointments all about politics: Ball 4-Jul-19 Dwight Ball
P-04367 Email dated June 18, 2012, 4:59:49 PM from Jacquelyn Howard to Heather Maclean, Glenda Power, et al re Fw: Appointments to Nalcor Board a missed opportunity 4-Jul-19 Dwight Ball
P-04368 Email dated June 28, 2012, 9:28:09 AM from Jacquelyn Howard to Glenda Power, Heather Maclean, et al re FW: Ball releases letter to Premier on Muskrat Falls debate 4-Jul-19 Dwight Ball
P-04369 The Telegram news article dated August 1, 2012 re Opposition asks: how about those DG3 numbers? 4-Jul-19 Dwight Ball
P-04370 Email dated August 21, 2012, 8:53:13 AM from Jacquelyn Howard to Heather Maclean, Lynn Hammond et al re FW: Level of personal attacks by government is disturbing: Ball 4-Jul-19 Dwight Ball
P-04371 Email dated September 7, 2012, 12:05:24 PM from Jacquelyn Howard to Lynn Hammon, Milly Brown, et al re FW: What happened to the Deputy Minister 4-Jul-19 Dwight Ball
P-04372 Email dated September 17, 2012, 2:38:17 PM from Jacquelyn Howard to Lynn Hammond, Debbie Marnell, et al re FW: Liberals Present Government with Proposed Rules for Muskrat Falls Debate 4-Jul-19 Dwight Ball
P-04373 Email dated September 28, 2012, 9:22:03 AM from Jacquelyn Howard to Heather Maclean, Lynn Hammond, et al re FW: Kennedy Questioned Debate Rules a Decade Earlier 4-Jul-19 Dwight Ball
P-04374 Email dated October 11, 2012, 9:33:21 AM from Jacquelyn Howard to Heather Maclean, Lynn Hammond, et al re FW: Liberals Question the Premier's Commitment to Debating Muskrat Falls 4-Jul-19 Dwight Ball
P-04375 Email dated October 12, 2012, 6:44:22 PM from Paul Wilson to Charles W. Bown re FW: Fax: Special Debate on Muskrat Falls - Dwight Ball 4-Jul-19 Dwight Ball
P-04376 Letter dated October 12, 2012 from Dwight Ball to Ed Martin re Special Debate on Muskrat Falls 4-Jul-19 Dwight Ball
P-04377 Email dated October 29, 2012, 12:59:37 PM from Jacquelyn Howard to Lynn Hammond, Debbie Marnell, et al re FW: Premier Making a Mockery of Muskrat Falls 4-Jul-19 Dwight Ball
P-04378 Email dated October 31, 2012, 2:57:36 PM from Catherine Evans to Mary Byrne re FW: Opposition dissatisfied with information released 4-Jul-19 Dwight Ball
P-04379 Email dated November 6, 2012, 5:21:07 PM from Bradley Power to Darrell Hynes and Derrick Dalley re Fw: Pulling the plug on the Muskrat Falls Special Debate is an insult to democracy 4-Jul-19 Dwight Ball
P-04380 Email dated November 20, 2012, 9:48:52 AM from Heather Maclean to Jerome Kennedy, Charles W. Bown et al re media: CP - Opposition fumes as province limits debate on Muskrat Falls project in Labrador 4-Jul-19 Dwight Ball
P-04381 Email dated November 23, 2012, 3:09:31 PM from Jennifer Collingwood to Lynn Hammond, Milly Brown, et al re FW: Government continues to mislead the public on Muskrat Falls 4-Jul-19 Dwight Ball
P-04382 Email dated November 28, 2012, 7:30:07 PM from Bradley Power to Derrick Dalley and Darrell Hynes re Fw: Government shoot down a Liberal motion for an Independent Report on Muskrat Falls 4-Jul-19 Dwight Ball
P-04383 Email dated November 30, 2012, 5:27:59 PM from Jacquelyn Howard to Lynn Hammond, Debbie Marnell, et al re Fw: Liberals ask Where is the Loan Guarantee? 4-Jul-19 Dwight Ball
P-04384 Email dated December 3, 2012, 8:29:26 PM from Heather Maclean to Jerome Kennedy, Charles W. Bown, et al re FYI: Emera in the driver's seat on possible loan guarantee 4-Jul-19 Dwight Ball
P-04385 Email dated December 5, 2012, 4:43:58 PM from Jennifer Collingwood to Lynn Hammond, Lynette Carroll, et al re FW: Government planning to take the teeth out of energy watchdog 4-Jul-19 Dwight Ball
P-04386 Email dated December 5, 2012, 6:44:31 PM from Jennifer Collingwood to Lynette Carroll, Lynn Hammond, et al re Fw: Premier makes a joke out of Muskrat Falls debate 4-Jul-19 Dwight Ball
P-04387 Email dated December 11, 2012, 5:54:05 PM from Jacquelyn Howard to Heather Maclean, Tina Williams, et al re Fw: Government Makes Another Mistake with more Negligent Decisions 4-Jul-19 Dwight Ball
P-04388 Email dated December 13, 2012, 6:21:11 PM from Jacquelyn Howard to Luke Joyce, Heather Maclean, et al re Fw: Cost of Muskrat Falls forces Government to seek funding 4-Jul-19 Dwight Ball
P-04389 Email dated December 13, 2012, 9:15:43 AM from Heather Maclean to Jerome Kennedy, Charles W. Bown, et al re fyi: Government back peddles on sanctioning promise for Muskrat Falls 4-Jul-19 Dwight Ball
P-04390 Email dated December 17, 2012, 7:07:51 PM from Jacquelyn Howard to Heather Maclean, Tina Williams, et al re Fw: Democratic process a joke when it comes to Muskrat Falls 4-Jul-19 Dwight Ball
P-04391 Email dated December 17, 2012, 6:08:41 PM from Bradley Power to Derrick Dalley and Darrell Hynes re FW: Confidence in Public Utilities Board remains high on Muskrat Falls: Liberals 4-Jul-19 Dwight Ball
P-04392 Email dated December 17, 2012, 7:53:17 PM from Bradley Power to Derrick Dalley and Darrell Hynes re FW: Questions still remain with sanctioning of Muskrat Falls 4-Jul-19 Dwight Ball
P-04393 Email dated December 18, 2012, 7:14:49 PM from Jacquelyn Howard to Heather Maclean, Lisa E. Lawlor, et al re Fw: Filibuster only option for dreadful Muskrat Falls legislation 4-Jul-19 Dwight Ball
P-04394 Email dated December 18, 2012, 7:13:32 PM from Jacquelyn Howard to Heather Maclean, Tina Williams, et al re Fw: Minister Does Not Know Muskrat Falls Project 4-Jul-19 Dwight Ball
P-04395 Email dated December 19, 2012, 7:46:24 AM from Jacquelyn Howard to Heather Maclean, Tina Williams, et al re Fw: Government Shuts Down Debate on Muskrat Falls Legislation 4-Jul-19 Dwight Ball
P-04396 Email dated December 22, 2012, 1:40:27 PM from Jacquelyn Howard to Heather Maclean, Lynn Hammond, et al re Fw: Muskrat Falls Filibuster ends with Significant Debate 4-Jul-19 Dwight Ball
P-04397 Email dated May 23, 2013, 4:49:22 PM from Jennifer Collingwood to Jennifer L Tulk, Tracey Boland, et al re Fw: Secrets prevail with Government and Nalcor 4-Jul-19 Dwight Ball
P-04398 Email dated May 31, 2013, 3:28:05 PM from Jennifer Collingwood to Diana Quinton, Jennifer L. Tulk, et al re Fw: Questions raised over conditions of the Muskrat Falls federal loan guarantee 4-Jul-19 Dwight Ball
P-04399 Email dated July 22, 2013, 4:52:40 PM from Jennifer Collingwood to Diana Quinton, Jennifer Tulk, et al re Fw: Maritime Link decision from Nova Scotia threatens Muskrat Falls project 4-Jul-19 Dwight Ball
P-04400 Email dated September 12, 2013, 3:36:40 PM from Jennifer Collingwood to Diana Quinton, Jennifer Tulk, et al re FW: Answers needed on Muskrat Falls project 4-Jul-19 Dwight Ball
P-04401 Email dated October 21, 2013, 4:47:11 PM from Jennifer Collingwood to Diana Quinton, Jennifer Tulk, et al re FW: PCs walk away from Industrial Development in NL 4-Jul-19 Dwight Ball
P-04402 Email dated November 4, 2013, 6:08:41 PM from Jennifer Collingwood to Diana Quinton, Jennifer Tulk, et al re Fw: Dunderdale giving away benefits of Muskrat Falls to Nova Scotia 4-Jul-19 Dwight Ball
P-04403 Email dated November 14, 2013, 5:42:46 PM from Jennifer Collingwood to Diana Quinton, Jennifer Tulk, et al re Fw: Government and Nalcor at odds over importance of Water Management Agreement 4-Jul-19 Dwight Ball
P-04404 Email dated November 20, 2013, 5:31:42 PM from Jennifer Collingwood to Heather MacLean, Diana Quinton, et al re Fw: Premier fails to reveal all the facts on Muskrat Falls 4-Jul-19 Dwight Ball
P-04405 Email dated November 29, 2013, 12:34:20 PM from Jennifer Collingwood to Diana Quinton, Jennifer Tulk, et al re FW: Muskrat Falls: A Great Deal for Nova Scotia 4-Jul-19 Dwight Ball
P-04406 Email dated March 19, 2014, 11:02:28 AM from Jennifer Collingwood to Diana Quinton, Hugh Donnan, et al re FW: No truly Independent Oversight on Muskrat Falls Project 4-Jul-19 Dwight Ball
P-04407 Email dated March 24, 2014, 6:22:10 PM from Diana Quinton to Derrick Dalley, Ian Froude, et al re Fw: Muskrat Falls Oversight Committee lacks independence: Ball 4-Jul-19 Dwight Ball
P-04408 Email dated March 26, 2014, 5:49:09 PM from Jennifer Collingwood to Tracey Boland, Milly Brown, et al re FW: Government rejects opportunity for AG oversight of Nalcor 4-Jul-19 Dwight Ball
P-04409 Email dated April 15, 2014, 6:42:57 PM from Jennifer Collingwood to Diana Quinton, Tracey Boland, et al re Fw: Project overruns at Muskrat Falls with fall to ratepayers 4-Jul-19 Dwight Ball
P-04410 Email dated April 23, 2014, 3:03:33 PM from Jennifer Collingwood to Tina Williams, Diana Quinton, et al re FW: Ball calls on Premier to clarify Muskrat Falls comments 4-Jul-19 Dwight Ball
P-04411 Email dated May 23, 2014, 11:46:28 AM from Jennifer Collingwood to Diana Quinton, Tracey Boland, et al re FW: Muskrat Falls Power Purchase Agreement should be public: Ball 4-Jul-19 Dwight Ball
P-04412 VOCM media clip dated June 27, 2014, 11:25 AM re Nalcor Announcement: "Dwight Ball", Liberal Leader first of all gives a shout out to the organizers of Expo Labrador because it was a wonderful event 4-Jul-19 Dwight Ball
P-04413 Email dated September 30, 2015, 11:35:56 AM from Brian Scott to Darrell Hynes, Donna Ivey, et al re CBC - Muskrat Falls cost increase shows poor management from Nalcor, says Dwight Ball 4-Jul-19 Dwight Ball
P-04414 GNL presentation dated June 27, 2019 re Muskrat Falls Project Oversight Committee - Quarterly Project Update - Period Ending March 31, 2019 2-Jul-19 Stan Marshall
P-04415 Email dated February 27, 2017, 10:46 AM from PHarrington@lowerchurchillproject.ca to Paul Carter, cc StevePellerin@lowerchurchillproject.ca, GBennett@nalcorenergy.com, et al re Ice conditions 2-Jul-19 Stan Marshall
P-04416 Nalcor Energy - Lower Churchill Project presentation dated June 15, 2017 re Lower Churchill Project - The Link - Transmission Update 2-Jul-19 Stan Marshall
P-04417 Nalcor Energy presentation dated November 2015 re Nalcor's Evolution - The path to long term sustainability 2-Jul-19 Stan Marshall
P-04418 Nalcor Energy presentation re Transition to Operations - Ready for Commercial Integration 2-Jul-19 Stan Marshall
P-04419 PUB-Nalcor-078 - Rate Mitigation Options and Impacts Reference 2-Jul-19 Stan Marshall
P-04420 Nalcor Energy - Lower Churchill Project - Cold Eye Review of Design and Technical Specifications, North Spur Stabilization Works - Final Report dated January 9, 2014 2-Jul-19 Environmental Panel
P-04421 Nalcor Energy - Annual Activity and Compliance Report - Code of Business Conduct and Ethics dated February 13, 2017 4-Jul-19 Jennifer Fiddian-Green
P-04422 Nalcor Energy Internal Audit - Ethics Line Report 8, 9, 11 - Conflict of Interest and Procurement dated April 12, 2018 4-Jul-19 Jennifer Fiddian-Green
P-04423 Nalcor Energy Internal Audit - Ethics Line Report 27 - Conflict of Interest and Procurement dated January 24, 2019 4-Jul-19 Jennifer Fiddian-Green
P-04424 Nalcor Energy Internal Audit - Note to File re: Procurement and Conflict of Interest Investigation 4-Jul-19 Jennifer Fiddian-Green
P-04425 Nalcor Energy presentation dated November 2015 re Internal Audit Planning - Audit Committee - Nalcor Energy 4-Jul-19 Jennifer Fiddian-Green
P-04426 Nalcor Energy presentation dated November 2016 re Board of Directors - Nalcor Energy - Internal Audit Plan 4-Jul-19 Jennifer Fiddian-Green
P-04427 Nalcor Energy Internal Audit - Audit Plan dated November 2017 4-Jul-19 Jennifer Fiddian-Green
P-04428 LCP Response to GT Q#4 in response to Request List for Additional Scope of Work dated December 19, 2018 4-Jul-19 Jennifer Fiddian-Green
P-04429 Internal Audit Memo dated October 25, 2017 from Jackie Borden to Scott O'Brien, cc Lance Clarke re Muskrat Falls Site Timesheet Review 4-Jul-19 Jennifer Fiddian-Green
P-04430 Curriculum Vitae - Denise Hanrahan 16-Jul-19 Financial Impacts Panel
P-04431 Curriculum Vitae - Kevin Fagan 16-Jul-19 Financial Impacts Panel
P-04432 Curriculum Vitae - Lorraine Michael 16-Jul-19 Financial Impacts Panel
P-04433 Curriculum Vitae - Brandon Schaufele 16-Jul-19 Financial Impacts Panel
P-04434 Curriculum Vitae - Bernice Hancock 16-Jul-19 Financial Impacts Panel
P-04435 Curriculum Vitae - Jerry Earle 16-Jul-19 Financial Impacts Panel
P-04436 Curriculum Vitae - Peter Alteen 16-Jul-19 Financial Impacts Panel
P-04437 Curriculum Vitae - Ole Jonny Klakegg 24-Jul-19 Dr. Ole Jonny Klakegg
P-04438 Professor Ole Jonny Klakegg, NTNU, presentation re Governance frameworks - The Norwegian State Project Model and other schemes. Preconditions and effective elements - suggestions for Newfoundland and Labrador 24-Jul-19 Dr. Ole Jonny Klakegg
P-04439 Concept Report No. 47 re Governance Schemes for Major Public Investment Projects - A comparative study of principle and practices in six countries dated September 2016 24-Jul-19 Dr. Ole Jonny Klakegg
P-04440 International Journal of Project Management - Taming the 'trolls': Major public projects in the making dated April 8, 2015 24-Jul-19 Dr. Ole Jonny Klakegg
P-04441 C.D. Howe Institute Commentary No. 528 - Dammed If You Do: How Sunk Costs Are Dragging Canadian Electricity Ratepayers Underwater dated January 2019 18-Jul-19 AJ Goulding
P-04442 Muskrat Falls Inquiry Speaking Notes dated July 2019 provided by Jerry Earle, NAPE 16-Jul-19 Financial Impacts Panel
P-04443 The Impact of the Muskrat Falls Project: A Choice for Government prepared for NAPE dated July 10, 2019 16-Jul-19 Financial Impacts Panel
P-04444 NAPE presentation re Financial Impact of the Muskrat Falls Project 16-Jul-19 Financial Impacts Panel
P-04445 Report to the Muskrat Falls Inquiry - Review of Several Financial Issues Relating to the Decision to Proceed with the Muskrat Falls Project prepared by MPA Morrison Park Advisors Inc. dated May 2019 17-Jul-19 Pelino Colaiacovo
P-04446 Commission of Inquiry Respecting the Muskrat Falls Project presentation by Peter Alteen dated July 16, 2019 16-Jul-19 Financial Impacts Panel
P-04447 Letter dated April 25, 2019 from Darlene Whalen to Siobhan Coady re Rate Mitigation Options and Impacts Reference 16-Jul-19 Financial Impacts Panel
P-04448 Newfoundland and Labrador Board of Commissioners of Public Utilities - Reference to the Board - Rate Mitigation Options and Impacts - Muskrat Falls Project - Interim Report dated February 15, 2019 16-Jul-19 Financial Impacts Panel
P-04449 GNL Report - Protecting You From the Cost Impacts of Muskrat Falls dated April 2019 16-Jul-19 Financial Impacts Panel
P-04450 2018 Tax Review Report - Independent Tax Review Committee - Newfoundland and Labrador dated November 30, 2018 16-Jul-19 Financial Impacts Panel
P-04451 GNL - Mitigating Muskrat: 38 Month Review 16-Jul-19 Financial Impacts Panel
P-04452 Public Utilities Board Reference to Board on Rate Mitigation Options and Impacts dated April 24, 2019 16-Jul-19 Financial Impacts Panel
P-04453 2018 Tax Review Report: Background and Analysis - Independent Tax Review Committee - Newfoundland and Labrador dated November 30, 2019 16-Jul-19 Financial Impacts Panel
P-04454 Dennis Browne's Bio 16-Jul-19 Financial Impacts Panel
P-04455 Newfoundland Labrador Hydro presentation dated July 16, 2019 re Muskrat Falls Project & Customer Rates 16-Jul-19 Financial Impacts Panel
P-04456 Opening Remarks for Denise Hanrahan, Deputy Minister of Finance - Muskrat Falls Inquiry Phase III dated July 16, 2019 16-Jul-19 Financial Impacts Panel
P-04457 London Economics - Regulatory and policy issues of interest to the Muskrat Falls Inquiry dated July 11, 2019 18-Jul-19 AJ Goulding
P-04458 Curriculum Vitae - A.J. Goulding 18-Jul-19 AJ Goulding
P-04459 Presentation to Commission of Inquiry Respecting the Muskrat Falls Project by Lorraine Michael dated July 16, 2019 16-Jul-19 Financial Impacts Panel
P-04460 Financial Impact of the Muskrat Falls Project - Panel Presentation by Bernice Hancock 16-Jul-19 Financial Impacts Panel
P-04461 Impacts of the Muskrat Falls Project on Ratepayers and Taxpayers by Brandon Schaufele dated July 16, 2019 16-Jul-19 Financial Impacts Panel
P-04462 Statistics Canada Census 2016 16-Jul-19 Financial Impacts Panel
P-04463 Principles of Public Utility Rates and various documents provided by Dennis Browne 16-Jul-19 Financial Impacts Panel
P-04464 Morrison Park Advisors - Presentation to Commission of Inquiry Respecting the Muskrat Falls Project dated July 2019 17-Jul-19 Pelino Colaiacovo
P-04465 Curriculum Vitae - Mel Cappe, O.C. 26-Jul-19 Mel Cappe
P-04466 Mel Cappe presentation re Governance and The Role of the Public Service in Westminster Parliamentary Democracies dated July 26, 2019 26-Jul-19 Mel Cappe
P-04467 ScienceDirect International Journal of Project Management - Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance dated January 19, 2015 24-Jul-19 Dr. Ole Jonny Klakegg
P-04469 Report of the 2014 Statutory Review - Access to Information and Protection of Privacy Act - Newfoundland and Labrador - Volume I: Executive Summary 22-Jul-19 Gobhina Nagarajah/ Judge Donovan Molloy
P-04470 Report of the 2014 Statutory Review - Access to Information and Protection of Privacy Act - Newfoundland and Labrador - Volume II: Full Report 22-Jul-19 Gobhina Nagarajah/ Judge Donovan Molloy
P-04471 Government of Newfoundland and Labrador - Management of Information Act - SNL2005 Chapter M-1.01 - An Act Respecting the Management of Government Information for the Province dated May 19, 2005 22-Jul-19 Gobhina Nagarajah/ Judge Donovan Molloy
P-04472 Government of British Columbia - Information Management Act [SBC 2015] Chapter 27 dated May 28, 2015 22-Jul-19 Gobhina Nagarajah/ Judge Donovan Molloy
P-04473 London Economics International LLC presentation re Regulatory and policy issues in Newfoundland and Labrador dated July 18-19, 2019 18-Jul-19 AJ Goulding
P-04474 Government of British Columbia News Release dated March 8, 2017 re British Columbia legislates a "duty-to-document" 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04475 Vancouver Sun news article dated March 14, 2017 re Opinion: B.C. government's 'duty to document' bill an empty façade 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04476 Government of British Columbia News Release dated April 1, 2019 re Legislative updates increase transparency, accountability 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04477 Curriculum Vitae - Dr. Kelly Blidook 25-Jul-19 Dr. Kelly Blidook
P-04478 Speak No Evil, Write No Evil: Exploring Chain-of-Command Communications and Documentation Practices in the NL Public Service by Dr. Kelly Blidook dated July 16, 2019 25-Jul-19 Dr. Kelly Blidook
P-04479 Backgrounder on A Duty to Document 25-Jul-19 Dr. Kelly Blidook
P-04480 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2016-022 - Department of Natural Resources dated October 4, 2016 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04481 Canadian Centre for Management Development - A Strong Foundation - Report of the Task Force on Public Service Values and Ethics dated January 2000 26-Jul-19 Mel Cappe
P-04482 Notes for Remarks by The Honourable Gordon Osbaldeston dated January 22, 1988 26-Jul-19 Mel Cappe
P-04483 Mowat Research #122 - Creating a High-Performing Canadian Civil Service Against a Backdrop of Disruptive Change dated June 2016 26-Jul-19 Mel Cappe
P-04484 Management of the Public Service - Report 4: Paperwork and Systems Management 26-Jul-19 Mel Cappe
P-04485 Royal Commission on Financial Management & Accountability - Final Report dated March 1979 26-Jul-19 Mel Cappe
P-04486 Court of Appeal Judgment - Churchill Falls (Labrador) Corporation Limited v Hydro-Quebec dated June 20, 2019 24-Jul-19 Dr. Ole Jonny Klakegg
P-04487 ATIPPA, 2015 - Jurisdiction Scan completed by August 2016 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04488 Government of Newfoundland and Labrador - Information Management System and Duty to Document Update dated July 18, 2019 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04489 GNL - Government Information Management System 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04490 GNL - Government Information Management System (On-line links) 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04491 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2015-011 - Department of Municipal and Intergovernmental Affairs dated December 14, 2015 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04492 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2016-005 - Premier's Office dated April 13, 2016 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04493 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report P-2017-003 - Human Resource Secretariat dated August 16, 2017 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04494 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2019-005 - Nalcor Energy dated January 25, 2019 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04495 Statement dated May 17, 2019 from BC Information and Privacy Commissioner regarding independent oversight over government's duty to document and use of personal communication tools 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04496 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2016-021 - Nalcor Energy dated October 4, 2016 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04497 CBC news article dated October 31, 2017 re Access to information requests overwhelming staff, says privacy commissioner 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04498 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2019-002 - Department of Natural Resources dated January 11, 2019 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04499 House of Assembly Proceedings, Vol. XLVII No. 3 dated April 23, 2015 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04500 GNL Briefing Note dated May 18, 2005 re Management of Government Information Act 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04501 House of Assembly Proceedings Vol. XLV No. 25 dated May 12, 2005 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04502 House of Assembly Proceedings Vol. XLV No. 27 dated May 17, 2005 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04503 GNL Information Note dated August 28, 2017 re Legislating a Duty to Document 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04504 Memo dated March 17, 2017 from Nina Goudie to Bern re Duty to Document 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04505 Memo dated June 28, 2017 to Betty re Questions related to Duty to Document 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04506 GNL Memorandum to the Executive Council dated March 15, 2005 re The Management of Government Information Act 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04507 Update: Implementation Table for ATIPPA Review Committee's 90 Recommendations (updated July 2019) 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04508 Office of the Information and Privacy Commissioner - Transitory Records dated November 13, 2018 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04509 GNL Office of the Chief Information Officer IM Services - Identifying and Disposing of Transitory Records dated September 24, 2018 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04510 GNL Office of the Chief Information Officer - Directive - Instant Messaging dated September 24, 2018 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04511 GNL Budget Speech - Budget 2016 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04512 Department of Finance - Duty to Document - Program Costs Estimates dated January 13, 2017 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04513 Appendix B - Recent OCIO Training 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04514 Osgoode Hall Law School of York University - 2001 The Law-Making Role of the Supreme Court of Canada: Rapporteur's Synthesis 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04515 GNL - Government's Information Management System and Supports dated July 19, 2019 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04516 Newfoundland and Labrador Regulation 2018 - Access to Information and Protection of Privacy Act, 2015 - Schedule B Amendment Order under the Access to Information and Protection of Privacy Act, 2015 (O.C. 2018-020) dated February 8, 2018 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04517 GNL News Release dated March 3, 2015 re Improving Access to Information 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04518 SNL2002 Chapter A-1.1 Access to Information and Protection of Privacy Act dated March 14, 2002 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04519 SNL2015 Chapter A-1.2 Access to Information and Protection of Privacy Act dated June 1, 2015 22-Jul-19 Gobhina Nagarajah/Judge Donovan Molloy
P-04520 Office of the Information and Privacy Commissioner - Newfoundland and Labrador - Report A-2017-026 - Nalcor Energy dated December 5, 2017 22-Jul-19 Gobhina Nagarajah/ Judge Donovan Molloy
P-04521 New Zealand Legislation - Public Records Act 2005 dated September 28, 2017 22-Jul-19 Gobhina Nagarajah/ Judge Donovan Molloy
P-04522 GNL - Focusing Our Energy - Energy Plan Progress Report - 2015 26-Jul-19 CIMFP
P-04523 Letter dated January 11, 2013 from Dionne Schulze to Gilbert Bennett re Hydroelectric generating facility project on the lower course of the Churchill River; n/d 7550-001 26-Jul-19 CIMFP
P-04524 Letter dated February 28, 2013 from Tilman Bieger to Chief Jean-Charles Pietacho & counsellors re Authorisation for works impacting the habitat of fish as a result of construction of the hydroelectric generating facility on the lower course of the Churchill River - Muskrat Falls Reservoir (Courtesy Translation) 26-Jul-19 CIMFP
P-04525 Email dated December 9, 2013, 9:55 PM from David Schulze to stephen.corbett@tc.gc.ca, cc Jean-Charles Pietacho, Yves Bernier, et al re Follow-up Application for approval of work to install the transmission line from the Muskrat Falls to the Churchill falls, as well as a number of temporary bridges (Courtesy Translation) 26-Jul-19 CIMFP
P-04526 Labrador and Aboriginal Affairs - Lower Churchill Project - Government of Newfoundland and Labrador Permit Approvals dated June 30, 2016 26-Jul-19 CIMFP
P-04527 Professor Ole Jonny Klakegg, NTNU, presentation re Governance frameworks - The Norwegian State Project Model and other schemes. Preconditions and effective elements - suggestions for Newfoundland and Labrador (with notes) 24-Jul-19 Dr. Ole Jonny Klakegg
P-04528 Reference Class Forecasting: A clear and present danger to cost-effective capital investment on major infrastructure projects dated May 2019 24-Jul-19 Dr. Ole Jonny Klakegg
P-04529 Volume 2: The Public Service and Transparency - Defining Boundaries: The Constitutional Argument for Bureaucratic Independence and its Implication for the Accountability of the Public Service 26-Jul-19 Mel Cappe
P-04530 Volume 2: The Public Service and Transparency - Encouraging "Rightdoing" and Discouraging Wrongdoing: A Public Service Charter and Disclosure Legislation 26-Jul-19 Mel Cappe
P-04531 Volume 2: The Public Service and Transparency - For the Want of a Nail: The Role of Internal Audit in the Sponsorship Scandal 26-Jul-19 Mel Cappe
P-04532 Canadian Audit and Accountability Foundation - Parliamentary Oversight - Committees and Relationships - A Guide to Strengthening Public Accounts Committees 26-Jul-19 Mel Cappe
P-04533 Minutes of the Third Meeting of the Board of Directors of Labrador-Island Link General Partner Corporation dated November 14, 2012 26-Jul-19 CIMFP
P-04534 GNL - List of ATIPP Coordinators dated June 27, 2019 25-Jul-19 Dr. Kelly Blidook
P-04535 Minutes of the Second Meeting of the Board of Directors of Lower Churchill Management Corporation dated March 18, 2014 26-Jul-19 CIMFP
P-04536 Minutes of the Third Meeting of the Board of Directors of Muskrat Falls Corporation dated March 19, 2014 26-Jul-19 CIMFP
P-04537 Minutes of the Fourth Meeting of the Board of Directors of Muskrat Falls Corporation dated June 20, 2014 26-Jul-19 CIMFP
P-04538 Minutes of the Third Meeting of the Board of Directors of Lower Churchill Management Corporation dated June 24, 2014 26-Jul-19 CIMFP
P-04539 Minutes of the Fifth Meeting of the Board of Directors of Muskrat Falls Corporation dated November 20, 2014 26-Jul-19 CIMFP
P-04540 Moody's Investors Service - Rating Action: Moody's downgrades Newfoundland and Labrador's ratings to A1, outlook changed to stable dated July 24, 2019 26-Jul-19 CIMFP
P-04541 SNL1995 Chapter E-16.1 - Executive Council Act 26-Jul-19 Mel Cappe
P-04542 Litigation Meaning 26-Jul-19 Mel Cappe
P-04543 CBC news article dated July 23, 2019 re Methylmercury deal struck with 2 of 3 Labrador Indigenous groups 26-Jul-19 Environmental Panel
P-04544 CBC news article dated July 22, 2019 re Nunatsiavut president pleads with premier to pump the brakes on Muskrat Falls flooding 26-Jul-19 Environmental Panel
P-04545 NTV news article dated July 23, 2019 re Nunatsiavut rejects methylmercury compensation deals reached with two indigenous groups 26-Jul-19 Environmental Panel
P-04546 Nunatsiavut Government Media Release dated July 22, 2019 re President calls on Premier to direct Nalcor to suspend flooding of Muskrat Falls reservoir 26-Jul-19 Environmental Panel
P-04547 CBC news article dated July 26, 2019 re Weighing the methylmercury risk: What researchers say about country food 26-Jul-19 Environmental Panel
P-04548 Construction Owners Association of Alberta - Alberta Report III - A Best Practice of the Construction Owners Association of Alberta dated June 2019 26-Jul-19 CIMFP
P-04549 Nalcor's Response to Commission - Question 1 - AJ Goulding Report 12-Aug-19 CIMFP
P-04550 LWHN-NLH-023 - 2013 NLH General Rate Application (Appendix for Question 1 - P-04549) 12-Aug-19 CIMFP
P-04551 Nalcor's Response to Commission - Question 2 - AJ Goulding Report 12-Aug-19 CIMFP
P-04552 Nalcor's Response to Commission - Question 3 - AJ Goulding Report 12-Aug-19 CIMFP
P-04553 Nalcor's Response to Commission - Question 5 - AJ Goulding Report 12-Aug-19 CIMFP
P-04554 Nalcor's Response to Commission - Question 5 - AJ Goulding Report (Appendix for Question 5 - P-04553) 12-Aug-19 CIMFP
P-04555 Letter dated August 12, 2019 from Ted Lomond to Commissioner Richard LeBlanc re Responses to A.J. Goulding Report 12-Aug-19 CIMFP
P-04556 Submission of the Consumer Advocate to the Commission of Inquiry Respecting the Report of A.J. Goulding dated August 14, 2019 15-Aug-19 CIMFP
P-04557 Letter dated August 14, 2019 from Darren C. Stratton to R. Barry Learmonth and Irene Muzychka re CIMFP Exhibit P-03875 - Correspondence from Martin Whalen Hennebury Stamp dated May 3, 2019 15-Aug-19 CIMFP
P-04558 Memorandum prepared by Nalcor Energy for the Commission of Inquiry regarding the Muskrat Falls Project dated August 14, 2019 re oversight or verification of the determination of the amount of Project costs to be paid through commercial arrangements by consumers of electricity in the province of Newfoundland and Labrador 15-Aug-19 CIMFP
P-04559 Council for Clean & Reliable Energy - Jurisdictional Review of Energy Regulation by Province and Territory dated July 2019 15-Aug-19 CIMFP

 